751_19152.JBB_PlansPart-1.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ - 171 - 220000000246
- Issued by
- Keweenaw County, Michigan
About this file
This document is a set of civil and electrical plans for water system upgrades at Fort Wilkins Historic State Park in Keweenaw County, Michigan, prepared by OHM Advisors for the Michigan Department of Technology, Management and Budget. The project involves installing new year-round and seasonal water mains, water service lines, valves, and appurtenances to the East Campground, Day Use Area, Park Headquarters, Well House, and West Campground. The work will be phased between August 1 and November 10, 2022, with the East Campground closing on August 1 and the West Campground remaining open until October 31, 2022. Archaeological monitoring will be required in specified areas during excavation. Contractors must comply with all relevant codes and regulations, obtain necessary permits, and coordinate work with the owner and engineer.
Regarding pricing, the document does not specify set-asides, incumbents, or funding sources. Contractors will be responsible for all costs associated with the project, including removals, replacements, and slope restoration work required to install the new infrastructure. Payment terms and any bonding requirements are not provided in the plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICAGO
MILWAUKEE
LAKE
MICHIGAN
DETROIT
LAKE
HURON
SAULT
STE
MARIE
MARQUETTE
HOUGHTON
LAKE
SUPERIOR
DULUTH
MINNEAPOLIS
GREEN BAY
ESCANABA
TRAVERSE
CITY
GRAND RAPIDS
LANSING
PROJECT
LOCATION
FORT WILKINS HISTORIC STATE PARK WATER SYSTEM UPGRADES
AREA LOCATION MAP
GENERAL NOTES:
1. GENERAL NOTES APPLY TO ALL DRAWINGS.
2. EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE CONTRACT
DOCUMENTS AND SPECIFICATIONS CONTAINED HEREIN. ALL MATERIALS AND
WORKMANSHIP SHALL BE ACCORDING TO THE MICHIGAN DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION, 2020 EDITION.
3. DO NOT SCALE DRAWINGS. ANY DIMENSIONAL INFORMATION REQUIRED WHICH IS
NOT INDICATED ON DRAWING DIMENSION STRINGS SHALL BE OBTAINED FROM THE
ENGINEER.
4. CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS. IF
DISCREPANCIES ARE FOUND, NOTIFY ENGINEER BEFORE PROCEEDING WITH WORK.
5. CONTRACTOR SHALL PAY ALL PERMIT FEES AND FEE REQUIRED FOR ANY PERMIT
EXTENSIONS EXCEPT FOR PERMITS OBTAINED BY THE ENGINEER.
6. CONTRACTOR SHALL MAINTAIN THE IMMEDIATE CONSTRUCTION SITE IN A SECURE,
CLEAN AND SAFE MANNER.
7. PROTECTION: CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR TAKING ALL
STEPS NECESSARY TO PROTECT THE PUBLIC FROM INJURY AND ADJACENT PROPERTY
DAMAGES DURING CONSTRUCTION AS REQUIRED BY LOCAL CODES.
8. REPAIR ALL EXISTING CONSTRUCTION AFFECTED BY NEW WORK TO ITS ORIGINAL
CONDITION.
9. THE LOCATION OF ALL PUBLIC UTILITIES SHOWN ON THESE PLANS IS TAKEN FROM
THE BEST AVAILABLE DATA. PURSUANT TO ACT 174 OF THE P.A. OF 2013, AS A
CONDITION OF THIS CONTRACT, NOTICE SHALL BE GIVEN TO MISS DIG PRIOR TO
UNDERGROUND WORK TO BE PERFORMED. PHONE (800) 482-7171.
