00-Dwg_Set-25031-Mapleton_MS-25-04-28.pdf
PDF 26 MB Posted
- Attached to
- Community Kitchen Construction
- Solicitation number
- S-P20015-00013726
- Issued by
- Lane County, Mcminnville City, Oregon
About this file
This file is a comprehensive construction document set for the Mapleton School District Middle School Community Kitchen project, involving Wilson Architecture as the design firm and located at 10868 E Mapleton Rd, Mapleton, Oregon. The project involves renovating an existing building's kitchen space, with construction documents dated 4/28/2025. The documents include detailed architectural, mechanical, electrical, and plumbing plans for a community kitchen renovation, covering approximately 22'-0" by 32'-0" of space in Room 3, which will include new commercial kitchen infrastructure such as a residential oven, potential commercial range, refrigerator, dishwasher, and multiple sink configurations.
The project includes significant mechanical and electrical upgrades, including a new make-up air unit (MAU-1), exhaust fans, a type 2 exhaust hood, and electrical panel modifications. The renovation will involve selective demolition of existing wall finishes, ceiling systems, and mechanical/electrical components, with careful preservation of existing structural elements. The documents indicate coordination with existing occupants like the Siuslaw Watershed Council, who will maintain access to certain building areas during construction. Funding and specific budget details are not explicitly outlined in the construction documents, but the comprehensive nature of the drawings suggests a thorough, well-planned renovation of the existing school district facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 245132 Intent to Award.pdf | ||
| Addendum-1-MMS_Kitchen-WA-25-05-14.pdf | ||
| 00-Project_Manual-MS_Community_Kitchen-WA-25-04-28.pdf | ||
| 00_0101-Title_Info_Page-25031-WA.docx | DOCX document | |
| 00_1113-Ad_for_Bid-25031-WA.docx | DOCX document | |
| Addendum-2-MMS_Kitchen-WA-25-05-15.pdf | ||
| Addendum-3-MMS_Kitchen-WA-25-05-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
Title Sheet
CW
T1
Middle School
THIS DRAWING SET IS PART OF THE CONSTRUCTION DOCMENTS
SET FOR THIS PROJECT IN ADDITION TO THE PROJECT MANUAL.
Mapleton School District
MS Community Kitchen 10868 E Mapleton Rd, Mapleton, OR 97453
OWNER
Mapleton School District 10868 E Mapleton Rd Mapleton, OR 97453 Contact: Jeron Ricks
ARCHITECT
Wilson Architecture 86530 Sanford Rd Eugene, OR 97402 Contact: Curt Wilson, AIA
SHEET INDEX
T1 TITLE SHEET
G000 SYMBOLS AND ABBREVIATIONS
G001 SITE PLAN
G021 EXISTING BUILDING INFORMATION
G311 OVERALL FLOOR PLAN
G321 OVERALL CEILING PLAN
D311.3 DEMO PLAN - SE
D321.3 DEMO CEILING PLAN - SE
A311.3 FLOOR PLAN - SE
A321.3 CEILING PLAN - SE
A329.3 ROOF PLAN - SE
A351 BUILDING SECTION
A360 ASSEMBLIES
A361 DETAILS
A362 DETAILS
A370 SCHEDULES
A371 INTERIOR ELEVATIONS
A391.3 FURNITURE PLAN - SE
P310.3 PLUMBING PLAN - CRAWL SPACE - SE
P311.3 PLUMBING PLAN - FLOOR PLAN &
ABOVE CEILING - SE
P330 PLUMBING DETAILS
M311.3 MECHANICAL PLAN - SE
M330 MECHANICAL LEGEND
M331 PLUMBING AND MECHANICAL
SCHEDULES
E311.3 ELECTRICAL PLAN - SE
E321.3 LIGHTING PLAN - SE
E330 ONE LINE DIAGRAM
VICINITY MAP
4/28/2025
CONSULTANT
Systems West Engineers 725 A Street Springfield, OR 97477 Contact: Steven Savich, CPD, GPD, ASSE 6060, LEED AP
CONSULTANT
Paradigm Engineering 85193 Apple Tree Drive Eugene, OR 97405 Contact: James Krumsick, PE
HWY 126
H W
Y 126
Mapleton Rd
M apleton Rd
Accessible Water Closet Plan1/2" = 1'-0"
5'-0"
1' -6
5' -0
CLEAR FLOOR AREA
3'-6"
3'-4"
10"
3' -0
6"
GB 2
GB 3
WC
GB 1
4' -2
4' -2
SD
Soap
Dispenser
3' -7
/2
3' -4
2' -6
2' -4
"4' -6
3' -4
M1 Mirror
(24" x 36")
FEC
Fire
Extinguisher Cabinet
FE
Fire
Extinguisher
PTD
Paper Towel
Dispenser
S18 Shelf (18")
SCD
Seat Cover Dispenser
SD
Sanitary Napkin
Disposal (Recessed)
TH
Towel Hook
TPD
Toilet Paper
Dispenser
2' -1
0"
GB's WC Back
Wall
2' -1
0"
3' -4
3'-0" 6"
1' -5
1' -6
3'-6" 1'-0"
3'-4"
2'-0"1'-6"
1' -6
1/
2"
DISPENSER
ZONE
GB2
GB3
GB3
GB1
GB's WC Side
Wall
4' -6
2' -1
0"
Mounting Height Schedule General Schedule - See Interior Elevations for Additional Requirements1/4" = 1'-0"
Door Opening at Intersection Walls Wood Stud Framing - Plan3/4" = 1'-0"
ROUGH OPENING 4 1/2"
FULL HEIGHT STUD
TRIMMER STUD
UNO
NEW WALL - THERMAL INSULATION
NEW WALL - ACOUSTIC INSULATION
NEW WALL - NO INSULATION
EXST WALL TO REMAIN
EXST FRAMING, NEW FINISH
EXST FRAM'G REMAIN, DEMO FINISH
DEMO WALL
1 1/2" = 1'-0" Fire Extinguisher Cabinet
Wall Opening Standard Details - Plan Details1 1/2" = 1'-0"
3 1/2" to 4" Wide Framed Wall
5 1/2" and Wider Framed Wall
SEE PRODUCT INFO
FOR ROUGH
OPENING FILL SPACE BEHIND CABINET WITH RIGID
INSULATION AT INSULATED WALLS.
PLACE INSULATION TIGHT FROM STUD TO
STUD AND FILL GAPS TOP AND BOTTOM
TO REMAINDER OF INSULATION.
SEE SPECIFICATION SECTION 10 4400 - FIRE
PROTECTION SPECIALTIES FOR FIRE
EXTINGUISHER INTENDED FOR FRAMING
CAVITY DEPTH. “COSMOPOLITAN 1037V10
WITH VIEW WINDOW” BY JL INDUSTRIES
REPRESENTED IN THIS DRAWING.
SEE PRODUCT INFO
FOR ROUGH
OPENING SEE ABOVE FOR INSULATION.
SEE SPECIFICATION SECTION 10 4400 - FIRE
PROTECTION SPECIALTIES FOR FIRE
EXTINGUISHER INTENDED FOR FRAMING
CAVITY DEPTH. “COSMOPOLITAN 1036V10
WITH VIEW WINDOW” BY JL INDUSTRIES
REPRESENTED IN THIS DRAWING.
