Addendum 3: Revised Owner Responses to Requests for Information
This is an addendum to the Invitation to Bid issued by Sharon Housing Trust, Inc., a Connecticut-based 501(c)(3) organization, for siding, windows, doors, trim, and paint work at three residential properties located at 91, 93, and 95 North Main Street in Sharon, Connecticut. Addendum 3 provides clarifications and scope additions in response to bidder inquiries and revises requirements previously stated in the original Invitation to Bid and accompanying drawings. The scope now includes replacement of all soffits on all three buildings with vinyl soffits manufactured by CertainTeed; replacement of vinyl porch ceilings at 93 and 95 North Main Street; installation of new exterior vents; painting of the gable end and canopy ceiling at 91 North Main Street; limewashing of the cinderblock chimney at 95 North Main Street with Romabio limewash; and all hazardous-material abatement required for the work. All added scope is included in the Base Bid and not priced as an Add Alternate. The original bid due date has been extended to November 6, 2026, at 4:00 p.m. Bidders must acknowledge receipt of Addendum 1 and Addendum 3 on the revised Bid Form and submit pricing for the porch work, soffits, vents, chimney work, and hazardous-material abatement in their designated line items.
The project is subject to Connecticut Historic Preservation Office (SHPO) requirements, mandating preservation of underlying cedar shake siding and porch wood columns, beams, and trim during removal of existing vinyl siding. All three buildings are subject to State historic preservation standards. All hazardous-material abatement, including lead-safe work practices for painted components and Connecticut-licensed asbestos abatement contractor removal of asbestos-containing window glazing at 95 North Main Street, is the contractor's responsibility and is included in the Base Bid. Suspect PCB-containing materials must be sampled before disturbance and disposed of in accordance with EPA and Connecticut DEEP requirements. Compliance with CHRO (Connecticut Commission on Human Rights and Opportunities) approval is required as a State-funded requirement. Building permits are the contractor's responsibility, and the contractor shall verify bedroom window compliance with egress requirements and obtain building inspector approval before ordering windows. The anticipated project timeline includes work commencement as soon as possible, with window installation potentially occurring in early 2027 pending weather conditions, and coordination with separate cellulose insulation work conducted from the exterior.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHARON HOUSING TRUST
INVITATION TO BID FOR SIDING, WINDOWS, DOORS, TRIM, & PAINT
SHARON HOMES – 91, 93, 95 NORTH MAIN STREET
Addendum 3: REVISED Owner Responses to Requests for Information – Revisions are shown in Red
General: Unless a response below states otherwise, all scope added by this Addendum (replacement of all soffits, all hazardous-material abatement required for the work, painting of the gable end and canopy ceiling at 91 North Main Street, replacement of the vinyl porch ceilings at 93 and 95 North Main Street, new vents, and limewashing of the chimney at 95 North Main Street) is included in the Base Bid and the Grand Total; it is not an Add Alternate. A revised Invitation to Bid and Bid Form incorporating this Addendum are issued with it, and bidders shall submit the revised Bid Form. On the revised Bid Form, price the porch ceilings and the 91 canopy painting in the Porch work line item, and the soffits, other exterior vents, and chimney limewash in the new Soffits, Vents, and Chimney line item, and hazard-material abatement in the new Hazardous-Material Abatement line item. Where this Addendum conflicts with the Invitation to Bid or the drawings, this Addendum governs.
The bid due date is being extended: bids are now due by 4:00 p.m. on November 6, 2026. Acknowledge receipt of Addendum 1 and Addendum 3 on the Bid Form.
1. Please confirm that Sharon Housing Trust, Inc (SHT). is a 501(c)(3) and that a tax-exempt certificate can be provided.
Yes.
2. Are the soffits staying or being replaced?
Yes. Replace all soffits on all three buildings. Remove and dispose of the existing soffit panels, vents, and trim, and install new vinyl soffit from the same manufacturer as the new siding (CertainTeed), with vented panels and matching trim; color to be selected by SHT. Provide at least the existing attic ventilation. This replaces ITB Section VII and Sheet Legend Note 7, which said the existing soffit would remain. This is added scope and is included in the Base Bid.
3. What is the anticipated timeline for this work?
We hope that the bidder selected can get started as soon as possible. However, we do anticipate that it could be a long order time for the windows, so that work may happen in early 2027, as long as weather conditions allow. We anticipate that there will be other items in the scope that can be done in advance of that. Realistic timeline will be discussed with the selected contractor.
4. Will there be new insulation put in?
Yes, the insulation work is being done separately, outside this scope, but it may have to be coordinated with this work. Cellulose insulation will be shot in from outside. We will discuss this with the selected contractor.
5. Will the small roofs over the front porch on building #91 be replaced?
No. The canopy roofs and shingles at 91 remain (Sheet Note 2). Remove the existing metal wrap at the posts and beam and re-wrap in new aluminum (Sheet Note 6). Re-wrap the fascia and rake in aluminum per ITB Section VII. Paint the gable end and canopy ceiling to match the new siding color. Painting the gable end and canopy ceiling is added scope and is included in the Base Bid.