10. IF ANY ARTIFACTS ARE DISCOVERED DURING THE CONSTRUCTION ALL WORK IS TO
STOP AND JARED HYRKAS AND BOB WILD SHALL BE NOTIFIED. ARTIFACTS OR
ARCHAEOLOGICAL MATERIALS ARE DEFINED AS ABORIGINAL ANTIQUITIES AND OTHER
RECORDS ON ANTIQUITY, INCLUDING MOUNDS, MINES, EARTHWORKS, VILLAGE SITES,
CAMP SITES, BURIALS, HUMAN OR OTHER BONES, SHELLS, STONE IMPLEMENTS, BONE
OR COPPER IMPLEMENTS, POTTERY OR SHARD OF POTTERY OR OTHER OBJECTS
RELATING TO NATIVE AMERICAN OCCUPATION; AND MORE MODERN ARTIFACTS, SUCH
AS FORTS, RELICS, AND OTHER ARTIFACTS RELATING TO THE HISTORIC, COLONIAL,
TERRITORIAL, AND EARLY STATEHOOD PERIODS.
CIVIL
DRAWING INDEX:
C-001 - NOTES
C-002 - OVERALL SITE PLAN
C-003 - OVERALL SITE PHASES
C-121 - EAST CAMPGROUND
C-122 - EAST CAMPGROUND PROFILES
C-123 - EAST CAMPGROUND PROFILES
C-124 - EAST CAMPGROUND PROFILES
C-125 - EAST CAMPGROUND BUILDING CONNECTION
C-131 - DAY USE AREA
C-132 - DAY USE AREA WINTERIZATION
C-133 - DAY USE AREA BUILDING CONNECTIONS
C-134 - DAY USE TO CHECK-IN STATION
C-135 - DAY USE TO CHECK IN STATION BUILDING CONNECTIONS
C-141 - PARK HEADQUARTERS
C-142 - PARK HEADQUARTERS WINTERIZATION
C-143 - PARK HEADQUARTERS BUILDING CONNECTIONS
C-151 - WEST CAMPGROUND - ALT 1
C-152 - WEST CAMPGROUND SANITARY - ALT 1
C-153 - WEST CAMPGROUND BUILDING CONNECTION - ALT 1
C-501 - DETAILS
C-502 - DETAILS
C-503 - DETAILS - ALT 1
C-504 - DTMB SESC DETAILS
E-001 - GENERAL ELECTRICAL INFORMATION
E-101 - WEST CAMPGROUND ELECTRICAL PLAN - ALT 1
E-102 - PARK HEADQUARTER'S ELECTRICAL PLAN
E-301 - ELECTRICAL DETAILS AND SCHEDULES
DT TITLE SHEET
DEPARTMENT OF NATURAL RESOURCES
I Certify That The Civil and Plumbing Plans Were Prepared Under My Direct Supervision
PROJECT LOCATION MAP
OHM PROJECT No.
DATE:
DTMB File No.
7136-19-0090 03/18/2022
FOR BIDDING
751/19152.JBB
OWNER:
DEPARTMENT OF NATURAL RESOURCES
FORT WILKINS HISTORIC STATE PARK
15223 US-41 E
P.O. BOX 71
COPPER HARBOR, MI 49918
PROJECT CONTACTS:
906.289.4215 BOB WILD, PARK MANAGER
906.250.3993 DAN DOWDY, WESTERN UP FIELD PLANNER
906.251.0727 JEFF BARSCH, PROJECT DIRECTOR
517.331.5369 DANIELLE FOERTSCH, FIELD REPRESENTATIVE
906.475.7857 BARRY JAMES, ARCHAEOLOGY
517.335.2591 STACY TCHORZYNSKI, ARCHAEOLOGY
ENGINEER:
OHM ADVISORS
424 HANCOCK STREET
HANCOCK, MI 49930
906.482.0535
PROJECT CONTACT - JARED HYRKAS, PE
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N
S U
L
A M
A
M
O E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ Fo rt_ W ilk ins
_S ew er _S ys _U pg ra de s\D ra wi ng s\C ivi l\M isc \19
CO
V.
