Addendum_4,_Roadway_Plans,_Olive_Road_PHI,_2026-7-2.pdf
PDF 4 MB Posted
- Solicitation number
- PD 25-26.072
- Issued by
- Escambia County, Florida
About this file
This Addendum 4 to the Olive Road Street Improvement Project roadway plans, issued by Escambia County, Florida on July 2, 2026, contains design and construction documentation for a comprehensive street reconstruction project extending approximately 1.14 miles along Olive Road from Carpenter Creek to North Davis Highway (Station 191+40.00 to Station 252+06.95). The project scope includes roadway milling and resurfacing, curb and gutter installation, sidewalk and shared-use path construction, closed storm drainage system installation, waterline and sewer collection improvements, traffic signal upgrades at three intersections with video detection and NEMA Type 2 controllers, intersection lighting, fiber optic cabling infrastructure, signing and pavement marking, and landscaping with 29 Crape Myrtle trees. The design is prepared by Moffatt & Nichol with Engineer of Record Alexander J. Welfle (Florida Registration No. 86552) and project manager Michael Segars. Addendum 4 specifically added Sheet 2A to the index of plans and includes revised pay items and updated quantities for multiple infrastructure components. The sealed bid due date is July 13, 2026 at 10:00 a.m., with a pre-bid meeting held on June 16, 2026 via Microsoft Teams, and questions due by June 30, 2026 at 12:00 p.m.
The project is funded through CDBG-DR (Community Development Block Grant – Disaster Recovery) from HUD and is subject to Davis-Bacon prevailing wage requirements and Section 3 employment provisions mandating minimum 25% of total project hours by Section 3 workers and 5% by Targeted Section 3 workers. The contract term is 365 calendar days with 335 days for substantial completion and 30 days for final completion, with no weather allowance and liquidated damages of $5,021 per calendar day. Bids must include lump-sum pricing with 5% bid surety and electronic submission, with successful bidders required to furnish Performance and Payment bonds at 100% of contract value. Minimum insurance requirements include $1 million general liability, $1 million business auto liability, and workers compensation at statutory limits. The contractor must maintain FDOT prequalification for Flexible Paving and Drainage Work Classes, hold an Escambia County Business License, possess Work Zone Safety Traffic Supervisor Certifications, and employ a Certified Stormwater Management Inspector. Asbestos cement pipe abandonment and disposal must be performed by a Florida-licensed Asbestos Abatement Contractor with estimated costs of $45.06 per ton for non-friable materials and $235.47 per ton for friable materials, plus an $11.64 vehicle fee. Traffic signal contractors must maintain IMSA Level II certification. The County encourages participation from small businesses, minority- and women-owned businesses, and disadvantaged business enterprises.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A L A B A M A
A
L
A
B
A
M
A
S A
N T
R O
S
C
U
N T
Y
SANTA R
OSA C
OUNTY
SANTA ROSA COUNTY
B A L D
W I N C
O U N T Y
GULF ISLANDS NATIONAL SEASHORE
GULF IS
LANDS NATIONAL SEASHORE
AQUATIC PRESERVE
FORT PICKENS
SITE 8-A
OLF
INTRACOASTAL WATERWAY
INT
RAC
OAST
AL W
ATE
RWAY
ESCAMBIA COUNTY
Old R ive r
Pop. 1,714
CENTURY
G U L F
O F
M E X I
C O
PENSACOLA
Bay
Macky
Bay
Tarkiln
151617
20 21
282930
31 32
34 35 36
10 11
20 21 22
23 24
32 33 34
7 8 9 10 11
34 35
8 9
23 24
10 11
20 21 22
31 32 33 34 35 36
10 11
20 21
31 32
34 35 36
23456
7 8
151618
20 21
31 32
1415161718
20 21
23 24
7 8
19 20 21
33 34
11 12
22 23
31 32
9 10 11
303132
33 34 35 36
10 11
23 24
8 9 10 11
151617
19 20 21 22
13 14
4 3
37 10
19 20
15 16 17 18
11 12
23 24 25
26 32
2 1
Bay
Sabine
ONO I
SLAND
Perd ido
Key
Main St.
Pe rd id o
B ay
Santa Ro sa Sound
Pens acol a Ba y
E scam bia B ay
Big
Lag oon
ESCAMBIA COUNTY, FLORIDA
PLANS PROPOSED FOR
VICINITY MAP
CONSTRUCTION MANAGEMENT DIVISION
BOARD OF COUNTY COMMISSIONERS
DISTRICT TWO
DISTRICT ONE
DISTRICT FIVE
DISTRICT FOUR
DISTRICT THREE
COMMISSIONERS
LUMON MAY
ENGINEERING DEPARTMENT
I-10
SHEET NO. & DESCRIPTION
INDEX OF PLANS
D A
V
IS
H
W Y
R .R
OLIVE RD.
P A L A F
O X S
T
PROJECT MANAGER:
PROJECT ENGINEER:
SECTION / TOWNSHIP / RANGE: DISTRICT:
REG FLA ENG NO:
3 & 418, 20, & 21 / 1S / 30W
ALEXANDER J. WELFLE 86552
PHONE NUMBER
PLANS PREPARED BY:
CERTIFICATE OF AUTHORIZATION NO.: 4877
PENSACOLA, FL 32502
226 S. PALAFOX PLACE, FLOOR 6
MOFFATT & NICHOL
T H
E
F
F I
C I
L
C O
D
I
E E
T
E C
T R
O N
G I
T A
L
Y
G N
N
A L
U
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
K E
Y S
R D
1P
H I .d g n p d o r s e y
:3
:0
P
M D e f a u lt
850-595-3495
N.T.S.
N.T.S.
SHEET
OLIVE ROAD
STA. 252+06.95
END PROJECT
CONTRACT PLAN COMPONENTS
GOVERNING STANDARD PLANS:
MICHAEL SEGARS
MIKE KOHLER
RELATED DOCUMENTS OR THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS.
SPECIFICATION REFERED HEREIN OR OTHERWISE LISTED IN THESE PLANS OR
COVENANTS, SHALL BE EXCLUDED AND NOT APPLICAPABLE TO ANY
CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS AND
ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS.
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE LATEST
AVAILABLE AT THE FOLLOWING WEBSITE: http://www.fdot.gov/design/standardplans STANDARD PLANS FOR ROAD CONSTRUCTION AND ASSOCIATED IRs ARE
ROAD AND BRIDGE CONSTRUCTION AND APPLICABLE INTERIM REVISIONS (IRs).
FLORIDA DEPARTMENT OF TRANSPORTATION, FY2026-27 STANDARD PLANS FOR
STREET IMPROVEMENT PROJECT
OLIVE ROAD
NOT ISSUED FOR CONSTRUCTION
STEVEN BARRY
ASHLEE HOFBERGER, CHAIR
STEVE STROBERGER, VICE CHAIR
C O
D Y L
N
WATER AND SEWER PLANS
LANDSCAPE PLANS
ITS PLANS
SIGNALIZATION PLANS
SIGNING AND PAVEMENT MARKING PLANS
ROADWAY PLANS
PHASE I
SOLICITATION ID: PD 20-21.052
(FROM E OF CARPENTER CREEK TO N DAVIS HIGHWAY)
ROADWAY PLANS
OLIVE ROAD
STA. 191+90.00
BEGIN PROJECT
STA. 191+40.00
BEGIN CONSTRUCTION
ADDENDUM 4
JULY 2026
ADDENDUM:
DESCRIPTIONDATE
KEY SHEET ADDENDUM
7/2/26 ADDED SHEET NUMBER 2A TO THE INDEX
1 KEY SHEET
2 - 2A SIGNATURE SHEET
3 - 5 SUMMARY OF PAY ITEMS
6 - 7 TABULATION OF QUANTITIES
8 - 12 DRAINAGE MAP
13 - 19 TYPICAL SECTIONS
20 - 24 TYPICAL SECTION DETAILS
25 - 32 SUMMARY OF DRAINAGE STRUCTURES
33 OPTIONAL MATERIALS TABULATION
34 PROJECT LAYOUT
35 GENERAL NOTES
36 - 50 ROADWAY PLAN-PROFILE
51 - 93 DRAINAGE STRUCTURES
94 MAZUREK STORMWATER POND
95 - 96 DRAINAGE DETAILS
97 - 153 CROSS SECTIONS
154 - 170 TEMPORARY TRAFFIC CONTROL PLAN
171 - 173 STORMWATER POLLUTION PREVENTION PLAN
174 - 182 UTILITY ADJUSTMENTS
183 SUMMARY OF VERIFIED UTILITIES
184 - 185 SOIL SURVEY
186 - 189 REPORT OF CORE BORINGS
(REVISED 07/02/26)
WATER AND SEWER PLAN SHEETS: U-1, U-3 TO U-8
ITS PLAN SHEETS: IT-1 to IT-19
SIGNALIZATION PLAN SHEETS: SL-1, SL-2A, SL-3, SL-6, SL-8
ROADWAY PLAN SHEETS: 1, 2A, 3, 4, 13, 18, 24, 154
PROJECT ID: PD 20-21.052
IM
P
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y S I G
N R
D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N O
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
No 86552
E L
FL
E
W .J REDNA
X
E L
A
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
SHEET NO. SHEET DESCRIPTION
IG
N A
T U
R E S
H E
2A
ALEXANDER J. WELFLE, P.E. NO. 86552
PENSACOLA, FLORIDA 32502
226 SOUTH PALAFOX PLACE, FLOOR 6
MOFFATT & NICHOL
ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED ON ANY
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
A D
D
W E
L F
L E
A L
E X
A N
D E
J
/2 /2
A D
D E
D S
H E
E T
A
1 KEY SHEET
2A SIGNATURE SHEET
3 - 4 SUMMARY OF PAY ITEMS
13, 18 TYPICAL SECTIONS
24 TYPICAL SECTION DETAILS
154 TEMPORARY TRAFFIC CONTROL PLAN
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
C E
S S
R D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N
M
M A
R Y O
F P
A Y I
T E
M
PAY ITEM NOTES
A D
D
W E
L F
L E
A L
E X
A N
D E
R J
THESE PAY ITEMS
MATERIAL, INCLUDING BUT NOT LIMITED TO POSTS, CORNER AND END/PULL POSTS, FENCING, AND TOP RAIL SHALL BE INCLUDED IN
LOCATIONS IDENTIFIED IN THE PLANS. PROPOSED FENCE SHALL MATCH EXISTING FENCE IN TERMS OF MATERIAL AND DESIGN. ALL
PAY ITEM 32 & 33 - FENCING AND GATES: CONTRACTOR SHALL COORDINATE WITH THE PROPERTY OWNER TO INSTALL NEW FENCE AT 5.
