This is a Field Order Directive form issued by the State of Arizona General Services Division for use in managing construction change orders on state projects. The document serves as a template for the Design Professional, Contractor, and Agency Designated Representative to authorize modifications to existing construction contracts. The form allows for documentation of proposed changes including lump sum increases, unit price adjustments, or other cost modifications, as well as changes to the substantial completion timeline. The Field Order Directive requires the contractor and design professional to submit a complete Construction Contractor Change Order Summary Form within a reasonable timeframe following execution, which should include supporting documentation such as drawings, material substitution literature, and detailed cost breakdowns specifying labor, materials, markup, and tax components.
All requirements, specifications, terms, and conditions of the original contract remain unchanged unless explicitly modified through this Field Order process. The directive becomes effective immediately upon signed approval by all three authorized parties: the Contractor, Design Professional, and Agency Designated Representative. No work associated with the change order shall proceed until all parties have executed the document. The form is designed to ensure clear communication and documentation of any contract modifications while maintaining the integrity of the underlying construction agreement and establishing a formal record of authorized changes to project scope or schedule.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit I Field Order Directive Summary No:
State of Arizona General Services Division
100 N 15th Avenue, Suite 103 Phoenix, AZ 85007Contract / APP No.
Project Name: State Project No: Statutory Review No:
Design Professional: Contractor: State Project Manager:
1. Description of the proposed Construction Change Order:
Proposed Change Order to the Project Lump Sum $ increase NOT TO EXCEED $ Unit Price $ $ Other $ (Provide Description)
Proposed change to increase number of calendar days for Substantial Completion for the Contract Days
2. Within a reasonable time of the executed Field Order Directive the Design Professional and Contractor shall provide complete description of reduced or Additional Work, including documents in support of the Field Order Directive (e.g.
drawings, material substitution literature, cost reduction or increase detail including breakout of labor, materials, markup and tax) on a Construction Contractor Change Order Summary Form.
Contractor (Firm Name): Design Professional (Firm Name): Agency Designated Representative
Address: Address: Agency and Address:
Authorized Signature and Date: Authorized Signature and Date: Authorized Signature and Date:
ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED
This Field Order shall modify the Contract only upon the signed approval of the Contractor, Design Professional and Agency Designated Representative as specified in the signature block. When signed by all parties, this Field Order becomes effective immediately and the Contractor shall proceed with the change(s) identified and approved.
ACKNOWLEDGEMENT AND AUTHORIZATION
Page | 1 of 1 REV 2/6/19
| Field Order Directive Summary No: |
| Contract No: |
| Project Name: |
| State Project No: |
| Statutory Review No: |
| Design Professional: |
| Contractor: |
| Project Manager: |
| fill_10: |
| fill_12: |
| Other Provide Description: |
| fill_14: |
| Contractor Firm Name: |
| Design Professional Firm Name: |
| State Project Manager: |
| Address: |
| Address_2: |
| Agency and Address: |
| Text2: |
| Date4_af_date: |
| Date8_af_date: |
| Date9_af_date: |
File details come from the government source that posted it. Updated .