This is an Addendum No. 1 to the Advertisement for Bids issued by Lamar Community College, a Colorado community college, for the Equine Complex Roof Replacement project (Project No. 2024-077M23). The project scope includes removal and disposal of existing metal roofing and deteriorated insulation from a pre-engineered metal building, followed by installation of new standing seam metal roofing, insulation, and vapor barrier to meet current building code and energy code requirements. The base bid is limited to specified areas with three additive alternates addressing additional work areas. A mandatory pre-bid conference and site tour was held on September 10, 2026, at the Equine Complex located at 2401 South Main Street in Lamar, Colorado. The revised bid deadline is October 6, 2026, at 1:00 PM MDT, with public bid opening scheduled for 1:30 PM MDT the same day. One hard copy of the sealed bid submittal must be delivered to Lamar Community College, Attention Ava Bair. The anticipated notice to proceed is October 19, 2026, with construction start on May 3, 2027, and substantial completion on July 20, 2027.
The estimated project cost is $1,419,477. Bidders must meet minimum qualifications including no previous termination by the State for non-performance, operation under the same business name for two years, demonstrated contracting experience with at least two projects exceeding $1,500,000 in hard costs, bonding capability up to $2,000,000, and attendance at the mandatory pre-bid conference. The project is subject to Colorado prevailing wage requirements, Colorado labor utilization requirements (80% Colorado labor), and apprenticeship utilization requirements for mechanical, electrical, and plumbing trades. Payment and performance bonds are required at not less than 50% of contract value for contracts exceeding $150,000. A Notice of Final Settlement is required per C.R.S. 38-26-107. The addendum addresses clarifications on substantial completion dates, occupancy during roof work, insulation allowance scope, bird netting removal, metal panel specifications, and roofing insulation requirements, requiring contractors to implement delegated design for insulation systems meeting R-30 minimum thermal performance with WMP-50 vapor barrier facing strength.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lamar Community College Addendum No. 1 Equine Arena Roof Replacement (Repair Roof & Ceiling, Indoor Arena and Stalls) 09/28/2026 Page 1 of 5
1935 Dominion Way, Suite 202
Colorado Springs, CO 80918
Office: 719.277.7300
ADDENDUM NUMBER 1 DATE: September 28, 2026
PROJECT: Lamar Community College Bowman Building Renovation (Capital Renewal) Project No.: 2022-010P22
OWNER: Lamar Community College 2401 S. Main St.
Lamar, Colorado 81052
The Drawings, Specifications and Contract Documents on the subject project are modified, corrected, supplemented and/or superseded as hereinafter described.
The following additions, deletions, changes and information shall become a part of and modify all work shown or described in the Drawings and Project Manual.
All bidders shall make necessary adjustments in their bid on account of this addendum.
Each and every bidder, subcontractor, and material supplier shall be responsible for reading each item in this addendum to ascertain to what extent and in what manner it affects the work in which they are interested. Each Bidder shall indicate on the Bid Form their acknowledgment of receipt of this addendum document by addendum number and addendum date.
GENERAL
1. The bidders’ walkthrough sign-in list is attached. This was a mandatory pre-bid conference for all primary bidders.
2. Bid Advertisement has been revised (dated 09/24/2026) and re-posted to
ColoradoVSS. It is also attached to this Addendum. The changes include modifications to the bid period schedule. The revised document inadvertently only modified the bid opening date on page 4 of the Bid Advertisement, but the following change is also made on page 5 of the Bid Advertisement via this Addenda:
One (_1_) hard copies of the sealed bid submittal are due 9/29/26 10/06/26 and shall be received no later than 1:00 PM (MDT/ST), and shall be submitted/accepted via USPS, UPS, FedEx, or hand delivered, as described in the Information for Bidders (SBP-6.12) Sealed Bid Submittals shall be delivered to:
Lamar Community College Attn: Ava Bair 2401 S Main St Lamar, CO 81052
09/28/2026 Page 2 of 5
3. We received several emails with written requests for clarification. The Answers to those Questions are stated below. However, several of those emails also included statements indicating that their emails include their assumptions or that they will be qualifying their bids. It should be noted that Colorado State bidding procedures require that the “Bid shall not be modified or conditioned in any manner.” (See Information for Bidders paragraph 1). Bids that contain such qualifying statements, may be considered non-responsive and may be rejected.
