Addendunm_4,_Bid_Tab,_Olive_Road_PHI,_2026-7-2.pdf

PDF 56 KB Posted

Attached to
CDBG-DR Olive Road Street Improvement Project - Phase I Construction - HS005
Solicitation number
PD 25-26.072
Issued by
Escambia County, Florida

About this file

Addendum 4 - Bid Tab Summary

This document is an Addendum 4 Bid Tab prepared by the Florida Department of Transportation (FDOT) for the Escambia County CDBG-DR Olive Road Street Improvement Project - Phase I Construction (HS005). The bid tab itemizes 35 line items encompassing comprehensive roadway reconstruction services along approximately 1.14 miles of Olive Road in Pensacola, Florida, spanning from Carpenter Creek to N. Davis Highway. Major work categories include mobilization and maintenance of traffic; clearing, grubbing, and excavation; asphalt milling at varying depths totaling approximately 24,445 square yards; Superpave asphaltic concrete placement in multiple traffic designations and thicknesses totaling approximately 47,900 square yards; concrete curb and gutter installation totaling approximately 10,590 linear feet; concrete sidewalk and driveway construction totaling approximately 5,450 square yards; performance turf sodding of 10,000 square yards; pipe handrail and guiderail installation; detectable warnings; fencing with swing gates; and removal and replacement of unsuitable materials. The pre-bid meeting is scheduled for June 16, 2026 at 2:00 p.m. via Microsoft Teams, with sealed bids due July 13, 2026 at 10:00 a.m. The contract term is 365 calendar days with 335 days for substantial completion and 30 days for final completion.

Pricing for individual pay items is not populated in this addendum document; unit costs and total costs remain blank, indicating this is a preliminary bid tab awaiting contractor submissions. The project is federally funded through Community Development Block Grant-Disaster Recovery (CDBG-DR) funds and is subject to Davis-Bacon prevailing wage requirements. Section 3 employment and contracting goals mandate a minimum of 25 percent of total project hours performed by Section 3 workers and 5 percent by Targeted Section 3 workers. Contractors must maintain FDOT prequalification for Flexible Paving and Drainage Work Classes, hold an Escambia County Business License, possess Work Zone Safety Traffic Supervisor Certifications, and employ a Certified Stormwater Management Inspector. Liquidated damages are assessed at $5,021 per calendar day. Performance and Payment bonds at 100 percent of contract value are required, along with minimum insurance coverage including $1 million general liability and $1 million business auto liability.

View the file

Other files

File Type Posted
CDBG-DR_Olive_Road_Street_Improvement_Project_-_Phase_I_Construction_-_HS005_(Addendum_#4_Revision).pdf PDF
Addendum_4,_Water_Plans,_Olive_Road_PHI,_2026-7-1.pdf PDF
Addendum_4,_Signal_Plans,_Olive_Road_PHI,_2026-7-2.pdf PDF
Addendum_4,_Roadway_Plans,_Olive_Road_PHI,_2026-7-2.pdf PDF
Addendum_4,_ITS_Plans,_Olive_Road_PHI,_2026-7-2.pdf PDF
Addendum_4,_ECUA_Specifications,_Olive_Road_PHI,_2026-06-16.pdf PDF
CDBG-DR_Olive_Road_Street_Improvement_Project_-_Phase_I_Construction_-_HS005_(Addendum_#3_Revision).pdf PDF
Wage_Determination_Heavy_Construction_06.08.2026.pdf PDF
FINAL_Roadway_Plans,_Olive_Road_PHI,_2026-5-07.pdf PDF
Specifications_Package,_Olive_Road_PHI,_2026-03-31.pdf PDF
FINAL_Water_Plans,_Olive_Road_PHI,_2026-3-27.pdf PDF
FINAL_Signalization_Plans,_Olive_Road_PHI,_2026-05-06.pdf PDF
FINAL_ITS_Plans,_Olive_Road_PHI,_2026-05-06.pdf PDF
FINAL_S&PM_Plans,_Olive_Road_PHI,_2026-05-04.pdf PDF
FINAL_Landscape_Plans,_Olive_Road_PHI,_2026-05-06.pdf PDF
ECUA_Water_&_Sewer-_Special_Provisions.pdf PDF
Specification_References.docx DOCX document
ECUA_027500_Asbestos_Cement_Pipeline_Abandonment_and_Disposal.pdf PDF
Exhibit.FederalContractProvisions.HUD_with_signature_5.6.26.pdf PDF
Section-3-project-implementation-plan-template---forms-0-8.pdf PDF
Escambia_County_Section_3_Business_Application_CDBG-DR.pdf PDF
Escambia_County_Section_3_Contract_Clause_CDBG-DR.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FDOT PAY

