20261020_SHT_SiteWalk_Windows_Questions_Final2.pdf

PDF 103 KB Posted

Attached to
Sharon Housing Trust: Siding, Windows, Doors, Trim, and Paint
Solicitation number
39372
Issued by
Middlesex County, Connecticut

About this file

This document is an Addendum 1 containing owner responses to requests for information for Sharon Housing Trust, Inc.'s Invitation to Bid for siding, windows, doors, trim, and paint work at three residential properties (91, 93, and 95 North Main Street) in Sharon, Connecticut. The scope of work includes removal and replacement of all existing windows, siding, and exterior trim; six apartment front doors; the basement door at 95 North Main Street; porch work; and building modifications at 93 North Main Street. The addendum clarifies and updates the scope to include replacement of all three soffit vents, new front step installation at Building #93, replacement of vinyl porch ceilings at Buildings 93 and 95, and limewashing of the cinderblock chimney on Building 95. A mandatory site walk occurred on October 20, 2026, with bids due by 4 p.m. on November 6, 2026. The anticipated timeline for work is flexible, with some items potentially completed in advance and window installation expected in early 2027 pending weather conditions and the material lead time. The contractor selected will be responsible for obtaining building permits and coordinating with ongoing insulation work to be performed separately.

Key technical requirements include installation of code-compliant egress windows in bedrooms without enlarging existing openings, installation of tempered glass in bathroom windows, and adherence to State Historic Preservation Office (SHPO) requirements to preserve underlying cedar shake siding and porch wood columns, beams, and trim. The contractor must address hazardous materials, including treating all painted components as containing lead-based paint with appropriate safety precautions and arranging for a Connecticut licensed asbestos abatement contractor to remove windows containing asbestos in the glazing at Building 95. Window lite patterns must follow elevation drawings with simulated divided lites as shown. Sharon Housing Trust is a 501(c)(3) organization and requires compliance with Connecticut Commission on Human Rights and Opportunities (CHRO) approval and an Affirmative Action Plan. Interested contractors should email LindsayL@thehousingcollective.org to be added to the interest list for receipt of updates and addendums.

View the file

Other files

File Type Posted
39372_Oct_26_26_solicitation_doc.pdf PDF
Addendum3_REVISED_Owner_Responses_Final.pdf PDF
39372_Nov_19_26_solicitation_doc.pdf PDF
Addendum3_REVISED_Invitation_to_Bid_Sharon_Homes_Final.pdf PDF
39372_Nov_4_26_solicitation_doc.pdf PDF
39372_Nov_10_26_solicitation_doc.pdf PDF
39372_Nov_18_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_39372_v2_Oct_29_26.pdf PDF
39372_Nov_2_26_solicitation_doc.pdf PDF
SHT_919395_Bid_Drawings_20261009.pdf PDF
HazMat report 91 93 95.pdf PDF
39372_Nov_9_26_solicitation_doc.pdf PDF
39372_Oct_20_26_solicitation_doc.pdf PDF
39372_Nov_6_26_solicitation_doc.pdf PDF
39372_Oct_29_26_solicitation_doc.pdf PDF
39372_Nov_11_26_solicitation_doc.pdf PDF
39372_Nov_3_26_solicitation_doc.pdf PDF
39372_Oct_28_26_solicitation_doc.pdf PDF
Addendum2_SHT_DateChange.pdf PDF
39372_Nov_12_26_solicitation_doc.pdf PDF
Invitation to Bid_Windows_Siding_Doors_Sharon Homes_FINAL_20261009.pdf PDF
39372_Nov_13_26_solicitation_doc.pdf PDF
SNM Ex 04.8.c 2 Lead Mgmt Plan 91-95 North Main Street Sharon.pdf PDF
24127.003 91-95 North Main Street Sharon CT ACM OandM Plan.pdf PDF
SHT_919395_Preliminary_Window_Door_Schedule_20261009.pdf PDF
39372_Nov_17_26_solicitation_doc.pdf PDF
39372_Nov_5_26_solicitation_doc.pdf PDF
39372_Oct_15_26_solicitation_doc.pdf PDF
39372_Oct_30_26_solicitation_doc.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHARON HOUSING TRUST

INVITATION TO BID FOR SIDING, WINDOWS, DOORS, TRIM, & PAINT

SHARON HOMES – 91, 93, 95 NORTH MAIN STREET

Addendum 1: Owner Responses to Requests for Information

1. Please confirm that Sharon Housing Trust, Inc (SHT). is a 501(c)(3) and that a tax-exempt certificate can be provided.

