This is Addendum Two to the contract documents for the Upper ER Sanitary Sewer Improvements – Phase Two project issued by the City of Marietta Board of Lights and Water. The addendum revises the bid date to Wednesday, January 21, 2026 at 10:00 AM local time and was issued on Friday, January 16, 2026. The project involves construction of 2,450 linear feet of 12-inch DIP sanitary sewer using open cut methods, 532 linear feet of pipe burst replacement from existing 8-inch to 12-inch HDPE sanitary sewer, 811 linear feet of pipe burst replacement from existing 10-inch to 12-inch HDPE sanitary sewer, 60 linear feet of 24-inch steel casing, 26 sanitary sewer manholes to be replaced or rehabilitated totaling 232 vertical feet, bypass pumping, and site restoration. Bidders must acknowledge receipt of the addendum and are required to make a written oath per Georgia Code 36-91-21 subsection (e) before commencing work. The contractor must coordinate access and scheduling for work on private property through the Owner/Engineer and shall not enter private property outside of established easement limits without written authorization. Plans and specifications are available for public inspection at AtkinsRealis, 1600 Riveredge Parkway NW Suite 700, Atlanta, Georgia 30328.
Addendum Two modifies multiple sections of the specifications and construction drawings, including revisions to the Table of Contents, Advertisement for Bidders, Bid Form, and sections covering earthwork, pipe bursting sewer replacement, sanitary sewer service lateral reconnection and repair, and limited cast-in-place concrete and grouting. Drawing revisions include changes to manhole details, profile sheets, erosion control details, and construction monitoring plans. The addendum addresses ten bidder questions and clarifications, including modifications to payment width specifications for trench rock removal and asphalt replacement, requirements for DIPS OD HDPE pipe, pre-construction CCTV scope, backfill material specifications for paved areas, and an increased bid form quantity for asphalt paving to 6,100 square yards to accommodate possible curb-to-curb mill and overlay work. All contractors must receive plans and bid documents directly from the engineer to have their bids opened.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AtkinsRéalis - Baseline / Référence
CONTRACT ADDENDUM TWO
ATKINSREALIS Project No. 100073309
ADDENDUM NO: Two (2)
OWNER'S NAME: City of Marietta / Board of Lights and Water
PROJECT NAME: Upper ER Sanitary Sewer Improvements – Phase Two
REVISED BID DATE: Wednesday, January 21, 2026 at 10:00 AM, local time
DATE ISSUED: Friday, January 16, 2026
GENERAL:
1. Easements / Private Property Access. The Owner is in the process of obtaining easements on private property required for construction of the Work. The Owner anticipates that the portions of the Work requiring such easements will be available to the Successful Bidder for construction.
The Contractor shall coordinate access and scheduling for work on private property through the
Owner/Engineer. The Contractor shall not enter private property outside of established easement limits or without written authorization.
2. Before commencing the work, the Contractor is required to make an oath in writing per GA Code
§ 36-91-21 subsection (e).
SPECIFICATIONS:
3. Section 00005 – TABLE OF CONTENTS
a. Delete Table of Contents
b. Replace with a new Section 00005 – Table of Contents (Addendum 2)
4. Section 00100 – ADVERTISEMENT FOR BIDDERS
a. Delete Section 00100 – Advertisement for Bidders
b. Replace with a new Section 00100 – Advertisement for Bidders (Addendum 1)
5. Section 00300 – BID FORM
a. Delete Section 00300 – Bid Form
b. Replace with a new Section 00300 – Bid Form (Addendum 2)
6. Section 02200 – EARTHWORK
a. Add Section 02200 - Earthwork
7. Section 02720 – PIPE BURSTING SEWER REPLACEMENT
a. Delete Section 02720 – Pipe Bursting Sewer Replacement
b. Replace with a new Section 02720 – Pipe Bursting Sewer Replacement (Addendum 2)
8. Section 02737 – SANITARY SEWER SERVICE LATERAL RECONNECTION AND
REPAIR
a. Delete Section 02737 – Sanitary Sewer Service Lateral Reconnection And Repair
b. Replace with a new Section 02737 – Sanitary Sewer Service Lateral Reconnection And
Repair (Addendum 2)
9. Section 03007 – LIMITED CAST-IN-PLACE CONCRETE, GROUTING, AND FLOWABLE
FILL (CLSM)
a. Add Section 03007 – Limited Cast-In-Place Concrete, Grouting, and Flowable Fill
(CLSM)
DRAWINGS:
10. The following revisions are made to the Construction Drawings and are attached to and made part of this addendum:
i. C-01 – revised BLW Board of Directors
ii. G-01 – removed D-03 from the index and corrected the Erosion Control Detail sheets in index, added information to revisions chart
iii. D-03 – Deleted.
