ADOA_Exhibit_J21_Change_Order_Proposal_ADOA.pdf

PDF 71 KB Posted

Attached to
St. Johns Shooting Range Water Retention Project
Solicitation number
BPM005756
Issued by
Apache County, Arizona

About this file

This document is a Construction Change Order Worksheet (Exhibit J1) template used by the Arizona Department of Administration (ADOA) for the St. Johns Shooting Range Water Retention Project, a construction services contract with the Arizona Game and Fish Department (AGFD). The worksheet is designed to document and propose modifications to the contract documents, with a pre-bid meeting scheduled for October 25, 2023, at 11:30 a.m. on site at St. Johns Shooting Range, located three miles north of St. Johns, Arizona in Apache County. Solicitation Amendment One extended the bid due date to November 16, 2023, due to planned system upgrades affecting the Arizona Procurement Program (APP) on the original due date of November 8, 2023.

The change order worksheet provides a standardized format for contractors to itemize and propose costs for labor, equipment, and materials associated with contract modifications. The template includes sections for up to six subcontractors with their respective amounts, general contractor fees at zero percent, bond and insurance costs, and applicable taxes. All cost totals, subcontractor amounts, and fees default to $0.00 on the template, with space for schedule modifications measured in days. The worksheet requires submission to and review by both the State Project Manager and State Procurement Officer, with signature and date fields for approval documentation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal for Change Order Construction Change Order Worksheet Exhibit J1

Firm: Date:

Statutory Review #

Project: Change Order Item Request No:

The following Cost Proposal includes all costs associated with the modifications to the Contract Documents described in the Proposal Request.

Labor Equipment Material

Description Q ty

U ni ts Unit Price Extension Q ty U ni ts

Unit Price Extension Q ty

U ni ts Unit Price Extension

Sub 1: Name of Sub 1 Amt: $0.00 General Contractor's Subtotal

Sub 2: Name of Sub 2 Amt: $0.00 GC Fee @ 0%

Sub 3: Name of Sub 3 Amt: $0.00 Sub-Contractor's Total

Sub 4: Name of Sub 4 Amt: $0.00 Subtotal

Sub 5: Name of Sub 5 Amt: $0.00 (GC's) Bonds + Insurance

Sub 6: Name of Sub 6 Amt: $0.00 (GC's) Taxes

Sub-Contractor's Subtotal $0.00 Subtotal

General Contractor fee @ 0% ($ - ) Grand Total Sub- Contractor's Total $0.00 Schedule modification (days):

Submitted by: Title:

Reviewed by State Project Manager / Date Reviewed by State Procurement Officer / Date

Proposal for Change Order Construction Change Order Worksheet Exhibit J1

The following Cost Proposal includes all costs associated with the modifications to the Contract Documents described in the Proposal Request.

Totals

$0.00

Reviewed by State Project Manager / Date Reviewed by State Procurement Officer / Date

REV 2/7/19