Addendum-2-MMS_Kitchen-WA-25-05-15.pdf

PDF 7 MB Posted

Attached to
Community Kitchen Construction
Solicitation number
S-P20015-00013726
Issued by
Lane County, Mcminnville City, Oregon

About this file

Addendum 2 is issued by Wilson Architecture for the Mapleton School District's MS Community Kitchen project, modifying the original project manual, specifications, and drawings. The addendum changes the bid opening date to May 28, 2025, at 2:00 pm and provides updates on various project details. Key modifications include clarifications on electrical wiring methods, circuit configurations for exhaust fans, device manufacturer substitutions, and panel breaker styles. The document lists four potential prime bidders: Joseph Muller Construction, Ordell Construction, Bridgeway Construction, and Proper Built.

The addendum introduces several technical revisions across multiple drawing sheets, including updates to plumbing plans, electrical plans, interior elevations, and mechanical details. Changes involve flow line information for waste piping, painting extent, interior elevation updates, and modifications to electrical outlet and data port locations. The document also addresses specific technical queries from potential bidders, such as allowing MC cable for electrical connections, confirming circuit arrangements, and approving alternative manufacturers like Legrand for electrical devices. No product substitutions have been submitted or approved to date, and the addendum prepares bidders for the upcoming bid submission with updated project documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 2

Client: Mapleton School District

Project: MS Community Kitchen

Date: May 15, 2025

To: Interested Bidder

Prepared by: Curt Wilson, AIA; Principal, Wilson Architecture

This Addendum modifies the Project Manual, Specifications, and Drawings as follows:

1. General Information

1.1. The Bid Opening date has been changed to 5/28/2025 at 2:00 pm. See below for more information.

1.2. The Pre-Bid Meeting was held on 5/8/2025. The meeting sign-up sheet was included in

Addendum 1.

1.3. Addendum 1 was issued on 5/14/2025.

1.4. Potential Prime Bidders

• Joseph Muller Construction Joe Muller 5mullerconstruction@gmail.com*

• Ordell Construction Erik Stolle estolle@ordellconstruction.com

• Bridgeway Construction JJ Johansen jjj@bridgewaycontracting.com

• Proper Built Brad Anderson brad@properbuilt.net

* Use the gmail.com address for Joseph Muller Construction instead of the comcast.com address listed in the previous addenda.

2. Response to Questions

Question 1. Conduit & Wiring Methods to Lighting Pull-Boxes. The specifications (Section 26 0533) call for EMT raceways; please confirm whether MC cable is prohibited between luminaires and ceiling-mounted pull-boxes. If MC cable is not permitted, will a factory-installed luminaire whip satisfy the requirement? Alternatively, may we install a short section of FMC (flexible metal conduit) from each fixture’s junction box to the ceiling pull-box?

Response 1. MC cable is allowed. We do want to see home runs in EMT, but MC cable, FMC and luminaire whips would be acceptable.

Question 2. EF-3 Hood. Sheet E330 currently places EF-1, EF-2, and EF-3 all on circuit K-7. Our understanding is that EF-1 should occupy K-7, but EF-2 and EF-3 each require their own dedicated circuits per the equipment connection schedule.

Response 2. Circuits indicated on E311.3 are correct. The equipment schedule on E330 has been updated in Addendum 2 to coincide with the floor plans.

Addendum 2 Mapleton School District

MS Community Kitchen

Wilson Architecture 5/15/2025 Page 2

Question 3. Is the hood exhaust (EF-3) to be bid as a separate “Phase 2” package?

Response 3. The installation and power connection for EF-3 is in the scope of work for this project. The hood that will connect to it is a future project. We’ll revise the description in Addendum 2 to the scheduled to remove references to “phases”.

Question 4. Device Manufacturers. The specifications reference Levington for receptacles, switches, and plates. May Legrand (or other UL-listed “approved equals”) be substituted, provided they meet the same NEMA/UL requirements and match finish/color?

Response 4. Legrand is an acceptable manufacturer.

Question 5. Panel K Breaker Style. Our base bid includes bolt-on circuit breakers for Panel K. The documents do not explicitly prohibit plug-in (“stab-in”) breakers. Please confirm whether bolt-on breakers are mandatory, or if plug-in breakers are acceptable.

Response 5. Plug in breakers would be acceptable but we do want panelboard construction rather than loadcenters.

