This is Addendum No. 2 to an Agency Request for Quote (ARFQ DEP26-68) issued by the West Virginia Department of Environmental Protection (WVDEP) for the Shant Branch Portals project located in Nicholas County, West Virginia. The addendum publishes vendor questions and answers from the pre-bid conference held on February 12, 2026, and incorporates clarifications and modifications to the original solicitation. The project involves mine seal conveyance work, portal construction, erosion control measures, temporary stream crossings, and access road development. Key specifications clarified include stone types (non-calcareous crushed sandstone for wet mine seals, limestone or sandstone riprap for channels and check dams), use of 15-inch HDPE corrugated pipes for stream crossings, and confirmation that bat gate season restrictions do not apply. The project timeline permits timber cutting between November 15 and March 31, and temporary stream crossings must be removed upon completion. Vendors must acknowledge receipt of all addenda to avoid bid disqualification.
The Engineer's Estimate for the project is $182,065. The addendum requires contractors to add three entities as additional insured parties: H&M Limited Liability (Richmond, Virginia), Breckinridge Land LLC (Shepherdstown, West Virginia), and D C Chapman Ventures Inc (Summersville, West Virginia). The addendum clarifies that on-site material from ditch and portal excavation may be used for fill placement, and stone removed from temporary stream crossings and construction entrances may remain on site. No filter fabric or compacted clay is required in wet mine seals after bulkhead installation, and the access road does not require removal but must prevent access from the county route by reestablishing the WVDOH ditch line.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
DEP2600000068
1. To publish vendor questions and answers
2. To publish pre-bid sign-in sheet
3. To add additional insured requirements
ARFQ DEP 26*68
Addendum #2 Shant Branch Portals
The following are questions that were identified at the Pre-Bid Conference (PBC) conducted on-site on February 12, 2026, questions provided to the WVDEP Procurement, Project Clarifications, Project Notes, Project changes, Technical Specification Changes, and Project Plan Changes. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.
QUESTIONS AND ANSWERS
Q1. Can 18'' CFS be used in place of Silt Fence?
A1. 18'' CFS is not to be used in place of Silt Fence.
Q2. Since Bat gates are not being utilized , does the work have to be completed between May 31 and August 31 or anytime throughout the year?
A2. Bat gate season does not apply. Mine seals may be completed throughout the year.
Q3. Please define the type stone required for the different locations for project – confirm below:
i. Wet mine seal – non-calcareous stone for mine bulkhead (sandstone)
ii. Ditch Type I channel – grouted riprap -Limestone
iii. Check Dam for Channel - 3” x 6” coarse aggregate - Limestone
iv. Splash pad – 6” x 9” Limestone
v. Access Road – 6” Class I compacted topped with 307 crushed limestone aggregate
vi. STABILIZED CONSTRUCTION ENTRANCE 3” x 6” coarse aggregate –with 1 ?” clean stone cap - Limestone
vii. Temporary Stream Crossing - 3” x 6” coarse aggregate – Limestone
A3. Wet mine seal stone is non-calcareous crushed sandstone for mine bulkhead.
Ditch Type I channel shall be non-grouted riprap consisting of limestone or sandstone per the specifications.
Check Dam stone shall be 3” x 6” riprap consisting of limestone or sandstone.
Splash pad stone shall be as per the channel specifications for riprap.
The access road stone shall be per the specification of #4 stone capped with 1 ½ inch crusher run for a total depth of six inches.
The stabilized construction entrance shall be 3” x 6” stone.
Temporary Stream Crossing stone shall be 3” x 6” limestone or sandstone.
Q4. Temporary Stream Crossing will utilize 3 – 15” HAVI DW ASTM STIB SOLID 20'
ATTACHMENT A
Shant Branch Portals
F2648 WHITE pipes?
A4. Temporary Stream Crossing will be 15 inch HDPE pipes shall consist of corrugated high density polyethylene pipe, such as ADS’s N-12 WT (watertight joint) pipe, Hancor Hi-Q pipe, or approved equal.
Q5. It was stated during the Prebid meeting that material above the portals was not to be disturbed however the drawing P-4 and P-5 shows fill material to be placed with colored contours. Please clarify. If so, can we use the material on site?
A5. The area above the portals were not to be disturbed. Fill material is to be placed as per colored contours above the portals. On site material shall be used from ditch and/or portal excavation.
Q6. On Drawing P-5 it stated Shant Portal #5 & #6, but the plan only shows Portal #5.
Where is Portal #6?
A6. Reference to Portal #6 should be deleted. There is no Portal #6.
Q7. As for the Mine Seal conveyance pipes on drawing D-4 it states two joints (28 feet) which should be two 14 feet pipes per portal connected behind the stone bulkhead??
A7. Mine Seal conveyance pipes on drawing D-4 it states two joints (28 feet) that is two
14 feet pipes per portal connected behind the stone bulkhead.
