This document is Addendum #5 to the Request for Proposals (RFP) issued by the Town of West Newbury, Massachusetts for an IP Telephony and Voicemail System. The RFP seeks proposals from certified telecommunications contractors to supply, provision, install, and test a unified Voice-over-Internet Protocol (VoIP) telephone system across three town facilities. The addendum extends the proposal due date from February 14 to March 13, 2024 and indicates that the town will provide a scope of work and bid price sheet for cabling, with an optional site walk specifically for cabling. The estimated procurement calendar is also updated. The document includes attachments with Q&A from the mandatory site walk, electronic floor plans, a link to site walk photos, and a user list for the 1910 Building.

The RFP requires 5 hardcopy and 1 electronic proposal submission. The town is looking for a cloud-based solution to centralize the three facilities, with separate voice and data networks, and a minimum of CAT 5E cabling, preferring CAT 6. The town currently uses an old ComDial phone system and has Aruba wireless networks that are over 8 years old. The public safety complex has call recording managed separately, and the library uses basic cordless phones. The town will hold vendor demonstrations after proposal submissions.

View the file

Other files

File Type Posted
PW Rate Sheet 20231208-010.pdf PDF
Addendum #2.pdf PDF
Addendum 1.pdf PDF
Addendum #3.pdf PDF
Addendum #7 Binder.pdf PDF
Addendum #6.pdf PDF
Addendum #4.pdf PDF
Addendum 8 Packet.pdf PDF
2024-WN-003 Telecommunications RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

West Newbury – VoIP Phone System Addendum #5

2024-WN-003

IP Telephony and Voicemail System Town of West Newbury

Addenda

RFP# 2024-WN-003

Town of West Newbury

381 Main Street West Newbury, MA 01985

ADDENDUM #5

Notice to all prospective bidders.

Addendum #5 released Monday January 29th, 2024

PROPOSAL DUE DATE CHANGE AND UPDATED

PROCUREMENT SCHEDULE

The proposal due date will be extended from Wednesday February 14th, 2024 at 10:00 A.M to Wednesday March 13th, 2024 at 10:00 A.M. The Town of West Newbury will be providing a scope of work and bid price sheet for cabling momentarily. There will be an optional site walk specifically for cabling. Date and time of this site walk to be issued with the cabling scope of work and bid price sheet addendum. Please see the updated estimated procurement calendar below.

Attachments:

A – Q&A from Mandatory Site Walk

B – Electronic Floor Plans

C – Link to Google Drive with Site Walk Photos: See below

D – User List for 1910 Building https://drive.google.com/drive/folders/13ohiIVj8W8gDaSHCMcU8I6VHVFEJ8EaW?usp=sharing

Date Time 12/11/2023 10:00 A.M 1/17/2024 10:00 A.M 2/28/2024 4:00 P.M 3/6/2024 4:00 P.M

3/13/2024 10:00 A.M 3/27/2024 4:00 P.M 4/30/2024 4:00 P.M

Proposal submission deadline on or before Bidder Evaluations - Vendor Presentations Scheduled b Preliminary award on or after

Estimated Procurement Calendar Tasks RFP Issued on Commbuys Mandatory pre-submission site walk Written questions/clarification due on or before Release of official responses due on or before https://drive.google.com/drive/folders/13ohiIVj8W8gDaSHCMcU8I6VHVFEJ8EaW?usp=sharing

Atachment A

January 17, 2024

RFP # 2024-WN-003

IP Telephony and Voicemail System Voice Over Internet Protocol Solu�on (VoIP) 1910 Building (Town Offices), Public Safety Complex and GAR Library

Mandatory Briefing and On-Site Tour

Town Staff Present:

Chris�ne Wallace, P.E., West Newbury DPW Project Manager Angus Jennings, West Newbury Town Manager Michael Dwyer, Chief of Fire & Police Katelyn Barker, West Newbury Chief Procurement Officer James RW Blatchford, West Newbury Town Clerk Brian Richard, West Newbury Facilities Manager Jake Soucy, West Newbury IT Consultant

From the Sign-in Sheet:

Raul Valdez, Al Enterprise Bill Vozella, Beacon Telecom Michael Urquhart, Comcast Bill Dunahue, Comcast Rob Aloi, Connectivity Point Tony Foglia, Connectivity Point William Smith, East Coast Telecom Solutions Ben Denardo, Granite Net Andrew Tucker, INNO4 John Wood, Konica-Minolta Business Solutions Michael Redler, Kyocera Corey Palmer, Kyocera John Faria, MD Com Deborah Damiano, Onec1 Cindy Szpila, Partners Technology Jim Rabbit, Partners Technology Jim Power, Valley Communications Joshua Esposito, Verizon Scot Medeiros, Vertical Stefano Jean Joseph, JeanComputech Corp Steven Chase, Visual Edge IT Greg Earley, VoDaVi Technologies

