07 01 50.19 SF - Preparation for Reroofing.pdf
PDF 127 KB Posted
- Solicitation number
- IFB1 GJFA 2027000028 4
- Issued by
- Pitkin County, Lakewood City, Colorado
About this file
This is a specification document for preparation and reroofing work at Lamar Community College in Colorado, specifically for the Repair Roof and Ceiling, Indoor Arena, and Stalls project (Project Number 2024-077M23). The scope of work includes full and partial tear-off of existing metal panel roofing (both standing seam and lapped seam products), removal of flashings and counterflashings, and preparation of the substrate for new roofing installation. The contractor must conduct a preliminary roofing conference before starting work and submit photographs or videotape documenting existing conditions of adjacent construction and site improvements prior to commencing operations. Work must be coordinated with the College to minimize disruption to ongoing operations, with the contractor required to provide at least 72 hours' written notice of activities affecting the Owner's operations. The existing roofing system will remain in a partial state during work, and the contractor is responsible for investigating existing conditions, as provided drawings are for informational purposes only.
The specification includes a $4,000 allowance for removal of existing wet insulation and replacement with new insulation as detailed in Section 012100. The contractor must maintain roof drains in functioning condition, manage debris removal using dust-tight chutes, and implement alternative drainage methods if needed to prevent water infiltration into remaining roofing components. All work must proceed only under weather conditions that prevent water entry into the existing roofing system or building, with the requirement that only as much roofing as can be made watertight in a single day be removed. The contractor must survey exposed substrates for moisture using infrared thermography per ASTM C1153 and electrical capacitance/impedance testing per ASTM D7954/D7954M, with wet or damp materials removed as directed by the Architect. The installer must be approved by the existing roofing system's warrantor, and existing warranties on the current roofing system are not in effect.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lamar Community College Repair Roof and Ceiling, Indoor Arena, and Stalls Project Number: 2024-077M23
PREPARATION FOR REROOFING (Bid & Const. Set) 070150.19 - 1
SECTION 070150.19 - PREPARATION FOR REROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Full tear-off of roof system at areas indicated on Drawings.
2. Partial tear-off of roof areas indicated on Drawings.
3. Removal of flashings and counterflashings.
B. Work Sequence and Planning: See Division 1 Specification Sections and 02 41 19 Selective Demolition for additional information on the requirements for careful work sequencing, work performance and planning.
1.2 ALLOWANCES
A. Provide an Allowance in the amount of $4000 for removal of existing wet insulation, and replacement with new insulation, is specified under Section 012100 "Allowances."
1.3 PREINSTALLATION MEETINGS
A. Preliminary Roofing Conference: Before starting removal Work, conduct conference at [Project site] .
1.4 INFORMATIONAL SUBMITTALS
A. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, that might be misconstrued as having been damaged by reroofing operations.
1. Submit before Work begins.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Approved by warrantor of existing roofing system to work on existing roofing.
1.6 FIELD CONDITIONS
A. Existing Roofing System: [Metal Panel Roofing, both standing seam and lapped seam products. The lapped seam products have a coating applied.] roofing.
B. Owner [will] occupy portions of building immediately below reroofing area.
1. Conduct reroofing so Owner's operations are not disrupted.
2. Provide Owner with not less than [72] hours' written notice of activities that may affect
Owner's operations.
3. Coordinate work activities daily with Owner so Owner has adequate advance notice to place protective dust and water-leakage covers over sensitive equipment and furnishings, PREPARATION FOR REROOFING (Bid & Const. Set) 070150.19 - 2 shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below work area.
4. Before working over structurally impaired areas of deck, notify Owner to evacuate occupants from below affected area.
a. Verify that occupants below work area have been evacuated before proceeding with work over impaired deck area.
C. Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.
D. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
E. Conditions existing at time of inspection for bidding will be maintained by Owner as far as practical.
1. Partial Construction Drawings for existing roofing system are provided for Contractor's convenience and information, but they are not a warranty of existing conditions. They are intended to supplement rather than serve in lieu of Contractor's own investigations.
Contractor is responsible for conclusions derived from existing documents.
F. Limit construction loads on existing roof areas to remain, and existing roof areas scheduled to be reroofed.
G. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building.
1. Remove only as much roofing in one day as can be made watertight in the same day.
1.7 WARRANTY
A. Existing Warranties: Are not in effect.
PART 2 - PRODUCTS
2.1 AUXILIARY REROOFING MATERIALS
A. General: Use auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of existing and new roofing system.
PART 3 - EXECUTION
3.1 PREPARATION
A. Seal or isolate windows that may be exposed to airborne substances created in removal of existing materials.
B. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work.
1. Cover air-intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.
PREPARATION FOR REROOFING (Bid & Const. Set) 070150.19 - 3
C. During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain.
D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.
1. Prevent debris from entering or blocking roof drains and conductors.
a. Use roof-drain plugs specifically designed for this purpose.
b. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.
2. If roof drains are temporarily blocked or unserviceable due to roofing system removal or partial installation of new roofing system, provide alternative drainage method to remove water and eliminate ponding.
a. Do not permit water to enter into or under existing roofing system components that are to remain.
3.2 ROOF TEAR-OFF
A. Notify Owner each day of extent of roof tear-off proposed for that day.
B. Lower removed roofing materials to ground and onto lower roof levels, using dust-tight chutes or other acceptable means of removing materials from roof areas.
C. Roof Tear-off: Where indicated on Drawings, remove existing roofing and other roofing system components as indicated.
1. Remove fasteners from deck.
D. Partial Roof Tear-off: [Where indicated on Drawings, remove] existing roofing down to [existing insulation] and immediately check for presence of moisture.
1. Survey exposed substrate that is to remain using infrared color thermography according to ASTM C1153.
a. Prepare survey report of initial scan indicating locations of entrapped moisture, if any, and area calculations of locations of entrapped moisture.
2. Survey exposed substrate that is to remain using electrical capacitance/impedance testing according to ASTM D7954/D7954M.
a. Prepare survey report indicating locations of entrapped moisture, if any, and area calculations of locations of entrapped moisture.
3. Remove wet or damp materials below existing roofing and above deck as directed by Architect.
a. [Removal is paid for through the use of the Allowance or by adjusting the Contract Sum according to the Contract Documents.]
PREPARATION FOR REROOFING (Bid & Const. Set) 070150.19 - 4
3.3 BASE FLASHING REMOVAL
A. Remove existing base flashings.
1. Clean substrates of contaminants, such as asphalt, sheet materials, dirt, and debris.
B. Do not damage metal counterflashings that are to remain.
1. Replace metal counterflashings damaged during removal with counterflashings of same metal, weight or thickness, and finish as existing.
END OF SECTION 070150.19