Middle School
CW
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
G000 Abbreviations, Symbols, and
Standard Components
SYMBOLS ABBREVIATIONS
A.B. ANCHOR BOLT
A.C. ASPHALTIC CONCRETE
ACT ACOUSTICAL CEILING TILE
ADD'L ADDITIONAL
A.D. AREA DRAIN
AFF ABOVE FINISH FLOOR
ARCH. ARCHITECT
BITUM. BITUMINOUS
BD BOARD
B.0. BOTTOM OF
C.B. CATCH BASIN
C.I. CAST IRON
C.J. CONTROL JOINT
CL CENTER LINE
CLR CLEAR
CLG CEILING
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
C.T. CERAMIC TILE
D.L. DEAD LOAD
DIA. (∅) DIAMETER
DS DOWNSPOUT
DWG DRAWING
E.W. EACH WAY
EXST EXISTING
E.P. EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EXT EXTERIOR
F.A. FIRE ALARM
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
FFE FINISH FLOOR ELEVATION
FIN. FINISH
FLR. FLOOR
F.O. FACE OF
FRM'G FRAMSING
FT. FOOT
FTG FOOTING
FTR FUTURE
GA GAUGE
GALV. GALVANIZED
GL GRID LINE
GLB GLUE LAM BEAM
GB GRAB BAR
GND GROUND
GYP GYPSUM
GALW. INCH
H.B. HOSE BIB
H.M. HOLLOW METAL
HOR. HORIZONTAL
HSS HOLLOW STRUCTURAL STEEL
I.D. INSIDE DIMENSION
INT INTERIOR
J.B. JUNCTION BOX
JT JOINT
LAM. LAMINATE
LBS. POUNDS
L.L. LIVE LOAD
LOC. LOCATION
LONG. LONGITUDINAL
MAX. MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL, PLUMBING
MEMB. MEMBRANE
MFR MANUFACTURER
OFFICE
8.
IC6.16M0.0
D
A161
DETAIL REFERENCE
DETAIL #
SHEET #
ROOM NAME
ROOM NUMBER
DOOR NUMBER. SEE SHEET A180
WALL ASSEMBLY. SEE SHEET A160.
A171 ELEVATION REFERENCE
DETAIL #
SHEET #
WINDOW AND/OR RELITE REFERENCE
TOP OF WALL TYPE. SEE SHEET A151.
CEILING ELEVATION
SECTION REFERENCE
DETAIL #
SHEET #
A151
W.A.
GRID LINE
10'-0"
VERTICAL ELEVATION REFERENCE
SHEAR WALL TYPE
A
HOLD DOWN TYPE
5 KEYNOTE SYMBOL
M,H, MANHOLE
MIN. MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
M.P. MID-POINT
M.S. MACHINE SCREW
MNTD MOUNTED
MTL METAL
MUL MULLION
N.I.C. NOT IN CONTRACT
NLB NON-LOAD BEARING
NOM. NOMINAL
NTS NOT TO SCALE
OC ON CENTER
O.D. OUTSIDE DIAMETER
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED, OWNER INSTALLED
OFD OVER-FLOW DRAIN
OPP. OPPOSITE
OWJ OPEN WEB JOIST
PCF POUNDS PER CUBIC FEET
PEMB PRE-ENGINEERED METAL BUILDING
PL PLATE
PLN PLAN
PLUMB PLUMBING
PNT PAINT
P.B. PORCELAIN TILE
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FEET
PT POST TENSION
PTN PARTITION
RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF. REFERENCE
REINF REINFORCING
REQ'D REQUIRED
R.O. ROUGH OPENING
S.C. SOLID CORE
SCHED SCHEDULE
SHT SHEET
SIM SIMILAR
SM SHEET METAL
SMS SHEET METAL SCREW
SOG SLAB ON GRADE
SPEC SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT. STRUCTURAL
S.T.S SELF-TAPPING SCREW
SUSP. SUSPEND
SYM. SYMMETRICAL
THRU THROUGH
T&B TOP AND BOTTOM
T.O. TOP OF
THK. THICK
TRD. THREAD
T&G TONGUE AND GROOVE
TB TOWEL BAR
TJ TRUSS JOIST
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT. HORIZONTAL
VER. VERIFY
V.I.C. VERIFY IN FIELD
V.T.R. VENT THROUGH ROOF
WC WATER CLOSET
WF WIDE FLANGE
W/ WITH
W/O WITHOUT
W.O. WINDOW OPENING
WOM WALK OFF MAT
SYMBOLS
OFFICE
8.
IC6.16M0.0
D
A161
DETAIL REFERENCE
DETAIL #
SHEET #
ROOM NAME
ROOM NUMBER
DOOR NUMBER. SEE SHEET A180
WALL ASSEMBLY. SEE SHEET A160.
A171 ELEVATION REFERENCE
DETAIL #
SHEET #
WINDOW AND/OR RELITE REFERENCE
TOP OF WALL TYPE. SEE SHEET A151.
CEILING ELEVATION
SECTION REFERENCE
DETAIL #
SHEET #
A151
W.A.
GRID LINE
10'-0"
VERTICAL ELEVATION REFERENCE
SHEAR WALL TYPE
A
HOLD DOWN TYPE
5 KEYNOTE SYMBOL
WALL LEGEND - PLANS
GENERAL NOTES - THIS SHEET
A. THIS SHEET PROVIDES GENERAL INFORMATION
APPLICABLE TO MOST PROJECT'S OF THE FIRM. ALL
DETAILS MAY NOT APPLY TO THIS PROJECT. THE INTENT
OF THIS INFORMATION IS TO SUPPLEMENT SCOPE OF
WORK REQUIREMENTS DESCRIBED ON OTHER SHEETS.
CW1Site Plan Middle School
Site Plan
Middle School
GENERAL NOTES - SITE PLAN
a. ---
60'30'15'0'
1" = 30'
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
G001
CONTRACTOR PARKING AND
STAGING AREA. SEE G111 FOR
ADDITIONAL INFORMATION
BUS LOADING AREA. DO NOT BLOCK
WHEN SCHOOL IS IN SESSION.
T
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
Xref ..\00-Base\Sht_Ansi_D-Base-CD-24011-V2.dwg
CW
Existing Conditions Photos
Existing Building Information
G021
1. Rm 3 - South Wall 2. Rm 3 - Existing Built-Ins 3. Rm 3 - West Wall 4. Rm - West Wall
5. Rm 3 - North Wall 6. Rm 3 - East Wall 7. Rm 3 - East Wall 8. Rm 3 - East Wall
9. Rm - Above Ceiling 10. Rm 120 - East Wall 11. Rm 120 - SW Corner 12. Rm 4 - East Wall
13. Attic - Looking East to U-2A 14. Crawl Space - Looking East 15. Exterior - South - SW Corner Rm 3 16. Exterior - East Wall
KEY PLAN
9 Above Clg
Not To Scale
Attic
Crawl Space
DW
DWB
DWH
T
T
CW1Floor Plan Overall
Floor Plan - Overall
GENERAL NOTES - FLOOR PLAN
a. SEE SHEET A360 FOR ASSEMBLIES.
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
G311 16'8'4'0'
1/8" = 1'-0"
ROOM 3
KITCHEN
ROOM 4
ROOM 5 SIUSLAW
WS OFFICE
ROOM 6 SIUSLAW
WS MTG
ROOM 9
ROOM 10
ROOM 7
ROOM 8
ROOM 2
ROOM 1
STORAGE
H4
NE HALL
H1
MAIN HALL
BOYS RR
GIRLS RR
JAN
SWS
SWS
H2
SOUTH HALL
H3
NW HALL
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
PRODUCE
ROOM
0.
E2
3.
E1
120.E4
120.E1
120.E310 4.
E1
4.
E2
6.
E1
8.
E1
9.
E1
H5.E1114.E1
5.
E1
H 4.
E1
102.E1
102.E2
H4.E2
101.E1
101.E3
101.E2
103.1
STORAGE
BOILER BLDG
A351
A351
A311.3
TENANT OCCUPIED SPACE
SIUSLAW WATERSHED COUNCIL
A361
EXISTING CRAWL
SPACE ACCESS
CONTRACTOR CAN USE ROOM 4 FOR
STORAGE, STAGING, AND CONSTRUCTION
OFFICE. REPAIR ALL DAMAGE CAUSED
DURING CONSTRUCTION.