Yes.

2. Are the soffits staying or being replaced?

Replace all 3 soffit vents. Please note this addendum updates the scope of work to replace the soffits.

3. What is the anticipated timeline for this work?

We hope that the bidder selected can get started as soon as possible. However, we do anticipate that it could be a long order time for the windows, so that work may happen in early 2027, as long as weather conditions allow. We anticipate that there will be other items in the scope that can be done in advance of that. Realistic timeline will be discussed with the selected contractor.

4. Will there be new insulation put in?

Yes, the insulation work is being done separately, outside this scope, but it may have to be coordinated with this work. Cellulose insulation will be shot in from outside. We will discuss this with the selected contractor.

5. Will the small roofs over the front porch on building #91 be replaced?

No. The canopy roofs and shingles at 91 remain (Sheet Note 2). Remove the existing metal wrap at the posts and beam and re-wrap in new aluminum (Sheet Note 6). Re-wrap the fascia and rake in aluminum per ITB Section VII. Paint the gable end and canopy ceiling to match the new siding color. Consider this addendum as an update to the scope of work.

6. Will the front step at Building #93 also be replaced?

Yes, we will add this to the scope. Consider this an addendum as an update to the scope of work, to include replacing the front step at Building #93.

7. Bedroom windows must be egress windows; how should that be handled?

Yes, each bedroom needs at least one code-compliant egress window. Where an existing opening is too small, the code’s replacement-window provision applies: install the largest standard double-hung that fits the existing rough opening. Do not enlarge openings. Contractor to verify each bedroom window, obtain the building inspector’s approval before ordering, and notify SHT of any unit that won’t comply.

8. Are there any bathroom windows to be replaced?

Yes, so they will have to be tempered glass.

9. Is there any State Historic Preservation Office (SHPO) involvement?

Yes, all 3 buildings are under the purview of SHPO. Therefore, the underlying cedar shake siding along with any underlying porch wood columns, beams and trim must be preserved, in the process of removing the old vinyl siding and replacing it.

10. Have the building permits been acquired?

No, the contractor is responsible for that.

11. Is the replacement of the lattice work under the front porches included in the bid documents?

Yes, replace all lattice work and replace with lattice stained to match vinyl.

12. Will all the windows have grids?

Correction: grids are not shown correctly on the window schedule. Lite patterns are per the elevation drawings (Sheets A-200 to A-202), with simulated divided lites where shown. See ITB Section VI and Schedule Note 3.

13. Are all entry doors being replaced or just the front doors?

Only the 6 front entry storm doors are being replaced at this time. Any screen doors will be removed and not replaced.

14. Are the vents being replaced?

Yes, include all new vents.

15. Is CHRO approval required?

Per the Invitation to Bid: “State-funded requirements for an Affirmative Action Plan, applicable procurement requirements and goals, and compliance with and approval by the Connecticut Commission on Human Rights and Opportunities (CHRO) are required.”

16. Are the walls plaster?

Some might be, but it’s probably mostly sheetrock.

17. Are the vinyl porch ceilings of Buildings 93 and 95 being replaced?

Yes. Consider this addendum an update to the scope of work to include replacing the vinyl porch ceilings of Buildings 93 and 95.

18. How should hazardous materials be treated?

A Hazardous Materials Assessment was conducted in 2023. Lead based paint and asbestos presence was identified in different locations throughout the homes. All painted components of windows, trim and wood siding shall be treated as containing lead-based paint, with appropriate normal safety precautions and disposal. The windows in building 95 have asbestos in the glazing. These windows will be removed intact without disturbance to the glazing. The removal of those windows needs to be handled by a CT licensed asbestos abatement contractor and disposed of in accordance with applicable transportation and disposal regulations, which the contractor should be able to handle.

19. Will there be indoor storage?

There may be indoor storage, but it’s not confirmed. This is something we will discuss with the selected contractor.

20. Should the scope include anything for the cinderblock chimney on Building 95?

Limewash by Romabio color to be selected by SHT. Consider this addendum an update to the scope of work to include limewashing the cinderblock chimney on Building 95.