QUESTIONS & ANSWERS
4. Q: Substantial Completion date. Can you confirm the substantial completion date, or let us know if it needs revision? Section 01 10 00 lists it as due before "July 20, 2026" — that can't be right, since it's before the anticipated Start of Field Work (5/3/27). Every other schedule reference points to 2027, so we're bidding substantial completion as July 20, 2027.
A: The correct substantial completion date is July 20, 2027.
5. Q: Occupancy during active roof work. Will interior areas directly below active roof work be vacated for that work, or should we plan for them to stay occupied?
Section 07 01 50.19 §1.6.B provides for a notice/evacuation protocol for those areas, so we're assuming they're vacated while we're working overhead and we'll coordinate notice/timing with the Owner per that protocol.
A: The Owner will not have personnel occupying the facility during the re-roofing activities. However, see specifications section 01 70 00 paragraph 3.7.C which describes that the Owner’s furnishings and contents will remain in the facility during this project. If Owner needs personnel access to the facility during re-roofing activities, they will coordinate such access with the contractor.
6. Q: Wet insulation allowance scope. Should base bid and Add Alternate 1 also be covered by an allowance for moisture-saturated insulation? Section 01 21 00's $4,000 contingency allowance only covers Add Alternates 2 & 3. We're assuming base bid and Add Alt 1 carry no allowance, and anything moisture-saturated found there during tear-off will go through Change Order.
A: All insulation within the Base Bid and Add Alternate 1 scopes of work is to be completely removed and replaced with new, no change orders for removal of that insulation would be accepted. This is indicated by Keynote 1 on A1.20. The Allowance is only for the potential of replacement of damaged rigid insulation found within the areas of work described in Add Alternates 2 & 3.
7. Q: Bird netting. Drawings A4.00/A4.01 show existing bird netting near the arena roof ridge, and the Demolition RCP (A1.10, Key Note 4) calls for removing it as part of reroofing. Our bid includes removing and disposing of the netting — reinstallation isn't included.
A: Bird netting is currently located sporadically throughout the facility at the underside of some roof insulation installations. Where encountered, it shall be completely removed along with the insulation in those areas.
09/28/2026 Page 3 of 5
8. Q: Cricket at tower/entry canopy wall intersection. Can you provide a keyed cricket or valley flashing detail where the entry canopy roof meets the light tower wall, or confirm reconstruction "in kind" without a cricket is intended? Site photos show failed/deteriorated flashing at that inside corner (SW corner, Add Alt 3 area), and Drawings A8.01, A8.02, and A8.03 only cover the tower-to-arena tie-in and straight/linear roof-to-wall conditions — nothing addresses this specific corner.
A: Sheet A2.20 (keynotes 4 & 5) and the elevation drawing 1/A4.02 both indicate crickets to be installed at the tower/entry roof intersections. These conditions are located on a solid roof deck and a simple sheetmetal fabricated cricket assembly is all that is expected. See referenced details 8 & 9/A8.02.
9. Q: Please clarify if you want a two or three coat pvdf finish. We can get a 40-year finish warranty with the standard two coat finish.
A: Specification Section 13 34 19.01 paragraph 2.2.B.b indicates that a three-coat fluoropolymer / PVFD coating is the Basis of Design. Specification Section 13 34 19.01 paragraph 1.7.A.1 indicates that a 20-year finish warranty is required. However, if the submitted metal panel can demonstrate that a two-coat PVFD finish can provide the required 20-year finish warranty, then it will be acceptable.
10. We received several questions asking for general confirmation about the specified roofing panel specification and whether other panels would be considered. Our response to all of these follows the two questions indicated below:
Q: Standing seam panel replacement. Can you confirm Nucor CFR standing seam is acceptable to replace the existing panel? The existing main arena roof panel is Nucor R-Panel — an exposed-fastener, trapezoidal profile, not a standing-seam product — while Section 13 34 19.01 §2.2 names Nucor CFR Standing Seam as the basis of design. We're bidding replacement of the existing R-Panel system with new Nucor CFR standing seam.
