About this file
This document is an Addendum to RFP #23-161-G issued by Eugene Water & Electric Board (EWEB) for a Control House with integrated medium voltage switchgear for their Danebo Substation in Eugene, Oregon. The addendum extends the Closing Date to October 4, 2023 and provides the anticipated project schedule, including manufacturer drawings in January 2024, factory acceptance testing in August 2024, and delivery to the project site from September to October 2024. The last day for EWEB to receive questions from Proposers is September 26, 2023, and the last day EWEB will post Addenda is September 28, 2023. The intent to award announcement is scheduled for October 12, 2023, with board approval on November 7, 2023 and contract award on November 9, 2023.
The contract opportunity is open to manufacturing companies interested in providing the specified control house and switchgear for the Danebo Substation project in Eugene, Oregon, which is located within Lane County. The addendum constitutes a material change to the RFP, and receipt of the addendum must be acknowledged by the bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-161-G Control House for Danebo Substation-FINAL~2.pdf | ||
| Addendum 8.pdf | ||
| Notice of Intent to Award Wenaha Hay.pdf | ||
| Addendum 3~5.pdf | ||
| Addendum 2~8.pdf | ||
| Addendum 1~13.pdf | ||
| Addendum 6.pdf | ||
| Addendum 5~5.pdf | ||
| Addendum 4~5.pdf | ||
| Notice of Intent to Award-to Public.pdf | ||
| Exhibit 1 Sample Contract for Prop Redline.doc | DOC document | |
| Bid Tab~10.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
August 24, 2023
ADDENDUM # 7
Control House for Danebo Substation
RFP #23-161-G
This addendum modifies the RFP and/or bidding document(s) only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original RFP document and shall become part of the work required.
Last day for EWEB to receive questions from Proposers September 26, 2023
Last day EWEB will post Addenda September 28, 2023
Closing date (last day to submit proposals to EWEB) October 4, 2023
Responses evaluated October 12, 2023
Intent to Award Announcement October 12, 2023
Optional to EWEB – Factory tour TBD if applicable
Board Approval November 7, 2023
Contract Award November 9, 2023
ANTICIPATED PROJECT SCHEDULE:
Manufacturer Drawings January, 2024
Factory Acceptance Testing August 2024
Delivery to Project Site September – October
Rev 4-21-20
CLOSING DATE AND TIME
Closing Date is extended to October 4, 2023 (from September 5, 2023). Time remains 2:00 pm (PST)
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR
BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Sandra Hahn, Purchasing Contact
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________
Date __________________________
End of Addendum
File details come from the government source that posted it. Updated .