SIZE OF TREES AND ALL REMOVAL ITEMS BEFORE BIDDING.
COUNTY AT NO ADDITIONAL COST TO THE COUNTY. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE AMOUNTS, LOCATIONS,
12.38 ACRES. THE REMOVAL OF ANY ADDITIONAL IMPROVEMENTS IDENTIFIED ON SITE MAY BE ADDED AT THE REQUEST OF THE
A 10 FOOT VERTICAL CLEARANCE WITHIN 2 FEET OF THE SHARED USE PATH. AREA OF CLEARING AND GRUBBING IS ESTIMATED TO BE
CONSTRUCTION. ALL TREE LIMBS AND SHRUBS SHALL BE TRIMMED TO PROVIDE A 7 FOOT VERTICAL CLEARANCE OVER SIDEWALKS AND
VEGETATION, ASPHALT, DRAINAGE STRUCTURES, FENCING, POLES, BOLLARDS, TIRES, AND DEBRIS WITHIN THE LIMITS OF
TREES IDENTIFIED TO BE REMOVED, AS WELL AS CONFLICTING SHRUBS, CONFLICTING TREES THAT ARE UNDER 12" DIAMETER, OTHER
PAY ITEM 4 - CLEARING AND GRUBBING: A LUMP SUM PAY ITEM FOR THIS PROJECT AND SHALL INCLUDE, BUT NOT LIMITED TO, ALL 4.
STORMWATER SYSTEMS AS A RESULT OF CONSTRUCTION.
WILL ALSO INCLUDE MONITORING EXISTING PONDS AND CLEANING OUT SEDIMENT FROM CARPENTER CREEK AND DOWNSTREAM
METHODS IDENTIFIED IN THE STATE OF FLORIDA EROSION AND SEDIMENT CONTROL MANUAL, MOST RECENT VERSION. THIS PAY ITEM
BARRIERS, TURBIDITY BARRIERS, INLET PROTECTION SYSTEMS, CHECK DAMS, TEMPORARY RIP RAP, OR ANY OTHER EROSION CONTROL
BE FREE OF SEDIMENT AND DEBRIS PRIOR TO FINAL ACCEPTANCE. THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO, SEDIMENT
INSTALLED AND MAINTAINED BETWEEN THE WORK AREA AND ALL WETLAND AREAS. ALL STORMWATER PIPES AND STRUCTURES SHALL
BE PROTECTED TO KEEP SEDIMENT OUT OF THE DRAINAGE SYSTEM. A DOUBLE ROW OF SEDIMENT BARRIER WITH HAYBALES SHALL BE
CONFORMING TO THE STORMWATER POLLUTION PREVENTION PLAN THROUGHOUT THE DURATION OF CONSTRUCTION. ALL INLETS SHALL
PAY ITEM 3 - TEMPORARY EROSION CONTROL: THIS IS A LUMP SUM PAY ITEM WHICH SHALL INCLUDE ALL COSTS ASSOCIATED WITH 3.
COSTS ASSOCIATED WITH MAINTAINING A SAFE WORK ZONE AND ROADWAY DURING CONSTRUCTION.
PORTABLE CHANGEABLE MESSAGE SIGNS, FLAGGERS, LAW ENFORCEMENT OFFICERS, LABOR, UTILITY COORDINATION, AND ANY OTHER
DETECTION, SIGNALIZATION, STRIPING, DRAINAGE, ASPHALT, EARTHWORK, DETOURS, BARRICADES, BARRIER WALLS, ARROW BOARDS, TEMPORARY TRAFFIC CONTROL. THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO, TEMPORARY ITEMS SUCH AS SIGNAGE, TRAFFIC
PAY ITEM 2 - MAINTENANCE OF TRAFFIC: A LUMP SUM PAY ITEM WHICH SHALL INCLUDE ALL COSTS ASSOCIATED WITH THE 2.
WITH THE ABOVE SHALL BE INCLUDED IN THE COST OF MOBILIZATION. THIS ITEM SHALL INCLUDE PERFORMANCE AND PAYMENT BOND.
CONTRACTOR SHALL RETURN ALL SITES USED FOR THESE PURPOSES TO ORIGINAL CONDITION OR BETTER. ANY COSTS ASSOCIATED
PERMISSION TO USE OTHER SITES/PARCELS FOR LAYDOWN OR TEMPORARY EARTHWORK DISPOSAL INCLUDING SEDIMENT CONTROL. THE
MANPOWER, LAYDOWN, AND TEMPORARY EARTHWORK DISPOSAL AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SELECT AND GAIN
PAY ITEM 1 - MOBILIZATION: A LUMP SUM PAY ITEM WHICH SHALL INCLUDE ALL COSTS ASSOCIATED WITH EFFORTS TO DELIVER 1.
MATERIAL IS ENCOUNTERED. THIS PAY ITEM REQUIRES APPROVAL BY ESCAMBIA COUNTY PRIOR TO PERFORMANCE.
PAY ITEM 35A - REMOVE AND REPLACE UNSUITABLE MATERIALS: THIS IS A CONTINGENT PAY ITEM, TO BE USED IF UNSUITABLE 9.
AND TABLE IN THE TYPICAL SECTION DETAILS SHEETS FOR INFORMATION ON THE THICKNESS.
PAY ITEM 23 - OVERBUILD: THE THICKNESS OF OVERBUILD VARIES THROUGHOUT THE PROJECT. SEE THE OVERBUILD DETAIL 8.
TREES AND TURF. SEE 365-DAY ESTABLISHMENT PERIOD MAINTENANCE PLAN NOTES IN THE LANDSCAPE PLANS.
PAY ITEM LD-4 - TEMPORARY IRRIGATION: THIS PAY ITEM IS TO BE UTILIZED DURING THE ESTABLISHMENT PERIOD FOR ALL 7.
GROUNDWATER.
ALSO INCLUDE ALL SAMPLING, TESTING AND PERMITTING COSTS NECESSARY TO SECURE A PERMIT FOR DISCHARGE OF PRODUCED
INSTALLATION, POND EXCAVATION, POND REGRADING, DRAINAGE STRUCTURE AND PIPING INSTALLATION THIS PAY ITEM SHALL
PAY ITEM D-29 - DEWATERING: A LUMP SUM PAY ITEM FOR DEWATERING FOR ALL CONSTRUCTION AREAS INCLUDING CULVERT 6.