dw g
M ar
, 2
2 -
:13 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
COPPER HARBOR
PROJECT LOCATION
47°28'0.88"N
87°51'41.86"W
REGION LOCATION MAP
PROJECT LOCATION
I Certify That The Electrical Plans Were Prepared Under My Direct Supervision
ELECTRICAL
P
L
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N S
U
L A
M
A
M
O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ Fo rt_ W ilk ins
_S ew er _S ys _U pg ra de s\D ra wi ng s\C ivi l\P lan s_
Co ns t\1
0C
ON
.dw g M ar
, 2
2 -
:13 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
45030015075
PARK HEADQUARTERS SHEETS C-140 SERIES
DAY USE AREA
SHEETS C-130 SERIES
EAST
CAMPGROUND
SHEETS C-120
SERIES
NOTES
1. WATER MAIN SHALL BE INSTALLED IN THE SAME TRENCH AS THE EXISTING LINES, TO DEPTHS INDICATED ON
THE PLANS, UNO.
2. INSTALL SEASONALLY IN-SERVICE WATER MAIN AT 2 FT (MIN) TOP OF PIPE BURY DEPTH.
3. WATER MAINS THAT REMAIN IN SERVICE ALL YEAR SHALL BE 6 FT (MIN) WITH INSULATION UNLESS BEDROCK
IS ENCOUNTERED IN WHICH CASE BEDROCK SHALL BE EXCAVATED TO A MINIMUM OF 3.5 FT DEEP AND
INSTALLED AND INSULATED PER DETAILS 1 AND 2 ON SHEET C-501.
4. EXISTING WATER MAIN LOCATIONS ARE BASED ON EXISTING FACILITY MAPS AND MAY VARY.
5. CONTRACTOR SHALL INCLUDE ALL REMOVALS AND REPLACEMENTS OF WALKWAYS, PATHS, ASPHALT, CONCRETE, TURF ETC. AS NECESSARY TO ACCOMPLISH INSTALLATION OF THE NEW WATER MAIN AND
APPURTENANCES WHETHER OR NOT SHOWN ON THE PLANS.
6. WATER MAIN ON THE SITE, SHALL BE INSTALLED TO ALLOW FOR IT TO BE PROPERLY WINTERIZED.
7. ARCHAEOLOGICAL MONITORING OF EXCAVATION REQUIRED BETWEEN APPROXIMATELY STATIONS 2+50 TO
7+50 (DAY USE PATH), 8+50 TO 9+50 (CEMETERY), 20+00 TO 20+75 (SOLDIER'S QUARTERS), AND 32+30 TO
34+10 (RANGE LIGHTKEEPERS). OWNER TO PROVIDE ARCHAEOLOGICAL PROFESSIONAL, CONTRACTOR
SHALL COMPLY AND COORDINATE WORK WITH THE PROFESSIONAL.
U
S
YEAR ROUND PARK HEADQUARTERS WATER MAIN, SHEET C-141
SEASONAL WEST CAMPGROUND
WATER MAIN & SANITARY
SHEETS C-150 SERIES
ALTERNATE 1
SEASONAL SOLIDER QUARTERS TO CONCESSIONS WATER MAIN, SHEET C-132
YEAR ROUND DAY USE WATER MAIN C-131
SEASONAL DAY USE DRINKING
FOUNTAIN WATER MAIN, SHEET C-132
SEASONAL DAY USE TO CHECK-IN STATION WATER MAIN, SHEET C-134
YEAR ROUND WELL HOUSE WATER MAIN, SHEET C-122
SEASONAL EAST CAMPGROUND
BRANCH 1 WATER MAIN, SHEET C-122
SEASONAL EAST CAMPGROUND
BRANCH 2 WATER MAIN, SHEET C-123
SEASONAL EAST CAMPGROUND
WATER MAIN, SHEET C-121
SEASONAL EAST CAMPGROUND
BRANCH 3 WATER MAIN, SHEET C-123