SIUSLAW WATERSHED COUNCIL
OCCUPIES ROOMS 1 & 2 FOR STORAGE.
CONTRACTOR TO ALLOW FOR PERIODIC
ACCESS BY SIUSLAW WSC STAFF.
THE HALLWAYS CONNECTING THE
WEST AND SOUTH ENTRANCES TO
BE AVAILABLE AND UNBLOCKED AT
ALL TIMES.
MAPLETON SCHOOL DISTRICT MAY ACCESS
THE SPACES IN THE NORTHWEST CORNER
OF THE BUILDING DURING CONSTRUCTION,
HOWEVER REGULAR OCCUPANCY IS NOT
ANTICIPATED.
CONTRACTOR CAN USE THIS AREA FOR STAGING
AND CONSTRUCTION PARKING. SIUSLAW WSC
PARKS VEHICLES IN THIS AREA AND FOR ACCESS
TO STORAGE. COORDINATE ACCESS AND USE BY
SIUSLAW WSC THROUGHOUT CONSTRUCTION.
DO NOT BLOCK THIS DRIVE FOR LONGER THAN 4 HOURS.
COORDINATE WITH SIULAW WSC FOR ACCESS.
OS
OS
B B B
B
B B
B
BBB
CC
A
A
CW1Ceiling Plan Overall
Ceiling Plan - Overall
Middle School
8'4'2''0'
1/4" = 1'-0"
GENERAL NOTES - CEILING
a. THIS SHEET PROVIDED FOR REFERENCE ONLY.
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
G321
9'-6"
10'-0"
9'-6"
ROOM 3
KITCHEN
ROOM 4
ROOM 5 SIUSLAW
WS OFFICE
ROOM 6 SIUSLAW
WS MTG
ROOM 9
ROOM 10
ROOM 7
ROOM 8
ROOM 2
ROOM 1
STORAGE
H4
NE HALL
H1
MAIN HALL
BOYS RR
GIRLS RR
JAN
SWS
SWS
H2
SOUTH HALL
H3
NW HALL
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
PRODUCE
ROOM
STORAGE
BOILER BLDG
A351
A351
EXISTING ATTIC ACCESS
I
CW1Demo Floor Plan
SE
Demo Floor Plan - SE
GENERAL NOTES - DEMO PLAN
a. SEE SHEET A360 FOR ASSEMBLIES.
b. CAREFULLY REMOVE AND SALVAGE FOR POSSIBLE
RE-USE HORIZONTAL WOOD TRIM ON WALLS TO BE
COVERED BY NEW WOOD FRAMING.
c. SEE SHEET A311.3 AND A360 FOR DESCRIPTION OF EXST
WALL SYSTEM COMPONENTS TO REMAIN.
d. SEE SHEET G021 FOR PHOTOS OF EXST CONDITIONS.
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
D311.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
ROOM 2
STORAGE
BOILER BLDG
2B A361
1B A361
KEYNOTES - DEMO PLAN
1. DEMO DOOR, OPENING FOR NEW FRAME.
2. DEMO WHITEBOARD TRIM
3. EXST ELEC PANEL, SEE E311.3.
4. EXST FLOOR SYSTEM WITH EXPOSED DIAGONAL
SHEATHING.
5. EXST WINDOWS TO REMAIN
6. EXST STUD WALL TO REMAIN, DEMO WALL FINISH ON EAST
SIDE OF WALL.
7. EXST ABANDONDED FIRE HOSE CABINET.
A362
5TYP
A362
X
XS
SS
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
GENERAL NOTES - DEMO CEILING PLAN
a. SEE SHEET E321.3 FOR LIGHTING LEGEND.
b. SEE SHEET G021 FOR PHOTOS OF EXISTING CONDITIONS.
D321.3CW1Demo Ceiling Plan
SE
Demo Ceiling Plan - SE
Middle School
8'4'2''0'
1/4" = 1'-0"
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
ROOM 2
9'-4"
10'-3/4"
9'-4"
STORAGE
BOILER BLDG
KEYNOTES - DEMO CEILING PLAN
1. DEMO 8x8 SQUARE IN CEILING FOR NEW HVAC GRILLE.
2. DEMO HVAC GRILLE
3. DEMO LIGHT SWITCH
4. DEMO LIGHT
5. EXST CEILING GRID TO REMAIN
6. REMOVE CEILING TILE IN ROOM 3. SALVAGE WHOLE AND
NON-STAINED TILE FOR FUTURE USE BY OWNER. DISPOSE
OF PARTIAL AND STAINED TILE.
4 4
4 4
4 4
DWH
T
T
CW1Floor Plan
SE
Floor Plan - SE
GENERAL NOTES - FLOOR PLAN
a. SEE SHEET A360 FOR ASSEMBLIES.
b. DIMENSIONS TO FACE OF FRAMING U.N.O.
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A311.3
22'-0"
'-0
"103
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
0.
E2
3.
E1
120.E4
120.1
120.E310 4.
E1
6.
E1
8.
E1
9.
E1
H5.E1114.E1
5.
E1
H 4.
E1
ROOM 2
102.E1
103.1
STORAGE
BOILER BLDG
4.
E2
32'-0"
'-0
/2
9' -5
/8
13'-4 1/8"
'-0
/2
2A A361
1A A361
A351
IA 4.24 W0.0
FIN FINFIN FIN
FI
N
FI
N
FI
N
FI
N
FINFIN
FI
N
FI
N
FI
N
4' -1
1/
2"
2' -0
C
LE
A
R
A371
A371
A371
A360
A362
KEYNOTES - FLOOR PLAN
1. SEE INTERIOR ELEVATIONS FOR LOCATION OF WALL
REPAIR.
2. FRP PANEL
3. RESIDENTIAL OVEN, BY OWNER
4. COMMERCIAL RANGE - FUTURE
5. FRIDGE, BY OWNER
6. DISHWASHER, SEE PLUMBING
7. SINK, SEE PLUMBING
8. APPROXIMATE LOCATION OF EXST SEPTIC TANK, FIELD
VERIFY.
9. DOMESTIC WATER HEATER, SEE PLUMBING
10. GREASE INTERCEPTOR, SEE PLUMBING
11. THERMOSTAT
12. EXST HVAC RETURN
13. ELECTRICAL PANEL
14. FEC
15. EXST CRAWL SPACE ACCESS
TYP
A351
6"
FI
N
6" FIN
A360
A360
A362
EA 4.24 W1
EB 4.24 W1
IB 4.24 W0.0
F.A
F.A
F.A1
F.A1
A360
A360
A360
EB 4.24 W1
TYP AT EXTERIOR WALL
TYP OF
RED
A361
SIM
OS
B B B
B
B B
B
BBB
CC
A
A
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
GENERAL NOTES - CEILING PLAN
a. SEE SHEET E321.3 FOR LIGHTING LEGEND.
A321.3CW1Ceiling Plan
SE
Ceiling Plan - SE
Middle School
8'4'2''0'
1/4" = 1'-0"
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
ROOM 2
9'-6"
10'-3/4"
9'-6"
STORAGE
BOILER BLDG
A362
KEYNOTES - CEILING PLAN
1. ACT TILE
2. PATCH CEILING
3. REPAIR AND PAINT EXST CEILING
4. EXST HVAC GRILLE
5. HVAC GRILLE
6. EXHAUST HOOD
7. EXST LIGHT
2 3
C.1
C.1
C.2
C.3
TYP
EF3
EF1
RH1
EF2
CW1Roof Plan
SE
Roof Plan - SE
GENERAL NOTES - ROOF PLAN
a. ---
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A329.3
A362
A362
(E) U-1A
(E) U-1B
(E) U-2(E) U-3
EXST 14"∅ ROOF VENT WITH
EXISTING 14∅ EXHAUST VENT
EXST 8"∅ ROOF VENT WITH
EXISTING 8∅ EXHAUST VENT
A362
A362
EXST ROOF VENT, TYP.