IT
-2
IT
-3
IT
-4
IT
-5
A N
D I
T -9
A D
D E
D P
A Y I
T E
M N
O T
E
A D
D E
D P
A Y I
T E
M N
U M
B E
R
A I
T -8
A
U P
D A
T E
D Q
U A
N T
IT
IE
S F
O R I
T -1
/0
/2
OLIVE ROAD STREET IMPROVEMENT PROJECT
LANDSCAPE
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
LD-1 0110 21 TREE PROTECTION BARRIER LF 1179
LD-2
LAGERSTROEMIA 'TONTO', 8-10' OVERALL HEIGHT
LANDSCAPE- TREES, CRAPE MYRTLE STANDARD/SINGLE
EA 29
LD-3 MULCH SY 97
LD-4 TEMPORARY IRRIGATION LS 1
OLIVE ROAD STREET IMPROVEMENT PROJECT
DRAINAGE
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
D-1 0425 1311 INLETS, CURB, TYPE P-1, <10' EA 5
D-2 0425 1331 INLETS, CURB, TYPE P-3, <10' EA 31
D-3 0425 1341 INLETS, CURB, TYPE P-4, <10' EA 3
D-4 0425 1351 INLETS, CURB, TYPE P-5, <10' EA 1
D-5 0425 1411 INLETS, CURB TYPE J-1, <10' EA 1
D-6 0425 1412 INLETS, CURB, TYPE J-1, >10' EA 2
D-7 0425 1431 INLETS, CURB, TYPE J-3, <10' EA 7
D-8 0425 1432 INLETS, CURB, TYPE J-3, >10' EA 5
D-9 0425 1441 INLETS, CURB, TYPE J-4, <10' EA 1
D-10 0425 1452 INLETS, CURB, TYPE J-5, >10' EA 2
D-11 0425 1523 INLETS, DT BOT, TYPE C,JBOT,>10' EA 2
D-12 0425 1531 INLETS, DT BOT, TYPE C MOD- BACK OF SIDEWALK,<10' EA 8
D-13 0425 1533 INLETS, DT BOT, TYPE C MOD- BACK OF SIDEWALK,JBOT,<10' EA 7
D-14 0425 1534 INLETS, DT BOT, TYPE C MOD- BACK OF SIDEWALK,JBOT,>10' EA 8
D-15 0425 1581 INLETS, DT BOT, TYPE H, <10' EA 1
D-16 0425 2 61 MANHOLES, P-8, <10' EA 4
D-17 0425 2 91 MANHOLES, J-8, <10' EA 4
D-18 0425 2 92 MANHOLES, J-8, >10' EA 3
D-19 0425 17 18 BACK OF SIDEWALK ENDWALL, 18" PIPE DIA. EA 2
D-20 0430175118 PIPE CULVERT, RCP,ROUND, 18"S/CD LF 3600
D-21 0430175124 PIPE CULVERT, RCP,ROUND, 24"S/CD LF 650
D-22 0430175130 PIPE CULVERT, RCP,ROUND, 30"S/CD LF 200
D-23 0430175136 PIPE CULVERT, RCP,ROUND, 36"S/CD LF 2000
D-24 0430175142 PIPE CULVERT, RCP,ROUND, 42"S/CD LF 1600
D-25 0430175218 PIPE CULVERT, RCP, ELLIP/ARCH, 14"x23" S/CD LF 130
D-26 0430175242 PIPE CULVERT, RCP, ELLIP/ARCH, 34"x53" S/CD LF 160
D-27 0430982125 MITERED END SECTION, RCP ROUND, 18" CD EA 3
D-28 0430982625 MITERED END SECTION, ELLIP/ARCH, 14"x23" CD EA 2
D-29 - DEWATERING LS 1
OLIVE ROAD STREET IMPROVEMENT PROJECT
ROADWAY
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
1 0101 1 MOBILIZATION (All Components) LS 1
2 0102 1 MAINTENANCE OF TRAFFIC (All Components) LS 1
3 - TEMPORARY EROSION CONTROL LS 1
4 0110 1 1 CLEARING AND GRUBBING LS 1
5 0110 4 10 REMOVAL OF EXISTING CONCRETE SY 750
6 0110 7 1 MAILBOX, F&I SINGLE EA 38
7 0120 1 REGULAR EXCAVATION CY 880
8 0120 6 EMBANKMENT CY 8000
9 0160 4 TYPE B STABILIZATION SY 14000
10 0285701 OPTIONAL BASE, BASE GROUP 01 SY 4500
11 0285708 OPTIONAL BASE, BASE GROUP 08 (Type B-12.5-5.5") SY 3900
12 0285713 OPTIONAL BASE, BASE GROUP 13 (Type B-12.5-8") SY 1400
13 0326 70 1 MILLING EXISTING ASPHALT PAVEMENT, 1" AVG DEPTH SY 165
14 0327 70 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH SY 790
15 0327 70 5 MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH SY 4350
16 0327 70 6 MILLING EXISTING ASPHALT PAVEMENT, 1.5" AVG DEPTH SY 1000
17 0327 70 15 MILLING EXISTING ASPHALT PAVEMENT, 2 3/4" AVG DEPTH SY 18000
18 0327 70 19 MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH SY 140
19 0334 1 52
THICK)
SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 (MUP) (1.5"
SY 4200
20 0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (1" THICK) SY 4350
21 0334 1 53
THICK)
SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (1.5"
SY 2300
22 0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 (2" THICK) SY 21350
23 0334 1 53
(OVERBUILD) (THICKNESS VARIES)
SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22
SY 19700
24 0337 7 82
FC-9.5, PG 76-22 (1" THICK)
ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C,
SY 25650
25 0515 1 2 PIPE HANDRAIL - GUIDERAIL, ALUMINUM LF 225
26 0520 1 7 CONCRETE CURB & GUTTER, TYPE E LF 80
27 0520 1 10 CONCRETE CURB & GUTTER, TYPE F LF 10500
28 0520 70 CONCRETE TRAFFIC SEPARATOR, SPECIAL, VARIABLE WIDTH SY 25
29 0522 1 CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK SY 2600
30 0522 2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK SY 2850
31 0527 2 DETECTABLE WARNINGS SF 800
32 - FENCING LF 425
33 - 6'hX12'w DBL CHAIN LINK SWING GATE, (2) 6'w GATES EA 2
34 0570 1 2 PERFORMANCE TURF, SOD SY 10000
35 - SAW CUT EXISTING ASPHALT LF 15000
35A - REMOVE AND REPLACE UNSUITABLE MATERIALS CY 1000
OLIVE ROAD STREET IMPROVEMENT PROJECT
ITS
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
IT-1 630-2-11 CONDUIT, F&I, OPEN TRENCH LF 4720
IT-2 630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 1900
IT-3 633-1-121 FIBER OPTIC CABLE, F&I, UNDERGROUND,2-12 FIBERS LF 730
IT-4 633-1-123 FIBER OPTIC CABLE, F&I, UNDERGROUND,49-96 FIBERS LF 6400
IT-5 633-2-31 FIBER OPTIC CONNECTION, INSTALL, SPLICE EA 44
IT-6 633-3-11 FIBER OPTIC CONNECTION HARDWARE, F&I, SPLICE ENCLOSURE EA 3
IT-7 633-3-12 FIBER OPTIC CONNECTION HARDWARE, F&I, SPLICE TRAY EA 6
IT-8 633-3-15
PATCH PANEL
FIBER OPTIC CONNECTION HARDWARE, F&I, PRETERMINATED
EA 3
IT-8A 635-2-11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 2
IT-9 635-2-12 PULL & SPLICE BOX, F&I, 24" X 36" COVER SIZE EA 14
IT-10 635-2-13
COVER SIZE
PULL & SPLICE BOX, F&I, 30" X 60" RECTANGULAR OR 36" ROUND
EA 3
IT-11 684-1-1 MANAGED FIELD ETHERNET SWITCH, FURNISH & INSTALL EA 2
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
C E
S S
R D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N
M
M A
R Y O
F P
A Y I
T E
M
A D
D
W E
L F
L E
A L
E X
A N
D E
R J
PAY ITEM NOTES
S I-
U -4
U -6
U P
D A
T E
D P
A Y I
T E
M N
O T
E S
U P
D A
T E
D P
A Y I
T E
M D
E S
C R
IP
T
IO
N S I-
U P
D A
T E
D Q
U A
N T
IT
IE
S F
O R S I-
/0
/2
IN CONFLICT WITH PROPOSED WORK OR OUTSIDE THE TRAVEL LANES OF OLIVE RD.
INCLUDING ANY AND ALL CONDUIT CONTAINED WITHIN THE DUCTBANK, CONCRETE, AND OTHER DUCT BANK MATERIALS, PAY ITEM U-6 - THIS PAY ITEM SHALL INCLUDE THE REMOVAL AND DISPOSAL OF ABANDONED AT&T DUCT BANK, 4.
GRADE.
OUTSIDE OF THE TRAVEL LANES OF OLIVE ROAD, INCLUDING REMOVAL, DISPOSAL, AND EMBANKMENT TO THE PROPOSED
PAY ITEM U-5 - THIS PAY ITEM SHALL INCLUDE ALL WORK NECESSARY TO REMOVE ABANDONED AT&T MANHOLES 3.