SEASONAL EAST CAMPGROUND
BRANCH 5 WATER MAIN, SHEET C-124
SEASONAL EAST CAMPGROUND
BRANCH 4 WATER MAIN, SHEET C-124
YEAR ROUND MANAGER'S RESIDENCE WATER MAIN BRANCH, SHEET C-142
WATER-(YEAR ROUND SERVICE)
WATER-(SEASONAL SERVICE)
PROPOSED LEGEND
SANITARY-(SEASONAL SERVICE)
L
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N S
U
L A
M
A
M
O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ Fo rt_ W ilk ins
_S ew er _S ys _U pg ra de s\D ra wi ng s\C ivi l\P lan s_
Co ns t\1
0C
ON
.dw g M ar
, 2
2 -
:14 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
45030015075
1. CONTRACTOR SHALL FURNISH, INSTALL, AND MAINTAIN ORANGE CONSTRUCTION FENCING WHICH
PROHIBITS PEDESTRIAN TRAFFIC FROM ENTERING WORK ZONES AT ALL TIMES. FENCING ARRANGEMENTS
MAY REQUIRE PHASE SPECIFIC ARRANGEMENTS TO PROVIDE SAFETY BARRIER AT ALL LOCATIONS WHERE
EQUIPMENT IS IN OPERATION AND WHERE OPEN TRENCHES OR EXPOSED UTILITY WORK EXISTS. USE OF
EXISTING POSTS, FENCES, MAY BE UTILIZED WITH COORDINATION WITH PARK STAFF AND APPROVAL.
2. NO WORK DURING THE THURSDAY THRU MONDAY OF LABOR DAY WEEKEND. WORK MAY RESUME THE
TUESDAY FOLLOWING LABOR DAY.
3. WHEN PHASES MAY OCCUR:
3.1. AUGUST 1 - NOVEMBER 10: PHASES 1, 2A, 2B, 2C
3.2. SEPTEMBER 14 - NOVEMBER 10: PHASES 2B, 2C, 3, 4
4. THE EAST CAMPGROUND WILL BE CLOSED ON AUGUST 1, 2022 SO THERE WON'T BE CAMPERS IN THAT AREA
WHILE WORKING. THE WEST CAMPGROUND WILL REMAIN OPEN FOR FULLY MODERN USE (INCLUDING
WATER) UNTIL OCTOBER 17, 2022 AND THE WEST CAMPGROUND WILL BE OPEN FOR SEMI-MODERN USE (NO
WATER, ONLY ELECTRICITY) UNTIL OCTOBER 31, 2022 SO ALTERNATE 1 WORK NEEDS TO ACCOMODATE
THOSE DATES. BOTH CAMPGROUNDS WILL RE-OPEN FOR SEMI-MODERN USE AGAIN ON MAY 1, 2023 AND
FULL MODERN USE ON MAY 15, 2023.
U
S
LAY DOWN AREAS
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 3
PHASE 4
PHASE 1
PHASE 2B
PHASE 2A
PHASE 2C
PROPOSED LEGENDNOTES:
● PHASE 1
- SEASONAL EAST CAMPGROUND WATER MAIN, SHEET C-121
- SEASONAL EAST CAMPGROUND BRANCH 1 WATER MAIN, SHEET C-122
- SEASONAL EAST CAMPGROUND BRANCH 2 WATER MAIN, SHEET C-123
- SEASONAL EAST CAMPGROUND BRANCH 3 WATER MAIN, SHEET C-123
- SEASONAL EAST CAMPGROUND BRANCH 4 WATER MAIN, SHEET C-124
- SEASONAL EAST CAMPGROUND BRANCH 5 WATER MAIN, SHEET C-124
● PHASE 2A
- SEASONAL DAY USE DRINKING FOUNTAIN WATER MAIN, SHEET C-132
● PHASE 2B
- SEASONAL DAY USE TO CHECK-IN STATION WATER MAIN, SHEET C-134
● PHASE 2C
- SEASONAL SOLDIER QUARTERS TO CONCESSIONS WATER MAIN, SHEET C-132