Question 6. We have received the available fault current from the utility company for the transformer serving the site. We are requesting clarification regarding responsibility for determining the proper AIC ratings for the switchgear, 800A main panel, and Panel K. Is it the electrical contractor’s responsibility to perform the AIC calculation and determine the appropriate ratings for downstream equipment? Or is this information provided elsewhere in the project documents beyond what is shown in the electrical blueprints? Please confirm whether we are expected to size the AIC ratings or if this has already been addressed in the design documents.

Response 6. AIC information noted has been added to Drawing E330 in Addendum 2.

1. Changes to the Project Manual

1.1. Section 00 0101 – Project Title and Information Page

a. Change date of Date of Last Addendum to 5/23/2025.

b. Change date for Bid Period Closing and First-Tier Sub. Disclosure Due to 5/28/2025.

1.2. Section 00 1113 – Advertisement for Bid

a. Change Bid Submission Deadline in Item 1 to 5/28/2025. Time remains 2:00 pm.

1.3. Section 00 4338 – First-Tier Subcontractor Disclosure Form

a. Change Bid Closing to 5/28/2025. Time remains 2:00 pm.

1.4. Change the Bid Submission Deadline in any other section note listed above to 5/28/2025 at 2:00 pm.

1.5. Section 00 0110 – Table of Contents

a. Delete Section 23 7420 – Packaged Outdoor Heating and Cooling Unit from the TOC.

Wilson Architecture 5/15/2025 Page 3

2. Changes to the Drawings

2.1. Sheet A351

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Clarification of flow line information for waste piping.

2.2. Sheet A370

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Revised extent of painting.

2.3. Sheet A371

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Multiple interior elevations updated.

2.4. Sheet P310.3 – Plumbing Plan – Crawl Space -SE

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Elevation of flow line at waste piping connect to the existing pipe identified.

2.5. Sheet P311.3

a. Item 1: Add Ice Maker Boxes (IMB-1) to plumbing floor plan.

b. Item 2: Add Trap Primer Array (TPA-1) to Plumbing Floor Plan.

2.6. Sheet P330

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

b. Item 1: Delete Expansion Tank Schedule (ET).

c. Item 2: Revise Detail Exterior Grease Interceptor , 2, as shown on attached revision.

d. Item 3: Add Ice Maker Box (IMB-1) to Plumbing Fixture Schedule.

2.7. Sheet E311.3

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Modifications to power outlet and data ports impacted by new door between Rooms

3 and 4.

• Power to trap primer in wall between Room 3 and Room 120.

2.8. Sheet E330

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Edits to the Panel Schedule, Equipment Connection Schedule, and One Line Diagram.

Wilson Architecture 5/15/2025 Page 4

3. Approved Product Substitutions

3.1. No product substitutions submitted nor approved to date.

End of Addendum

4. Attachments

4.1. Replacement sheets as noted above

4 2 42

4 2

4242 42

4 2

4 2

4 2

Sections

CW2Section

Middle School

GENERAL NOTES

a. ---

9'-6"

CEILING LEVEL

0'-0"

FIRST FLOOR

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A351

1Section

8'4'2''0'

1/4" = 1'-0"

13'-6 1/4"

ATTIC LEVEL

1' -5

2'

-6

26x14 SA

14∅ SA (E) 18x10 SA(E) 24x18 RA

9'-6"

CEILING LEVEL

0'-0"

FIRST FLOOR

13'-6 1/4"

ATTIC LEVEL

7' -0

(E) U-2A

A360

A360

A360

MIR

1/4" = 1'-0"

IA 4.24 W0.0 EA 4.24 W1

EB 4.24 W1

F.A

F.A1

C.1

C.1C.3

IA 4.24 W0.0

ADD 02 - 5/15/2025

ADD 2

A

LOCATION DISTANCE BELOW FFE DESCRIPTION

A. -1'-6 1/2"± B.O. SIDING

B. -4-0 1/2"± APPROXIMATE FINISH GRADE AT

BUILDING STEMWALL

C. -5'-1 1/2"± FLOWLINE, G.I. INLET

D. -5'-1 1/2"± FLOWLINE, G.I. DISCHARGE

E. -6'-6"± FLOWLINE CONNECTION OF NEW

WASTE PIPE TO EXISTING NORTH

OF SEPTIC TANK.

