Addendum No. 3, dated February 5, 2025, is issued by the City of Umatilla for the Lake Ferns Road Industrial Park project, with the bid number ITB-25-PW-001. The addendum addresses several clarifications and modifications to the original bid documents, including a change in pipe specification from CCP to CPP and the addition of a line item for hauling and disposing of site strippings. The document confirms that there are no minority requirements or American-made product requirements for this project.
The addendum requires bidders to acknowledge receipt by signing and submitting the provided form with their bid. No specific pricing details are disclosed in this document. The key changes involve technical specifications and waste disposal expectations, which bidders must incorporate into their proposals. The document serves to provide official communication and updates to potential contractors, ensuring all bidders have the most current information for preparing their submissions for the Lake Ferns Road Industrial Park project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 3
DATE: February 5, 2025
BID NO: ITB-25-PW-001
PROJECT: City of Umatilla, Lake Ferns Road Industrial Park
ALL PROSPECTIVE BIDDERS ARE HEREBY NOTIFIED OF THE
CHANGES OR ALTERATIONS IN THE ABOVE-REFERENCED
PROJECT
Questions from Bidders:
1. On response #19 you changed the pipe to CPP instead of CCP. These changes were only changed on the plans and not on the SOV.
Response: Revised SOV to CPP.
2. Are there minority requirements for this project?
Response: No.
3. Are there American made requirements on this project?
Response: No.
4. Will the vegetation stripping's from the Industrial Park site be suitable embankment material anywhere on site? If not, can they be stockpiled at the water treatment plant or will they need to be hauled off site and disposed of at contractors expense?
Response: Include in bid hauling and disposing of Stripping’s. Added line item to SOV.
ALL BIDDERS ARE REQUESTED TO ACKNOWLEDGE RECEIPT
OF THIS ADDENDUM BY SIGNING BELOW AND SUBMITTING
THE BID.
ACKNOWLEDGE RECEIPT- ADDENDUM NO. 3
NAME OF BIDDER ________________________________________________
SIGNATURE _____________________________________________________
TITLE ____________________________ DATE _________________________