● PHASE 3
- YEAR ROUND WELL HOUSE WATER MAIN, SHEET C-122
- YEAR ROUND DAY USE WATER MAIN, SHEET C-131
- YEAR ROUND PARK HEADQUARTERS WATER MAIN, SHEET C-141
- YEAR ROUND MANAGER'S RESIDENCE WATER MAIN BRANCH, SHEET C-142
● PHASE 4 ALTERNATE #1
- SEASONAL WEST CAMPGROUND WATER MAIN, SHEET C-151
- SEASONAL WEST CAMPGROUND SANITARY, SHEET C-152
PHASE SHEETS
APPROVED SOIL SPOILS AREA
10+50
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
19+23
P
L
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N S
U
L A
M
A
M
O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ Fo rt_ W ilk ins
_S ew er _S ys _U pg ra de s\D ra wi ng s\C ivi l\P lan s_
Co ns t\1
0C
ON
.dw g M ar
, 2
2 -
:14 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
120804020
EAST CAMPGROUND PLAN2
EAST CAMPGROUND PROFILE1
APPROX EX GROUND AT
CENTERLINE OF PROPOSED WM
3" HDPE, 380 LF
EX. WELL #2
EX. WELL #5
3" HDPE (380 LF)
2" HDPE (80 LF)
3" HDPE (72 LF)
IN SERVICE
YEAR ROUND
REMOVE EXISTING WATER FOUNTAIN,
DO NOT REPLACE
SLOPE RESTORATION, TYP
SLOPE RESTORATION AS
NECESSARY TO INSTALL
WATER MAIN AND APPURTANCES
REMOVE EXISTING VAULT,
DO NOT REPLACE
EAST CAMPGROUND BRANCH 4
SEE SHEET C-124
SALVAGE AND REINSTALL
EXISTING WATER SPIGOT
3" HDPE (70 LF)
3" HDPE (47 LF) IN SERVICE
YEAR ROUND
3" HDPE (95 LF)
2" HDPE (59 LF)
1" HDPE (94 LF)
CAUTION: APPROXIMATE UNDERGROUND ELECTRICAL
DEPTH UNKNOWN
CAUTION: APPROXIMATE
UNDERGROUND ELECTRICAL
DEPTH UNKNOWN
3" HDPE WM, 72 LF
6' MINIMUM BURY DEPTH, TYP
2" HDPE, 80 LF
3" HDPE WM, 47 LF
3" HDPE, 95 LF
3" HDPE, 70 LF
2" HDPE, 59 LF
HDPE SERVICE NORTH (250 LF), SIZE
VARIES 1" HDPE SERVICE SOUTH (70 LF)
& NORTH TO CHECK IN
3" HDPE (130 LF) IN SERVICE YEAR ROUND
TO WELL HOUSE
1" HDPE SERVICE (147 LF)
SEE BRANCH 1 VAULT #4,
DETAIL 7 ON C-122
1" HDPE SERVICE (57 LF)
SEE BRANCH 2, DETAIL 3 ON C-123
1" HDPE SERVICE (205 LF)
SEE BRANCH 3 VAULT #3,
DETAIL 6 ON C-123
1" HDPE SERVICE, 322 LF
SEE EAST CAMPGROUND VAULT #2,
DETAIL 6 ON C-124
FLAMMABLE MATERIAL
HAZARDOUS OR
NOTES:
1. ABANDON EX WATER LINES IN PLACE UNLESS ENCOUNTERED WHILE
TRENCHING, IN WHICH CASE THEY SHALL BE REMOVED WITHIN THE
TRENCH AND CAPPED ON EACH END OF THE TRENCH.
2. EXISTING WATER LINE DEPTH UNKNOWN.
3. ALL NEW/REINSTALLED PLUMBING/WATER FIXTURES SHALL BE
PLACED ON A 4'X4' CONCRETE SLAB PER DETAIL 9 ON C-501.
4. INCLUDE SLOPE RESTORATION ALONG THE WHOLE LINE AND AROUND
ALL FIXTURE INSTALLATIONS, CONCRETE PADS, VAULTS AND BORE
PITS.
