Addendum 2 is issued by Wilson Architecture for the Mapleton School District's MS Community Kitchen project, modifying the original project manual, specifications, and drawings. The addendum changes the bid opening date to May 28, 2025, at 2:00 pm and provides updates on various project details. Key modifications include clarifications on electrical wiring methods, circuit configurations for exhaust fans, device manufacturer substitutions, and panel breaker styles. The document lists four potential prime bidders: Joseph Muller Construction, Ordell Construction, Bridgeway Construction, and Proper Built.
The addendum introduces several technical revisions across multiple drawing sheets, including updates to plumbing plans, electrical plans, interior elevations, and mechanical details. Changes involve flow line information for waste piping, painting extent, interior elevation updates, and modifications to electrical outlet and data port locations. The document also addresses specific technical queries from potential bidders, such as allowing MC cable for electrical connections, confirming circuit arrangements, and approving alternative manufacturers like Legrand for electrical devices. No product substitutions have been submitted or approved to date, and the addendum prepares bidders for the upcoming bid submission with updated project documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00-Dwg_Set-25031-Mapleton_MS-25-04-28.pdf | ||
| Addendum-1-MMS_Kitchen-WA-25-05-14.pdf | ||
| 00-Project_Manual-MS_Community_Kitchen-WA-25-04-28.pdf | ||
| 00_0101-Title_Info_Page-25031-WA.docx | DOCX document | |
| 00_1113-Ad_for_Bid-25031-WA.docx | DOCX document | |
| Addendum-3-MMS_Kitchen-WA-25-05-21.pdf | ||
| 245132 Intent to Award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 2
Client: Mapleton School District
Project: MS Community Kitchen
Date: May 15, 2025
To: Interested Bidder
Prepared by: Curt Wilson, AIA; Principal, Wilson Architecture
This Addendum modifies the Project Manual, Specifications, and Drawings as follows:
1. General Information
1.1. The Bid Opening date has been changed to 5/28/2025 at 2:00 pm. See below for more information.
1.2. The Pre-Bid Meeting was held on 5/8/2025. The meeting sign-up sheet was included in
Addendum 1.
1.3. Addendum 1 was issued on 5/14/2025.
1.4. Potential Prime Bidders
• Joseph Muller Construction Joe Muller 5mullerconstruction@gmail.com*
• Ordell Construction Erik Stolle estolle@ordellconstruction.com
• Bridgeway Construction JJ Johansen jjj@bridgewaycontracting.com
• Proper Built Brad Anderson brad@properbuilt.net
* Use the gmail.com address for Joseph Muller Construction instead of the comcast.com address listed in the previous addenda.
2. Response to Questions
Question 1. Conduit & Wiring Methods to Lighting Pull-Boxes. The specifications (Section 26 0533) call for EMT raceways; please confirm whether MC cable is prohibited between luminaires and ceiling-mounted pull-boxes. If MC cable is not permitted, will a factory-installed luminaire whip satisfy the requirement? Alternatively, may we install a short section of FMC (flexible metal conduit) from each fixture’s junction box to the ceiling pull-box?
Response 1. MC cable is allowed. We do want to see home runs in EMT, but MC cable, FMC and luminaire whips would be acceptable.
Question 2. EF-3 Hood. Sheet E330 currently places EF-1, EF-2, and EF-3 all on circuit K-7. Our understanding is that EF-1 should occupy K-7, but EF-2 and EF-3 each require their own dedicated circuits per the equipment connection schedule.
Response 2. Circuits indicated on E311.3 are correct. The equipment schedule on E330 has been updated in Addendum 2 to coincide with the floor plans.
Addendum 2 Mapleton School District
MS Community Kitchen
Wilson Architecture 5/15/2025 Page 2
Question 3. Is the hood exhaust (EF-3) to be bid as a separate “Phase 2” package?
Response 3. The installation and power connection for EF-3 is in the scope of work for this project. The hood that will connect to it is a future project. We’ll revise the description in Addendum 2 to the scheduled to remove references to “phases”.
Question 4. Device Manufacturers. The specifications reference Levington for receptacles, switches, and plates. May Legrand (or other UL-listed “approved equals”) be substituted, provided they meet the same NEMA/UL requirements and match finish/color?