B

C D

E

B

M W

T

DWH

T

T

3' -0

8"

~7"~7"

7' -0

R.O. +1/4" BEYOND

ALL SIDES, TYP

SCHEDULE

FRAME, TYP

SC

H

ED

U

LE

CW1Door and Frame Type

Finish Schedule

Middle School

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A370

ROOM 2

FINISH SCHEDULE

IDENTIFICATION

LOCATIONRM #

102 ROOM 2

FLOOR

BASE

FINMAT FINMAT FINMAT

NORTH

FINMAT

EAST

FINMAT

SOUTH

FINMAT

WEST

WALL CEILING

FINMAT

CASEWK

TYPE

NOTES RM #

H1

SWS

SWS

JAN

LOUNGE

RR

CLOSET

MAIN HALL

ROOM 3 KITCHEN

ROOM 4

SHEET

VINYL

FAC COVE FAC

EXST ACT

FAC

FAC

1/4" = 1'-0"

KEYNOTES - FINISH SCHEDULE

1. THE OWNER IS REPLACING EXISTING FLOORING AND

UNDERLAYMENT IN MOST ROOMS OF THE BUILDING UNDER

A SEPARATE CONTRACT. SEE FLOOR ASSEMBLY FA1 FOR

THE WORK. THIS WORK IS SCHEDULED TO BE COMPLETED

BY THE END OF JUNE 2025, WHICH IS PRIOR TO THE

PLANNED START OF THE KITCHEN PROJECT, THEREFORE IT

IS REFERRED TO AS “EXISTING”.

2. THE NEW FLOORING BY THE OWNER IN ROOM 4 WILL BE

INSTALLED AFTER THE NEW DOOR AND FLOORING IN

ROOM 3 IS INSTALLED.

3. PAINT ALL EXPOSED SIDES OF NEW HM DOOR AND FRAME.

4. PAINT WALLS, CEILING, AND CASEWORK IN SMALL

STORAGE ROOMS ON WEST SIDE OF ROOM 120.

H4

H5

NE HALL

SE HALL

H2 SOUTH HALL

H1

H4

H5

H2

120 PRODUCE ROOM EXST

PLASTER

DOOR SCHEDULE

IDENTIFICATION PERFORMANCE

FIRE RATING (minute)

DOOR FRAME

LOCATIONMARK

ROOM NAMERM #

SMOKE SOUND

CHARACTERISTICS

DOOR

TYPE FIN.

NOM. DIMENSIONS

WIDTH HEIGHT

NOTES

103.1 103

STATUS

MATER.

FRAME

TYPE FIN.MATER.

HARDWARE

GROUP

MARK

THERMAL

ROOM 3 KITCHEN

ROOM 3 KITCHEN103103.E1 --

NEW WD -- 103.1

ROOM 4104104.E1 --

ROOM 4104104.E2 --

0.

E2

3.

E1

120.E4

120.E1 / 120.1

120.E3

103.1

4.

E1

4.

E2

6.

E1

8.

E1

9.

E1

H5.E1114.E1

H 4.

E1

102.E1

PRODUCE ROOM120120.E1 --

120120.E2 --

120120.E3 --

120120.E4 --

PRODUCE ROOM

PRODUCE ROOM

PRODUCE ROOM

103.E1

104.E1

104.E2

120.E1

120.E2

120.E3

120.E4

EXST

EXST

EXST

DEMO

EXST

EXST

EXST

ROOM 3 KITCHEN

ROOM 4

PRODUCE

ROOM

H1

MAIN HALL

H4

NE HALL

H4H4.E1 --NE HALL H4.E1EXST

4'-0" 7'-0"

ACT

ACT

EXST

EXST

EXST

EXST

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

GYP

FRP

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

GYP

FRP

EXST

PLASTER

EXST

PLASTER

3'-0" 7'-0"

3'-0" 7'-0"

2'-0" 7'-0"

54H5.E1 --SE HALL H5.E1EXST 3'-0" 7'-0"

3'-0" 7'-0"

3'-0" 7'-0"

2'-0" 7'-0"

2'-0" 7'-0"

3'-0" 7'-0"