6. Will the front step at Building #93 also be replaced?
Yes. The new front porch entry steps at 93 North Main Street are already included in the Base Bid under Building Modifications C and F (Sheet A-201; ITB Section VIII). This is not added scope. Price this work once, in the Building Modifications A–F line item on the Bid Form.
7. Bedroom windows must be egress windows; how should that be handled?
Yes, each bedroom needs at least one code-compliant egress window. Where an existing opening is too small, the code’s replacement-window provision applies: install the largest standard double-hung that fits the existing rough opening. Do not enlarge openings. Contractor to verify each bedroom window, obtain the building inspector’s approval before ordering, and notify SHT of any unit that won’t comply.
8. Are there any bathroom windows to be replaced?
Yes, so they will have to be tempered glass.
9. Is there any State Historic Preservation Office (SHPO) involvement?
Yes, all 3 buildings are under the purview of SHPO. Therefore, the underlying cedar shake siding along with any underlying porch wood columns, beams and trim must be preserved, in the process of removing the old vinyl siding and replacing it.
10. Have the building permits been acquired?
No, the contractor is responsible for that.
11. Is the replacement of the lattice work under the front porches included in the bid documents?
Yes. Replace all porch lattice and skirting with PVC or composite lattice (no wood) in a perimeter trim frame, color to match the new siding, per ITB Section VII and Sheet Note 8. This work is included in the Base Bid.
12. Will all the windows have grids?
Correction: grids are not shown correctly on the window schedule. Lite patterns are per the elevation drawings (Sheets A-200 to A-202), with simulated divided lites where shown. See ITB Section VI and Schedule Note 3.
13. Are all entry doors being replaced or just the front doors?
Only the six (6) apartment front entry doors are being replaced: 91 North Main Street D-1 and D-2; 93 North Main Street D-2 and D-3; and 95 North Main Street D-1 and D-2 (ITB Section VI). These are the entry doors themselves, not storm doors; no storm doors are included. Door D-1 at 93 North Main Street is replaced by a window under Building Modification B. The basement door at 95 North Main Street is also replaced. Rear doors D-4 and D-5 are not included. Existing porch screen doors are removed and not replaced (Sheet Note 4).
14. Are the vents being replaced?
Yes. Replace all existing exterior vents on all three buildings with new vents (soffit vents are replaced with the new soffit in Response 2), installed with the CertainTeed mounting blocks or accessories required by ITB Section VII. This is added scope and is included in the Base Bid.
15. Is CHRO approval required?
Per the Invitation to Bid: “State-funded requirements for an Affirmative Action Plan, applicable procurement requirements and goals, and compliance with and approval by the Connecticut Commission on Human Rights and Opportunities (CHRO) are required.”
16. Are the walls plaster?
Some might be, but it’s probably mostly sheetrock.
17. Are the vinyl porch ceilings of Buildings 93 and 95 being replaced?
Yes. Remove and replace the vinyl porch ceilings at Buildings 93 and 95 with new vinyl ceiling panels, color to be selected by SHT. This is added scope and is included in the Base Bid.
18. How should hazardous materials be treated?
A Hazardous Materials Assessment was conducted in 2023 (2023 Limited Hazmat Survey Report, Big East Environmental, Project #23622.01). The Operations and Maintenance Plan for Asbestos-Containing Materials and the 2024 Lead Management Plan are also available, and bidders shall review them before bidding. Lead based paint and asbestos presence was identified in different locations throughout the homes. All painted components of windows, trim and wood siding shall be treated as containing lead-based paint, with EPA lead-safe work practices (40 CFR § 745.85) and proper disposal. The windows in building 95 have asbestos in the glazing (approximately 24 units). These windows will be removed in-tact without disturbance to the glazing. The removal of those windows needs to be handled by a CT li-censed asbestos abatement contractor and disposed of in accordance with applicable transportation and disposal regulations. The Contractor is responsible for all hazardous-material abatement required for the work, and it is included in the Base Bid. Asbestos abatement shall be performed by a Connect-icut-licensed asbestos abatement contractor, and any lead abatement by a Connecticut-licensed lead abatement contractor; either may be the Contractor or its subcontractor. Suspect PCB-containing win-dow glazing and window and door caulking shall be sampled before it is disturbed, and any material confirmed to contain PCBs shall be removed and disposed of in accordance with EPA and Connecticut
DEEP requirements. This replaces the statement in ITB Section II that abatement is excluded from the Base Bid. Price this work in the Hazardous-Material Abatement line item on the revised Bid Form.
19. Will there be indoor storage?
There may be indoor storage, but it’s not confirmed. This is something we will discuss with the selected contractor.
20. Should the scope include anything for the cinderblock chimney on Building 95?
Limewash the cinderblock chimney on Building 95 with Romabio limewash; color to be selected by SHT. This is added scope and is included in the Base Bid.