TRAVEL LANES OF OLIVE RD.
PAY ITEM U-4 - THIS PAY ITEM SHALL INCLUDE FILLING ALL ABANDONED AT&T MANHOLES AND DUCTBANK WITHIN THE 2.
ALL MATERIALS, APPLICATION, CURING, PROTECTION, AND ALL INCIDENTALS NECESSARY TO COMPLETE THE WORK.
AND PLACEMENT OF PAVEMENT MARKINGS. INCLUDING BUT NOT LIMITED TO PREPARING THE SURFACES, FURNISHING
PAY ITEM S-8 - PAINTED PAVEMENT MARKINGS, FINAL SURFACE: A LUMP SUM PAY ITEM WHICH INCLUDES FURNISHING 1.
OLIVE ROAD STREET IMPROVEMENT PROJECT
SIGNALIZATION
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
SI-1 630-2-11 CONDUIT, F&I, OPEN TRENCH LF 380
SI-2 630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 515
SI-3 632-7-1
INSTALL
SIGNAL CABLE - NEW OR RECONSTRUCTED INTERSECTION, FURNISH &
PI 2
SI-4 632-7-6 SIGNAL CABLE, REMOVE- INTERSECTION PI 2
SI-5 635-2-11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 25
SI-6 639-1-122
CONTRACTOR
ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER PURCHASED BY
AS 2
SI-7 639-2-1 ELECTRICAL SERVICE WIRE, FURNISH & INSTALL LF 60
SI-8 641-2-12 PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE EA 2
SI-9 641-2-80
GREATER
PRESTRESSED CONCRETE POLE, COMPLETE POLE REMOVAL- POLE 30' AND
EA 4
SI-10 646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL EA 8
SI-11 646-1-60 ALUMINUM SIGNALS POLE, REMOVE EA 4
SI-12 649-21-1 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE ARM 30' EA 1
SI-13 649-21-3 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, SINGLE ARM 40' EA 1
SI-14 649-21-8 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 50'-40' EA 1
SI-15 649-21-12 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 60'-40' EA 1
SI-16 649-21-23 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 78'-40' EA 1
SI-17 650-1-34
SECTION, 1 WAY
VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 3
AS 15
SI-18 650-1-36
SECTION, 1 WAY
VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 4
AS 4
SI-19 650-1-38
SECTION STRAIGHT, 1 WAY
VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 5
AS 1
SI-20 653-1-11 PEDESTRIAN SIGNAL, F&I LED COUNT, 1 WAY AS 2
SI-21 653-1-12 PEDESTRIAN SIGNAL, F&I LED COUNT, 2 WAY AS 6
SI-22 654-2-21
& INSTALL- SOLAR, COMPLETE SIGN ASSY- SINGLE DIRECTION
MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH
AS 4
SI-23 654-2-22
& INSTALL- SOLAR, COMPLETE SIGN ASSEMBLY- BACK TO BACK
MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH
AS 2
SI-24 660-4-11
EQUIPMENT
VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL CABINET
EA 2
SI-25 660-4-12
EQUIPMENT
VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL ABOVE GROUND
EA 4
SI-26 665-1-11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD EA 14
SI-27 670-5-160 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA W/STANDARD LOCK AS 2
SI-28 670-5-600 TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET AS 2
SI-29 682-1-173 ITS CCTV CAMERA, NON-PRESSURIZED, IP, HIGH DEFINITION EA 2
SI-30 684-6-3 WIRELESS COMMUNICATION SYSTEM DEVICE, INSTALL EA 2
SI-31 685-1-14
CONVERSION WITH CABINET
UNINTERRUPTIBLE POWER SUPPLY, FURNISH AND INSTALL, ONLINE/DOUBLE
EA 2
SI-32 700-3-201 SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF EA 7
SI-33 700-5-22
12-18 SF
INTERNALLY ILLUMINATED SIGN, FURNISH & INSTALL, OVERHEAD MOUNT,
EA 8
OLIVE ROAD STREET IMPROVEMENT PROJECT
ECUA - WATER MAIN
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
W-1 - 4" PVC C900 DR25 WATER MAIN LF 27
W-2 - 6" PVC C900 DR25 WATER MAIN LF 112
W-3 - 8" PVC C900 DR25 WATER MAIN LF 4742
W-4 - 6" DI C151 CL. 350 WATER MAIN LF 185
W-5 - 8" DI C151 CL. 350 WATER MAIN LF 1047
W-6 - 6" D.I. R.J. WATER MAIN LF 111
W-7 - 12" X 8" DI MJ REDUCER EA 1
W-8 - 4" DI MJ CAP EA 1
W-9 - 6" DI MJ CAP EA 6
W-10 - 8" DI MJ CROSS EA 1
W-11 - 8" DI MJ CAP EA 8
W-12 - 12" DI MJ CAP EA 1
W-13 - 8" X 4" DI MJ TEE EA 1
W-14 - 8" X 6" DI MJ TEE EA 6
W-15 - 8" X 8" DI MJ TEE EA 5
W-16 - 6" FIRE HYDRANT ASSEMBLY EA 7
W-17 - 8" FOSTER ADAPTER EA 1
W-18 - 12" FOSTER ADAPTER EA 1
W-19 - 4" MJ GATE VALVE W/ BOX EA 1
W-20 - 6" MJ GATE VALVE W/ BOX EA 13
W-21 - 8" MJ GATE VALVE W/ BOX EA 21
W-22 - 1" WM SERVICE LINE LF 1145
W-23 - 2" WM SERVICE LINE LF 170
W-24 - WATER METER RESET EA 41
W-25 - WATER VALVE BOX RESET EA 13
W-26 - SEWER VALVE BOX RESET EA 2
W-27 - WM ABANDONMENT LF 9100
OLIVE ROAD STREET IMPROVEMENT PROJECT
SIGNING & PAVEMENT MARKING
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
S-1 0700 1111 SINGLE POST SIGN, F&I GROUND MT, UP TO 12 SF AS 22
S-2 0700 1500 SINGLE POST SIGN, RELOCATE AS 20
S-3 0700 1600 SINGLE POST SIGN, REMOVE AS 11
S-4 0700 3501 SINGLE POST SIGN, RELOCATE, UP TO 12 SF AS 2
S-5 0704 1 2 TUBULAR MARKER, DURABLE, 36" YELLOW POSTS EA 4
S-6 0706 1 3 RAISED PAVEMENT MARKER, TYPE B EA 816
S-7 0710 11290 PAINTED PAVEMENT MARKINGS, STD, YELLOW, ISLAND NOSE SF 27
S-8 0710 90 PAINTED PAVEMENT MARKINGS, FINAL SURFACE LS 1
S-9 0711 11123
AND ROUNDABOUT
THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK
LF 2704
S-10 0711 11124
AND CHEVRONS
THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS
LF 345
S-11 0711 11125
AND CROSSWALK
THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE
LF 445
S-12 0711 11141 THERMO., STD., WHITE, GUIDE LINE, 6" (2/4) GM 0.029
S-13 0711 11241 THERMO., STD., YELLOW, GUIDE LINE, 6" (2/4) GM 0.087
S-14 0711 11160 THERMO., STD., MESSAGE OR SYMBOL EA 1
S-15 0711 11170 THERMO., STD., ARROWS EA 54
S-16 0711 11224
CHEVRONS
THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR
LF 418
S-17 0711 14125 THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR CROSSWALK LF 1850
S-18 0711 14160 THERMO., PREFORMED, MESSAGE OR SYMBOL EA 2
S-19 0711 14170 THERMO., PREFORMED, ARROWS (BIKE THRU) EA 2
S-20 0711 16101 THERMOPLASTIC, STANDARD, OTHER SURFACES, WHITE, SOLID, 6" GM 2.625
S-21 0711 16131 THERMO., STD. - OTHER, WHITE, SKIP, 6" (10/30) GM 0.091
S-22 0711 16201 THERMOPLASTIC, STANDARD, OTHER SURFACES, YELLOW, SOLID, 6" GM 2.380
S-23 0711 16231 THERMOPLASTIC, OTHER SURFACES, YELLOW, SKIP, 6" GM 1.065
OLIVE ROAD STREET IMPROVEMENT PROJECT
UTILITIES
ITEMS
FDOT PAY DESCRIPTION UNIT QUANTITY
U-1 - ADJUST TO GRADE MANHOLES (ALL) EA 9
U-2 - ADJUST TO GRADE METERS & VALVES (ALL) EA 4
U-3 - ADJUST TO GRADE HANDHOLES-PEDS (ALL) EA 15
U-4 0121-70 FLOWABLE FILL (AT&T) CY 279.8
U-5 MANHOLE REMOVAL (AT&T) EA 4
U-6 DUCT BANK REMOVAL (AT&T) LF 5038
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
T Y
P S
R D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N O
SAWCUT
EXIST. PAV'T.