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

B

B

A

A

A

B

A

A

A

A

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

PAINT

PAINT

PAINT

NA

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT1 1

1 3

1 EXST

1 EXST

1 EXST

1 3

1 2

1 2

1 EXST

1 EXST

EXST

PLASTER

EXST

EXST

PAINT

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

PAINT

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

PAINT

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

PRODUCE ROOM120120.1 -- 120.1NEW 3'-0" 7'-0"NA NA NA NA YES B HMHM PAINT PAINT1 4

KEYPLAN

First Floor NTS

Type A Type B

GYP

FRP

PAINT GYP

FRP

PAINT GYP

FRP

PAINT

EXST

SHEET

VINYL

EXST

VINYL

PLANK

SHEET

VINYL

FAC

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

COVE FAC

Door Frame 1

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

ADD 02 - 5/15/2025

ADD 2

ADD 2

PAINTPAINT PAINT PAINT

43ADD 2

ADD 2

CW

Interior Elevations

KEYNOTES

1. NEW WALL

2. FRP PANEL

3. COVED BASE

4. RESIDENTIAL RANGE

5. COMMERCIAL RANGE - FUTURE

6. SS COUNTER, BY OWNER

7. SINGLE SINK COUNTER, SEE PLUMBING

8. DOUBLE SINK COUNTER, SEE PLUMBING

9. TRIPLE SINK COUNTER, SEE PLUMBING

10. DISHWASHER, SEE PLUMBING

11. FRIDGE, BY OWNER

12. HAND WASH SINK, SEE PLUMBING

13. MOP SINK, SEE PLUMBING

14. FLOOR SINK

15. TYPE 2 EXHAUST HOOD

16. DEMO OUTLET

17. ELECTRICAL OUTLET

18. DEMO LIGHT SWITCH

19. PATCH AND REPAIR WALL FINISH AT DEMO

20. DEMO TRIM AS NEEDED

21. FIELD VERIFY LOCATION OF EXST SURFACE MOUNTED

DATA DEVICE AND CABLING. DEMO IS WITHIN 6" OF NEW

WOOD TRIM. TERMINATE ABOVE THE CEILING

22. DEMO SURFACE MOUNTED DATA DEVICE AND CABLING.

TERMINATE ABOVE THE CEILING.

23. RESIDENTIAL RANGE HOOD

24. DEMO GRILL AND DUCTWORK IN CABINET, SEE

MECHANICAL

25. ACCESS PANEL AT TRAP PRIMER

26. INFILL RECESSED AREA WITH 3/8" GYP BOARD WITH

FURRING AT 12" OC. TO FLUSH OUT WITH ADJACENT

WOOD FRAME.

27. RECESSED AREA TO REMAIN

28. WALL FRAMING TO REMAIN

29. DEMO WALL

30. DEMO WALL AS NEEDED FOR NEW DOOR

31. NEW WOOD TRIM. PAINT TO MATCH EXST TRIM.

32. WOOD TRIM TO REMAIN

33. DEMO WOOD TRIM

34. DEMO CASE WORK

35. DOOR TO REMAIN

Middle School

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A371 Interior Elevation

2Interior Elevation

1Interior Elevation

NorthWest

East

Room 3 Kitchen

Produce Room

3Interior Elevation3/8" = 1'-0"

3/8" = 1'-0"

Rm 4

SouthEast

64"32"16''0'

3/8" = 1'-0"

NorthWestSouthEast

13 13

TYP

TYP

TYP

TYP

17 171717

1717 17

Interior Elevation 4Interior Elevation3/8" = 1'-0" Rm 3 Kitchen Demo

WestWest

ADD 2

ADD 2

ADD 02 - 5/15/2025

ADD 2

ADD 2

ADD 2

ADD 2

ADD 2

NOTE: SEE 4/A371 FOR

EXISTING CONDITION

AND DEMO OF WEST

WALL OF ROOM 3.

+4'-6"

T.O. FRP

ADD 2

31 31

DW

DWB

DWH

T

T

CW1Plumbing Plan Crawl Space - SE

Plumbing Plan - Crawl Space - SE

GENERAL NOTES - PLUMBING PLAN

a. SEE M330 FOR PLUMBING LEGEND.

Middle School

64"32"16"0'

3/8" = 1'-0"

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

P310.3

ADD 2

ROOM 3

KITCHEN

ROOM 4

PRODUCE

ROOMH1

MAIN HALL

H4

NE HALL

0.

E2

3.

E1

120.E4

120.1

120.E3

103.1

4.

E1

H 4.