ITEM #

DESCRIPTION UNIT QUANTITY UNIT COST TOTAL

1 0101 1 MOBILIZATION (All Components) LS 1

2 0102 1 MAINTENANCE OF TRAFFIC (All Components) LS 1

3 - TEMPORARY EROSION CONTROL LS 1

4 0110 1 1 CLEARING AND GRUBBING LS 1

5 0110 4 10 REMOVAL OF EXISTING CONCRETE SY 750

6 0110 7 1 MAILBOX, F&I SINGLE EA 38

7 0120 1 REGULAR EXCAVATION CY 880.0

8 0120 6 EMBANKMENT CY 8,000.0

9 0160 4 TYPE B STABILIZATION SY 14,000

10 0285701 OPTIONAL BASE, BASE GROUP 01 SY 4,500

11 0285708 OPTIONAL BASE, BASE GROUP 08 (Type B-12.5-5.5") SY 3,900

12 0285713 OPTIONAL BASE, BASE GROUP 13 (Type B-12.5-8") SY 1,400

13 0326 70 1 MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH SY 165

14 0327 70 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH SY 790

15 0327 70 5 MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH SY 4,350

16 0327 70 6 MILLING EXISTING ASPHALT PAVEMENT, 1.5" AVG DEPTH SY 1,000

17 0327 70 15 MILLING EXISTING ASPHALT PAVEMENT, 2 3/4" AVG DEPTH SY 18,000

18 0327 70 19 MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH SY 140

19 0334 1 52 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 (MUP) (1.5") SY 4,200

20 0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (1") SY 4,350

21 0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (1.5") SY 2,300

22 0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (2") SY 21,350

23 0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (OVERBUILD) SY 19,700

24 0337 7 82

ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C,

FC-9.5, PG 76-22 (1")