4 2 42
4 2
4242 42
4 2
4 2
4 2
Sections
CW2Section
Middle School
GENERAL NOTES
a. ---
9'-6"
CEILING LEVEL
0'-0"
FIRST FLOOR
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A351
1Section
8'4'2''0'
1/4" = 1'-0"
13'-6 1/4"
ATTIC LEVEL
1' -5
2'
-6
26x14 SA
14∅ SA (E) 18x10 SA(E) 24x18 RA
9'-6"
CEILING LEVEL
0'-0"
FIRST FLOOR
13'-6 1/4"
ATTIC LEVEL
7' -0
(E) U-2A
A360
A360
A360
MIR
1/4" = 1'-0"
IA 4.24 W0.0 EA 4.24 W1
EB 4.24 W1
F.A
F.A1
C.1
C.1C.3
IA 4.24 W0.0
EXST LATH AND PLASTER
PLASTER ASSEMBLY PER
1A4.24W0.0.
WALL CORE ELEMENT
4.24 2x4 3 1/2" 24" O.C.
# STUD SIZE SPACING
FIRE RATING
.0 NOT RATED
Field VerifySTUD SIZE & SPACING
0 NONE
2x4 @ 24" O.C.
EXST WOOD STUDS
IA4.24W0.0
EXST WD STUD - EXST LATH AND PLASTER
INTERIOR WALL ASSEMBLY
EXST PLASTER BROWN
COAT
EXST PLASTER SCRATCH
COAT
WALL CORE ELEMENT
4.24 2x4 3 1/2" 24" O.C.
# STUD SIZE SPACING
FIRE RATING
.0 NOT RATED
STUD SIZE & SPACING
0 NONE
NOTE: SPACING OF EXST
STUDS ASSUMED. FIELD
VERIFY.
EXST WOOD LATH
EXST WOOD STUDS
IB4.24W0.0
EXST WD STUD - EXST L&P - NEW FURRING
INTERIOR WALL ASSEMBLY
Field Verify
6"
GYP BOARD
FRP WHERE SCHEDULED
1x4 FLAT @ 24" O.C.
EXST LATH AND PLASTER
PLASTER ASSEMBLY PER
1A4.24W0.0.
Field Verify
EXST SIDING SYSTEM -
FIELD VERIFY
EXST WOOD STUDS
EXST WD STUD - EXST L&P - NEW FURRING
6"
GYP BOARD
FRP WHERE SCHEDULED
EXTERIOR WALL ASSEMBLY EB4.24W1
SIDING TYPE
1 EXST WOOD LAP SIDING -
SUBSTRATE TO BE
DETERMINED.
# STUD SIZE SPACING
4.24 2x4 3 1/2" 24" 0.C.
STUD SIZE & SPACING
NOTE: SPACING OF EXST
STUDS ASSUMED. FIELD
VERIFY.
NOTE: SPACING OF EXST
STUDS ASSUMED. FIELD
VERIFY.
BATT INSULATION (R-21)
VAPOR BARRIER
VAPOR BARRIER
EXST LATH AND PLASTER
PLASTER ASSEMBLY PER
1A4.24W0.0.
Field Verify
EXST SIDING SYSTEM -
FIELD VERIFY
EXST WOOD STUDS
EXST WD STUD - EXST L&P - NEW FURRING
EXTERIOR WALL ASSEMBLY EA4.24W1
SIDING TYPE
1 EXST WOOD LAP SIDING -
SUBSTRATE TO BE
DETERMINED.
# STUD SIZE SPACING
4.24 2x4 3 1/2" 24" 0.C.
STUD SIZE & SPACING
NOTE: SPACING OF EXST
STUDS ASSUMED. FIELD
VERIFY.
Wall Assemblies Section1 1/2" = 1'-0"
PLYWOOD UNDERLAYMENT (3/4")
FLOORING PER SCHEDULE
Floor Assembly F.A Flooring Covering - Underlayment - Exst Wood Structure
FLOOR ASSEMBLIES
EXST WOOD BEAM
EXST 2" x 7 1/4" FLOOR JOIST @ 16' O.C.
EXST 1x6 DIAGONAL SHEATHING
PLYWOOD UNDERLAYMENT BY
OWNER (3/4")
FLOORING BY OWNER
Floor Assembly F.A1 Flooring Covering - Underlayment - Exst Wood Structure
FLOOR ASSEMBLIES
EXST WOOD BEAM
EXST 2" x 7 1/4" FLOOR JOIST @ 16' O.C.
EXST 1x6 DIAGONAL SHEATHING
+13'-6 1/4" ±
T.O. ATTIC FRAMING
+12'-2 1/2"
B.O. PLASTER CEILING
+9'-6"
B.O. CEILING
EXST 2 1/2" x 13 1/4" FLOOR JOIST @ 24" O.C.
EXST 1x6 DIAGONAL SHEATHING
EXST BATT INSULATION, 8"±
EXST SUSPENDED CEILING
SYSTEM SUPPORT WIRE.
EXST CEILING GRID TO REMAIN.
NEW CEILING TILE.
Ceiling Assembly C.1CEILING ASSEMBLIES
Exst Attic Framing - Exst Suspended Ceiling
Ceiling Assembly C.2CEILING ASSEMBLIES
EXST LATH AND PLASTER CEILING
SYSTEM
+10'-0 3/4"
B.O. PLASTER CEILING
EXST 2 x 6 ATTIC/CEILING JOIST @ 24" O.C.
EXST BATT INSULATION, 6"±
EXST LATH AND PLASTER CEILING
SYSTEM
Exst Ceiling/Attic Framing - Plaster Finishe
Ceiling Assembly C.3CEILING ASSEMBLIES
+10'-0 3/4"
B.O. PLASTER CEILING
EXST 2 x 6 ATTIC/CEILING JOIST @ 24" O.C.
EXST BATT INSULATION, 6"±
EXST LATH AND PLASTER CEILING
SYSTEM
Exst Ceiling/Attic Framing - Adhered Ceiling Tile
Floor Assemblies Section1 1/2" = 1'-0"
Ceiling Assemblies Section1 1/2" = 1'-0"
EXST ADHERED 12" x 12" ± CEILING
TILE.
2x4 @ 24" O.C.
BATT INSULATION (R-21)
Top of Wall - Furring Wall Section1 1/2" = 1'-0"
+9'-6"
B.O. CEILING
WALL ASSEMBLY EB4.24W1
5 1/2" x 14" x 3/4"
PLYWOOD STRIPS @ 24"
O.C.
DOUBLE TOP PLATES
(3) ROWS OF (3) 2 1/2"
WOOD SCREWS PER
STRIP.
WALL ASSEMBLY EA4.24W1
2x RIP TO 3" FULL LENGTH OF
WALL.
(2) 4" WOOD SCREWS PER
STUD.
EXST SUSPSENDED
CEILING TILE SYSTEM
CW1
Middle School
Assemblies
WALL ASSEMBLY LEGEND
I C 4 . 24 W 0 . 0 - INTERIOR
FIRE RATING (IN HRS)
WALL CORE ELEMENT
FRAMING MATERIAL
STUD SPACING (ON CENTER)
NOMINAL CORE THICKNESS/STUD DEPTH
ASSEMBLY TYPE
INTERIOR WALL/PARTITION
E A 6 . 24 W 2 - EXTERIOR
SIDING/EXTERIOR FINISH TYPE
FRAMING MATERIAL
STUD SPACING (ON CENTER)
NOMINAL CORE THICKNESS/STUD DEPTH
ASSEMBLY TYPE
EXTERIOR WALL
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A36023
FRP at Window Sill Section1 1/2" = 1'-0"
New Wall - Base Section1 1/2" = 1'-0"
SST A33 CLIP, EVERY
OTHER STUD.