1"
2.75"
MILLING
BEGIN PROJECT
ASPHALT FEATHERING DETAIL
S T
A
.0
F E
A T
H E
R I N
G B
E G
P
A
T H
E R I
G
A
.0
EXIST. R/W LINE
EXIST. R/W LINE
Natural Ground
11' 11'
VARIES (34'-35')
POINT
PROFILE GRADE
MILL & RESURFACING LIMITS
NATURAL GROUND
TRAFFIC DATA
DESIGN SPEED = 18 MPH (SHARED USE PATH)
DESIGN SPEED = 35 MPH
K = 9.0% D = 55.2% T = 5% (24 HOUR)
ESTIMATED DESIGN YEAR = 2045 AADT = 11,800
CURRENT YEAR = 2021 AADT = 11,800
MAX
1:6
� CONST. OLIVE RD
EXISTING BASE
(SEE DETAIL)
OVERBUILD
RESURFACING DETAIL
TYPE SP-9.5 STRUCTURAL COURSE (TRAFFIC C) (PG 76-22) (1")
OVERBUILD
THICKNESS VARIES (SEE OVERBUILD TABLE)
TYPE SP-12.5 OVERBUILD (TRAFFIC C)(PG 76-22)
EXISTING STABLIZATION MILLED SURFACE
VARIES VARIES
VARIES VARIES
MILLING DETAIL
PAVEMENT (1" MAX. DEPTH)
MILL EXISTING ASPHALT
SODSOD 5' 5'
MAX
1:6
2' SOD2' SOD
DROP CURB TRANSITION DETAIL
0'-5'
VARIES
SHLDR.
GUTTER TYPE F
DROP CURB &
TRANSITION DETAIL
SEE DROP CURB
EX. ASPHALT
SAW CUT
PAVEMENT
EXISTING ASPHALT
22'-32'
TRANSITION DETAIL
SEE DROP CURB
LEFT CURB SHOWN. RIGHT CURB OPPOSITE.
STA. 191+40.00 TO STA. 191+90.00
OLIVE ROAD
TYPICAL SECTION 1
BEGIN CONSTRUCTION BEGIN PROJECT
SAWCUT
P
IC
A L S
E C
T
IO
LEVEL
2' SOD
32'
OVERBUILD
1" STRUCTURAL
SECTION 2
SEE TYPICAL
NOT FLATTER THAN 1:6
PROPERTY OWNER,
SOD-1:2 OR TO SUIT
A D
D
/2 /2
W E
L F
L E
A L
E X
A N
D E
R J
A D J U
S T
E D P
A V
E M
E N
T D
E S
IG
N F
R O
M S
P -1
.5 T
O S
P -9 .5
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
T Y
P S
R D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N
P
IC
A L S
E C
T
IO
Natural Ground
MATCH EXISTING MATCH EXISTING
MILL & RESURFACING LIMITS
VARIES (30' MIN)
EXIST. R/W LINE
EXIST. R/W LINE
� CONST.
Natural Ground Natural GroundMATCH EXISTING MATCH EXISTING
VARIES (22' MIN)
EXIST. R/W LINE
EXIST. R/W LINE
� CONST.
VARIES (30' - 45')VARIES (30' - 45')
VARIES VARIES
WHITMIRE DRIVE (N & S)
CODY LANE (N) &
TYPICAL SECTION 6
RESURFACING DETAIL
TYPE SP-12.5 STRUCTURAL COURSE (TRAFFIC C) (PG 76-22) (1½")
WIDENING CONSTRUCTION
WIDENING CONSTRUCTION
SIDE STREETS & CURBED DRIVEWAYS
TYPICAL SECTION 7
OVERBUILD
THICKNESS VARIES (SEE SIDE STREET & CURBED DRIVEWAYS OVERBUILD TABLE)
TYPE SP-12.5 OVERBUILD (TRAFFIC C) (PG 76-22)
CURB & GUTTER TYPE F
CURB & GUTTER TYPE F
1:4 1:4
4" 4"
Ground
Natural
4"
WIDEN. 2'
ASPHALT
EXISTING
SAW-CUT
12" TYPE B STABILIZATION LBR 40 12" TYPE B STABILIZATION LBR 40
STABILIZATION LBR 40
12" TYPE B
4"
WIDEN.2'
ASPHALT
EXISTING
SAW-CUT
STABILIZATION LBR 40
12" TYPE B
CURB & GUTTER TYPE F
TYPE F
CURB & GUTTER
12" TYPE B STABILIZATION LBR 40
CURB & GUTTER TYPE F
RESURFACING LIMITS
4' MIN.
VARIES
4' MIN.
VARIES
EL ESTRECHO DR. (S), CITY NORTH APARTMENTS DRIVEWAY (N), ERNESTINE RD. (N)
CARPENTER CREEK HEADWATER PARK DRIVEWAYS (S), DOLLAR GENERAL DRIVEWAY (N), HEIRLOOM DR. (N) & (S), TYPE SP-12.5 STRUCTURAL COURSE (TRAFFIC C) (PG 76-22) (1½")
TYPE B-12.5 (5½")
(SEE PLANS FOR LIMITS OF WIDENING)
FRICTION COURSE FC 9.5 (PG 76-22) (1")
TYPE SP-12.5 STRUCTURAL COURSE (TRAFFIC C) (PG 76-22) (2")
TYPE B-12.5 (5½")
(SEE PLANS FOR LIMITS OF WIDENING)
MILLING & RESURFACING
FRICTION COURSE FC 9.5 (PG76-22) (1")
TYPE SP-12.5 STRUCTURAL COURSE (TRAFFIC C) (2")
MILL 3" PAVEMENT TO MATCH SLOPE4
A D
D
/2 /2
W E
L F
L E
A L
E X
A N
D E
R J
A D J U
S T
E D P
A V
E M
E N
T D
E S
IG
N F
R O
M S
P -9 .5 T
O S
P -1
.5
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
T Y
P S
R D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N O
1:
5'
6'
' 1
6'4'4'
DROP CURB
M I N
S T
D
M I N
S T
D
M I N
S T
D
M I N
S T
D
P L
A N
S S
V
R I
A N
S S
V
R I
DRIVEWAY DETAIL
SIDEWALK
4"
NORTH SIDE (SIDEWALK) SOUTH SIDE (MUP)
WIDTH VARIES
M A
X
S
L O
P E
.0
M A
X
S
L O
P E
.0
PATH
USE
SHARED
TYPE F
GUTTER
CURB &
TYPE F
GUTTER
CURB &
T Y
P
IC
A L S
E C
T
IO
N D
E T
A
IL
OR ASPHALT DRIVEWAYS
SAWCUT EXISTING CONCRETE
(N.T.S.)
PAVEMENT REPAIR DETAIL
STORM DRAIN TRENCH CUT
VARIES
18"-42"
1' MIN.1' MIN.
1'-6"1'-6"
ELEVATION INFORMATION
STRUCTURE SHEETS FOR
SEE DRAINAGE
7' MAX.
10' MAX.
VARIES 1' MIN.1' MIN.
1'-6"1'-6"
3' MAX.
6' MAX.
(N.T.S.)
PAVEMENT REPAIR DETAIL
UTILITY TRENCH CUT
1"-20"
MILLED DURING MILLING OPERATIONS
TOP OF ASPHALT PATCH IS SACRIFICIAL AND WILL BE
5.5" - TYPE B-12.5 (MINOR SIDESTREETS/DRIVEWAYS)
8" - TYPE B-12.5 (OLIVE RD., CODY LN., WHITMIRE DR.)
ELEVATION INFORMATION
SEWER PLANS FOR
SEE WATER &
A D
D
/2 /2
W E
L F
L E
A L
E X
A N
D E
R J
R E
M O
V E
D B
A C
K F
IL
L R
E Q
U
IR
E M
E N
T S F
R O
M P
A V
E M
E N
T R
E P
A
IR
D
E T
A
IL
R O
V E
M E
N T P
R O J E
C T
O L
IV
E R
O A
D S
T R
E
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
P
O R
L
D D
A c t iv e -0 -0
-0 r o a d w a y
T C
G N
R D
P H I .d g n p d o r s e y
N U
M B
E R
R E
V
IS
IO
N S
D R
A W
N B
Y
D A
T E
A P P
R O
V E
D B
Y
D A
T E
F
IE
L D B
O O
K P
A G
E S
D E
S
IG
N E
D B
Y
C H
E C
K E
D
B
Y
P R
O J E
C T M
A N
A G
E R
D
IS
T R
IC
T
SHEET
S
W
M O
F F
A T
T N
IC
H O
L
E S
C A
M B
IA
C
O U
N T
Y F
L O
R
ID
A
P D
A W
G A
S E
V
IL
L E T
O W
E R S
O U
T H P
A L
A F
O X P
L A
C E F
L O
O R P
E N
S A
C O
L A F
L O
R
ID
A
:3
:5
P
M
M
IC
H A
E L S
E G
A R
S P
H O
N E N
U M
B E
R
(8 -3
A L
E X
A N
D E
R J
W E
L F
L E
E N
G
IN
E E
R O
F R
E C
O R
D
S E
C T
IO
N T
O W
N S
H
IP
R
A N
G E
R E
G F
L A E
N G
N O
G
N R
A L N
O T
M P
O R
A R
Y T
R A
F F
IC
C
O N
T R
O L P
L
CONSTRUCTION.