Response 4. Legrand is an acceptable manufacturer.
Question 5. Panel K Breaker Style. Our base bid includes bolt-on circuit breakers for Panel K. The documents do not explicitly prohibit plug-in (“stab-in”) breakers. Please confirm whether bolt-on breakers are mandatory, or if plug-in breakers are acceptable.
Response 5. Plug in breakers would be acceptable but we do want panelboard construction rather than loadcenters.
Question 6. We have received the available fault current from the utility company for the transformer serving the site. We are requesting clarification regarding responsibility for determining the proper AIC ratings for the switchgear, 800A main panel, and Panel K. Is it the electrical contractor’s responsibility to perform the AIC calculation and determine the appropriate ratings for downstream equipment? Or is this information provided elsewhere in the project documents beyond what is shown in the electrical blueprints? Please confirm whether we are expected to size the AIC ratings or if this has already been addressed in the design documents.
Response 6. AIC information noted has been added to Drawing E330 in Addendum 2.
1. Changes to the Project Manual
1.1. Section 00 0101 – Project Title and Information Page
a. Change date of Date of Last Addendum to 5/23/2025.
b. Change date for Bid Period Closing and First-Tier Sub. Disclosure Due to 5/28/2025.
1.2. Section 00 1113 – Advertisement for Bid
a. Change Bid Submission Deadline in Item 1 to 5/28/2025. Time remains 2:00 pm.
1.3. Section 00 4338 – First-Tier Subcontractor Disclosure Form
a. Change Bid Closing to 5/28/2025. Time remains 2:00 pm.
1.4. Change the Bid Submission Deadline in any other section note listed above to 5/28/2025 at 2:00 pm.
1.5. Section 00 0110 – Table of Contents
a. Delete Section 23 7420 – Packaged Outdoor Heating and Cooling Unit from the TOC.
Wilson Architecture 5/15/2025 Page 3
2. Changes to the Drawings
2.1. Sheet A351
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
• Clarification of flow line information for waste piping.
2.2. Sheet A370
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
• Revised extent of painting.
2.3. Sheet A371
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
• Multiple interior elevations updated.
2.4. Sheet P310.3 – Plumbing Plan – Crawl Space -SE
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
• Elevation of flow line at waste piping connect to the existing pipe identified.
2.5. Sheet P311.3
a. Item 1: Add Ice Maker Boxes (IMB-1) to plumbing floor plan.
b. Item 2: Add Trap Primer Array (TPA-1) to Plumbing Floor Plan.
2.6. Sheet P330
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
b. Item 1: Delete Expansion Tank Schedule (ET).
c. Item 2: Revise Detail Exterior Grease Interceptor , 2, as shown on attached revision.
d. Item 3: Add Ice Maker Box (IMB-1) to Plumbing Fixture Schedule.
2.7. Sheet E311.3
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
• Modifications to power outlet and data ports impacted by new door between Rooms
3 and 4.
• Power to trap primer in wall between Room 3 and Room 120.
2.8. Sheet E330
a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.
• Edits to the Panel Schedule, Equipment Connection Schedule, and One Line Diagram.
Wilson Architecture 5/15/2025 Page 4
3. Approved Product Substitutions
3.1. No product substitutions submitted nor approved to date.
End of Addendum
4. Attachments
4.1. Replacement sheets as noted above
4 2 42
4 2
4242 42
4 2
4 2
4 2
Sections
CW2Section
Middle School
GENERAL NOTES
a. ---
9'-6"
CEILING LEVEL
0'-0"
FIRST FLOOR
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A351
1Section
8'4'2''0'
1/4" = 1'-0"
13'-6 1/4"
ATTIC LEVEL
1' -5
2'
-6
26x14 SA
14∅ SA (E) 18x10 SA(E) 24x18 RA
9'-6"
CEILING LEVEL
0'-0"
FIRST FLOOR
13'-6 1/4"
ATTIC LEVEL
7' -0
(E) U-2A
A360
A360
A360
MIR
1/4" = 1'-0"
IA 4.24 W0.0 EA 4.24 W1
EB 4.24 W1
F.A
F.A1
C.1
C.1C.3
IA 4.24 W0.0
ADD 02 - 5/15/2025
ADD 2
A
LOCATION DISTANCE BELOW FFE DESCRIPTION
A. -1'-6 1/2"± B.O. SIDING
B. -4-0 1/2"± APPROXIMATE FINISH GRADE AT
BUILDING STEMWALL
C. -5'-1 1/2"± FLOWLINE, G.I. INLET
D. -5'-1 1/2"± FLOWLINE, G.I. DISCHARGE
E. -6'-6"± FLOWLINE CONNECTION OF NEW
WASTE PIPE TO EXISTING NORTH
OF SEPTIC TANK.