2x4 w/ 4" WOOD SCREW
EVERY EXST STUD
FRP PANEL
FRP OUTSIDE CORNER
TRIM
PLYWOOD, 1/2"
EXST WINDOW SYSTEM
5/16"∅ x 4" LAG BOLT
EVERY OTHER JOIST
(2) 16d EACH STUD
COVE BASE
FRP BOTTOM TRIM
6"
FRP
GYP BOARD
IB4.24W1
IB4.24W1
FLOOR ASSEMBLY A
3'-7 1/2"
T.O. EXST WINDOW
SILL TRIM
FRP PANEL
DWH
T
I
Jamb - Door Opening Section1 1/2" = 1'-0"
2 2 2
(E)
(E)
(x)
DIMENSION
POINT PER
PLAN
DEMO AS
NEEDED FOR
NEW
OPENING.
EXST STUD TO REMAIN
TRIMMER STUD
KING STUD
RM 4
RM 3
EXST FINISH TO REMAIN,
PROTECT
PT
FRP
WALL ASSEMBLY PER PLAN
CONC SLAB
24ga SHT MTL DRIP FLASHING, MIN 2" UP WALL, SLOPE TO DRAIN
TO SINK, AND SET IN SEALANT.
FRP SYSTEM BOTTOM OF
PANEL TRIM
CONTINOUS 2x6 BETWEEN
WALL AND MOP SINK.
SHIM AS REQ'D.
MOP SINK
Flash at B.O. FRP Panel to Mop Sink Section3" = 1'-0"
CW2
Middle School
DetailsFloor Plan Enlarged Plan
GENERAL NOTES
a. SEE D311.3 & A311.3 FOR APPLICABLE KEYNOTES.
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A361 3/4" = 1'-0"
13/4" = 1'-0" Floor Plan
Enlarged Plan
A. NewB. Demo
A. NewB. Demo
A361
A361
TYP TYP
EB 4.24 W1
GYP BOARD
EXST TRIM
FRP PANEL, TYP
OF RED
EXST WALL
SEE MECH
EXST TRIM
DEMO TRIM
DEMO WALL
FINISH SYSTEM
DEMO FOR DOOR OPENING, SEE
2/A362.
DEMO
CASEWORK,
FIELD VERIFY.
DEMO WALL
SYSTEM
DEMO, SEE
MECH
DEMO SHELVES
DEMO WALL
SYSTEM
EXST TRIM
EXST WALL
DEMO TRIM
EXPOSE EXST
STUD WALL
DEMO WALL
FINISH SYSTEM
SEE MECH
DEMO WALL
DEMO DOOR
EXST TRIM
EXST STUD
WALL
SEE ELEC
EXST
FINISH
PATCH WALL FINISH
DEMO WALL
FINISH
EXST STUD WALL
DEMO TRIM
SEE PLUMBING
2' -0
C
LE
A
R
FRP PANEL, TYP OF
RED
GYP BOARD
EXST STUD WALL
A361
CW
Middle School
Details
GENERAL NOTES
a. SEE D311.3 & A311.3 FOR ADDITIONAL INFORMATION.
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A362
1Thru Existing Relite Wall Section3/4" = 1'-0"2Thru Closet
Wall Section3/4" = 1'-0"
A360
SIM
A360
SIM
+4'-6"
T.O. FRP
2x4 FLAT FURRING AT 16"
O.C. AT RECESS AT EXST
RELITE SYSTEM.
SHIM SURFACE OF 2x4 FLAT
TO ALIGN WITH SURFACE OF
1x4 FLAT ABOVE.
REMOVE RELITE CASING AS
NEEDED TO ACCOMODATE
VERTICAL WALL FURRING
EXST RELITE SYSTEM
NOTE: FIELD VERIFY EXST
CONDITIONS, COORDINATE
WITH ARCHITECT IF
CONDITIONS VERIFY FROM
REPRESENTATION IN THESE
DRAWINGS.
IB 4.24 W1
IA 4.24 W0.0 IA 4.24 W0.0
F.A1 F.A F.A F.A
C.2
C.1C.1C.1
A. NewB. DemoA. NewB. Demo
FIELD VERIFY EXST
HEADER, PROTECT.
EXST TRIM TO REMAIN.
DEMO SOFFIT. SEE
INTERIOR ELEVATIONS
FOR EXTENT.
REMOVE EXST STUDS TO
ACCOMODATE NEW
HEADER.
EXST TRIM TO REMAIN.
REMOVE EXST STUDS TO
ACCOMODATE NEW
HEADER AND DOOR
OPENING. PROTECT EXST
LATH AND PLASTER
SYSTEM ON WEST SIDE OF
WALL.
SIMSIM
NEW HEADER. SEE 4/A361
FOR JAMB STUDS. 3/4" WOOD TRIM.
MATCH EXST TRIM
PROFILE.
GYP BOARD AT SOFFIT AND
SIDEWALL.
2x4 SOFFIT FRAMING
AT 16" O.C.
3/4" x 2 1/2" WOOD TRIM. MATCH
EXST WOOD TRIM PROFILE.
WOOD DOOR FRAME. MATCH EXST
DOOR FRAME PROFILE AND
DIMENSIONS.
WOOD DOOR.
EXST TRIM TO REMAIN. EXST TRIM WILL BE CONCEALED.
CONTRACTOR'S CHOICE TO LEAVE IN
PLACE, OR CAREFULLY REMOVE FOR
REUSE IN OTHER AREAS WHERE NEW
TRIM REQUIRED, TYP
IA 4.24 W0.0 SIM
W
T
DWH
T
T
3' -0
8"
~7"~7"
7' -0
R.O. +1/4" BEYOND
ALL SIDES, TYP
SCHEDULE
FRAME, TYP
SC
H
ED
U
LE
CW1Door and Frame Type
Finish Schedule
GENERAL NOTES - FINISH SCHEDULE
a. --.
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A370
ROOM 2
FINISH SCHEDULE
IDENTIFICATION
LOCATIONRM #
102 ROOM 2
FLOOR
BASE
FINMAT FINMAT FINMAT
NORTH
FINMAT
EAST
FINMAT
SOUTH
FINMAT
WEST
WALL CEILING
FINMAT
CASEWK
TYPE
NOTES RM #
CASEWORK TYPES
TYPE A
COUNTER: P.LAM
CABINET: P.LAM
H1
SWS
SWS
JAN
LOUNGE
RR
CLOSET
MAIN HALL
ROOM 3 KITCHEN
ROOM 4
SHEET
VINYL
FAC COVE FAC
EXST ACT
FAC
FAC
1/4" = 1'-0"
KEYNOTES - FINISH SCHEDULE
1. SEE INTERIOR ELEVATIONS FOR EXTENT OF WALL TILE
AND GYP BOARD ON EACH WALL.
H4
H5
NE HALL
SE HALL
H2 SOUTH HALL
H1
H4
H5
H2
120 PRODUCE ROOM EXST
PLASTER
DOOR SCHEDULE
IDENTIFICATION PERFORMANCE
FIRE RATING (minute)
DOOR FRAME
LOCATIONMARK
ROOM NAMERM #
SMOKE SOUND
CHARACTERISTICS
DOOR
TYPE FIN.
NOM. DIMENSIONS
WIDTH HEIGHT
NOTES
103.1 103
STATUS
MATER.
FRAME
TYPE FIN.MATER.
