The document is a Schedule of Unit Prices for the City of Umatilla's Lake Ferns Road Industrial Park project, detailing a comprehensive infrastructure improvement initiative. The schedule provides a detailed breakdown of unit prices for various construction activities across five main categories: General, Site Work, Roadway, Storm, Water, and Sewer. The project encompasses a wide range of infrastructure elements including mobilization, permit compliance, site clearing, earthwork, road construction, storm drainage systems, water mains, and sewer infrastructure. The unit price schedule allows for flexible pricing and potential adjustments in quantities of work, with units ranging from lump sum (LS) to linear feet (LF), square yards (SY), cubic yards (CY), and each (EA).
The document specifies that the unit prices represent the exact net amount to be paid by the contractor for additions or increases, or to be refunded by the owner for decreases. No additional adjustments will be allowed for overhead, profit, insurance, or other direct or indirect expenses. The bidder is responsible for performing necessary tests and calculations to determine required quantities. The pricing structure is designed to provide transparency and flexibility, with the owner having the option to use these unit prices as the basis for payment or credit when work quantities change. The schedule covers a comprehensive range of infrastructure components, suggesting a significant and complex municipal development project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item # Description Quantity Unit Unit Price Amount
GENERAL
1 Mobilization LS 2 NPDES Permit & Compliance LS 3 Construction Layout Survey LS 4 As-built Survey LS 5 Testing LS 6 Maintenance of Traffic LS 7 Silt Fence LF 8 Remove Chain Link Fence LF 9 6' Chain Link w/ Barb Wire w/ 3 Strands LF
10 20' Cantilevered Slide Gate EA 11 Demo LS 12 Floating Turbidity Barrier LF
SUB-TOTAL
SITE WORK
13 Clear & Grubb ROW AC 14 Clear Ditch AC 15 Clear Site AC 16 Earthwork Cut CY 17 Earthwork Fill CY 18 Final Grading SY 19 Seed & Mulch SY 20 Sod SY 21 Haul and Dispose of Strippings CY
SUB-TOTAL
3. The Unit Prices shall represent the exact net amount per unit to be paid by the Contractor (in the case of additions or increases) or to be refunded by the Owner (in the case of decrease). No additional adjustments will be allowed for overhead, profit, insurance, or to other direct or indirect expenses of the Contractor or Subcontractors, and no additional adjustments will be allowed.
City of Umatilla Lake Ferns Road Industrial Park
Schedule of Unit Prices
1. It shall be the responsibility of the BIDDER to perform whatever tests and/or calculations as are necessary to determine quantities required for the performance of the work described herein.
2. Should certain additional work be required, or should the quantities submitted by the Contractor of certain classes of work be increased or decreased from those required by the Contract Documents, by authorization of the Owner, the unit prices contained in the following Schedule of Unit Prices shall, at the option of the Owner, be the basis of payment to the Contractor credit to the Owner, for such increase or decrease in the work.
ROADWAY
22 2" SP 9.5 Asphalt SY 23 8" Limerock SY 24 12" Stabilized Subgrade SY 25 12" Ribbon Curb LF 26 Type "F" Curb LF 27 Drop Curb LF 28 Street Signs EA 29 Pavement Marking LS
SUB-TOTAL
STORM
30 Storm Manhole EA 31 Type "F" Inlet w/ Skimmer EA 32 Type "F" Inlet EA 33 Type "F" Inlet w/ J Bottom EA 34 18" MES w/ Splash Pad EA 35 30" MES w/ Splash Pad EA 36 36" MES w/ Splash Pad EA
37 36" MES EA
38 18" RCP LF
39 24" RCP LF
40 30" RCP LF
41 36" RCP LF
42 24" CPP LF
43 Concrete Flume w/ Splash Pad EA 44 Concrete Weir LS 45 North American Vmax C-350 SY 46 Concrete Jacket Index 425-001 EA
SUB-TOTAL
WATER
47 4" PVC Watermain LF 48 10" PVC Watermain LF
49 10" DIP LF
50 4" Gate Valve EA 51 10" Gate Valve EA 52 4" Plug EA 53 10" Plug EA
54 12" HDPE LF
55 12" Gate Valve EA 56 12" HDPE to 10" DIP Transition EA 57 10" x 4" Tee EA 58 10" 22.5° Bend EA 59 10" 45° Bend EA 60 10" 90° Bend EA 61 Fire Hydrant Assembly EA 62 Thrust Restraint EA 63 Pressure Test LS 64 Bactees LS
SUB-TOTAL
SEWER
65 4" PVC Force Main LF
66 4" DIP LF
67 4" x 12" Wet Tap w/ Tapping Sleeve & Valve EA 68 4" 45° Bend EA 69 4" 90° Bend EA 70 4" Plug Valve EA 71 4" Wye EA 72 4" Cap EA 73 4" x 4" Tee EA 74 Pressure Test LS 75 Air Release Valve EA
Subtotal 110% Payment & Performance Bond Total Price
TOTAL BASE BID PRICE for the contract sum (Sum of items 1-75 and Bond)