SY 25,650

25 0515 1 2 PIPE HANDRAIL - GUIDERAIL, ALUMINUM LF 225

26 0520 1 7 CONCRETE CURB & GUTTER, TYPE E LF 80

27 0520 1 10 CONCRETE CURB & GUTTER, TYPE F LF 10,500

28 0520 70 CONCRETE TRAFFIC SEPARATOR, SPECIAL, VARIABLE WIDTH SY 25

29 0522 1 CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK SY 2,600

30 0522 2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK SY 2,850

31 0527 2 DETECTABLE WARNINGS SF 800

32 - FENCING LF 425

33 - 6'hX12'w DBL CHAIN LINK SWING GATE, (2) 6'w GATES EA 2

34 0570 1 2 PERFORMANCE TURF, SOD SY 10,000

35 - SAW CUT EXISTING ASPHALT LF 15,000

35A - REMOVE AND REPLACE UNSUITABLE MATERIALS CY 1000.0

D-1 0425 1311 INLETS, CURB, TYPE P-1, <10' EA 5

BID TAB

Olive Road Street Improvement Project Phase I

ITEM #

DESCRIPTION UNIT QUANTITY UNIT COST TOTAL

BID TAB

Olive Road Street Improvement Project Phase I

D-2 0425 1331 INLETS, CURB, TYPE P-3, <10' EA 31

D-3 0425 1341 INLETS, CURB, TYPE P-4, <10' EA 3

D-4 0425 1351 INLETS, CURB, TYPE P-5, <10' EA 1

D-5 0425 1411 INLETS, CURB TYPE J-1, <10' EA 1

D-6 0425 1412 INLETS, CURB, TYPE J-1, >10' EA 2

D-7 0425 1431 INLETS, CURB, TYPE J-3, <10' EA 7

D-8 0425 1432 INLETS, CURB, TYPE J-3, >10' EA 5

D-9 0425 1441 INLETS, CURB, TYPE J-4, <10' EA 1

D-10 0425 1452 INLETS, CURB, TYPE J-5, >10' EA 2

D-11 0425 1523 INLETS, DT BOT, TYPE C,JBOT,>10' EA 2

D-12 0425 1531 INLETS, DT BOT, TYPE C MOD- BACK OF SIDEWALK,<10' EA 8

D-13 0425 1533 INLETS, DT BOT, TYPE C MOD- BACK OF SIDEWALK,JBOT,<10' EA 7

D-14 0425 1534 INLETS, DT BOT, TYPE C MOD- BACK OF SIDEWALK,JBOT,>10' EA 8

D-15 0425 1581 INLETS, DT BOT, TYPE H, <10' EA 1

D-16 0425 2 61 MANHOLES, P-8, <10' EA 4

D-17 0425 2 91 MANHOLES, J-8, <10' EA 4

D-18 0425 2 92 MANHOLES, J-8, >10' EA 3

D-19 0425 17 18 BACK OF SIDEWALK ENDWALL, 18" PIPE DIA. EA 2

D-20 0430175118 PIPE CULVERT,RCP,ROUND, 18"S/CD LF 3,600

D-21 0430175124 PIPE CULVERT,RCP,ROUND, 24"S/CD LF 650

D-22 0430175130 PIPE CULVERT,RCP,ROUND, 30"S/CD LF 200

D-23 0430175136 PIPE CULVERT,RCP,ROUND, 36"S/CD LF 2,000

D-24 0430175142 PIPE CULVERT,RCP,ROUND, 42"S/CD LF 1,600

D-25 0430175218 PIPE CULVERT,RCP, ELLIP/ARCH, 14"x23" S/CD LF 130

D-26 0430175242 PIPE CULVERT,RCP, ELLIP/ARCH, 34"x53" S/CD LF 160

D-27 0430982125 MITERED END SECTION, RCP ROUND, 18" CD EA 3

D-28 0430982625 MITERED END SECTION, ELLIP/ARCH, 14"x23" CD EA 2

D-29 - DEWATERING LS 1

S-1 0700 1111 SINGLE POST SIGN, F&I GROUND MT, UP TO 12 SF AS 22

S-2 0700 1500 SINGLE POST SIGN, RELOCATE AS 20

S-3 0700 1600 SINGLE POST SIGN, REMOVE AS 11

S-4 0700 3501 SINGLE POST SIGN, RELOCATE, UP TO 12 SF AS 2

S-5 0704 1 2 TUBULAR MARKER, DURABLE, 36" YELLOW POSTS EA 4

S-6 0706 1 3 RAISED PAVEMENT MARKER, TYPE B EA 816

S-7 0710 11290 PAINTED PAVEMENT MARKINGS, STD, YELLOW, ISLAND NOSE SF 27

S-8 0710 90 PAINTED PAVEMENT MARKINGS, FINAL SURFACE LS 1

S-9 0711 11123

THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND

ROUNDABOUT

LF 2,704

ITEM #

DESCRIPTION UNIT QUANTITY UNIT COST TOTAL

BID TAB

Olive Road Street Improvement Project Phase I

S-10 0711 11124

THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS AND

CHEVRONS

LF 345

S-11 0711 11125

THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND

CROSSWALK

LF 445

S-12 0711 11141 THERMO., STD., WHITE, GUIDE LINE, 6" (2/4) GM 0.029

S-13 0711 11241 THERMO., STD., YELLOW, GUIDE LINE, 6" (2/4) GM 0.087

S-14 0711 11160 THERMO., STD., MESSAGE OR SYMBOL EA 1

S-15 0711 11170 THERMO., STD., ARROWS EA 54

S-16 0711 11224

THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR

CHEVRONS

LF 418

S-17 0711 14125 THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR CROSSWALK LF 1,850