Q8. Could you verify if filter fabric and compacted clay are required in wet mine seals after bulkhead installation?
A8. No filter fabric or compacted clay are required in wet mine seals after bulkhead installation.
Q9. Can you verify if stone removed from temporary stream crossing, and construction entrances will be left on site or if they need to be removed from site?
A9. Stone removed from temporary stream crossing and construction entrances may be left on site.
Q10. Can 18'' CFS be used in place of Silt Fence?
A10. 18'' CFS is not to be used in place of Silt Fence.
PRE-BID QUESTIONS AND ANSWERS
Q11. Will the temporary stream crossing be removed upon completion?
A11. Yes.
Q12. Does the access road need to be removed? How much grading is involved?
A12. The access road does not need to be removed; however, the WVDOH ditch line at the entrance needs to be reestablished preventing access to the road from the county route. Minimal grading is anticipated on the access road construction. Road is anticipated to be built on existing path.
Q13. Can the less than eight-inch diameter trees and debris be windrowed?
A13. Trees less than eight (8) inches in diameter may be windrowed on site at the outer edge of the site. Timber cutting dates between November 15 and March 31 apply to this project.
Q14. Is the Type I Channel need to be grouted?
A14. Plan sheet D-3; Detail shown as Type I Channel is titled as (Grouted
Riprap). The correct title is (Riprap). No grout is required on the project.
REVISED SPECIFICATIONS
NA
REVISED DRAWINGS
1. Cover and Index Sheet is attached.
CLARIFICATIONS, NOTES, AND CHANGES
1. Contractor will be required to add additional insured for:
H& M Limited Liability 301 Virginia St, Unit 1203 Richmond, VA 23219
(804) 370-3899 herbhhill@gmail.com
Breckinridge Land LLC 631 Rudder Rd Shepherdstown, WV 25543 304-876-2744 breckreg@aol.com
D C Chapman Ventures Inc 50 Stonewall Dr Summersville, WV 26651 304-651-5698 craig@tcowv.com
2. Engineer’s Estimate is $182,065.
PRE-BID SIGN IN SHEETS
*All Revised documents should be attached in the same order. If there is a revised Engineer estimate it needs to be attached separate, we do not provide these to the vendor. Just the amount.
PROJECT AREA
H
AN
C O
C K
BR
O
O
KE
OHIO
PENNSYLVANIA
MARYLAND
JE
FF
ER
SO
NBE
RKE
LE
YMORG
AN
MINERAL
HAMPSHIRE
MARSHALL
WETZEL MONONGALIA
PRESTON
HARDY
GRANT
TAYLOR
MARION
HARRISON
DODDRIDGE
RITCHIE
TYLER
PLEASANTS
WOOD
LEWIS
BARBOUR
TUCKER
PENDLETON
RANDOLPH
UPSHUR
BRAXTON
WIRT
C
AL
H O
U N
ROANE
JACKSON
MASON
WEBSTER
POCAHONTAS
GREENBRIER
NICHOLAS
CLAY
PUTNAM
CABELL
WAYNE
LINCOLN
FAYETTE
KANAWHA
BOONE
LOGAN
RALEIGH
SUMMERS
MERCER
WYOMING
MCDOWELL
KENTUCKY
OHIO
VIR
GIN
IA
GILMER
MONROE
MINGO
NICHOLAS COUNTY, WEST VIRGINIA
LOCATION MAP
INDEX OF SHEETS BID SCHEDULE
SCHEDULE DESCRIPTION
SHEET INDEXI-1
PROJECT AREA
PROJECT AREA
SCALE: 1" = 5000'
N. 38° 26' 32.25" W. 80° 47' 02.80"
VICINITY MAP
SCALE: 1" = 2000'
PROJECT MAP
\\m ai n\ (1
5) m in in ge ng in ee rin g\
0_ am lp ro je ct s\
6-w vd ep a m l-s ha nt p or ta ls \c ad d\
_t itl e_ ge nn ot es
\c ov er s he et
.d w g Pl ot te d by
: s ke lly
5088 Washington Street, West Charleston, WV 25313 Phone: 304-776-7473
Fax: 304-776-6426 www.elrobinsonengineering.com
P.E. 10619ERIC COBERLY 2/17/2026
west virginia department of environmental protection
HAROLD D. WARD, CABINET SECRETARY
SHANT BRANCH PORTALS
DIVISION OF LAND RESTORATION
OFFICE OF ABANDONED MINE LANDS AND RECLAMATION
EXISTING PLAN SHEET SITE 1E-1-E-2
PLAN SHEET SITE 1P-1-P-2
TYPE I CHANNEL PLAN AND PROFILE SHEETP-3
PORTAL PLAN & PROFILE SHEETP-4-P-5
DETAILSD-1-D-4
PROJECT AREA
WVDOH PLAN PROFILE SHEETEX-1-EX-2
File details come from the government source that posted it. Updated .