This document is a Schedule of Unit Prices for the City of Umatilla's Lake Ferns Road Industrial Park project, detailing a comprehensive infrastructure development opportunity. The schedule covers multiple project categories including General, Site Work, Roadway, Storm, Water, and Sewer work, with line items spanning mobilization, environmental permits, surveys, earthwork, infrastructure installation, and various utility system components. The document provides a detailed breakdown of construction activities with units of measurement including lump sum (LS), linear feet (LF), square yards (SY), cubic yards (CY), and each (EA), allowing for precise pricing and potential quantity adjustments throughout the project.

The unit pricing structure is designed to provide flexibility for the owner, with the document explicitly stating that unit prices represent the exact net amount per unit to be paid or refunded, with no additional adjustments allowed for overhead, profit, insurance, or other direct or indirect expenses. The pricing schedule enables the owner to increase or decrease work quantities by authorization, using the established unit prices as the basis for payment or credit. While specific monetary values are not filled in, the document provides a comprehensive framework for bidders to propose pricing for an extensive infrastructure development project that includes roadway, water, sewer, and stormwater system improvements.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item # Description Quantity Unit Unit Price Amount

GENERAL

1 Mobilization LS 2 NPDES Permit & Compliance LS 3 Construction Layout Survey LS 4 As-built Survey LS 5 Testing LS 6 Maintenance of Traffic LS 7 Silt Fence LF 8 Remove Chain Link Fence LF 9 6' Chain Link w/ Barb Wire w/ 3 Strands LF

10 20' Cantilevered Slide Gate EA 11 Demo LS 12 Floating Turbidity Barrier LF

SUB-TOTAL

SITE WORK

13 Clear & Grubb ROW AC 14 Clear Ditch AC 15 Clear Site AC 16 Earthwork Cut CY 17 Earthwork Fill CY 18 Final Grading SY 19 Seed & Mulch SY 20 Sod SY

SUB-TOTAL

3. The Unit Prices shall represent the exact net amount per unit to be paid by the Contractor (in the case of additions or increases) or to be refunded by the Owner (in the case of decrease). No additional adjustments will be allowed for overhead, profit, insurance, or to other direct or indirect expenses of the Contractor or Subcontractors, and no additional adjustments will be allowed.

City of Umatilla Lake Ferns Road Industrial Park

Schedule of Unit Prices

1. It shall be the responsibility of the BIDDER to perform whatever tests and/or calculations as are necessary to determine quantities required for the performance of the work described herein.

2. Should certain additional work be required, or should the quantities submitted by the Contractor of certain classes of work be increased or decreased from those required by the Contract Documents, by authorization of the Owner, the unit prices contained in the following Schedule of Unit Prices shall, at the option of the Owner, be the basis of payment to the Contractor credit to the Owner, for such increase or decrease in the work.

ROADWAY

21 2" SP 9.5 Asphalt SY 22 8" Limerock SY 23 12" Stabilized Subgrade SY 24 12" Ribbon Curb LF 25 Type "F" Curb LF 26 Drop Curb LF 27 Street Signs EA 28 Pavement Marking LS

SUB-TOTAL

STORM

29 Storm Manhole EA 30 Type "F" Inlet w/ Skimmer EA 31 Type "F" Inlet EA 32 Type "F" Inlet w/ J Bottom EA 33 18" MES w/ Splash Pad EA 34 30" MES w/ Splash Pad EA 35 36" MES w/ Splash Pad EA

36 36" MES EA

37 18" RCP LF

38 24" RCP LF

39 30" RCP LF

40 36" RCP LF

41 24" CCP LF

42 Concrete Flume w/ Splash Pad EA 43 Concrete Weir LS 44 North American Vmax C-350 SY 45 Concrete Jacket Index 425-001 EA

SUB-TOTAL

WATER

46 10" PVC Watermain LF

47 10" DIP LF

48 10" Gate Valve EA 49 10" Plug EA

50 12" HDPE LF

51 12" Gate Valve EA 52 12" HDPE to 10" DIP Transition EA 53 10" 22.5° Bend EA 54 10" 45° Bend EA 55 10" 90° Bend EA 56 Fire Hydrant Assembly EA 57 Thrust Restraint EA 58 Pressure Test LS 59 Bactees LS

SUB-TOTAL

SEWER

60 4" PVC Force Main LF

61 4" DIP LF

62 4" x 12" Wet Tap w/ Tapping Sleeve &

Valve EA 63 4" 45° Bend EA 64 4" 90° Bend EA 65 4" Plug Valve EA 66 4" Wye EA 67 4" Cap EA 68 4" x 4" Tee EA 69 Pressure Test LS 70 Air Release Valve EA

Subtotal 110% Payment & Performance Bond Total Price

TOTAL BASE BID PRICE for the contract sum (Sum of items 1-70 and Bond)

(In Words) (In Figures)

Lake Ferns & N-S Road & Storm