S-18 0711 14160 THERMO., PREFORMED, MESSAGE OR SYMBOL EA 2

S-19 0711 14170 THERMO., PREFORMED, ARROWS (BIKE THRU) EA 2

S-20 0711 16101 THERMOPLASTIC, STANDARD, OTHER SURFACES, WHITE, SOLID, 6" GM 2.625

S-21 0711 16131 THERMO., STD. - OTHER, WHITE, SKIP, 6" (10/30) GM 0.091

S-22 0711 16201 THERMOPLASTIC, STANDARD, OTHER SURFACES, YELLOW, SOLID, 6" GM 2.380

S-23 0711 16231 THERMOPLASTIC, OTHER SURFACES, YELLOW, SKIP, 6" GM 1.065

SI-1 630-2-11 CONDUIT, F&I, OPEN TRENCH LF 380

SI-2 630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 515

SI-3 632-7-1

SIGNAL CABLE - NEW OR RECONSTRUCTED INTERSECTION, FURNISH &

INSTALL

PI 2

SI-4 632-7-6 SIGNAL CABLE, REMOVE- INTERSECTION PI 2

SI-5 635-2-11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 25

SI-6 639-1-122

ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER PURCHASED

BY CONTRACTOR

AS 2

SI-7 639-2-1 ELECTRICAL SERVICE WIRE, FURNISH & INSTALL LF 60

SI-8 641-2-12 PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE EA 2

SI-9 641-2-80

PRESTRESSED CONCRETE POLE, COMPLETE POLE REMOVAL- POLE 30' AND

GREATER

EA 4

SI-10 646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL EA 8

SI-11 646-1-60 ALUMINUM SIGNALS POLE, REMOVE EA 4

SI-12 649-21-1 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE ARM 30' EA 1

SI-13 649-21-3 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE ARM 40' EA 1

SI-14 649-21-8

STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 50'-

40'

EA 1

SI-15 649-21-12

STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 60'-

40'

EA 1

SI-16 649-21-23

STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 78'-

40'

EA 1

SI-17 650-1-34

VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 3

SECTION, 1 WAY

AS 15

SI-18 650-1-36

VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 4

SECTION, 1 WAY

AS 4

SI-19 650-1-38

VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 5

SECTION STRAIGHT, 1 WAY

AS 1

SI-20 653-1-11 PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS 2

SI-21 653-1-12 PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAY AS 6

SI-22 654-2-21

MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON,

FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSY- SINGLE DIRECTION

AS 4

SI-23 654-2-22

MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON,

FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSEMBLY- BACK TO BACK

AS 2

ITEM #

DESCRIPTION UNIT QUANTITY UNIT COST TOTAL

BID TAB

Olive Road Street Improvement Project Phase I

SI-24 660-4-11

VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL CABINET

EQUIPMENT

EA 2

SI-25 660-4-12

VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL ABOVE

GROUND EQUIPMENT

EA 4

SI-26 665-1-11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD EA 14

SI-27 670-5-160 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA W/STANDARD LOCK AS 2