E1

ROOM 2122

BOILER BLDG

4.

E2

2" V (UP)

2" V (UP)

1" CW (UP) 1" HW (UP)

2" V (UP)

3/4" HW (UP)

3/4" CW (UP)

1/2" CW (UP)

1/2" HW (UP)

GI-1, SEE DETAIL 2/P330

3" GW (UP TO FS)

2" GW (UP TO FD)

3" GW (UP TO FS)

2" GW (UP TO FD)

2" V (UP)

4" GW (UP TO COTG)

4" W (UP TO COTG)

(E) 4" W TO SEPTIC SYSTEM

3" GW (UP TO FD)

2" GW (UP TO FS)

2" V (UP)

3" GW (UP TO MS)

2" GW (UP TO HS)

3" GW 3" GW

4" G W

4" G

W

3/ 4"

H W

3/ 4"

C W

1" C

W

1" H

W

4" G W

4" GW

1-1/4" CW

CONNECT (N) 1-1/4" CW TO

(E) 2-3/4" CW OD

1-1/4" CW (UP)

(E) 2" UP TO FIRE HOSE

CABINET

4" W 4" W

4" W (UP TO COTG)

DET-1

(E)1/2" OD(E) 1-1/4" OD(E) 2" OD(E) 2-3/4" OD

(E ) 4

" W

CONNECT (N) 4" W

TO (E) 4" W

SEE 1/A351 FOR FLOWLINE

ELEVATION AT WASTE PIPE

CONNECTION TO EXST.

ADD 02 - 5/15/2025

E

X

P

I

R

E

S : 12

J

A

N

1, DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 59,544

OREGONP

A

U L

E . F O O

K S

DW

DWB

DWH

T

T

CW1Plumbing Plan Floor Plan & Above Ceiling -SE

Plumbing Plan - Floor Plan & Above Ceiling - SE

GENERAL NOTES - PLUMBING PLAN

a. SEE M330 FOR PLUMBING LEGEND.

Middle School

64"32"16"0'

3/8" = 1'-0"

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

P311.3

ADD 2

ROOM 3

KITCHEN

ROOM 4

PRODUCE

ROOMH1

MAIN HALL

H4

NE HALL

ROOM 2122

BOILER BLDG

0.

E2

3.

E1

120.E4

120.1

120.E3

103.1

4.

E1

H 4.

E1

4.

E2

3" VTR (UP)

2" V (DN)

2" V

1/ 2"

H W1/ 2"

C W

1-1/4" CW

1-1/4" HW

1" CW

1" HW

2" V2" V

1-1/4" H&CW CONNECTIONS

1-1/4" CW (DN)

3" VTR (UP)

1" CW (DN)

1" HW (DN)

2" V (DN)

3/4" HW (DN)

3/4" CW (DN)

1/2" HW (DN)

1/2" CW (DN)

FD-2

FD-1

FD-3

KS-2

FS-1

FS-1

KS-3

FS-1

KS-1 FS-1

MS-1

HS-1

DWH-1, SEE DETAIL 1/P361

GI-1, SEE DETAIL 2/P330

DET-1

WALL CLEANOUT

WALL CLEANOUT

COTG

COTGCOTG

TPA-1

1/2" CW (DN) IMB-1

IMB-1

ADD 02 - 5/15/2025

ADD 2

E

X

P

I

R

E

S : 12

J

A

N

1, DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 59,544

OREGONP

A

U L

E . F O O

K

PROVIDE 3/4" MINUS

GRAVEL BACKFILL, 95%

COMPACTION

UNDISTURBED SOIL

GREASE WASTE INLET.

SEE DRAWINGS FOR

CONTINUATION.

GREASE & SANITARY

VENTS, SEE DRAWINGS FOR

SIZE & CONTINUATION.

GRADE, SURFACE FLOW CONTROL FITTING

HEIGHT AS REQ'D MATCH

GRADE

COVER FLUSH W/ GRADE

EXTENSION COLLAR AS

REQUIRED

CLEANOUT FLUSH W/

GRADE

SANITARY WASTE OUTLET.

SEE DRAWINGS FOR

CONTINUATION.

SEE 1/A351 FOR ADDITIONAL INFORMATION.

RV

DWH-1

DET

CW

HWS

TEMP/PRESSURE RELIEF

VALVE. ROUTE DISCHARGE

TO MOP SINK.

