Addendum 3 19152.pdf
PDF 69 KB Posted
- Solicitation number
- RFQ - 171 - 220000000246
- Issued by
- Keweenaw County, Michigan
About this file
This document is Addendum No. 3 related to the Fort Wilkins Historic State Park Water System Upgrades project for the State of Michigan. The addendum revises the requirements for the manufacturer's or licensed pump installer's services, specifying that a factory-trained representative or licensed pump installer must provide installation supervision, start-up, testing, and training services, with a minimum of two site visits. All costs for additional visits are to be borne by the manufacturer or pump installer, not the owner.
The related state and local contract opportunity is for the Fort Wilkins SP - Water System Upgrades project, with a bid due date of April 20, 2022. The project is located in Keweenaw County, Michigan. The solicitation provides guidance on submitting questions and proposal documents electronically via the SIGMA VSS system, with additional instructions for handling COVID-19 precautions such as mask requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 3 Page 1 of 1
ADDENDUM NO. 3
DATE: April 15, 2022
PROJECT: Fort Wilkins Historic State Park Water System Upgrades
OWNER: State of Michigan
DTMB FILE #: 751/19152.JBB
BID DATE: Wednesday, April 20, 2022 **THIS ADDENDUM DOES NOT CHANGE THE BID
DATE OR TIME
The following shall be incorporated into the Contract Documents dated 18 MARCH 2022.
PROJECT MANUAL
22 11 23 DOMESTIC WATER PUMPS
Revise 3.4 Manufacturer’s Services as follows:
3.4 MANUFACTURER’S / LICENSED PUMP INSTALLER’S SERVICES
A. A factory trained representative or licensed pump installer shall be provided for installation supervision, start-up and test services and operation and maintenance personnel training services. The representative shall make a minimum of 2 visits to the Site. The first visit shall be for assistance in the installation of equipment. Subsequent visits shall be for checking the completed installation, start-up, and training of the system. Manufacturer's representative or license pump installer shall test operate the system in the presence of the ENGINEER and verify that the equipment conforms to the requirements. Representative or pump installer shall revisit the Site as often as necessary until all trouble is corrected and the installation is entirely satisfactory.
B. All costs, including travel, lodging, meals and incidentals, for additional visits shall be at no additional cost to the OWNER.
End of Addendum No. 3
File details come from the government source that posted it. Updated .