BOTTOM AND/OR THE DEBRIS SEPARATING BAFFLE BOX THROUGHOUT THIS ENTIRE SEGMENT OF
POND, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING SEDIMENT FROM THE POND
CARPENTER CREEK HEADWATER STORMWATER DETENTION POND. ONCE CONNECTED TO THE
CONSTRUCT DRAINAGE STRUCTURES S-306, S-305 AND CROSS-DRAIN PIPE. CONNECT TO NEW 7.
TO RELOCATE ANY CONFLICTING UTILITIES.
FIELD LOCATE DRAINGE STRUCTURES AND ALLOW UP TO THREE (3) WEEKS FOR UTILITY OWNERS 6.
INSTALL ANY NECESSSARY SEDIMENT BARRIERS AND INLET PROTECTION SYSTEMS.5.
CONTROL PLAN UTILIZING FDOT INDEX 102-603 AND 102-604.
INSTALL LOW PROFILE BARRIER AND TRAFFIC CONTROL DEVICES AS DETAILED IN THE TRAFFIC 4.
OPERATIONS. UTILIZE FDOT INDEX 102-600 AND 102-604.
SPECIFICATION 102-9.12 UNLESS INSTRUCTED OTHERWISE BY ESCMABIA COUNTY TRAFFIC
ALIGN VIDEO DETECTION ZONES. TEMPORARY VIDEO DETECTION SHALL MEET FDOT
SIGNALIZED INTERSECTIONS. COORDINATE WITH ESCAMBIA COUNTY TRAFFIC OPERATIONS TO
INSTALL TEMPORARY VIDEO DETECTION ON OLIVE ROAD AT CODY LANE AND WHITMIRE DRIVE
ADJUST SIGNAL HEADS FACING OLIVE ROAD, CODY LANE AND WHITMIRE DRIVE, AS NECESSARY. 3.
INDEX 102-603, 102-604, AND THE TEMPORARY TRAFFIC CONTROL PLAN.
TEMPORARY STRIPING AS DETAILED IN THE TEMPORARY TRAFFIC CONTROL PLAN. UTILIZE FDOT
DURING ONE WORK PERIOD, REMOVE ANY CONFLICTING PAVEMENT MARKINGS AND INSTALL 2.
THE TEMPORARY TRAFFIC CONTROL PLAN.
ADJUST TEMPORARY TRAFFIC CONTROL DEVICES AND ADVANCE WARNING SIGNAGE AS SHOWN IN 1.
PHASE I - CONSTRUCT DRAINAGE TRUNK LINE AND IMPROVEMENTS NORTH OF ROADWAY
ERECT SIGNAGE UNDER INDEX 102-602.4.
PLACE ROADWAY STRIPING UTILIZING FDOT INDEX 102-603 AND 102-604.3.
CONSTRUCT FINAL FRICTION COURSE UTILIZING FDOT INDEX 102-603, 102- 604.2.
TEMPORARY ASPHALT WEDGES AS NECESSARY ACCORDING TO GENERAL NOTE 7.
FDOT INDEX 102-603, 102- 604 AND THE TEMPORARY TRAFFIC CONTROL PLANS. CONSTRUCT
MILL AND RESURFACE LANES OF TRAFFIC, NOT INCLUDING THE FRICTION COURSE, UTILIZING 1.
THIS PHASE SHALL BE COMPLETED DURING NIGHT WORK (8:00PM TO 6:00AM).
PHASE III - MILLING AND RESURFACING WORK
RECONSTRUCTION, MILLING AND RESURFACING ALONG MAZUREK BLVD AND OLD NURSERY WAY.
CONSTRUCT DRAINAGE TRUNK LINE AND ASSCOCIATED STRUCTURES, FULL DEPTH 4.
REMOVAL, RELOCATION, OR REPLACEMENT OF SUCH SIGNAGE IS REQUIRED.
CONTRACTOR SHALL COORDINATE WITH THE OWNER OR THE ENGINEER WHEN TEMPORARY
THE CONTRACTOR SHALL PROTECT ALL EXISTING TRAFFIC AND STREET SIGNS. THE 5.
TRAFFIC OR CONSTITUTES IN ANY WAY A HAZARD TO THE PUBLIC.
102-600 AND 102-603 IN ALL PLACES WHERE THE WORK CAUSES OBSTRUCTION TO THE NORMAL
MARKINGS FOR HAZARDS AND THE CONTROL OF TRAFFIC IN ACCORDANCE WITH FDOT INDEX
CONTRACTOR SHALL FURNISH, ERECT, AND MAINTAIN ALL BARRICADES, WARNING SIGNS, AND 4.
OWNER A MINIMUM OF 5 WORKING DAYS IN ADVANCE.
CLOSURES ARE REQUIRED DURING CONSTRUCTION, THEN THE CONTRACTOR SHALL NOTIFY THE
CONTRACTOR SHALL NOTIFY THE OWNER A MINIMUM OF 3 WORKING DAYS IN ADVANCE. IF ROAD
MAINTAINED. IF ACCESS TO LOCAL TRAFFIC IS CHANGED DURING CONSTRUCTION, THE
ACCESS FOR LOCAL TRAFFIC WITH DESTINATIONS WITHIN THE PROJECT LIMITS SHALL BE 3.
SYSTEMS.
INSTALL AND MAINTAIN ANY NECESSSARY SEDIMENT BARRIERS AND INLET PROTECTION 2.
CONSTRUCTION.
NOTIFY ALL PROPERTY OWNERS ALONG MAZUREK BLVD AND NURSERY WAY PRIOR TO 1.
MAZUREK BLVD DRAINAGE IMPROVEMENTS
REQUIRE A LANE CLOSURE.
SHALL BE APPROVED BY ESCAMBIA COUNTY AND BE UTILIZED ONLY TO CONSTRUCT ITEMS THAT
VOLUMES, NO LANE CLOSURES WILL BE ALLOWED BETWEEN 6:00AM AND 8:00PM. NIGHT WORK
THIS SEGMENT IS ZONED PRIMARILY HIGH DENSITY MIXED USE (HD/MU). DUE TO THE HIGH TRAFFIC
FROM CARPENTER CREEK TO DAVIS HIGHWAY
TEMPORARY TRAFFIC CONTROL PHASING NOTES
Message Sign
Portable Changeable (Variable)
LEGEND
Sediment Barrier or Vertical Panel or Drum
Type I or Type II Barricade
Pavement Marking
Directional Arrow
Temporary Pavement
Work Zone
Type III Barricade
Work Zone Sign
PCMS
(Not a Pavement Marking)
Direction of Traffic
Lane Identification and
ELEVATION OF THE PAVEMENT DURING THIS PHASE.
DEPTH RECONSTRUCTION OF THE WIDENING AREAS SHALL NOT EXCEED THE EXISTING
NOTE: FOR WIDENING TO BE CONSTRUCTED AS PER THE PLANS, BASE INCLUDED WITHIN THE FULL
GUTTER CONSTRUCTION GUIDE. UTILIZE FDOT INDEX 102-603 AND 102-604 AS NECESSARY.
ON OVERBUILD TABLE) SEE TEMPORARY TRAFFIC CONTROL GENERAL NOTE 12 FOR CURB AND
WHERE OVERBUILD THICKNESS T1, T2, AND T3 EXCEEDS 4.75" COLLECTIVELY. (REFER TO NOTE
WEDGES AS NECESSARY ACCORDING TO GENERAL NOTE 7. CONSTRUCT OVERBUILD IN AREAS
MILLINGS TO STABILIZE DRIVEWAYS DURING CONSTRUCTION. CONSTRUCT TEMPORARY ASPHALT
PLANS. MAINTAIN ACCESS AT ALL DRIVEWAYS USING MISCELLANEOUS ASPHALT OR ASPHALT
SIGNALS, PEDESTRIAN SIGNALS, RRFB, ITS SYSTEM, AND MULTI-USE PATH ACCORDING TO THE
PLANS. CONSTRUCT DRAINAGE, PAVEMENT WIDENING, CURB & GUTTER, DRIVEWAYS, TRAFFIC
SAW CUT AND REMOVE EXISTING SHOULDER PAVEMENT, CLEAR, AND GRUB AS DETAILED IN THE 7.
