ADDENDUM_NO_3_Lake_Ferns__2-5-25.pdf
PDF 106 KB Posted
- Attached to
- Lake Ferns Road Improvements
- Solicitation number
- ITB 25-PW-001
- Issued by
- Lake County, Florida
About this file
This is Addendum No. 3 to ITB-25-PW-001, issued by the City of Umatilla, Florida on February 5, 2025, for the Lake Ferns Road Industrial Park infrastructure improvement project. The addendum addresses three bidder questions and clarifies project requirements. Key changes include revising the Schedule of Values (SOV) to reflect corrugated plastic pipe (CPP) instead of concrete composite pipe (CCP), consistent with updated project plans. The City confirmed there are no minority or American-made requirements for this project. Regarding vegetation stripping from the Industrial Park site, the City clarified that contractors must include costs for hauling and disposing of stripping materials in their bids, with a corresponding line item added to the SOV. All prospective bidders are required to acknowledge receipt of this addendum by signing and submitting it with their sealed bids, which were due February 13, 2025.
The addendum does not contain pricing information, set-asides, or funding details. All bidders must acknowledge and return the addendum as part of their bid submission process to ensure compliance with the project's revised specifications and requirements.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 3
DATE: February 5, 2025
BID NO: ITB-25-PW-001
PROJECT: City of Umatilla, Lake Ferns Road Industrial Park
ALL PROSPECTIVE BIDDERS ARE HEREBY NOTIFIED OF THE
CHANGES OR ALTERATIONS IN THE ABOVE-REFERENCED
PROJECT
Questions from Bidders:
1. On response #19 you changed the pipe to CPP instead of CCP. These changes were only changed on the plans and not on the SOV.
Response: Revised SOV to CPP.
2. Are there minority requirements for this project?
Response: No.
3. Are there American made requirements on this project?
Response: No.
4. Will the vegetation stripping's from the Industrial Park site be suitable embankment material anywhere on site? If not, can they be stockpiled at the water treatment plant or will they need to be hauled off site and disposed of at contractors expense?
Response: Include in bid hauling and disposing of Stripping’s. Added line item to SOV.
ALL BIDDERS ARE REQUESTED TO ACKNOWLEDGE RECEIPT
OF THIS ADDENDUM BY SIGNING BELOW AND SUBMITTING
THE BID.
ACKNOWLEDGE RECEIPT- ADDENDUM NO. 3
NAME OF BIDDER ________________________________________________
SIGNATURE _____________________________________________________
TITLE ____________________________ DATE _________________________
File details come from the government source that posted it. Updated .