Addendum No 1 ARFQ TPK27-9 Network Cameras.pdf
PDF 208 KB Posted
- Attached to
- Network Cameras for WVPA
- Solicitation number
- ARFQ 0809 TPK2700000009 2
- Issued by
- Putnam County, West Virginia
About this file
This addendum document, issued by the WV Parkways Authority (WVPA), modifies Solicitation ARFQ TPK27-9 for Network Cameras to correct specifications and address vendor inquiries. The primary modification clarifies that Commodity Line 4, the AXIS M3077-PLVE 6MP 360-degree Panoramic Network Dome Camera, requires a quantity of two (2) units rather than four (4) units as previously listed in wvOASIS. The addendum incorporates vendor questions and responses as Attachment A and requires all vendors to acknowledge receipt of addenda by completing and submitting the included Addendum Acknowledgement Form with their bids. Failure to acknowledge addenda may result in bid disqualification.
The addendum confirms that WVPA requires a minimum one (1) year manufacturer warranty for all cameras and specifies that the cameras will be integrated with the agency's existing Axis Camera Station video management system, with video servers located at each facility to manage and record footage. Vendors must submit their acknowledgement of this addendum as part of their proposal to expedite document processing. All other terms and conditions of the original solicitation remain in full force and effect unless modified by this or other official addenda.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WV Parkways Authority Solicitation – Addendum Number:
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Wesley Vandall Line
Wesley Vandall Line
Revised 04/21/2021
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.:
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.
I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
ARFQ TPK27*9 ADDENDUM 1 ATTACHMENT1
The following questions were received in regards to ARFQ TPK27*9 (Network Cameras for
WVPA).
Question 1) Could you please confirm the quantity required for Line Item 4 (AXIS M3077- PLVE 6MP 360degree Panoramic Network Dome Camera)? The pricing page lists 4 units while section 3.1.4 of the specifications references 2 units, and we would like to ensure our pricing is accurate.
Answer to Question 1) The quantity of 2 units in Section 3.1.4 of the specifications is correct. Commodity Line 4 in wvOASIS has been corrected to reflect 2 also.
Question 2) Does WVPA require a minimum manufacturer warranty period for the cameras?
Answer to Question 2) Yes, a minimum one (1) year manufacturer warranty period is required for the cameras.
Question 3) Are the cameras being added to an existing video management system (VMS)?
If so, can you confirm the platform currently in use?
Answer to Question 3) WVPA uses Axis Camera Station Agency wide. We have a video server at each location that manages and records the footage from the cameras.
| Addendum TPK27-9 Network Cameras.pdf |
| Addendum # 1.pdf |
| Addendum Acknowledgement Form.pdf |
Addendum TPK27-9 Network Cameras Attachment 1.pdf
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Yes |
| Check Box6: Off |
| Text1: ARFQ TPK27*09 |
| Text2: 1 |
| Text3: To answer questions submitted by vendors. |
Correction to Commodity Line 4 in wvOASIS. The quantity should be two (2) and not four (4) as listed previously.
| Text4: |
| Solicitation Number: ARFQ TPK27*9 |
| Company_2: |
| Date_2: |
| Check Box38: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
File details come from the government source that posted it. Updated .