5. PROTECT EXISTING TREES OUTSIDE OF THE TRENCH WIDTH.
WELL HOUSE
SEE SHEET C-122
EAST CAMPGROUND BRANCH 4,
SEE VAULT #2 DETAIL 6 ON C-124
2" HDPE, 53 LF
2" HDPE, 31 LF
SEE EAST CAMPGROUND
VAULT #1, DETAIL 4 ON
C-124
EXISTING SAN.
DEPTH UNKNOWN
APPROXIMATE EXISTING WATERMAIN
APPROXIMATE BEDROCK ELEVATION
CLEARING LIMITS MAX 10' WIDE
AND 12' HIGH, TYP. SUBJECT TO
ADJUSTMENT BASED ON SITE CONDITIONS
UPON REVIEW AND CONFIRMATION FROM
THE OWNER AND ENGINEER.
EAST CAMPGROUND BRANCH 1
SEE SHEET C-122
EAST CAMPGROUND BRANCH 2
SEE SHEET C-123
EAST CAMPGROUND BRANCH 3
SEE SHEET C-123
CHECK IN STATION DAY USE
SEE SHEET C-134
EAST CAMPGROUND BRANCH 5
SEE SHEET C-124
INSTALL WATERLINE DOWN TO
BEDROCK ELEVATION OR 6',
WHICHEVER IS SHALLOWER.
SEE SHEET C-501 FOR INSULATION
REQUIREMENTS OF LINES
SHALLOWER THAN 6'.
SEE VAULT #6, DETAIL #5 ON SHEET C-134
SEE WELL HOUSE VAULT #5, DETAIL #3 ON C-122
WATER & SEWER UTILITY SYMBOLS
VAULT
BUILDING CONNECTION
CURB STOP
REMOVE ASPHALT, REPLACE
WITH HMA, 5EL, TYP
REMOVE GRAVEL TRAIL,
REPLACE WITH AGGREGATE
SURFACE COURSE, 6 INCH, TYP
EAST
CAMPGROUND
VAULT #6, SEE
DETAIL 9 ON SHEET
C-135
WELL HOUSE VAULT
#5, SEE DETAIL #3
ON C-122
INSTALL WATERLINE DOWN TO 2' BELOW SURFACE.
EXCAVATE BEDROCK IF REQUIRED TO ACHIEVE PROPER DEPTH.
MAINTAIN MINIMUM 18"
VERTICAL SEPARATION
TRACE WIRE ACCESS
BOX AT TEE PER
DETAIL 14 ON C-502
EAST CAMPGROUND VAULT #1
SEE DETAIL 3 ON C-124
SHOWER CONNECTION
IN VAULT #1
GRAVEL
CONCRETE
HMA
SLOPE RESTORATION
EAST CAMPGROUND BRANCH 3,
SEE VAULT #3 DETAIL 6 ON C-123
EAST CAMPGROUND BRANCH 1,
SEE VAULT #4 DETAIL 7 ON C-122
TRACE WIRE
ACCESS BOX
1" BALL VALVE
2" BALL VALVE
3" GATE VALVE
AIR INJECTION PORT
CHLORINATION STANDPIPE
DRAIN VALVE AND VACUUM BREAKER
P
SAMPLING PORT
FIRE HYDRANT
CLEAN OUT
CURB STOP
VAULT
DRINKING FOUNTAIN
SANITARY MANHOLE
GRINDER PUMP
28+00
29+00
29+46
60+00
61+00
61+40
P
L
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N S
U
L A
M
A
M
O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ Fo rt_ W ilk ins
_S ew er _S ys _U pg ra de s\D ra wi ng s\C ivi l\P lan s_
Co ns t\1
0C
ON
.dw g M ar
, 2
2 -
:14 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
Know what's below.