PLANS.
TRAFFIC. UTILIZE FDOT INDEX 102-603, 102-604 AND THE TEMPORARY TRAFFIC CONTROL
BACKFILL, COMPACT AND CONSTRUCT ASPHALT PATCH OVER PIPE ASAP TO OPEN LANES TO
CONSTRUCT DRAINAGE PIPE CROSSING OLIVE ROAD DURING NIGHT WORK (8:00PM TO 6:00AM). 6.
TO RELOCATE ANY CONFLICTING UTILITIES.
FIELD LOCATE DRAINGE STRUCTURES AND ALLOW UP TO THREE (3) WEEKS FOR UTILITY OWNERS 5.
CONTROL PLAN UTILIZING FDOT INDEX 102-603 AND 102-604.
INSTALL LOW PROFILE BARRIER AND TRAFFIC CONTROL DEVICES AS DETAILED IN THE TRAFFIC 4.
INSTALL ANY NECESSSARY SEDIMENT BARRIERS AND INLET PROTECTION SYSTEMS.3.
102-600 AND 102-604.
ZONES ON OLIVE ROAD AT PALAFOX STREET SIGNALIZED INTERSECTION. UTILIZE FDOT INDEX
COORDINATE WITH ESCAMBIA COUNTY TRAFFIC OPERATIONS TO ADJUST VIDEO DETECTION
ADJUST SIGNAL HEADS FACING OLIVE ROAD AND PALAFOX STREET, AS NECESSARY. 2.
TRAFFIC CONTROL PLAN.
TEMPORARY SIGNAGE AS NEEDED. UTILIZE FDOT INDEX 102-603, 102-604, AND THE TEMPORARY
TEMPORARY STRIPING AS DETAILED IN THE TEMPORARY TRAFFIC CONTROL PLAN. ADJUST ANY
DURING ONE WORK PERIOD, REMOVE ANY CONFLICTING PAVEMENT MARKINGS AND INSTALL 1.
PHASE II - CONSTRUCT IMPROVEMENTS SOUTH OF ROADWAY
NEW TRAFFIC SIGNALS ARE INSTALLED AND OPERATIONAL.
CONTRACTOR SHALL MAINTAIN ALL CURRENT TRAFFIC SIGNALS DURING CONSTRUCTION UNTIL 20.
- THROUGHOUT THE DURATION OF DETOURS
- DURING ACTIVE LANE CLOSURES
- 14 DAYS AFTER A LANE HAS BEEN SHIFTED
- 14 DAYS PRIOR TO NEW LANE SHIFTS
- 14 DAYS PRIOR TO CONSTRUCTION
PORTABLE CHANGEABLE MESSAGE SIGNS SHALL BE PLACED DURING THE FOLLOWING TIMES:19.
LUMP SUM PAY ITEM "MAINTENANCE OF TRAFFIC"
SEGMENTS AND PHASES. THE COST OF THIS COORDINATION SHALL BE INCLUDED WITHIN THE
COORDINATE WITH FLORIDA POWER AND LIGHT DURING ALL MAINTENANCE OF TRAFFIC
THROUGHOUT THE PROJECT UNDER A SEPERATE CONTRACT. THE CONTRACTOR SHALL
FLORIDA POWER AND LIGHT WILL BE RESPONSIBLE FOR THE INSTALLATION OF THE LIGHTING 18.
TRAFFIC CONTROL PLANS ON OLIVE ROAD.
THE LEGEND FOUND ON THIS SHEET WILL BE USED IN THE PLANS FOR ALL PHASES OF THE 17.
TEMPORARY TRAFFIC CONTROL GENERAL NOTES CONT.
PORTABLE CHANGEABLE MESSAGE SIGN DISPLAY TABLE
DATE DISPLAY 1 DISPLAY 2
14 DAYS PRIOR TO CONSTRUCTION
XX/XX
CONST
OLIVE RD
N/A
14 DAYS PRIOR TO LANE SHIFT
14 DAYS AFTER LANE SHIFT
DURING ACTIVE LANE CLOSURES
XX/XX
SHIFTS
LANE
CAUTION
USE
AHEAD
SHIFT
LANE
CAUTION
USE
AHEAD
CLOSURE
LANE
STOP
TO
PREPARE
SHOWN IN THE SIGNAL PLANS PRIOR TO ANY OTHER IMPROVEMENTS.
NOTE: CONTRACTOR SHALL CONSTRUCT THE PROPOSED DIRECTIONAL BORE UNDER DAVIS HIGHWAY AS
RIGHT TURN LANES TO THE EXTENT POSSIBLE.
PRIOR TO CLOSURE. THE CONTRACTOR SHALL ADJUST LOW PROFILE BARRIERS TO ACCOMMODATE
TRAFFIC CONTROL PLANS. THE CONTRACTOR SHALL NOTIFY RESIDENTS AT LEAST 2 WEEKS
NEED TO BE CLOSED DURING ACTIVE CONSTRUCTION PERIODS AS SHOWN IN THE TEMPORARY
ADDITIONALLY, RIGHT TURN LANES AT HEIRLOOM DRIVE, AND BRIARWOOD CONDOMINIUMS MAY
NOTE: EXISTING RIGHT TURN LANE AT STONEBROOK DRIVE WILL BE CLOSED DURING LANE SHIFT.
ELEVATION OF THE PAVEMENT DURING THIS PHASE.
DEPTH RECONSTRUCTION OF THE WIDENING AREAS SHALL NOT EXCEED THE EXISTING
NOTE: FOR WIDENING TO BE CONSTRUCTED AS PER THE PLANS, BASE INCLUDED WITHIN THE FULL
GENERAL NOTE 12 FOR CURB AND GUTTER CONSTRUCTION GUIDE.
COLLECTIVELY. (REFER TO NOTE ON OVERBUILD TABLE) SEE TEMPORARY TRAFFIC CONTROL
OVERBUILD IN AREAS WHERE OVERBUILD THICKNESS T1, T2, AND T3 EXCEEDS 4.75"
TEMPORARY ASPHALT WEDGES AS NECESSARY ACCORDING TO GENERAL NOTE 7. CONSTRUCT
INDEX 102-603, 102-604 AND THE TEMPORARY TRAFFIC CONTROL PLANS. CONSTRUCT
SIGNALS, RRFB, ITS SYSTEM, PAVEMENT WIDENING, AND CURB & GUTTER UTILIZING FDOT
CONSTRUCT SIDEWALK, DRIVEWAYS, PROPOSED WATER MAIN, TRAFFIC SIGNALS, PEDESTRIAN 10.
AND THE TEMPORARY TRAFFIC CONTROL PLANS.
PATCH OVER PIPE ASAP TO OPEN LANES TO TRAFFIC. UTILIZE FDOT INDEX 102-603, 102-604
WITH PERMISSION FROM ESCAMBIA COUNTY. BACKFILL, COMPACT AND CONSTRUCT ASPHALT
CONTROL PLANS. THIS TASK SHALL BE COMPLETED DURING NIGHT WORK (8:00PM TO 6:00AM)
CONSTRUCT DRAINAGE PIPE CROSSING OLIVE ROAD AS SHOWN IN THE TEMPORARY TRAFFIC 9.
DRIVEWAYS DURING CONSTRUCTION.
ALL DRIVEWAYS USING MISCELLANEOUS ASPHALT OR ASPHALT MILLINGS TO STABILIZE
PLANS. CONSTRUCT DRAINAGE AS SHOWN IN THE TRAFFIC CONTROL PLAN. MAINTAIN ACCESS AT
SAWCUT AND REMOVE EXISTING SHOULDER PAVEMENT, CLEAR, AND GRUB AS DETAILED IN THE 8.
-FDOT'S DAVIS HIGHWAY RESURFACING FPID 453332-1-52-01
222476-1
-FDOT'S I-10 AT US 29 INTERCHANGE PROJECT (INCLUDING WORK ON PALAFOX STREET), FPID
PROJECTS, INCLUDING:
THESE TEMPORARY TRAFFIC CONTROL PLANS SHALL BE COORDINATED WITH NEIGHBORING 16.
MONEY WHICH IS DUE TO THE CONTRACTOR BY ESCAMBIA COUNTY.
ESCAMBIA COUNTY WILL HAVE THE RIGHT TO APPLY AS PAYMENT ON SUCH DAMAGES ANY
CONTRACTOR'S OPERATIONS.
THE CONTRACTOR, I.E., CATASTROPHIC EVENTS, ACCIDENTS NOT RELATED OR CAUSED BY THE
ASSESSED FOR FAILURE TO OPEN TRAFFIC LANES IF SUCH CAUSE IS BEYOND THE CONTROL OF
AT THE DISCRETION OF THE ENGINEER, DAMAGE RECOVERY/USER COST WILL NOT BE
SUCH COSTS WILL NOT EXCEED $15,000 OVER A 24 HOUR PERIOD.