HARDWARE
GROUP
MARK
THERMAL
ROOM 3 KITCHEN
ROOM 3 KITCHEN103103.E1 --
NEW WD -- 103.1
ROOM 4104104.E1 --
ROOM 4104104.E2 --
0.
E2
3.
E1
120.E4
120.E1 / 120.1
120.E3
103.1
4.
E1
4.
E2
6.
E1
8.
E1
9.
E1
H5.E1114.E1
H 4.
E1
102.E1
PRODUCE ROOM120120.E1 --
120120.E2 --
120120.E3 --
120120.E4 --
PRODUCE ROOM
PRODUCE ROOM
PRODUCE ROOM
103.E1
104.E1
104.E2
120.E1
120.E2
120.E3
120.E4
EXST
EXST
EXST
DEMO
EXST
EXST
EXST
ROOM 3 KITCHEN
ROOM 4
PRODUCE
ROOM
H1
MAIN HALL
H4
NE HALL
H4H4.E1 --NE HALL H4.E1EXST
4'-0" 7'-0"
ACT
ACT
EXST
EXST
EXST
EXST
EXST
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
GYP
FRP
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
EXST
PLASTER
GYP
FRP
EXST
PLASTER
EXST
PLASTER
3'-0" 7'-0"
3'-0" 7'-0"
2'-0" 7'-0"
54H5.E1 --SE HALL H5.E1EXST 3'-0" 7'-0"
3'-0" 7'-0"
3'-0" 7'-0"
2'-0" 7'-0"
2'-0" 7'-0"
3'-0" 7'-0"
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
NA NA NA NA NA
B
B
A
A
A
B
A
A
A
A
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
WD
PAINT
PAINT
PAINT
NA
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT1 1
1 3
1 EXST
1 EXST
1 EXST
1 3
1 2
1 2
1 EXST
1 EXST
EXST
PLASTER
EXST
EXST
PAINT
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
PAINT
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
PRODUCE ROOM120120.1 -- 120.1NEW 3'-0" 7'-0"NA NA NA NA YES B HMHM PAINT PAINT1 4
KEYPLAN
First Floor NTS
Type A Type B
GYP
FRP
PAINT GYP
FRP
PAINT GYP
FRP
PAINT
EXST
SHEET
VINYL
EXST
VINYL
PLANK
SHEET
VINYL
FAC
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
VINYL
PLANK
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
COVE FAC
Door Frame 1 Door Frame 1
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
EXST
CW
Interior Elevations
KEYNOTES
1. NEW WALL
2. FRP PANEL
3. COVED BASE
4. RESIDENTIAL RANGE
5. COMMERCIAL RANGE - FUTURE
6. SS COUNTER, BY OWNER
7. SINGLE SINK COUNTER, SEE PLUMBING
8. DOUBLE SINK COUNTER, SEE PLUMBING
9. TRIPLE SINK COUNTER, SEE PLUMBING
10. DISHWASHER, SEE PLUMBING
11. FRIDGE, BY OWNER
12. HAND WASH SINK, SEE PLUMBING
13. MOP SINK, SEE PLUMBING
14. FLOOR SINK
15. TYPE 2 EXHAUST HOOD
16. DEMO OUTLET
17. ELECTRICAL OUTLET
18. DEMO LIGHT SWITCH
19. PATCH AND REPAIR WALL FINISH AT DEMO
20. DEMO TRIM AS NEEDED
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A371 Interior Elevation
2Interior Elevation
1Interior Elevation
NorthWest
East
Room 3 Kitchen
Produce Room
3Interior Elevation3/8" = 1'-0"
3/8" = 1'-0"
Rm 4
SouthEast
64"32"16''0'
3/8" = 1'-0"
NorthWestSouthEast
13 13
TYP
TYP
TYP
TYP
17 171717
1717 17
161616
TYP
W
DW
DWB
DWH
T
T
CW1Furniture Plan
SE
Furniture Plan - SE
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
A391.3
ROOM 3
KITCHEN
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
0.
E2
3.
E1
120.E4
120.1
120.E310 4.
E1
6.
E1
8.
E1
9.
E1
H5.E1114.E1
5.
E1
H 4.
E1
ROOM 2
102.E1
103.1
STORAGE
BOILER BLDG
4.
E2
ROOM 4
DWH
T
T
CW1Plumbing Plan Crawl Space - SE
Plumbing Plan - Crawl Space - SE
GENERAL NOTES - PLUMBING PLAN
a. SEE M330 FOR PLUMBING LEGEND.
Middle School
64"32"16"0'
3/8" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
P310.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOMH1
MAIN HALL
H4
NE HALL
0.
E2
3.
E1
120.E4
120.E1
120.E3
103.1
4.
E1
H 4.
E1
ROOM 2122
BOILER BLDG
4.
E2
2" V (UP)
2" V (UP)
1" CW (UP) 1" HW (UP)
2" V (UP)
3/4" HW (UP)
3/4" CW (UP)
1/2" CW (UP)
1/2" HW (UP)
GI-1, SEE DETAIL 2/P330
3" GW (UP TO FS)
2" GW (UP TO FD)
3" GW (UP TO FS)
2" GW (UP TO FD)
2" V (UP)
4" GW (UP TO COTG)
4" W (UP TO COTG)
(E) 4" W TO SEPTIC SYSTEM
3" GW (UP TO FD)
2" GW (UP TO FS)
2" V (UP)
3" GW (UP TO MS)
2" GW (UP TO HS)
3" GW 3" GW
4" G W
4" G
W
3/ 4"
H W
3/ 4"
C W
1" C
W
1" H
W
4" G W
4" GW
1-1/4" CW
CONNECT (N) 1-1/4" CW TO
(E) 2-3/4" CW OD
1-1/4" CW (UP)
(E) 2" UP TO FIRE HOSE
CABINET
4" W 4" W
4" W (UP TO COTG)
DET-1
(E)1/2" OD(E) 1-1/4" OD(E) 2" OD(E) 2-3/4" OD
(E ) 4
" W
CONNECT (N) 4" W
TO (E) 4" W
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K S
DWH
T
T
CW1Plumbing Plan Floor Plan & Above Ceiling -SE
Plumbing Plan - Floor Plan & Above Ceiling - SE
GENERAL NOTES - PLUMBING PLAN
a. SEE M330 FOR PLUMBING LEGEND.
Middle School
64"32"16"0'
3/8" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
P311.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOMH1
MAIN HALL
H4
NE HALL
0.
E2
3.
E1
120.E4
120.E1
120.E3
103.1
4.
E1
H 4.
E1
ROOM 2122
BOILER BLDG
4.
E2
3" VTR (UP)
2" V (DN)
2" V
1/ 2"
H W1/ 2"
C W
1-1/4" CW
1-1/4" HW
1" CW
1" HW
2" V2" V
1-1/4" H&CW CONNECTIONS
1-1/4" CW (DN)
3" VTR (UP)
1" CW (DN)
1" HW (DN)
2" V (DN)
3/4" HW (DN)
3/4" CW (DN)
1/2" HW (DN)
1/2" CW (DN)
FD-2
FD-1
FD-3
KS-2
FS-1
FS-1
KS-3
FS-1
KS-1 FS-1
MS-1
HS-1
DWH-1, SEE DETAIL 1/P361
GI-1, SEE DETAIL 2/P330
DET-1
WALL CLEANOUT
WALL CLEANOUT
COTG
COTGCOTG
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K
PROVIDE 3/4" MINUS
GRAVEL BACKFILL, 95%
COMPACTION
UNDISTURBED SOIL
GREASE WASTE INLET.
SEE DRAWINGS FOR
CONTINUATION.
GREASE & SANITARY
VENTS, SEE DRAWINGS FOR
SIZE & CONTINUATION.