B
C D
E
B
M W
T
DWH
T
T
3' -0
8"
~7"~7"
7' -0
R.O. +1/4" BEYOND
ALL SIDES, TYP
SCHEDULE
FRAME, TYP
SC
H
ED
U
LE
CW1Door and Frame Type
Finish Schedule
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A370
ROOM 2
FINISH SCHEDULE
IDENTIFICATION
LOCATIONRM #
102 ROOM 2
FLOOR
BASE
FINMAT FINMAT FINMAT
NORTH
FINMAT
EAST
FINMAT
SOUTH
FINMAT
WEST
WALL CEILING
FINMAT
CASEWK
TYPE
NOTES RM #
H1
SWS
SWS
JAN
LOUNGE
RR
CLOSET
MAIN HALL
ROOM 3 KITCHEN
ROOM 4
SHEET
VINYL
FAC COVE FAC
EXST ACT
FAC
FAC
1/4" = 1'-0"
KEYNOTES - FINISH SCHEDULE
1. THE OWNER IS REPLACING EXISTING FLOORING AND
UNDERLAYMENT IN MOST ROOMS OF THE BUILDING UNDER
A SEPARATE CONTRACT. SEE FLOOR ASSEMBLY FA1 FOR
THE WORK. THIS WORK IS SCHEDULED TO BE COMPLETED
BY THE END OF JUNE 2025, WHICH IS PRIOR TO THE
PLANNED START OF THE KITCHEN PROJECT, THEREFORE IT
IS REFERRED TO AS “EXISTING”.
2. THE NEW FLOORING BY THE OWNER IN ROOM 4 WILL BE
INSTALLED AFTER THE NEW DOOR AND FLOORING IN
ROOM 3 IS INSTALLED.
3. PAINT ALL EXPOSED SIDES OF NEW HM DOOR AND FRAME.
4. PAINT WALLS, CEILING, AND CASEWORK IN SMALL
STORAGE ROOMS ON WEST SIDE OF ROOM 120.
H4
H5
NE HALL
SE HALL
H2 SOUTH HALL
H1
H4
H5
H2
120 PRODUCE ROOM EXST
PLASTER
DOOR SCHEDULE
IDENTIFICATION PERFORMANCE
FIRE RATING (minute)
DOOR FRAME
LOCATIONMARK
ROOM NAMERM #
SMOKE SOUND
CHARACTERISTICS
DOOR
TYPE FIN.
NOM. DIMENSIONS
WIDTH HEIGHT
NOTES
103.1 103
STATUS
MATER.
FRAME
TYPE FIN.MATER.
HARDWARE
GROUP
MARK
THERMAL
ROOM 3 KITCHEN
ROOM 3 KITCHEN103103.E1 --
NEW WD -- 103.1
ROOM 4104104.E1 --
ROOM 4104104.E2 --
0.
E2
3.
E1
120.E4
120.E1 / 120.1
120.E3
103.1
4.
E1
4.
E2
6.
E1
8.
E1
9.
E1
H5.E1114.E1
H 4.
