This document is Addendum No. 2 to RFP #38F-19 for the Traction Power Sub Meter Pilot Project issued by the Massachusetts Bay Transportation Authority (MBTA). The addendum revises the minimum insurance requirements for the project. Responses to the RFP are due at a public opening at the MBTA offices located at 10 Park Plaza, Suite 2810, Boston, MA 02116.

The RFP seeks proposals for a Traction Power Sub Meter Pilot Project within the state of Massachusetts, specifically in Suffolk County and the city of Boston. No other details about the project scope, quantities, or term are provided in this addendum.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BTA Lo go, Charles D. Baker, Governor, Karyn E. Polito, Lieutenant Governor, Stephanie Pollack, MassDOT Secretary & CEO, Luis Manuel Ramírez, General Manager & CEO, MassDOT logo

Massachusetts Bay Transportation Authority

Ten Park Plaza, Suite 3910, Boston, MA 02116 www.mbta.com

March 26, 2019

SUBJECT: RFP # 38F-19 Traction Power Sub Meter Pilot Project

Addendum No. 2

Dear Bidders:

Please be advised that the above has been amended and/or clarified herein. All references in

RFP #38F-19 Traction Power Sub Meter Pilot Project. See revised minimum insurance requirements.

Acknowledgment of this Addendum must be so noted on your proposal submittal.

ALL ELSE REMAINS AS PREVIOUSLY STATED.

Sincerely, John de Lalla