ADDENDUM NO 2 ARFQ DEP27-01 McAlpin (Lambert) Landslide.pdf
PDF 2 MB Posted
- Attached to
- AML - Mcalpin (Lambert) Landslide State and local contract opportunity
- Solicitation number
- ARFQ 0313 DEP2700000001 3
- Issued by
- Hampshire County, West Virginia
About this file
This is Addendum No. 2 to an Agency Request for Quote (ARFQ DEP27-01) issued by the West Virginia Department of Environmental Protection, Division of Land Restoration, Office of Abandoned Mine Lands and Reclamation for the McAlpin (Lambert) Landslide project. The solicitation encompasses mine dewatering, horizontal directional drilling (HDD), soil removal and backfilling, access road construction, removal of two Texas Road crossings with culvert installation, channel improvements, underdrain installation, and drainage improvements across multiple properties. The project includes construction of an HDD pad access road, removal of soil mass in the landslide area, installation of a temporary trap during dewatering and HDD operations, and construction of permanent access roads. Dewatering activities require up to four borings (contractor paid only for actual footage installed), with operations ceasing when water levels reach one foot or less above mine floor. The vendor questions deadline is August 19, 2026, at 4:00 PM EST, and the bid opening is scheduled for September 2, 2026, at 10:00 AM. All bids must be submitted electronically through the wvOASIS website. The project completion term is 365 calendar days with a $1,000 per day liquidated damage clause for delays. Tree clearing is restricted between March 31 and November 15, and landowners request no work during Thanksgiving week with advance notice for site visits.
The engineers' opinion of probable construction costs is $4,148,601. Prior to issuance of a Notice to Proceed, the contractor must be designated as "Co-Applicant #1" on the National Pollutant Discharge Elimination System stormwater permit application and shall assume responsibility for associated permit fees and violation fines. All suppliers, materials, proposed mixes, and required submittals must be approved by Potesta & Associates, the design consultant, prior to Notice to Proceed. The project requires compliance with West Virginia Division of Highways Case A-6 traffic control standards and an MM109 Highway Occupancy Permit, which has been obtained. Specific technical requirements include HDD specifications detailed in Section 18 of the specifications, prohibition of boring and jacking methods, and utilization of Rotating Magnetic Ranging System (RMRS) sensors installed in target borings to guide the pilot hole drill head. The design team includes Dave Sharp, PE, Project Manager; Chad Griffith, PE, Senior Engineer; and Claire McDonald, Staff Engineer from Potesta & Associates, with Eric Simpson as Regional Engineer and Justin Haymond as Construction Representative from the Fairmont Abandoned Mine Land office.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Final_ARFQ_0313_DEP2700000001_2_WV_ARFQ_FORM.PDF | ||
| SOLICITATION DOCUMENTS FILE 2_ARFQ_0313_DEP2700000001_1_AML Mcalpin (Lambert) Landslide.pdf | ||
| Final_ARFQ_0313_DEP2700000001_3_WV_ARFQ_FORM.PDF | ||
| Final_ARFQ_0313_DEP2700000001_1_WV_ARFQ_FORM.PDF | ||
| ADDENDUM NO 1 ARFQ DEP27-01 MCALPIN (LAMBERT) LANDSLID3E.pdf | ||
| SOLICITATION DOCUMENTS FILE 1_ARFQ_0313_DEP2700000001_1_AML Mcalpin (Lambert) Landslide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
DEP2700000001
1. To publish vendor questions and answers
2. To publish Pre-Bid Conference Checklist
3. To publish pre-bid sign-in sheet
Addendum #2 McAlpin (Lambert) Landslide
ARFQ DEP27000000001
The following are questions that were identified at the Pre-Bid Conference (PBC) conducted on-site on August 5, 2025, questions provided to the WVDEP Procurement, Project Clarifications, Project Notes, Project changes, Technical Specification Changes, and Project Plan Changes. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.
QUESTIONS AND ANSWERS
NA
PRE-BID QUESTIONS AND ANSWERS
Q1. How does the contractor determine when dewatering is complete?
A1. Refer to Section 9.3.1 of the Technical Specifications regarding construction methods of Mine Dewatering. According to the specifications, “Dewatering operations may cease when the water level in the existing piezometers indicate 1 foot or less of water from the mine floor.”
Q2. Why do the specifications require boring into the coal pavement for the dewatering holes?
A2. Refer to Section 9.3.1 of the Technical Specifications regarding construction methods of Mine Dewatering. According to the specifications, the bottom 20 feet of the 12-inch PVC casing pipe shall be perforated and shall socket 10-feet into the coal pavement to allow for placement of the Rotating Magnetic Ranging System (RMRS) sensor as described in the Specification Section 18.2.9.
Q3. How does the contractor abandon the vertical dewatering holes?
A3. Refer to Section 9.3.3 of the Technical Specifications. The piezometers and boreholes must be removed and abandoned by a person who has been certified by the State of West Virginia in accordance with 47CFR59 “Monitoring Well Regulations”.
Q4. Will there be any leniency in specs for HDD – for example using welded casing instead of threaded casing?