E1
102.E1
PRODUCE ROOM120120.E1 --
120120.E2 --
120120.E3 --
120120.E4 --
PRODUCE ROOM
PRODUCE ROOM
PRODUCE ROOM
103.E1
104.E1
104.E2
120.E1
120.E2
120.E3
120.E4
EXST
EXST
EXST
DEMO
EXST
EXST
EXST
ROOM 3 KITCHEN
ROOM 4
PRODUCE
ROOM
H1
MAIN HALL
H4
NE HALL
H4H4.E1 --NE HALL H4.E1EXST
4'-0" 7'-0"
ACT
ACT
EXST
EXST
EXST
EXST
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
GYP
FRP
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
GYP
FRP
EXST
PLASTER
EXST
PLASTER
3'-0" 7'-0"
3'-0" 7'-0"
2'-0" 7'-0"
54H5.E1 --SE HALL H5.E1EXST 3'-0" 7'-0"
3'-0" 7'-0"
3'-0" 7'-0"
2'-0" 7'-0"
2'-0" 7'-0"
3'-0" 7'-0"
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
B
B
A
A
A
B
A
A
A
A
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
PAINT
PAINT
PAINT
NA
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT1 1
1 3
1 EXST
1 EXST
1 EXST
1 3
1 2
1 2
1 EXST
1 EXST
EXST
PLASTER
EXST
EXST
PAINT
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
PAINT
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
PAINT
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
PRODUCE ROOM120120.1 -- 120.1NEW 3'-0" 7'-0"NA NA NA NA YES B HMHM PAINT PAINT1 4
KEYPLAN
First Floor NTS
Type A Type B
GYP
FRP
PAINT GYP
FRP
PAINT GYP
FRP
PAINT
EXST
SHEET
VINYL
EXST
VINYL
PLANK
SHEET
VINYL
FAC
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
COVE FAC
Door Frame 1
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
ADD 02 - 5/15/2025
ADD 2
ADD 2
PAINTPAINT PAINT PAINT
43ADD 2
ADD 2
CW
Interior Elevations
KEYNOTES
1. NEW WALL
2. FRP PANEL
3. COVED BASE
4. RESIDENTIAL RANGE
5. COMMERCIAL RANGE - FUTURE
6. SS COUNTER, BY OWNER
7. SINGLE SINK COUNTER, SEE PLUMBING
8. DOUBLE SINK COUNTER, SEE PLUMBING
9. TRIPLE SINK COUNTER, SEE PLUMBING
10. DISHWASHER, SEE PLUMBING
11. FRIDGE, BY OWNER
12. HAND WASH SINK, SEE PLUMBING
13. MOP SINK, SEE PLUMBING
14. FLOOR SINK
15. TYPE 2 EXHAUST HOOD
16. DEMO OUTLET
17. ELECTRICAL OUTLET
18. DEMO LIGHT SWITCH
19. PATCH AND REPAIR WALL FINISH AT DEMO
20. DEMO TRIM AS NEEDED
21. FIELD VERIFY LOCATION OF EXST SURFACE MOUNTED
DATA DEVICE AND CABLING. DEMO IS WITHIN 6" OF NEW
WOOD TRIM. TERMINATE ABOVE THE CEILING
22. DEMO SURFACE MOUNTED DATA DEVICE AND CABLING.
TERMINATE ABOVE THE CEILING.
23. RESIDENTIAL RANGE HOOD
24. DEMO GRILL AND DUCTWORK IN CABINET, SEE
MECHANICAL
25. ACCESS PANEL AT TRAP PRIMER
26. INFILL RECESSED AREA WITH 3/8" GYP BOARD WITH
FURRING AT 12" OC. TO FLUSH OUT WITH ADJACENT
WOOD FRAME.
27. RECESSED AREA TO REMAIN
28. WALL FRAMING TO REMAIN
29. DEMO WALL
30. DEMO WALL AS NEEDED FOR NEW DOOR
31. NEW WOOD TRIM. PAINT TO MATCH EXST TRIM.
32. WOOD TRIM TO REMAIN
33. DEMO WOOD TRIM
34. DEMO CASE WORK
35. DOOR TO REMAIN
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A371 Interior Elevation
2Interior Elevation
1Interior Elevation
NorthWest
East
Room 3 Kitchen
Produce Room
3Interior Elevation3/8" = 1'-0"
3/8" = 1'-0"
Rm 4
SouthEast
64"32"16''0'
3/8" = 1'-0"
NorthWestSouthEast
13 13
TYP
TYP
TYP
TYP
17 171717
1717 17
Interior Elevation 4Interior Elevation3/8" = 1'-0" Rm 3 Kitchen Demo
WestWest
ADD 2
ADD 2
ADD 02 - 5/15/2025
ADD 2
ADD 2
ADD 2
ADD 2
ADD 2
NOTE: SEE 4/A371 FOR
EXISTING CONDITION
AND DEMO OF WEST
WALL OF ROOM 3.