Atachments:

Atachment A (this document) – Atendance, Briefing Minutes/Q&A Responses Atachment B – Electronic Floor Plans

Briefing/Q&A (1910 Building, first floor hearing room 10:00 A.M) Chris�ne Wallace ini�ated the briefing and Q&A session by introducing the West Newbury town employees present. Atendees were informed that January 31, 2024 was the deadline to submit ques�ons concerning the RFP and the deadline for all proposals was February 14, 2024. Jennings stated no photographs would be allowed on the site by consultants but Blatchford would take pictures and include them with the addendum. Soucy stated that the town uses an old ComDial system and new technology is desperately needed.

Q: The RFP states 5 hard copies of the proposal is required, is digital files sent electronically, OK?

A: Yes, you may submit your proposals electronically via email to Procurement@wnewbury.org with the subject line: 2024-WN-003 RFP Submital.

Q. Is all wiring CAT 5E or above?

A. Yes, but would love a hybrid system. We would ideally like to replace old wiring to ensure all wiring is the same as the new phones being installed.

mailto:Procurement@wnewbury.org

Q. Will the new phone installa�ons need new wiring?

A. Yes, minimum of CAT 5E, but CAT 6 preferred.

Q. What firewall is in place at the three facili�es?

A. Sonic Wall at the 1910 Building (Town Offices) and at the Public Safety Complex. The GAR Library has For�net.

Q. Do we need all new data switches?

A. Yes, but Town Offices has FIOS and would not have POE data switches or routers.

Q. Primaries and secondaries?

A. Just primaries.

Q. Do we have a POE now?

A. No.

Q. Do we want separate data and phone?

A. We would like a separate voice and data network. Current wiring for phones is CAT 3 copper wiring.

Q. The RFP stated a cloud-based system is a must, please confirm.

A. We would look at another service system not listed as long as it is not �ed together (different loca�ons). We are looking for a cloud-based solu�on to centralize the three facili�es.

Q. Do we have any plans to upgrade to a dark fiber loop?

A. No.

Q. Do we need point-to-point wireless?

A. No.

Q. Do we have any need for a call center environment?

A. No.

Q. Does the Public Safety Complex have call recording?

A. Yes, it is managed separately.

Q. Do 911 calls go straight to the Public Safety Complex?

A. Yes.

Q. How many so� phones (mobile app) are needed? Could we be provided a user list for all lines?

A. We need 14 so� phones (mobile app) users. User list for the 1910 Building is atached to Addendum #5.

Q. Do we need tablets in the Public Safety vehicles?

A. No, we currently have laptops with Verizon service.

Q. How is the current WiFi?

A. It isn’t great in the Town Offices or Library, we may want to add access points. Public Safety Complex has decent WiFi.

Q. Will there be demonstra�ons of phone systems before or a�er the RFP due date?

A. A�er RFP is submited by vendors, we will select vendors to come in to demonstrate.

Q. Page 7 in the RFP lists several hardlines. Where are these located?

A. These are all located within the Public Safety Complex.

Q. What is the criteria to go by to be selected as a finalist to present?

A. Price and qualita�ve requirements. Please refer to page 13 of the RFP.

Q. Will we entertain two different proposals; one for cabling and one for phones?

A. That would be preferred.

Q. Is the calling for data and phones separate?

A. We would like to start with a converged network; separate would be preferred. The wiring in the 1910 Building (Town Offices) comes up from the basement. It is much cleaner when they are split.

Q. Will the exis�ng Aruba switches be replaced?

A. They do not need to be replaced for data but could be replaced, if needed, for POE.

Q. What is the bandwidth for the 1910 Building (Town Offices)?

A. 500 Mbps – Symmetric

Q. Do you want to separate or converge?

A. We would prefer separate – a new data cable at each loca�on with a new switch – all coming from one central loca�on.

Q. Will we need to run cabling? If so, prevailing wages will apply.

A. Per DLS, this work was a prevailing wage contract from the start. Please see email from DLS below.

“The prevailing wage statute makes repeated references to "construction" and "construction of public works" which is defined by section 27D, G.L. c.149 as follows: Wherever used in sections twenty-six to twenty-seven C, inclusive, the words "construction" and "constructed" as applied to public buildings and public works shall include additions to and alterations of public works, the installation of resilient flooring in, and the painting of, public buildings and public works; certain work done preliminary to the construction of public works, namely, soil explorations, test borings and demolition of structures incidental to site clearance and right of way clearance; and the demolition of any building or structure ordered by a public authority for the preservation of public health or public safety. (Emphasis added.)