GRADE, SURFACE FLOW CONTROL FITTING
HEIGHT AS REQ'D MATCH
GRADE
COVER FLUSH W/ GRADE
EXTENSION COLLAR AS
REQUIRED
CLEANOUT FLUSH W/
GRADE
SANITARY WASTE OUTLET.
SEE DRAWINGS FOR
CONTINUATION.
SEE 1/A151 FOR ADDITIONAL INFORMATION.
RV
DWH-1
DET
CW
HWS
TEMP/PRESSURE RELIEF
VALVE. ROUTE DISCHARGE
TO MOP SINK.
LOCKABLE ISOLATION VALVE
CW
Plumbing Details
GENERAL NOTES - PLUMBING PLAN
a. ---
Middle School
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4/28/2025
wilson-architecture.com | 541-912-0878
P330
Exterior Grease Interceptor SectionNTS
DWH - Electric SectionNTS
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K
DWH
T
T
PLAN VIEW
PLAN VIEW
PLAN VIEW
PLAN VIEW
SHEET METAL DUCT
LINED SHEET METAL BOOT
WIDTH OF
DIFFUSER NECK
CEILING
DUCT SIZE IS THE SAME
AS NECK CONNECTION
OF DIFFUSER 1
MAX 36" FLEXIBLE DUCT
CEILING DIFFUSER CEILING
FLEX DUCT ELBOW
SUPPORT
EQUALIZING
DEFLECTOR
WHERE SPECIFIED
RECTANGULAR
SHEET METAL DUCT
CEILING
WIDTH OF
DIFFUSER NECK
MAXIMUM OFFSET IN HORIZONTAL AND VERTICAL PLANE TO BE
15° FOR FLEXIBLE DUCT CONNECTION TO DIFFUSER BOOT
COLLAR. FASTEN FLEXIBLE DUCT TO SHEET METAL DUCT PER
SPECIFICATIONS.
CEILING
SHEET METAL DUCT
FLEXIBLE DUCT
LINED SHEET METAL BOOT
A.
B.
C.
DUCT LINER NOT SHOWN FOR CLARITY.
FOR ADDITIONAL DETAIL, DUCTWORK SHALL BE CONSTRUCTED PER
SMACNA HVAC DUCT CONSTRUCTION STANDARDS.
DUCT OFFSETS AND TRANSITIONS MAY CONVERT DUCT PROFILES TO
ANY COMBINATION FOR RECTANGULAR, ROUND OR FLAT OVAL
SHAPES.
D E T A I L G E N E R A L N O T E S : D E T A I L R E F E R E N C E N O T E S :
AIR FOIL
TURNVANE ELBOW
DUCT
OFFSETS ECCENTRIC
REDUCER
BRANCH
CONNECTION
45° ELL REDUCER90° ELL
30° MAX
ROUND DUCT
RECTANGULAR DUCT
SAME R:D
AS 90° ELL
R
30° MAX
15° MAX
30° MAX
OVER 30°
INNER RADIUS
= 6" MIN
TURN VANES
AS SPECIFIED
RADIUS
ELBOW
RADIUS-TO-
WIDTH RATIO
TRANSITION
30° MAX
45° BRANCH
SUPPLY OR RETURN
MANUAL
BALANCING
DAMPER
W / 4
(4" MIN)
RECTANGULAR ROUND
REFER TO SPECIFICATIONS FOR RADIUS-TO-WIDTH RATIO AND
RADIUS-TO-DIAMETER RATIO FOR SPECIFIC APPLICATIONS.
1 A.
B.
C.
DUCT LINER NOT SHOWN FOR CLARITY.
FOR ADDITIONAL DETAIL, DUCTWORK SHALL BE CONSTRUCTED PER
SMACNA HVAC DUCT CONSTRUCTION STANDARDS.
DUCT OFFSETS AND TRANSITIONS MAY CONVERT DUCT PROFILES TO
ANY COMBINATION FOR RECTANGULAR, ROUND OR FLAT OVAL
SHAPES.
1 1
D E T A I L G E N E R A L N O T E S :D E T A I L R E F E R E N C E N O T E S :
(E) SHINGLES
EA DUCT SEE
PLANSFOR SIZE &
LOCATION
STRUCTURAL FRAMING AS
REQUIRED. SEE
STRUCTURAL.
COUNTER FLASHING ROOF
SHINGLES & FELT FLASHING
PLYWOOD ROOF
DECK
CONDUIT BY ELEC.
CONTR.
CURB BY EF
MANUFACTURER
DAMPER ACTUATOR
WHERE REQUIRED
DAMPER
TRAY FILTER
HARDWIRE SAFETY DEVICE TO FAN MOTOR CONTROL SAFETY
SHUTDOWN.
DETAIL REFERENCE NOTES:
OUTSIDE
AIR
SUPPLY
AIR
T
POWER
ECM
DI
R C
DO
DI
SUPPLY FAN
AO
A
ELECTRIC HEATING
S R
DI
AO
NETWORKED
THERMOSTAT
T
DI
WALL SWITCH
INPUT
T
FP
MAX 36" FLEXIBLE DUCT
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4.28.2025
wilson-architecture.com | 541-912-0878
CW1Mechanical Plan
SE
Mechanical Plan - SE
GENERAL NOTES - MECHANICAL PLAN
a. INSTALL EXHAUST FAN EQUIPMENT MIN 10' FROM ROOF
EDGE.
Middle School
8'4'2''0'
1/4" = 1'-0" M311.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
SWS
SWS
7∅ RA
(E) U-2A HEAT PUMP
TO REMAIN
(E) 24x18 RA
U-2A
SA
REPLACE (D) 6∅ DUCT WITH 14∅ DUCT
SD-1
1000 CFM
REMOVE RA GRILLS &
DUCTWORK IN CABINET
(E) SD-1
425 CFM
(E) 16x6 SA
(E) SD-1
425 CFM
MAU-1
1400 LBS20x18 OSA
20x18 UP TO
ROOF HOOD,
RH-1
26x14 SA
SD-1 625
CFM
SD-1 625
CFM
SD-1 625
CFM
SD-1 625
CFM
(E) 18x10 SA
SA
SA
(D ) 16x6 SA
14"∅ EA TEMPORARY
DUCT WITH 1000 CFM
EG-1 & DAMPER.
8x8 EA UP
TO EF-1
(E) SD-1
150 CFM
12x12 EA UP
TO EF-2
12∅ EA
EG-1
1000 CFM
EA
EG-1
150 CFM
TYPE 2 EXHAUST HOOD 600
CFM. ROUTE UP THROUGH ATTIC
SPACE TO ROOF DISCHARGE.
(D ) 6
SA
2Diffuser Grille & Register Connection Diagram3Duct Construction
Diagram4MAU Control Diagram5Exhaust Curb - Roof Cap
Diagram
APPROXIMATE LOCATION
OF DRAFT STOP
ATTIC ACCESS
(D ) 1
6x
SAREMOVE (E)
GRILL & DUCT
WORK FROM
ATTIC SPACE
W W
W
D
NTSNTSNTSNTS
26x14 SA DN THROUGH ATTIC
FLOOR. CONTINUE ROUTING DUCT
IN FIRST FLOOR CEILING SPACE. RG-1
800 CFM12
x1
R A
(E) OSA UP THROUGH ROOF
RESIDENTIAL RANGE
HOOD SEE 1/A351
14x14 EA
UP TO EF-3
12∅ SA 12∅ SA
CENTER EXHAUST DUCT/DROP
FOR CONNECTION ON CENTER
OF HOOD.