+4'-6"
T.O. FRP
ADD 2
31 31
DW
DWB
DWH
T
T
CW1Plumbing Plan Crawl Space - SE
Plumbing Plan - Crawl Space - SE
GENERAL NOTES - PLUMBING PLAN
a. SEE M330 FOR PLUMBING LEGEND.
Middle School
64"32"16"0'
3/8" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
P310.3
ADD 2
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOMH1
MAIN HALL
H4
NE HALL
0.
E2
3.
E1
120.E4
120.1
120.E3
103.1
4.
E1
H 4.
E1
ROOM 2122
BOILER BLDG
4.
E2
2" V (UP)
2" V (UP)
1" CW (UP) 1" HW (UP)
2" V (UP)
3/4" HW (UP)
3/4" CW (UP)
1/2" CW (UP)
1/2" HW (UP)
GI-1, SEE DETAIL 2/P330
3" GW (UP TO FS)
2" GW (UP TO FD)
3" GW (UP TO FS)
2" GW (UP TO FD)
2" V (UP)
4" GW (UP TO COTG)
4" W (UP TO COTG)
(E) 4" W TO SEPTIC SYSTEM
3" GW (UP TO FD)
2" GW (UP TO FS)
2" V (UP)
3" GW (UP TO MS)
2" GW (UP TO HS)
3" GW 3" GW
4" G W
4" G
W
3/ 4"
H W
3/ 4"
C W
1" C
W
1" H
W
4" G W
4" GW
1-1/4" CW
CONNECT (N) 1-1/4" CW TO
(E) 2-3/4" CW OD
1-1/4" CW (UP)
(E) 2" UP TO FIRE HOSE
CABINET
4" W 4" W
4" W (UP TO COTG)
DET-1
(E)1/2" OD(E) 1-1/4" OD(E) 2" OD(E) 2-3/4" OD
(E ) 4
" W
CONNECT (N) 4" W
TO (E) 4" W
SEE 1/A351 FOR FLOWLINE
ELEVATION AT WASTE PIPE
CONNECTION TO EXST.
ADD 02 - 5/15/2025
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K S
DW
DWB
DWH
T
T
CW1Plumbing Plan Floor Plan & Above Ceiling -SE
Plumbing Plan - Floor Plan & Above Ceiling - SE
GENERAL NOTES - PLUMBING PLAN
a. SEE M330 FOR PLUMBING LEGEND.
Middle School
64"32"16"0'
3/8" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
P311.3
ADD 2
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOMH1
MAIN HALL
H4
NE HALL
ROOM 2122
BOILER BLDG
0.
E2
3.
E1
120.E4
120.1
120.E3
103.1
4.
E1
H 4.
E1
4.
E2
3" VTR (UP)
2" V (DN)
2" V
1/ 2"
H W1/ 2"
C W
1-1/4" CW
1-1/4" HW
1" CW
1" HW
2" V2" V
1-1/4" H&CW CONNECTIONS
1-1/4" CW (DN)
3" VTR (UP)
1" CW (DN)
1" HW (DN)
2" V (DN)
3/4" HW (DN)
3/4" CW (DN)
1/2" HW (DN)
1/2" CW (DN)
FD-2
FD-1
FD-3
KS-2
FS-1
FS-1
KS-3
FS-1
KS-1 FS-1
MS-1
HS-1
DWH-1, SEE DETAIL 1/P361
GI-1, SEE DETAIL 2/P330
DET-1
WALL CLEANOUT
WALL CLEANOUT
COTG
COTGCOTG
TPA-1
1/2" CW (DN) IMB-1
IMB-1
ADD 02 - 5/15/2025
ADD 2
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K
PROVIDE 3/4" MINUS
GRAVEL BACKFILL, 95%
COMPACTION
UNDISTURBED SOIL
GREASE WASTE INLET.
SEE DRAWINGS FOR
CONTINUATION.
GREASE & SANITARY
VENTS, SEE DRAWINGS FOR
SIZE & CONTINUATION.