iv. P-03 – changed MH 36A to rebuild invert
v. P-04 – added abandon with grout to exist main under house, added remove and replace ring and cover to MH 42, changed exist pipe to HDPE between MH 41 and 42, dashed exist sewer and added outside drop to profile text for MH 37
vi. P-05 – added open cut note to Cherry Street, added replace ring and cover to MH 49
vii. ECC-01 – changed to 2026 checklist
viii. CMP-01 – revised text for where Monitor A is located
ix. CMP-02 – revised location of Monitor A
CONTRACTOR ACTION:
11. Acknowledge receipt of this addendum by writing in Addendum No. 2 on page 00300-1 of bid form. Failure to do so may subject the Bidder to disqualification.
BIDDER QUESTIONS:
These questions and clarifications are for information only and do not form part of the contract documents.
1. Does the pipe under 582 Etowah Drive (Sheet P-04) require grout filling?
Answer: Yes. See revised Sheet P-04 included with this addendum.
2. Can the plan holders list be provided?
Answer: Yes. See attached plan holder list as of this addendum.
3. With the recent holidays, a bid date extension of 1 week would help everyone provide you with their best numbers possible for a project of this size. Can this be granted?
Answer: This bidder question was responded to in Addendum 1. The Bid Opening Date is
Wednesday, January 21, 2026 at 10:00 AM (local time).
4. Can static burst allowed as the spec only references pneumatic. The 10” HDPE line on Sheet P-
04 will require a static machine due to the HDPE.
Answer: See revised specification 02720: PIPE BURSTING SEWER REPLACEMENT -
ADDENDUM 2.
5. Are there any roads that cannot be shut down during the construction?
Answer: The Contractor shall be responsible for obtaining and properly implementing all required lane/street closure permits and detours/signage. The Contractor shall maintain access to hospital facilities at all times.
6. Can the maximum payment width for trench rock removal equal to the nominal pipe diameter plus 24” be increased as this will not cover what is required to safely excavate and shore the trench. At a minimum, we will need to cut a 4’ wide trench where shoring is required.
Answer: The maximum payment width shall equal the greater of (a) the nominal pipe diameter plus 24 inches, or (b) 4 feet.
7. Can the maximum payment width for asphalt replacement equal to the nominal pipe diameter plus 48” be increased as this will not cover what is required to safely excavate and shore the trench. At a minimum, we will need to cut a 4’ wide trench where shoring is required then when you add the 12” over cuts on each side, this will require a 6’ wide trench cap and patch.
Answer: The maximum payment width shall equal the greater of (a) the nominal pipe diameter plus 48 inches, or (b) 6 feet.
8. The City Road asphalt replacement detail shows backfilling with Sand or GAB. If the soils removed are adequate to achieve minimum compaction requirements, can we backfill with the dirt removed from the trench?
Answer: No. Backfill within paved areas (including under pavement and within limits of pavement restoration) shall be GAB. Reuse of excavated soil is not permitted in paved areas unless specifically approved in writing by the Engineer.
9. Will PreCCTV & cleaning be required for the entire project or just for the sections to be pipe burst?
Answer: Pre-construction CCTV and cleaning will only be required for the sections of existing sewer that are to be replaced with new pipe in the proposed project, including proposed pipe burst and open-cut sections.
10. Is IPS or DIPS approved for the HPDE on this project?
Answer: See revised specification 02720: Pipe Bursting Sewer Replacement Addendum 2 requiring DIPS OD.
11. Can the location of the existing manhole upstream of proposed manhole #25 be identified for suction? This is on the existing line that runs through the property identified as “NOW OR
FORMERLY GREAT SOUTHERN REALTY, LLC.”.
Answer: According to the BLW Asset Map, the existing manhole upstream of proposed MH #25 is Ex-SSMH #400943 (ref: proposed MH # 28 on Sheet P-02).
12. Can mill and overlay curb to curb be included to the work on Avery, Wellons, Pine, and Etowah?
With the depths of these lines, the patches will be 7-9’ wide. And with most of these road having newer asphalt and pronounced crowns, patching will be difficult.
Answer: The Bid Form quantity for Asphalt Paving is revised to 6,100-SY to incorporate possible curb-to-curb mill and overlay if approved during construction by the Engineer. See revised specification 00300 BID FORM - ADDENDUM 2.
Approved by:
Joshua Becker
Joshua Becker, PE