before you dig.Call
R
EAST CAMPGROUND BRANCH 1 PROFILE 5
CAUTION: APPROXIMATE
UNDERGROUND ELECTRICAL
DEPTH UNKNOWN
1" HDPE SERVICE (146 LF)
APPROX EX GROUND AT CENTERLINE
OF PROPOSED WM
APPROXIMATE EXISTING WATERMAIN
WELL HOUSE PROFILE2
APPROX EX GROUND AT CENTERLINE
OF PROPOSED WM
REMOVE EXISTING WATERMAIN
3" HDPE (140 LF) IN SERVICE YEAR ROUND
TO WELL HOUSE
WELL HOUSE VAULT #5
SEE DETAIL 3 ON THIS SHEET
TIE INTO EXISTING GALVANIZED PIPE AT
THE OUTSIDE EDGE OF THE BUILDING
EAST CAMPGROUND BRANCH #1,
SEE VAULT #4 DETAIL 7 ON THIS SHEET
EAST CAMPGROUND SPIGOT:
-REMOVE EXISTING FIXTURE
-INSTALL NEW WATER SPIGOT
& CONCRETE PAD
-SEE DETAIL 6 ON THIS SHEET
1" HDPE SERVICE (147 LF)
EAST CAMPGROUND SPIGOT:
-REMOVE EXISTING FIXTURE
-INSTALL NEW WATER SPIGOT
& CONCRETE PAD
WELL HOUSE PLAN1
EAST CAMPGROUND BRANCH 1 PLAN4
WELL HOUSE VAULT #53 EAST CAMPGROUND BRANCH 1 VAULT #47 EAST CAMPGROUND SPIGOT 6
INSTALL WATERLINE DOWN TO 2' BELOW SURFACE.
EXCAVATE BEDROCK IF REQUIRED TO ACHIEVE PROPER DEPTH.
WELL HOUSE VAULT #5
SEE DETAIL 3 ON THIS SHEET
EAST CAMPGROUND BRANCH #1,
SEE VAULT #4 DETAIL 7 ON THIS SHEET
WATER & SEWER UTILITY SYMBOLS
SLOPE RESTORATION, TYP
SLOPE RESTORATION, TYP
HMA, 5EL
HMA, 5EL
SEE SHEET C-134 FOR DAY USE
TO CHECK IN STATION BRANCH
CUT, CAP AND ABANDON
WATER LINE TO FOUNTAIN
INSTALL WATERLINE DOWN TO 6' BELOW SURFACE.
EXCAVATE BEDROCK IF REQUIRED TO ACHIEVE PROPER DEPTH.
INSTALL WATERLINE DOWN TO 2' BELOW SURFACE.
EXCAVATE BEDROCK IF REQUIRED TO ACHIEVE PROPER DEPTH.
MAINTAIN MINIMUM 18"
VERTICAL SEPARATION
CAUTION: APPROXIMATE LOW PRESSURE
SEWER DEPTH UNKNOWN MAINTAIN MINIMUM
18" VERTICAL SEPARATION
SLOPE RESTORATION AFTER
REMOVING EXISTING FOUNTAIN
AND CONCRETE
REMOVE AND SALVAGE
EXISTING FIXTURE,
PROVIDE TO OWNER.
ABANDON AND CAP
EXISTING WATER LINE
SPIGOT, SEE DETAIL 6 ON THIS SHEET
SPIGOT
REPLACE DISTURBED GRAVEL AT SITES
WITH AGGREGATE SURFACE COURSE, 6 INCH
REPLACE DISTURBED GRAVEL AT SITES
WITH AGGREGATE SURFACE COURSE, 6 INCH
SEE DETAIL 12 ON C-502
FOR TYPICAL VAULT DETAILS
SEE DETAIL 10 ON C-502
FOR TYPICAL VAULT DETAILS
FIRE HYDRANT
CLEAN OUT
CURB STOP
VAULT
DRINKING FOUNTAIN
SANITARY MANHOLE
GRINDER PUMP
ROUND CATCH BASIN
SQUARE CATCH BASIN
VAULT
BUILDING CONNECTION
CURB STOP
GRAVEL
CONCRETE
HMA
SLOPE RESTORATION
1" BALL VALVE
2" BALL VALVE
3" GATE VALVE
AIR INJECTION PORT
CHLORINATION STANDPIPE
DRAIN VALVE AND VACUUM BREAKER
SAMPLING PORT
44+00
45+00
46+00
46+16
63+00
63+57
P
L
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U
E
R
E
I S
P E
N I
N S
U
L A
M
A
M
O
E
N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ Fo rt_ W ilk ins
_S ew er _S ys _U pg ra de s\D ra wi ng s\C ivi l\P lan s_
Co ns t\1
0C
ON
.dw g M ar
, 2
2 -
:14 am
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
Know what's below.