Q: I see that the metal roof panels that are listed as BOD are both trapezoidal profiles. Would substitutions that meet all other specifications be considered if they are not trapezoidal, but rather are a standard straight leg in shape?
A: As was discussed during the pre-bid walk-through conference on September 10, 2026, we selected the Basis of Design panel products for qualities that we believe are appropriate for this project’s needs. We verbally indicated that we will accept other standing seam products. As we didn’t receive any specific vertical rib standing seam substitution requests, we are now providing some guidance for the panel qualities that must be met for all panel selections by the contractors:
It is the contractor’s responsibility as the delegated designer to select, properly design and submit a panel and attachment/clip assembly that can
09/28/2026 Page 4 of 5 span the existing purlin spacing and provide the structural performance indicated in the construction documents, as well as provide for the necessary insulation assembly performance criteria. The “Basis of Design” panel products listed in Section 13 34 19.01 paragraph 2.2 meet our intent for a concealed fastener mechanically seamed standing seam panel systems with a desired overall standing seam height of at least 2-1/2 inches above main flow of water within the pan of the panel, ribbed/striated panel pan profile, and 20-year factory finish warranty criteria. However, we have not evaluated the Basis of Design panels for structural compliance nor for specific attachment criteria, as these tasks are relegated to the delegated designer.
Vertical Rib Standing Seam panels with striations or intermediate ribs between standing seams are acceptable, as long as the standing seams are at least 2-1/2 inches above the waterflow plane. Vertical Rib Standing Seam panels with flat pans between standing seams are not acceptable. Batten type panel seams are not acceptable.
11. Q: We received requests to accept some specific metal panel products as “approved equals” to the basis of design as specified in section 13 34 19.01 paragraph 2.2.B. The following products were evaluated:
Trap-T as manufactured by McElroy: This standing-seam, trapezoidal profile metal panel product is acceptable if it can be demonstrated to meet the structural criteria identified in the construction documents during the delegated design review process. It was noted in the product literature that this panel is typically available in 24ga material and that 22ga/20ga options have minimum quantity limitations, so delegated designer is cautioned to verify its structural capabilities and availability.
238-T as manufactured by McElroy: The 238-T panel is NOT acceptable, it doesn’t meet the project’s standing seam height needs.
PAC T-250 as manufactured by PacClad: The PAC T-250 panel is NOT acceptable, it doesn’t meet the project’s standing seam height needs.
12. Q: We received several questions about the roof insulation intentions, ranging from the ability of the Basis of Design product to meet the stated maximum U-value, to the ability of the Basis of Design product to provide OSHA fall protection barrier. We also received a verbal request for clarification about some observed conduits that were attached to the roof beams, and/or purlins, and whether they would be required to be removed for the installation of the insulation systems.
Upon review of these questions, we provide the following new direction with respect to the roofing insulation:
A: It was our original intent to provide an over-the-purlin roof insulation system, to be able to increase the insulation of the roof to R-30 minimum, with an exposed vapor barrier facing which would provide relatively good resistance against bird damage. Since the selection of the proper insulation system also needs to meet the needs of the roof panel
09/28/2026 Page 5 of 5 attachment methods, we have decided to allow the selection of the roofing insulation to be entirely a delegated design, which must meet these following minimum requirements:
System Thermal Performance: = R-30 minimum
Exposed Vapor Barrier Facing Strength: WMP-50 by Lamtec Corp.
(or approved equal)
Thermal Blocking: Required
Furthermore, if the selected insulation system requires banding and/or facing attached to the bottom of the existing purlins, the contractor’s bid pricing shall include all costs associated with relocating electrical conduits as may be required to meet electrical code criteria for junction box access.
PROJECT MANUAL
13. Modification to Section 01 10 00, paragraph 1.3.D – Change the reference date for substantial completion to July 20, 2027.
14. Modification to Section 13 34 19.01, paragraphs 2.2 & 2.3 – replace these paragraphs with the attached document.
DRAWINGS
No Modifications
END OF ADDENDUM NUMBER 1
Attachments: Pre-Bid Conference Sign-in Sheet Advertisement for Bids dated 9/24/26 (with corrections from this Addenda) Revised specification section 13 34 19.01, paragraphs 2.2 & 2.3
OSA-AFB-1 pg. 1
REV 7/2025
ADVERTISEMENT FOR BIDS
Design / Bid / Build
State of Colorado
Notice Number: 2027-28 Project Number: 2024-077M23
Project Title: Repair Roof & Ceiling, Indoor Arena and Stalls
Estimated Project Cost: $1,419,477
NOTICES
1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
3. All respondents accept the conditions of this AFB, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.
5. Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at
OSA-AFB-1 pg. 2 the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.
6. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
7. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
PROJECT OVERVIEW
Introduction:
Lamar Community College is 1 of 13 Community Colleges that are a part of the Colorado Community College System. Lamar Community College is located near Kansas and Oklahoma borders in Southeast Colorado. LCC campus consists of 109 acres adjacent to Willow Creek.
The State of Colorado, Lamar Community College (LCC) is soliciting bids from qualified contractors for the Equine Complex Roof Replacement project.
1. This project consists of the removal and disposal of the existing metal roofing and deteriorated insulation and vapor barrier from a pre-engineered metal building. Installation of new standing seam metal roofing, insulation and vapor barrier to meet current building code and energy code requirements. The base bid scope of work is limited to those areas indicated on the drawings.
a. The project has (3) three additive alternates which address additional areas of work as indicated on the drawings.
b. The contractor shall include a set quantity of anticipated weather days in their base bid as defined in the project manual.
c. The project includes an allowance to be included within the Base Bid for the potential immediate replacement of moisture saturated rigid roofing insulation assemblies found within areas of partial roof replacement associated with Add Alternates 2 & 3.
OSA-AFB-1 pg. 3
c. This project is NOT subject to the requirements of the State of Colorado “Buy Clean Colorado Act” due to the types of materials being utilized on this project.
d. This project IS subject to the requirements of the State of Colorado “Prevailing Wage Statute”.
e. This project IS subject to the requirements of the State of Colorado required “Apprenticeship Utilization”, which applies to the following trades:
mechanical, mechanical sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work.
f. It is NOT expected that hazardous materials will be encountered in the Work.
See General Conditions and Division 2 “Selective Demolition” for additional clarifications.
Scope of Services
Please see Project Manual dated 08/21/2026 and construction documents drawings dated 03/31/26. These documents are available at the following dropbox location:
https://www.dropbox.com/scl/fo/qtbfwblaxd95zqubtxdda/AG5yFAN9dmFAGHql62 qCPs8?rlkey=qpjiq76h6j4vhdcxgle3qblzw&dl=0
The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.
Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.
MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
2. The bidding contractor must have been in the same business, under the same name for the last two (2) years.
OSA-AFB-1 pg. 4
3. Demonstrated specific contracting experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 1,500,000 (hard costs), utilizing the expertise present in their Colorado Office; and
4. Demonstrated bonding capability up to $ 2,000,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.
5. Demonstrated means and labor force necessary to perform the on-site work within the time-frame indicated which includes an anticipated maximum number of weather-related days, as defined in the project manual.
6. Attended and signed in at the Mandatory Pre-Bid Conference
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
MANDATORY PRE-BID CONFERENCE AND SITE TOUR
A mandatory Pre-Bid Meeting will be held at:
Building Address: Equine Complex – 2401 S Main St. Lamar, CO 81052
Room: Lobby
Date/Time 09/10/26 1:00 pm MDT
SCHEDULE
The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.
Advertisement for Bids Issued 09/1/26
Mandatory Pre-Bid Conference and Site Tour 09/10/26
Request for Clarifications Due 09/17/26
Final Addendum Issued (anticipated) 09/28/26
Bid Submittals Due (date and Time) 10/06/26 1:00 pm MDT
Public Bid Opening 10/06/26 1:30 pm MDT
Award Intent Notification (anticipated) 10/08/26 Contract Approval (anticipated) 10/15/26
Anticipated Notice to Proceed 10/19/26
Anticipated Construction Start (on-site) 05/03/27
Anticipated Construction Finish 07/20/27
The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
Commented [SL1]: Note to Drafter: Delete the Mandatory Pre-Bid Conference and Site Tour if not needed
OSA-AFB-1 pg. 5
QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this AFB will be issued under numerically sequenced addenda.
Owner initiated changes to this AFB will be posted in the form of addenda on ColoradoVSS.
Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.
Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.
All requests for clarifications shall be transmitted simultaneously to both “Points of Contract” persons listed below:
POINTS OF CONTACT/CLARIFICATION
Name: Sean Lirley
Agency: Lamar Community College
Email Address: sean.lirley@lamarcc.edu
Phone: 719.336.1543
Name: Stephen Hall
Agency: Hall Architects
Email Address: steve @hall-architects.com
Phone: 719.339.2495
BIDDING
Bids shall be submitted on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix A.
One (_1_) hard copies of the sealed bid submittal are due 9/29/26 10/06/26 and shall be received no later than 1:00 PM (MDT/ST), and shall be submitted/accepted via USPS, UPS, FedEx, or hand delivered, as described in the Information for Bidders
(SBP-6.12)
Sealed Bid Submittals shall be delivered to:
Attn: Ava Bair 2401 S Main St Lamar, CO 81052
OSA-AFB-1 pg. 6
Bid Forms and Appendices to be included with bid submittal:
Bid Form (SBP-6.13)
Bid Bond (SBP-6.14)
Bid Alternates (SBP-6.131)
Late bid submittals will be rejected without consideration. The State of Colorado assume no responsibility for costs related to the preparation of bid submittals.
NOTE: Overnight deliver to Lamar Community College is not a guarantee. Please plan accordingly.
BID OPENING
Public bid opening will take place at the date and time identified in Schedule
APPENDICES: The following documents are included in the Project Manual:
Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) Appendix B3: Bid Bond (SBP-6.14) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe
Rates Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-2.1) Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s
Agreement and General Conditions of the Contract
Section 13 34 19.01, paragraphs 2.2 & 2.3 – replace these paragraphs with the following:
2.2 MANUFACTURERS
A. Provide factory-formed standing-seam metal roof panels designed to be installed by lapping and interconnecting raised side edges of adjacent panels with joint type indicated and mechanically attaching panels to supports using concealed clips in side laps. Include clips, cleats, pressure plates, and accessories required for weathertight installation.
B. Basis of Design Product: Standing Seam Roofing Panels
1. The design for this product is based on the product by: Nucor Buildings Group: Nucor CFR Standing Seam Roof System or Ceco Double-Lok, gage as required and selected by design/build engineer to meet load and uplift requirements.
a. Mechanically seamed.
b. Standing Seam Height: 2-1/2 inches above pan plane
c. Pan Surface: striated and/or ribbed
d. Exterior Finish: Smooth with [Two or Three-coat fluoropolymer / PVDF to meet warranty requirement].
e. Color: [As selected by Architect from manufacturer's full range].
f. Provide necessary fastener clips, that will coordinate with existing conditions and new insulation requirements.
g. Provide necessary Zee Stand-offs to achieve flush panel installations at existing roof structure offsets (see drawings and existing field conditions).
2. Subject to compliance with requirements, provide either the named product or a comparable approved equal product by one of the following manufacturers:
a. Central States Manufacturing
b. McElroy
c. MetlSpan
d. Butler Manufacturing Company.
e. Approved Equal.
C. Basis of Design Product: Roofing Thermal insulation
1. The design for this product is a delegated design:
a. System Thermal Performance = R-30 minimum
b. Exposed Vapor Barrier Facing Strength: To meet criteria established with WMP-
50 by Lamtec Corporation or approved equal.
c. Thermal Blocking: Required.
2.3 THERMAL INSULATION
A. Faced Metal Building Insulation: ASTM C991, Type II, glass-fiber-blanket insulation; 0.5-lb/cu. ft.
density; vapor-barrier meeting strength criteria WMF-50 or approved equal; with a flame-spread index of 25 or less.
B. Unfaced Metal Building Insulation: ASTM C991, Type I, or NAIMA 202, glass-fiber-blanket insulation; 0.5-lb/cu. ft. density; with a flame-spread index of 25 or less.
C. Retainer Strips (if required): For securing insulation between supports, 0.025-inch nominal-thickness, formed, metallic-coated steel or PVC retainer clips colored to match insulation facing.
D. Vapor-Retarder Facing: ASTM C1136, with permeance not greater than 0.02 perm when tested according to ASTM E96/E96M, Desiccant Method.