Generally, this includes new construction, renovation, repair, demolition, road or highway work, etc. of a public work by a public entity.

Typically, this will include construction of a public work involving an “addition and or alteration” of a building and/or site, construction of a building and/or site, site infrastructure work, surveying, repair or installation of building components, affixed to a building and/or site, removed from a building and/or site, repaired or replaced such as building and/or site energy management systems, plumbing / hot water systems, communication systems, asbestos removal, painting, etc.., this would be defined as construction.

I would say that installation of a telephone systems within town buildings would meet the definition of construction as discussed above, and prevailing wage would apply.”

Q: How old is the wireless network?

A: We have an Aruba wireless network, 300 series, that is about 8 years old. Everything else is over 12 years old.

Q. Will you be offering a separate site walk to measure cabling?

A. No, we will provide a full scope of work and a bid sheet for the cabling. There will be an optional site walk to review cabling needs at a date to be determined. We will issue an addendum once a date and time is confirmed.

*TOUR* 1910 Building (Town Offices) – 10:45 A.M.

Q: Where are the data cables for the main floor?

A: All cables are located in the closet on the 1st floor.

Q. Is there an intercom system in the 1910 Building?

A. No.

Q. Which phones need to be wall mounted?

A. Just one phone located in the Annex.

*TOUR* Public Safety Complex – 11:15 A.M.

Q: Is there an overhead intercom in the Fire Department?

A: No.

Q. Is there only one MDF in the Public Safety Complex?

A. Yes.

Q. Do you want integra�on between phones and intercom?

A. It is currently not integrated but would like that as an op�on.

Q. Who is the manufacturer for the paging system?

A. The paging system is through the current phone system, ComDial.

Q. What is the Aria switch for?

A. This is for the buildings WiFi.

Q. Could we review the As-Built plans for the Public Safety Complex to see data drop loca�ons?

A. We only have the schema�c that is atached as part of the addendum.

*TOUR* GAR Memorial Library – 11:45 A.M

Q. How is the WiFi?

A. Ok, not great – could use upgrading.

Q. What type of phones are currently used in the Library?

A. We are currently using regular cordless home phones that are not efficient. There is no ability to transfer calls but the cordless ability is needed due to employees being on different ends/floors of the building.

Q. Who is your landline and data provider?

A. Our landline service is provided by Verizon and our data service is provided by Comcast. We would like to get FiOS in the future.

Addi�onal Ques�ons:

Q: Are there any phone users that require any more advanced physical phones with addi�onal BLF programmable keys?

A: No.

Q: Are we por�ng all the DID/phone numbers to the new provider?

A: Yes.

Q: For the wiring, is it required to pull a permit?

A: Only if hard wiring into the electrical system.

Attachment C

West Newbury – VoIP Phone System Addendum #5 – Attachment C

2024-WN-003

Link to Google Drive with Site Walk Photos from Wednesday January 17th, 2024 https://drive.google.com/drive/folders/13ohiIVj8W8gDaSHCMc U8I6VHVFEJ8EaW https://drive.google.com/drive/folders/13ohiIVj8W8gDaSHCMcU8I6VHVFEJ8EaW https://drive.google.com/drive/folders/13ohiIVj8W8gDaSHCMcU8I6VHVFEJ8EaW

Accountant – Jennifer Walsh 112

Assessor – Christian Kuhn 116

Assessor’s Clerk – Maureen Curtin 117

Conservation – Michelle Greene 126

CPC – Community Preservation . Committee

DPW Buildings & Grounds – Brian Richard John Savage

DPW Business Mgr – Katelyn Barker 135

DPW Highway – Richard “Butch” Hills 120

Finance Assistant – Kim Petosky 113

Health – Paul Sevigny-Health Agent 119

Health Admin – Jane Krafton 118

Inspection – Sam Joslin Building/Zoning

Inspection Admin – Joan Croteau 122

Planning – Sue Brown 125

Programs/Project Mgr – Christine Wallace 130

SAGE Center – Christine Marshall

Nutrition Coordinator – Jennifer Vincent

Town Clerk – James Blatchford

Asst Clerk – Maxwell Close

Town Manager – Angus Jennings

EA to Town Mgr – Rebecca Ambra

Treasurer/Collector – Kaitlin Gilbert

Reception Desk

Water Superintendent – Mark Marlowe 128

Water Admin – Jodi Bertrand 127

Addendum #5.pdf
Att A-Notes Telecommunications Briefing & Tour 01-17-24.pdf
Att C - Google Drive Link.pdf
Att D - TELEPHONE LIST - for building.pdf

File details come from the government source that posted it. Updated .