before you dig.Call
R
EAST CAMPGROUND BRANCH 3 PROFILE 5
UNDERGROUND ELECTRICAL
1" HDPE (216 LF)
APPROX EX GROUND AT CENTERLINE
OF PROPOSED WM
APPROXIMATE EXISTING WATERMAIN
EAST CAMPGROUND BRANCH 2 PROFILE 2
1" HDPE (57 LF)
APPROX EX GROUND AT CENTERLINE
OF PROPOSED WM
EAST CAMPGROUND BRANCH 2 PLAN 1
EAST CAMPGROUND SPIGOT BRANCH #2
SEE DETAIL 3 ON THIS SHEET
1" HDPE (57 LF)
REMOVE EXISTING FIXTURE
INSTALL NEW WATER SPIGOT
AND CONCRETE PAD
1" HDPE (216LF)
EAST CAMPGROUND BRANCH 3,
SEE VAULT #3 DETAIL 6 ON THIS SHEET
REMOVE EXISTING FIXTURE AND
INSTALL NEW WATER SPIGOT
AND CONCRETE PAD
REPLACE DISTURBED GRAVEL AT SITES
WITH AGGREGATE SURFACE COURSE, 6 INCH
EAST CAMPGROUND SPIGOT BRANCH 23
EAST CAMPGROUND BRANCH 3 VAULT #36
EAST CAMPGROUND BRANCH 3 PLAN4
SPIGOT BRANCH #2
SEE DETAIL 3 ON THIS SHEET
EAST CAMPGROUND BRANCH 3
SEE VAULT #3DETAIL 6 ON THIS SHEET
WATER & SEWER UTILITY SYMBOLS
SLOPE RESTORATION, TYP
SLOPE RESTORATION, TYP
INSTALL WATERLINE DOWN TO 2'
BELOW SURFACE. EXCAVATE BEDROCK IF
REQUIRED TO ACHIEVE PROPER DEPTH.
INSTALL WATERLINE DOWN TO 2'
BELOW SURFACE. EXCAVATE BEDROCK IF
REQUIRED TO ACHIEVE PROPER DEPTH.
WATER SPIGOT
APPROXIMATE UNDERGROUND ELECTRIC DEPTH UNKNOWN
APPROXIMATE UNDERGROUND ELECTRIC DEPTH UNKNOWN
REPLACE DISTURBED GRAVEL AT SITES
WITH AGGREGATE SURFACE COURSE, 6 INCH
SEE DETAIL 12 ON C-502
FOR TYPICAL VAULT DETAILS
FIRE HYDRANT
CLEAN OUT
CURB STOP
VAULT
DRINKING FOUNTAIN
SANITARY MANHOLE
GRINDER PUMP
ROUND CATCH BASIN
SQUARE CATCH BASIN
VAULT
BUILDING CONNECTION
CURB STOP
GRAVEL
CONCRETE
HMA
SLOPE RESTORATION
1" BALL VALVE
2" BALL VALVE
3" GATE VALVE
AIR INJECTION PORT
CHLORINATION STANDPIPE
DRAIN VALVE AND VACUUM BREAKER
SAMPLING PORT
File details come from the government source that posted it. Updated .