SI-28 670-5-600 TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET AS 2

SI-29 682-1-173 ITS CCTV CAMERA, NON-PRESSURIZED, IP, HIGH DEFINITION EA 2

SI-30 684-6-3 WIRELESS COMMUNICATION SYSTEM DEVICE, INSTALL EA 2

SI-31 685-1-14

UNINTERRUPTIBLE POWER SUPPLY, FURNISH AND INSTALL,

ONLINE/DOUBLE CONVERSION WITH CABINET

EA 2

SI-32 700-3-201 SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF EA 7

SI-33 700-5-22

INTERNALLY ILLUMINATED SIGN, FURNISH & INSTALL, OVERHEAD

MOUNT, 12-18 SF

EA 8

IT-1 630-2-11 CONDUIT, F&I, OPEN TRENCH LF 4,720

IT-2 630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 1,900

IT-3 633-1-121 FIBER OPTIC CABLE, F&I, UNDERGROUND,2-12 FIBERS LF 730

IT-4 633-1-123 FIBER OPTIC CABLE, F&I, UNDERGROUND,49-96 FIBERS LF 6,400

IT-5 633-2-31 FIBER OPTIC CONNECTION, INSTALL, SPLICE EA 44

IT-6 633-3-11 FIBER OPTIC CONNECTION HARDWARE, F&I, SPLICE ENCLOSURE EA 3

IT-7 633-3-12 FIBER OPTIC CONNECTION HARDWARE, F&I, SPLICE TRAY EA 6

IT-8 633-3-15

FIBER OPTIC CONNECTION HARDWARE, F&I, PRETERMINATED PATCH

PANEL

EA 3

IT-8A 635-2-11 PULL & SPLICE BOX, F&I, 13" X 24" COVER SIZE EA 2

IT-9 635-2-12 PULL & SPLICE BOX, F&I, 24" X 36" COVER SIZE EA 14

IT-10 635-2-13

PULL & SPLICE BOX, F&I, 30" X 60" RECTANGULAR OR 36" ROUND COVER

SIZE

EA 3

IT-11 684-1-1 MANAGED FIELD ETHERNET SWITCH, FURNISH & INSTALL EA 2

LD-1 0110 21 TREE PROTECTION BARRIER LF 1,179

LD-2

LANDSCAPE- TREES, CRAPE MYRTLE STANDARD/SINGLE LAGERSTROEMIA

'TONTO', 15 GAL, 5'-6' HEIGHT

EA 29

LD-3 MULCH SY 97

LD-4 TEMPORARY IRRIGATION LS 1

W-1

- 4" PVC C900 DR25 WATER MAIN LF 27

W-2

- 6" PVC C900 DR25 WATER MAIN LF 112

W-3

- 8" PVC C900 DR25 WATER MAIN LF 4,742

W-4

- 6" DI C151 CL. 350 WATER MAIN LF 185

W-5

- 8" DI C151 CL. 350 WATER MAIN LF 1,047

W-6

- 6" D.I. R.J. WATER MAIN LF 111

W-7

- 12" X 8" DI MJ REDUCER EA 1

W-8

- 4" DI MJ CAP EA 1

W-9

- 6" DI MJ CAP EA 6

W-10

- 8" DI MJ CROSS EA 1

W-11

- 8" DI MJ CAP EA 8

ITEM #

DESCRIPTION UNIT QUANTITY UNIT COST TOTAL

BID TAB

Olive Road Street Improvement Project Phase I

W-12

- 12" DI MJ CAP EA 1

W-13

- 8" X 4" DI MJ TEE EA 1

W-14

- 8" X 6" DI MJ TEE EA 6

W-15

- 8" X 8" DI MJ TEE EA 5

W-16

- 6" FIRE HYDRANT ASSEMBLY EA 7

W-17

- 8" FOSTER ADAPTER EA 1

W-18

- 12" FOSTER ADAPTER EA 1

W-19

- 4" MJ GATE VALVE W/ BOX EA 1

W-20

- 6" MJ GATE VALVE W/ BOX EA 13

W-21

- 8" MJ GATE VALVE W/ BOX EA 21

W-22

- 1" WM SERVICE LINE LF 1,145

W-23

- 2" WM SERVICE LINE LF 170

W-24

- WATER METER RESET EA 41

W-25

- WATER VALVE BOX RESET EA 13

W-26

- SEWER VALVE BOX RESET EA 2

W-27

- WM ABANDONMENT LF 9,100

U-1 - Adjust to Grade Manholes (All) EA 9

U-2 - Adjust to Grade Meters & Valves (All) EA 4

U-3 - Adjust to Grade HandHoles-Peds (All) EA 15

U-4 0121-70 FLOWABLE FILL (AT&T) CY 279.8

U-5 MANHOLE REMOVAL (AT&T) EA 4

U-6 DUCT BANK REMOVAL (AT&T) LF 5,038

Total: