ADDENDUM_NO_2_Lake_Ferns__1-31-25.pdf

PDF 125 KB Posted

Attached to
Lake Ferns Road Improvements
Solicitation number
ITB 25-PW-001
Issued by
Lake County, Florida

About this file

This is Addendum No. 2 dated January 31, 2025, for the City of Umatilla's Lake Ferns Road Industrial Park Project (Bid No. ITB-25-PW-001). The addendum addresses multiple bidder questions concerning project specifications, including fence requirements, maintenance of traffic, subcontractor listing, roadway construction, and site access. Key clarifications include confirming $4.8 million in grant funding, specifying a 6' chain link fence with 3 strands of barbed wire, establishing road construction methods, and providing guidance on site access and traffic management during construction.

The document reveals that the project involves roadway improvements with specific technical requirements, such as using SP12.5 asphalt with a maximum 25% recycled asphalt pavement (RAP), installing splash pads at mitered inlet sections, and constructing roadways with F-curb on the north side and ribbon curb on the south side. The city indicates that while the original project estimates were around $2.7 million, the current grant funding is $4.8 million. The addendum also clarifies site-specific details like existing dirt roads, irrigation removal, and access to the Wastewater Treatment Plant site, providing potential bidders with comprehensive information to prepare accurate project proposals.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

DATE: January 31, 2025

BID NO: ITB-25-PW-001

PROJECT: City of Umatilla, Lake Ferns Road Industrial Park

ALL PROSPECTIVE BIDDERS ARE HEREBY NOTIFIED OF THE

CHANGES OR ALTERATIONS IN THE ABOVE-REFERENCED

PROJECT

Questions from Bidders:

1. Can the city confirm the engineer’s estimate for TB-25-PW-001 Lake Ferns Road Industrial Park Project is $4,800,000.00 as stated during the pre-bid meeting?

Response: $4.8 Mil is the grant funding available for this project. We do not have an engineer’s estimate, however bids last year came in at $2.7mil.

2. Regarding the temporary fence for ITB-25-PW-001 Lake Ferns Road Industrial Park Project, which the city confirmed can be substituted in with permanent fence during the pre-bid meeting, where will it be installed & do you have details. As of now, I’m assuming FDOT Type ‘B’ Fence & it will be located at the limits of disturbance on Sheet C500. If the city wishes us to stick to using temporary fencing, what are the minimum requirements (height, railing OR tension wires, etc.)?

Response: no need for temporary fencing, please bid only fence removal and construction of new 6’ chain link fence with 3 strands barbed wire on top similar to existing fence. FDOT type B fence with 3 strand barb wire attachment.

3. In Section 00300: Bid Form, we are asked to provide with our bids Section 301-A:

Subcontractor Listing. However, the subcontractor listing form was NOT provided within the Specifications & Contract Documents. Do we A) need to be provided one, B) need to make our own, or C) not need to provide a list of subcontractors? If “B”, what information about the subcontractors are we supposed to provide?

Response: Section 301-A document added to this addendum for your use.

4. Regarding the maintenance of traffic for ITB-25-PW-001 Lake Ferns Road Industrial Park Project, I noticed we will be blocking access from Golden Gem Dr. into Umatilla Wastewater Treatment Facility. For employees or visitors to enter the facility, A) would they be able to take Crest Haven Rd. to reach the other end of Lake Ferns Rd., B) would we work on only one (1) lane of Lake Fern at a time, or C) would we only allow business traffic into Lake Fern as we work both lanes? I’m asking because the majority of Crest Haven Rd. & Lake Ferns Rd. are private roads that are gated off as private property & I do not know if the CITY or someone else owns that property Response: The only traffic along Lake Ferns Road is for City Employees to the Wastewater Plant site. Contractor to Construct Lake Ferns Road in halves or other means acceptable to the City to maintain access to the WWTP site. Lake Ferns Road ends just past the WWTP site and does not connect to Crest Haven Rd. (google maps is not correct)

5. Regarding the existing wire fence that lies right-on the east & west property lines, do they need to be removed?

Response: Fence along south and west property line to be removed. Fence along east property line to remain against mobile home park. All trees within 5 ft of the eastern property line against the mobile home park are to remain.

On sheet C-300, there is a note which points to a single sprinkler head which states, "exist. sprinklers & irrigation pipes to be removed during demo for Phillips Manufacturing Project". Would we have to remove any irrigation within the property line OR is it warning us that nearby irrigation will be removed during a separate project?

Response: Phillips Mfg. is a separate adjacent private project that is on hold. The City has removed all the spray field irrigation heads and pipes since the plans were finalized.

No irrigation to remove.

6. In response #2 you stated all MES will get a splash pad and that the plans would be updated to show each MES having a splash pad. I see on the plans now all have a splash pad except for the two 36" MES. Just wanted to verify when you say ALL that you mean for 36" MES as well if so, please update the line item for 36" MES to add splash pad.

Response: Added Splash pad to the westerly 36” MES in the large ditch, east side splash pad not needed.

7. In response #5 you stated there would be a line item added for the Geogrid. I do not see that on the new SOV.

Response: line item added for North American Vmax C-350 Permanent Turf and Earth Reinforcement Mat System.

8. It shows on the new set of plans a 16' double swing gate. On the SOV it still shows a 28' double swing gate. Will this get updated?

Response: Revised SOV to 20’ Cantilevered Slide Gate.

9. Regarding asphalt pavement, is 2" SP-12.5 an acceptable substitute for 2" SP-9.5? Also, what is the minimum allowable RAP %?

Response: Yes, SP12.5 is acceptable, and 25% RAP Max will be accepted.

10. What, if any, coordination is required with the city to drive onto the project site of Lake Ferns to view the existing decommissioned RIBS/Sprayfields and overall site conditions?

Response: Coordinate with Aaron Mercer or Vaughan Nilson for access. Lake Ferns Road is open, and the old RIBS site should be open.

11. Are the existing dirt roads within the Lake Ferns site stabilized with any particular material, or are they only dirt?

Response: Within Lake Ferns site (RIB site) is all just compacted dirt roads.

12. Can you confirm that the 'Demo Hatch Typical' gray area indicates the demolition of the existing dirt roads on and around the Lake Fern site, as well as the existing RIB/Sprayfield ponds?

Response: The hatched area within the RIBs site is over the existing dirt roads, really nothing to demo here, as they are just dirt roads.

13. Can you confirm that grading is not required in the swale on the north side of Lake Fern Road, as no elevations are provided?

Response: Swale is existing and overgrown, no grading is anticipated, just cleaning/clearing the ditch to restore to pre vegetation growth condition. Ditch has not been maintained in years and scope is to remove trees and reshape ditch and restabilize.

14. The plans show splash pads in the new ponds at the end of each mitered inlet section, but there are no callouts or details provided. Should we reference the flume splash pad detail, or is there another detail we should use?

Response: Detail for splash pad was added to sheet C-800 dated 1/24/2025 Addendum 1.

15. Can you confirm that F-curb is required only on the north side of Lake Fern Road and ribbon curb only on the south side?

Response: Confirm, road is pitched to drain to north into the F curb and to flumes into the ditch, south side of the road is ribbon curb.

16. It appears that both temporary and permanent chain-link fences are planned along the south side of Lake Fern Road. Can you confirm the precise areas where each type of fence will be installed? The extent of fencing is unclear.

Response: No need for temporary fencing, please bid only fence removal and construction of new 6’ chain link fence with 3 strands barbed wire on top similar to existing fence. FDOT type B fence with 3 strand barb wire attachment.

17. Can the city or engineer indicate at what stage of the project the temporary fence should be installed, removed, and then replaced with the permanent fence?

Response: Eliminate temporary fencing.

18. Can the city or engineer provide a detail for the chain-link fence?

Response: FDOT type B fence 6’ with 3 strand barb wire attachment.

19. Based on our research, 24” CCP pipe, as shown on page C-620, cannot be installed on pipes smaller than 30 inches in diameter. Given this limitation, it appears that the work cannot be completed as currently designed. Does the city have an alternative method they would prefer for this work?

Response: Pipe was mislabeled from survey, the existing pipe material is corrugated plastic pipe, CPP. Looks to be ADS or similar.

20. Will Lake Ferns Road need to remain operational during construction, or can it be fully closed? Our preference would be a full closure to expedite the work.

Response: See response to #4 above.

ALL BIDDERS ARE REQUESTED TO ACKNOWLEDGE RECEIPT OF THIS

ADDENDUM BY SIGNING BELOW AND SUBMITTING THE BID.

ACKNOWLEDGE RECEIPT- ADDENDUM NO. 2

NAME OF BIDDER ________________________________________________

SIGNATURE _____________________________________________________

TITLE ____________________________ DATE _________________________