This document is an Addendum to RFP #38F-19 for the Traction Power Sub Meter Pilot Project issued by the Massachusetts Bay Transportation Authority (MBTA). The addendum includes updates to the Table of Contents, Specification Section 01010 - Summary of Work, a new Communication Section C-76 to replace existing Sections 16711 and 16749, and an updated Plan Set with revisions requested by MBTA Communications. The project involves installing new conduits at the Braintree Traction Power Substation. Bidders must acknowledge receipt of this Addendum in their proposal submittal. The original RFP #38F-19 Traction Power Sub Meter Pilot Project is for the MBTA, located in Suffolk County, Boston, Massachusetts. The response due date and public opening are at the MBTA offices in Boston.
The Addendum does not provide any details on pricing, set-asides, incumbents, funding requirements, or other salient information beyond the scope changes outlined. Bidders should review the full RFP package, including this Addendum, to understand all requirements for submitting a responsive proposal.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BTA Lo go, Charles D. Baker, Governor, Karyn E. Polito, Lieutenant Governor, Stephanie Pollack, MassDOT Secretary & CEO, Luis Manuel Ramírez, General Manager & CEO, MassDOT logo
Massachusetts Bay Transportation Authority
Ten Park Plaza, Suite 3910, Boston, MA 02116 www.mbta.com
April 10, 2019
SUBJECT: RFP # 38F-19 Traction Power Sub Meter Pilot Project
Addendum No. 5
Dear Bidders:
Please be advised that the above has been amended and/or clarified herein. All references in
RFP #38F-19 Traction Power Sub Meter Pilot Project. RFP documents reflecting scope changes:
1. Updated Table of Contents for Plans and Specifications
2. Updated Specification Section 01010- Summary of Work
3. New Communication Section C-76 to replace existing Section 16711 and 16749
4. Updated Plan Set capturing revisions requested by MBTA Communications and showing new work for conduits run at Braintree TPSS.
5. List of documents:
TPSS_ESMS TOC_rev
SECTION 01010 rev 6
MBTA Communications Fiber Spec C-76 – Updated 2019
Plan SET 20190501 FINAL
Acknowledgment of this Addendum must be so noted in your proposal submittal.
ALL ELSE REMAINS AS PREVIOUSLY STATED.