$1,125.00EACH ADDITIONAL 30 MINUTE PERIOD OR A PORTION THEREOF:
$2,250.00FIRST 30 MINUTES AND UNDER:
THIS ASSESSMENT WILL BE IN THE FOLLOWING AMOUNTS:
CONTROL PLANS AND CONTINUE UNTIL ALL LANES ARE OPEN AS RECORDED BY THE ENGINEER.
COSTS WILL BE ASSESSED BEGINNING AT THE APPROPRIATE TIME AS SHOWN IN HTE TRAFFIC
ARE NOT OPEN TO TRAFFIC DURING THE TIMES AS SHOWN IN THE TRAFFIC CONTROL PLANS.
A DAMAGE RECOVERY/USER COST WILL BE ASSESSED AGAINST THE CONTRACTOR IF ALL LANES 15.
BE ADJUSTED WITH THE APPROVAL OF ESCAMBIA COUNTY.
CONSTRUCTION ACTIVITES BETWEEN THE HOURS OF 3:00 PM AND 7:00 PM. THESE HOURS MAY
ENFORCEMENT OFFICERS SHALL BE UTILIZED THROUGHOUT THE DURATION OF SEGMENT 1
RESURFACING LANE CLOSURES AT ALL SIGNALIZED INTERSECTIONS. ALSO, SPEED AND LAW
SHERIFFS OFFICE FOR THE USE OF TRAFFIC CONTROL OFFICERS DURING MILLING AND
FOR THE SAFETY OF THE WORKERS, CONTRACTOR SHALL COORDINATE WITH ESCAMBIA COUNTY 14.
SERVICES.
STREET NAME SIGNS SHALL REMAIN VISIBLE THROUGHOUT CONSTRUCTION FOR EMERGENCY 13.
APPROPRIATE FDOT STANDARD AS NECESSARY DURING THIS PROCESS.
MUST MEET FDOT OFFSET REQUIREMENTS. UTILIZE FDOT INDEX 102-603, 102-604 OR OTHER
UNTIL THAT PHASE OF CONSTRUCTION IS COMPLETED. ANY REMAINING LOW PROFILE BARRER
EXTENT OF ONE ACTIVE CONSTRUCTION PERIOD AND REPLACED WITH A CHANNELIZING DEVICE
DURING CURB CONSTRUCTION, LOW PROFILE BARRIER MAY BE REMOVED ONLY UP TO THE 12.
STANDARD PLANS TO IMPLEMENT THE REQUIRED LANE CLOSURES AT ALLOWABLE TIMES.
BE REQUIRED. THE CONTRACTOR WILL NEED TO PHASE THIS WORK AND UTILIZE FDOT
WORK THAT IS REQUIRED TO BE COMPLETED IN THAT PHASE. TEMPORARY LANE CLOSURES MAY
LOCATIONS WHERE THE WORK ZONE IS SHOWN IN OR THROUGH TRAVEL LANES INDICATES 11.
SEE DETOUR PLAN FOR ADDITIONAL RESTRICTIONS AND INFORMATION.
APPROVAL OF ESCAMBIA COUNTY AND FOR THE SPECIFIC SEGMENT AND PHASE IDENTIFIED.
THE DETOUR PLAN INCLUDED IN THIS PLAN SET IS ONLY TO BE IMPLEMENTED WITH THE 10.
ITEMS SHALL NOT BE STORED WITHIN THE SETBACK DISTANCE OF THE BARRIER.
OR WITHIN THE CLEAR ZONE OF TRAVEL LANES. IF A TEMPORARY BARRIER IS PRESENT, THESE
THE CONTRACTOR SHALL NOT STORE ANY MATERIAL OR EQUIPMENT WITHIN THE BUFFER AREA 9.
SHALL BE INCLUDED IN THE LUMP SUM PAY ITEM "MAINTENANCE OF TRAFFIC".
MILLINGS, AND ALL ASSOCIATED MATERIALS SUCH AS EARTHWORK, BASE MATERIALS ETC.
TRAVEL LANE WIDTH FOR TRAFFIC SHIFTS. THE COST OF TEMPORARY ASPHALT, ASPHALT
DRIVEWAYS, SIDE STREETS, OR TO MAINTAIN OLIVE ROAD TRAFFIC DUE TO INADEQUATE
TEMPORARY ASPHALT AND ASPHALT MILLINGS MAY BE REQUIRED FOR WEDGES, TEMPORARY 8.
4-INCHES.
DIFFERENCE OF 1½-INCHES OR AN ABOVE GROUND HAZARD ELEVATION DIFFERENCE OF
-BETWEEN A TRAVEL LANE AND CURB AND GUTTER THAT EXCEED A DROP OFF ELEVATION
DIFFERENCE OF 1½-INCHES.
-BETWEEN A TRAVEL LANE AND A SIDE STREET OR DRIVEWAY THAT EXCEED AN ELEVATION
-BETWEEN ADJACENT TRAVEL LANES THAT EXCEED AN ELEVATION DIFFERENCE OF 1½-INCHES.
STEEPER THAN 1:4. ASPHALT WEDGES SHALL BE REQUIRED IN THE FOLLOWING INSTANCES:
WHERE REQUIRED, TEMPORARY ASPHALT WEDGES SHALL BE CONSTRUCTED AT A SLOPE NO
DIFFERENCE GREATER THAN 3-INCHES BETWEEN OPEN LANES OF TRAFFIC AT ANY TIME.
(UNEVEN LANES) IS REQUIRED EVERY ½ MILE. THERE SHALL NOT BE AN ELEVATION
IF THERE IS A DIFFERENCE IN ELEVATION BETWEEN ADJACENT TRAVEL LANES, A W8-11 SIGN 7.
PERIOD, ONLY A CHANNELIZING DEVICES SHALL BE REQUIRED.
BARRIER. IF THE DROP-OFF CONDITION IS CREATED AND RESTORED WITHIN THE SAME WORK
ANY DROP-OFF CONDITION WITHIN THE CLEAR ZONE SHALL BE PROTECTED BY A TEMPORARY 6.
ADJUST GARBAGE/WASTE PICK-UP SERVICES.
SERVICES (850.476.0480) OF CONSTRUCTION PHASING/TRAFFIC CONTROL CHANGES SO ECUA CAN
PRIOR TO AND DURING CONSTRUCTION THE CONTRACTOR SHALL NOTIFY ECUA SANITATION 5.
ECAT.
CONTRACTOR WILL ONLY BE RESPONSIBLE FOR RELOCATION OF ECAT SIGNS, AT DIRECTION OF
ALL CHANGES IN TRAFFIC PATTERNS THROUGHOUT THE DURATION OF CONSTRUCTION.
CONSTRUCTION TO EXISTING ECAT BUS STOP LOCATIONS. CONTRACTOR SHALL NOTIFY ECAT OF
OF PROPOSED WORK AND PROACTIVELY COORDINATE WITH ECAT REGARDING IMPACTS OF
PRIOR TO CONSTRUCTION, CONTRACTOR SHALL NOTIFY ESCAMBIA COUNTY AREA TRANSIT (ECAT) 4.
DIRECTED LOWER BY THE ENGINEER.
ALL WORK ZONE SPEEDS ALONG OLIVE ROAD WILL BE POSTED AT 30 MPH UNLESS OTHERWISE 3.
UNTIL OTHERWISE DIRECTED BY THE ENGINEER.
NOTICE FOR A HURRICANE OR ANY OTHER EMERGENCY EVENT. LANES SHALL REMAIN OPEN
ALL LANES MUST BE REOPENED TO NORMAL TRAFFIC WITHIN 12 HOURS OF AN EVACUATION 2.
ONE LANE OF TRAFFIC SHALL BE KEPT OPEN AT ALL TIMES.
7:00 AM - 8:00 PM-OLIVE ROAD BETWEEN CODY LANE AND N DAVIS HIGHWAY
6:00 AM - 8:00 PMWHITMIRE DRIVE & OLIVE ROAD
6:00 AM - 8:00 PMCODY LANE & OLIVE ROAD
-WITHIN 600 FEET OF THE FOLLOWING INTERSECTIONS:
LANE CLOSURES ARE PROHIBITED AT THE FOLLOWING LOCATIONS AND TIMES:1.
TEMPORARY TRAFFIC CONTROL GENERAL NOTES
A D
D
/2 /2
W E
L F
L E
A L
E X
A N
D E
R J
A D J U
S T
E D N
O T
E R
E M
O V
E D N
O T
E S
| 2026-07-02T14:21:04-0400 | |
| Alexander J Welfle |
File details come from the government source that posted it. Updated .