GRADE, SURFACE FLOW CONTROL FITTING
HEIGHT AS REQ'D MATCH
GRADE
COVER FLUSH W/ GRADE
EXTENSION COLLAR AS
REQUIRED
CLEANOUT FLUSH W/
GRADE
SANITARY WASTE OUTLET.
SEE DRAWINGS FOR
CONTINUATION.
SEE 1/A351 FOR ADDITIONAL INFORMATION.
RV
DWH-1
DET
CW
HWS
TEMP/PRESSURE RELIEF
VALVE. ROUTE DISCHARGE
TO MOP SINK.
LOCKABLE ISOLATION VALVE
CW
Plumbing Details
GENERAL NOTES - PLUMBING PLAN
a. ---
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
P330
Exterior Grease Interceptor SectionNTS
DWH - Electric SectionNTS
ADD 2
ADD 02 - 5/15/2025
ADD 2
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K
E X X
E X
X X
X
DW
DWB
DWH
I
EF3
EF1
RH1
EF2
T
T
DUPLEX OUTLET MOUNTED AT +18"
UNLESS OTHERWISE NOTED
DATA PORT
X
E
EXST OUTLET TO REMAIN
EXST DUPLEX TO BE REMOVED
POWER
X
EXST FOURPLEX TO BE REMOVED
EF1
BRANCH CIRCUIT PANEL
EXHAUST FAN ELECTRICAL CONNECTION
AND DISCONNECT SWITCH
J
DISCONNECT SWITCH
MOTOR CONNECTION
JUNCTION BOX FOR EQUIPMENT
CONNECTION
RANGE OUTLET NEMA 5-50R
CW1Electrical Plan
SE
Electrical Plan - SE
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
E311.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
0.
E2
3.
E1
120.E4
120.1
120.E310 4.
E1
6.
E1
8.
E1
9.
E1
H5.E1114.E1
5.
E1
H 4.
E1
ROOM 2
102.E1
STORAGE
BOILER BLDG
ROOM 4
103.1
4.
E2
ROUTE NEW FEEDER TO
PANEL K IN ATTIC SPACE.
NEW 300/3 ENCLOSED
CIRCUIT BREAKER TAP
SWITCHBOARD BUS TO
FEED NEW BREAKER.
EXISTING 800 AMP MAIN
DISTRIBUTION PANEL.
NEW PANEL K
K-17
K-15
K-13
GFI
K-29 K-27
K-25
K-25
K-23
+42"
TRAP
PRIMER
OUTLET
K-23
K-21
GFI
+42"
GFI
TRAP
PRIMER
OUTLET
K-21
GFI
K-21+42"
K-21 +42"
GFI
K-19 K-19
GFI GFI
K-14
K-17K-19
K-7
K-20:22:24
K-8:10:12 J
J
K-2:4:6
J K-1:3:5
LEGEND - ELECTRICAL PLAN
K-33:35:37
U-2A
MAU-1
1400 LBS
K-9:11 R1
FIELD VERIFY LOCATION OF EXST
SURFACE MOUNTED DATA
DEVICE AND CABLING. DEMO IS
WITHIN 6" OF NEW WOOD TRIM.
TERMINATE ABOVE THE CEILING.
ADD 2
ADD 01 - 5/14/2025
ADD 2
ADD 2
K-16
ADD 2
GFI
TRAP PRIMER OUTLET
K-21
ADD 2
EXP 6/30 /2025
James Krumsick
CW1One Line Diagram One Line Diagram
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
E330
NTS
ADD 1
ADD 01 - 5/14/2025
ADD 2
ADD 2
ADD 2
ADD 2
ADD 2
ADD 2
ADD 2
K-20:22:24
AVAILABLE FAULT
CURRENT: 24,706 AIC
AVAILABLE FAULT
CURRENT: 52,600 AIC
1/2"C 3#12, #12GExhaust Fan for Future Hood D 2
BUSSING SHALL BE RATED FOR 22,000 AIC. BREAKERS SHALL BE SERIES
RATED WITH UPSTREAM 300 AMP FEEDER BREAKER FOR THE AVAILABLE
FAULT CURRENT AT THAT BREAKER: 24,706 AIC
Future Cooking Exhaust Hood