This file is a presentation from a pre-RFI meeting held on February 10, 2026, at 2:00 PM CT for the MAGIS-100 Access Platforms Request for Information. The meeting introduced the Fermilab procurement and project team, including Danielle Amico (Procurement Specialist), Jim Kowalkowski (Project Manager), and various engineers. The presentation outlined the RFI timeline with questions due by February 17, 2026, at 3:00 PM CT, responses to questions provided by February 24, 2026, and final submissions due by March 5, 2026, at 5:00 PM CT. All communications must be sent to damico@fnal.gov.

Respondents are required to provide sketches, drawings, and/or models of proposed platform designs; budgetary cost and lead time estimates; descriptions of installation services the vendor will perform or require others to perform; and examples of previous similar work. The project involves designing and installing access platforms for the MAGIS-100 experiment at Fermilab in Batavia, Illinois, to allow personnel safe access to designated experiment regions. Key components shown include a vacuum tube, structural support, magnetic shield, and chamber for cameras and vacuum pumps. The presentation included site images and conceptual design options, with design recommendations and proposed adjustments welcomed from respondents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tuesday, February 10, 2026

2:00PM CT

Pre-RFI Meeting

Introduction of Team

Danielle Amico, Procurement Specialist Jim Kowalkowski, Project Manager, MAGIS-100 Mandy Kiburg, Deputy Project Manager, MAGIS-100 Linda Valerio, Project Engineer, MAGIS-100 Ty Funk, Mechanical Engineer, MAGIS-100 Victor Guarino, Mechanical Engineer (ANL), MAGIS-100 Brian Rubik, Structural Engineer, MAGIS-100 2/10/2026

Agenda RFI Timeline Submittal Requirements Project Description

RFI Timeline Pre-RFI Meeting: Tuesday, 2/10/2026 at 2:00 PM, CT Question Due Date: Tuesday, 2/17/2026 at 3:00 PM, CT Responses to Questions: Tuesday, 2/24/2026 Responses Due: Thursday, 3/5/2026 at 5:00 PM, CT

Everything must be sent via email to damico@fnal.gov

Submittal Requirements Sketch, drawing, and/or model of a proposed platform design.

Budgetary cost and lead time estimate.

A description of the installation that the vendor will perform or that the vendor will require others to perform.

Examples of previous work designing and/or installing similar platforms if available.

Design recommendations and proposed adjustments are welcome.

Vacuum tube Structural support Magnetic shield Chamber for cameras and vacuum pumps

Project Overview

Site Images

View looking up from inside shaft.

View at top of shaft. Experiment follows orange line.

Platform Conceptual Designs

Questions/Answers

OPEN TO ATTENDEES

image2.jpeg image3.emf image14.png image15.png image16.png image17.png image18.jpeg image19.jpeg image20.png image21.png image22.png image23.png image24.png image1.png image4.jpeg image7.png

File details come from the government source that posted it. Updated .