A4. Changes can be requested and submitted to the engineer for review.
REVISED SPECIFICATIONS
REVISED DRAWINGS
ATTACHMENT A
Addendum #2
ARFQ DEP27000000001
CLARIFICATIONS, NOTES, AND CHANGES
REVISED BID SCHEDULE ( Submitted separately)
PRE-BID SIGN IN SHEETS
ATTACHED
PRE-BID CONFERENCE CHECKLIST
ARFQ 0313 DEP27000000001
West Virginia Department of Environmental Protection Division of Land Restoration (DLR)
Office of Abandoned Mine Lands and Reclamation (AMLR)
Everyone please sign the sign-in sheet. Anyone not signed in will not be eligible to bid on this project.
1. Bidding documents are available on the wvOASIS website www.wvoasis.org
2. All bidders must have a wvOASIS Vendor Self Service account in order to submit electronic bids. Paper bids will not be accepted.
3. The Vendor Questions Deadline is August 19th, 2026 at 4:00 PM (EST).
4. Bid Opening Date is September 2, 2026, at 10:30 am. All bids are to be submitted electronically through wvOASIS.
5. Prior to issuing a Notice to Proceed for Construction activities, the Contractor must submit the required documentation to be named as “Co-Applicant # 1” on the National Pollutant Discharge Elimination System storm water permit application. A Notice to Proceed will not be issued until the Contractor signs the co-applicant form and submits it to the Office of Abandoned Mine Lands via POTESTA. Once the transfer has been completed, the Contractor shall be responsible for any fees associated with violations or fines assessed against the project.
6. Contractor will have 365 calendar days to complete this project, and the $1,000 per day liquidated damage clause is in effect for each working day of delay.
7. The design consultant for the project is Potesta & Associates, represented by Dave Sharp, PE, Project Manager, Chad Griffith, PE, Senior Engineer, Claire McDonald, Staff Engineer.
8. The Regional Engineer will be: Eric Simpson, and the Construction representative will be:
Justin Haymond, out of the Fairmont Abandoned Mine Land (AML) office.
Notes:
Engineers’ opinion of probable construction costs is $4,148,601.
Points of Emphasis
We can/will discuss items today, but official answers will only be provided in the addendum. To ensure your question is properly received and answered it needs to be submitted through the electronic submission system.
All suppliers, materials, proposed mixes, and required submittals shall be submitted and approved by POTESTA prior to the Notice to Proceed. A complete submittal list will be provided in the addendum.
Tree clearing restrictions are in effect and may not start until November 15 and must be concluded prior to March 31.
Burning is allowed with presentation of permits.
Site is a former AML project that has continued to reveal additional concerns.
There are existing mine drainage features and grouted riprap channels that remain from the former project.
There are two Stabilized Construction Entrances. One is on the access road on the way up to the meeting area and the other is the access road that is to be used to access the underdrain located behind Mr. Lambert’s house.
Landowner’s have requested no work during Thanksgiving week and that we always provide a few days’ notice of when anyone will be at the site.
A MM109 Highway Occupancy Permit has been obtained for the Project. Traffic Control is to follow West Virginia Division of Highways Case A-6 which includes flaggers, cones, signage, etc. based on location and duration of working equipment.
Electric fence and controller are to be removed and provided to POTESTA.
If asphalt at bottom of Mr. Huffman’s road is damaged it will need repaired, same goes for existing gate. Gravel access road is to be regraded and surfaced with stone after construction. Concrete portion of access road is slated to be repaved with concrete.
Overview of Project Includes:
o Construction of HDD pad access road and removal of soil mass in area of landslide and cut slope above HDD access road. Soil removed from those areas shall be backfilled against highwall in accordance with design plans with drainage installed as noted on the plans. HDD Pad includes installation of Temporary Trap to be utilized during mine dewatering and HDD. This temporary trap is to be removed after HDD is completed with area being regraded as noted on plans for drainage control.
o Dewatering Mine prior to HDD. Dewatering Plan must be submitted to Potesta for review as a submittal. Two dewatering borings are proposed at each of the two HDD target locations. Depending on the findings of the first boring at each location, contractor is to discuss with POTESTA the need for the second boring. It is possible that only two dewatering borings will be required or there could be as many as 4 borings. Quantities are based on four borings but Contractor will only be paid for actual footages installed. Updated water levels compared to last year?
o Construction of Access Roads. Access Roads are to remain after construction.
o Removal of two Texas Road Crossings and installation of culvert piping it their place.
o Improvements to lower 100-foot section of channel closest to Shinn’s Run Road.
o Underdrain located behind Mr. Lambert’s house.
o Drainage improvements on Huffman Property (Channel B) which is to the left when you come up access road.
o HDD
Very specific requirements for HDD. Pay special attention to Section 18 of the specifications.
No Boring & Jack permitted.
Includes pay item for pilot holes, steel casing, and conveyance piping.
Navigation can include wireline or gyro guidance systems but must also utilize an RMRS installed in the HDD target borings to guide pilot hole drill head to necessary location.