Addendum No 2 RFI list 11102026.pdf

PDF 87 KB Posted

Attached to
Katharine Hepburn Cultural Arts Center Expansion
Solicitation number
39702
Issued by
Middlesex County, Connecticut

About this file

This Addendum No. 2, issued November 10, 2026, provides revised responses to proposer questions regarding the Katharine Hepburn Cultural Arts Center Expansion in Old Saybrook, Connecticut. The project is a municipal undertaking funded by municipal bonds and private donations, requiring Construction Manager at Risk services for a two-story, 7,290 square-foot addition and 1,396 square-foot interior renovation to remain operational throughout construction. The original proposal due date of November 16, 2026, has been extended one week to November 23, 2026. The addendum clarifies that site visits are not mandatory but available upon request, and construction documents are complete and ready for trade contractor bidding. The anticipated Construction Phase duration is twelve months, with the Owner and Construction Manager expected to work collaboratively on early release work where feasible. Post-award, pre-construction services including trade package assembly, public bidding, and guaranteed maximum price establishment are expected to take approximately two months.

The project requires adherence to Connecticut prevailing wage rates pursuant to Connecticut General Statute 31-53 et seq., 100% performance and labor/materials payment bonds, and non-discrimination compliance per Connecticut General Statute 4a-60; however, no minority business enterprise, women's business enterprise, or disadvantaged business enterprise set-aside goals apply due to the absence of state funding. Trade contractors will be competitively bid and awarded to the lowest responsible and qualified bidder. Construction Manager selection is quality-based with price as a factor. The cost proposal must segregate expenses according to the Cost Allocation Matrix and include a monthly general conditions/general requirements cost that will adjust once the final Construction Phase duration is established. A railroad protective liability insurance requirement listed in the original solicitation was identified as a typographical error and is not required. Proposals remain open for 90 days following submission, and the selected firm will execute a contract based on modified AIA Document A133-2019 terms.

View the file

Other files

File Type Posted
39702_Nov_3_26_solicitation_doc.pdf PDF
39702_Nov_27_26_solicitation_doc.pdf PDF
39702_Nov_13_26_solicitation_doc.pdf PDF
39702_Nov_4_26_solicitation_doc.pdf PDF
Exhibit F CM Cost Allocation Matrix.pdf PDF
39702_Nov_10_26_solicitation_doc.pdf PDF
39702_Nov_24_26_solicitation_doc.pdf PDF
39702_Nov_2_26_solicitation_doc.pdf PDF
Addendum No 4 RFI 11182026.pdf PDF
Addendum No 3 KATE 11 12 2026.pdf PDF
KHCAC CONSTRUCTION DOCUMENTS.pdf PDF
Exhibit D A133 2019 Exhibit B Ins Bond.pdf PDF
39702_Nov_12_26_solicitation_doc.pdf PDF
39702_Nov_25_26_solicitation_doc.pdf PDF
Adendum No 1 RFI list 11092026 V2.pdf PDF
39702_Nov_26_26_solicitation_doc.pdf PDF
39702_Nov_17_26_solicitation_doc.pdf PDF
KHCAC CD PROJECT MANUAL.pdf PDF
Exhibit B Schedule.pdf PDF
39702_Nov_20_26_solicitation_doc.pdf PDF
39702_Nov_6_26_solicitation_doc.pdf PDF
Addendum No 5 RFI 11192026.pdf PDF
39702_Nov_19_26_solicitation_doc.pdf PDF
Exhibit D A201 2017CC 101 thru 228.pdf PDF
39702_Nov_23_26_solicitation_doc.pdf PDF
Exhibit D A201 2017CC 1 thru 100.pdf PDF
39702_Nov_5_26_solicitation_doc.pdf PDF
KHCAC RFQP.pdf PDF
39702_Nov_11_26_solicitation_doc.pdf PDF
39702_Nov_18_26_solicitation_doc.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

REQUEST FOR INFORMATION (RFI)

The Katharine Hepburn Cultural Arts Center Expansion

Town of Old Saybrook, Connecticut

Date Issued: November 10, 2026

This Addendum #2 supersedes Addendum No. 1 dated November 9, 2026. The following are revised responses to questions posed by potential proposers. All proposers are to incorporate the responses in their respective proposals.

Q1 Will the State of CT be providing any funding for this project? If so, will there be any requirements for project administration such as Public Bidding of Trade Packages, Payment of Prevailing Wages or other requirements that are typically part of such funding? If so, please provide a list of these requirements.

A1 No State of Connecticut funding. The project is funded by municipal bonds and private donations from the Kate. The project is, however, a municipal project and the following requirements apply:

• Prevailing wage rates pursuant to Conn. Gen. Stat. § 31-53, et seq. are required.

• Trade Contractor Packages will be publicly bid. See, answer to Q2.

• A 100% performance bond and 100% labor and materials payment bond are required.

• Compliance with non-discrimination in accordance with Conn. Gen. Stat.

§ 4a-60 is required, but there are no MBE/WBE/DBE set aside goals as there is no funding from the State of Connecticut.

Q2 Does the Town of Old Saybrook have any municipal requirements for procurement such as those.

A2 Old Saybrook adopted most Connecticut state bidding requirements. The Town’s requirements can be viewed under Bidding on the Town’s website. In sum, the selection of the Construction Manager will be quality based with price as a factor.

Trade contractors for the project will be competitively bid in a public solicitation and awarded to the lowest, responsible and qualified bidder.

Q3 The schedule provided in Exhibit B does not include a timeline for post award, pre-construction services such as Trade Package Assembly and Bidding, Scope Reviews or Development of the GMP. When are these tasks anticipated to occur?

A3 Immediately following proposal due date the Owner will begin the process of selecting a Construction Manager. It is understood that the selection of the Construction Manager, the assembly of trade packages, public bidding of the trade packages, and the establishment of the guaranteed maximum price will take time.

The Owner hopes to limit the duration of CM selection and GMP establishment to approximately two (2) months. The Construction Phase is intended to begin after the establishment of the GMP, but the Owner and CM are expected to work together and consider early release work to the extent feasible and practical. The twelve (12) month Construction Phase duration set forth in Exhibit B is the Owner’s desired duration for the Construction Phase. The amount for lump sum general conditions and general requirements requested by the Cost Proposal (Exhibit E) shall be based on the twelve (12) month Construction Phase duration. Costs shall be segregated in accordance with the Cost Allocation Matrix (Exhibit F). This is segregation and allocation is required to enable the Owner to fairly compare and evaluate costs.

However, the Cost Proposal (Exhibit E) requires a monthly general conditions/general requirements cost, which will be used to adjust the general conditions/general requirements up or down, once a final Construction Phase duration is established in the GMP Amendment.

Q4 We did find the specifications on the website and want to confirm how bids are being submitted.

A4 Please read KHCAC RFQP (PDF) for submissions.

Q5 Insurance It shows you require railroad protective liability insurance.

A5 This is a typo and not a required insurance for this project.

Q6 Extension of proposal due date to better understand the project.

A6 Extension of one week is granted Proposal Due Date 11/23/2026.

Q7 Site visit required prior to proposal submission.

A7 No, however any firm can request a site visit if needed.

https://www.oldsaybrookct.gov/DocumentCenter/View/8067?bidId=13