LOCKABLE ISOLATION VALVE

CW

Plumbing Details

GENERAL NOTES - PLUMBING PLAN

a. ---

Middle School

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

P330

Exterior Grease Interceptor SectionNTS

DWH - Electric SectionNTS

ADD 2

ADD 02 - 5/15/2025

ADD 2

E

X

P

I

R

E

S : 12

J

A

N

1, DIGITALLY SIGNED

RE

GI

STERED PROFESSIONALENGINEER# 59,544

OREGONP

A

U L

E . F O O

K

E X X

E X

X X

X

DW

DWB

DWH

I

EF3

EF1

RH1

EF2

T

T

DUPLEX OUTLET MOUNTED AT +18"

UNLESS OTHERWISE NOTED

DATA PORT

X

E

EXST OUTLET TO REMAIN

EXST DUPLEX TO BE REMOVED

POWER

X

EXST FOURPLEX TO BE REMOVED

EF1

BRANCH CIRCUIT PANEL

EXHAUST FAN ELECTRICAL CONNECTION

AND DISCONNECT SWITCH

J

DISCONNECT SWITCH

MOTOR CONNECTION

JUNCTION BOX FOR EQUIPMENT

CONNECTION

RANGE OUTLET NEMA 5-50R

CW1Electrical Plan

SE

Electrical Plan - SE

Middle School

8'4'2''0'

1/4" = 1'-0"

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

E311.3

ROOM 3

KITCHEN

ROOM 4

PRODUCE

ROOM

LOUNGE

H5

SE HALL

RR

CLOSET

JAN

H2

SOUTH HALL

H1

MAIN HALL

H4

NE HALL

SWS

SWS

0.

E2

3.

E1

120.E4

120.1

120.E310 4.

E1

6.

E1

8.

E1

9.

E1

H5.E1114.E1

5.

E1

H 4.

E1

ROOM 2

102.E1

STORAGE

BOILER BLDG

ROOM 4

103.1

4.

E2

ROUTE NEW FEEDER TO

PANEL K IN ATTIC SPACE.

NEW 300/3 ENCLOSED

CIRCUIT BREAKER TAP

SWITCHBOARD BUS TO

FEED NEW BREAKER.

EXISTING 800 AMP MAIN

DISTRIBUTION PANEL.

NEW PANEL K

K-17

K-15

K-13

GFI

K-29 K-27

K-25

K-25

K-23

+42"

TRAP

PRIMER

OUTLET

K-23

K-21

GFI

+42"

GFI

TRAP

PRIMER

OUTLET

K-21

GFI

K-21+42"

K-21 +42"

GFI

K-19 K-19

GFI GFI

K-14

K-17K-19

K-7

K-20:22:24

K-8:10:12 J

J

K-2:4:6

J K-1:3:5

LEGEND - ELECTRICAL PLAN

K-33:35:37

U-2A

MAU-1

1400 LBS

K-9:11 R1

FIELD VERIFY LOCATION OF EXST

SURFACE MOUNTED DATA

DEVICE AND CABLING. DEMO IS

WITHIN 6" OF NEW WOOD TRIM.

TERMINATE ABOVE THE CEILING.

ADD 2

ADD 01 - 5/14/2025

ADD 2

ADD 2

K-16

ADD 2

GFI

TRAP PRIMER OUTLET

K-21

ADD 2

EXP 6/30 /2025

James Krumsick

CW1One Line Diagram One Line Diagram

Middle School

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

E330

NTS

ADD 1

ADD 01 - 5/14/2025

ADD 2

ADD 2

ADD 2

ADD 2

ADD 2

ADD 2

ADD 2

K-20:22:24

AVAILABLE FAULT

CURRENT: 24,706 AIC

AVAILABLE FAULT

CURRENT: 52,600 AIC

1/2"C 3#12, #12GExhaust Fan for Future Hood D 2

BUSSING SHALL BE RATED FOR 22,000 AIC. BREAKERS SHALL BE SERIES

RATED WITH UPSTREAM 300 AMP FEEDER BREAKER FOR THE AVAILABLE

FAULT CURRENT AT THAT BREAKER: 24,706 AIC

Future Cooking Exhaust Hood

Room 4 Receptacle

EXP 6/30 /2025

James Krumsick

File details come from the government source that posted it. Updated .