MAU-1
RELOCATE EXST
THERMOSTAT TO
WALL IN ROOM 4
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4.23.2025
wilson-architecture.com | 541-912-0878
M330CW
Mechanical Legend
Middle School
P PP
M E C H A N I C A L & P L U M B I N G L E G E N D
DUCTWORK GENERAL
CONTROL SYMBOLS
GENERAL NOTES
AFF ABOVE FINISHED FLOOR
AFS AUTOMATIC FIRE SPRINKLER
AI ANALOG INPUT
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
AWT AVERAGE WATER TEMPERATURE
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BTUH BRITISH THERMAL UNITS PER HOUR
CFH CUBIC FEET per HOUR CFM CUBIC FEET per MINUTE
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUATION
CU FT CUBIC FEET
(D) DEMOLITION
DB DRY BULB
dBa DECIBELS ACOUSTIC
DDC DIRECT DIGITAL CONTROL
DEMO DEMOLITION
DI DIGITAL INPUT
DN DOWN
DO DIGITAL OUTPUT
DP DIFFERENTIAL PRESSURE
DX DIRECT EXPANSION
1.
2.
SIZE AND LOCATION OF ALL PIPING AND OTHER MECHANICAL EQUIPMENT IS APPROXIMATE.
CONTRACTOR SHALL SITE VERIFY THE LOCATION OF EXISTING PIPING AND EQUIPMENT AND
CONSTRUCT WORK FROM FIELD DIMENSIONS. CONTRACTOR SHALL MAKE ADJUSTMENTS
NECESSARY TO ACCOMMODATE MINOR DEVIATIONS AT NO COST TO OWNER.
FINE (LIGHT) LINE WORK INDICATES EXISTING PIPING AND OTHER MECHANICAL EQUIPMENT. BOLD
(HEAVY) LINE WORK INDICATES NEW PIPING AND OTHER MECHANICAL EQUIPMENT.
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SYMBOL DESCRIPTION
ø OR dia
SHEET NUMBER
DIAMETER
NEW TO EXISTING POINT OF CONNECTION
NOTE REFERENCE MARKER
PLAN OR DETAIL REFERENCE MARKER
EQUIPMENT MARKER
ROOM NUMBER
EXISTING SHOWN LIGHT
NEW WORK SHOWN BOLD
EXISTING TO BE REMOVED
Room Name
PLAN OR DETAIL NUMBER
SYMBOL DESCRIPTION
SUPPLY AIR DUCT UP
RETURN AIR DUCT UP
EXHAUST AIR UP
OUTSIDE AIR UP
SUPPLY AIR, & MAKE-UP AIR
DUCT DOWN
RETURN AIR DOWN
EXHAUST AIR or OUTSIDE AIR DOWN
SA
RA
EA
OSA
FLEXIBLE DUCT CONNECTION
DUCT SIZE
RECTANGLE: WIDTH (IN) x DEPTH (IN) ROUND: DIAMETER(IN) ø
OVAL: WIDTH (IN) / DEPTH (IN)
12x6
DIFFUSER TYPE
SIZE - BLOW PATTERN (4-WAY IF NONE SHOWN)
AIR VOLUME IN CUBIC FEET per MINUTE (CFM)
GRILLE TYPE
SIZE
AIR VOLUME IN CUBIC FEET per MINUTE (CFM)
GRILLE TYPE
SIZE
AIR VOLUME IN CUBIC FEET per MINUTE (CFM)
GRILLE TYPE OR SIDE WALL DIFFUSER
SIZE
AIR VOLUME IN CUBIC FEET per MINUTE (CFM)
INTERNALLY LINED OR DOUBLE
WALL DUCTWORK
MANUAL BALANCING DAMPER
CONCENTRIC TRANSITION
ECCENTRIC TRANSITION
CONICAL BRANCH
(ROUND OR OVAL)
BEVELED BRANCH
(RECTANGULAR, ROUND, OR OVAL)
EG-1
12"x10"
RG-1
12"x10"
EG-1
8"x4"
RECTANGULAR DUCT ANGLED
CHANGE IN ELEVATION
ROUND DUCT ANGLED
CHANGE IN ELEVATION
SD-1
10"x10"
DEMOLITION NOTES
1.
2.
3.
4.
5.
REVIEW DEMOLITION DRAWINGS FOR ITEMS TO REMAIN, TO BE RETAINED FOR RELOCATION, OR TO
BE SALVAGED TO THE OWNER. REFER TO ARCHITECTURAL DOCUMENTS FOR ADDITIONAL
REQUIREMENTS.
DEMOLISH EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES INTERIOR TO THE BUILDING THAT ARE MADE OBSOLETE BY THE NEW WORK AND/OR ARE ABANDONED
AND NO LONGER IN USE.
PROTECT AND MAINTAIN OPERABLE EXISTING EQUIPMENT, FIXTURES, OR SYSTEMS THAT ARE
INDICATED TO REMAIN, INCLUDING ELECTRICAL POWER, CONTROLS, AND RELATED SYSTEMS
REQUIRED TO MAINTAIN OPERABILITY.
EXISTING CONDITIONS SHOWN ARE BASED ON RECORD DOCUMENTS AND LIMITED FIELD
OBSERVATIONS OF ACCESSIBLE AREAS AND MAY NOT SHOW THE ENTIRE SCOPE OF DEMOLITION
WORK. OMISSION OF EXISTING EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES FROM THE DEMOLITION DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE DEMOLITION OF SYSTEMS THAT ARE MADE OBSOLETE BY THE NEW WORK, ARE ABANDONED, OR AS OTHERWISE REQUIRED TO PERFORM THE WORK DESCRIBED HEREIN.
PROTECT AND MAINTAIN SERVICES TO REMAIN OPERATIONAL THAT PASS THROUGH THE AREA OF CONSTRUCTION. WHERE IT IS NOT POSSIBLE TO MAINTAIN THESE SERVICES INTACT, REPLACE, REROUTE, MODIFY, OR PROVIDE NEW AS REQUIRED TO MAINTAIN SERVICES.
PACKAGE EQUIPMENT BOUNDRY
M-521
M101MAKE-UP AIR DUCT UPMAS
ABBREV.
PROCESS PIPING SIGNAL
ELECTRICAL SIGNAL
ELECTRICAL CURRENT/POWER
T
FP
A ACTUATOR
A
AI
ALARM
AUTOMATIC CONTROL
DAMPER
BAS INPUT/OUTPUT POINT
AI = ANALOG INPUT
AO = ANALOG OUTPUT
DI = DIGITAL INPUT
DO = DIGITAL OUTPUT
FUNCTION DESIGNATION
S/S = START/STOP
E C
RELAY FREEZE PROTECTION
T AHU-1 SPACE THERMOSTAT
AC AIR CONDITIONER
AD AUTOMATIC DAMPER
AHU AIR HANDLING UNIT
BD BALANCING DAMPER
BDD BACK DRAFT DAMPER
BF BOOSTER FAN
CP CIRCULATING PUMP
CT COOLING TOWER
CU CONDENSING UNIT
CRU CONDENSATE RETURN UNIT
CV CONTROL VALVE
CWP CHILLED WATER PUMP
EAL EXHAUST AIR LOUVER
EDH ELECTRIC DUCT HEATER
EF EXHAUST FAN
EH EXHAUST HOOD
ET EXPANSION TANK
FD FIRE DAMPER
FF FINAL FILTER
FSD FIRE SMOKE DAMPER
DIFFUSERS AND GRILLES
SYMBOL DESCRIPTION
IW INDIRECT WASTE
KW KILOWATT
L LENGTH
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
mA MILLIAMPERE
MA MIXED AIR
MAX MAXIMUM
MBH THOUSAND BTUs per HOUR
MCA MINIMUM CIRCUIT AMPACITY
MERV MINIMUM EFFICIANCY REPORTING VALUE
MFR MANUFACTURER
MIN MINIMUM
MOP MAXIMUM OVERCURRENT PROTECTION
(N) NEW
NIC NOT IN CONTRACT
NR NOT REQUIRED
OAT OUTSIDE AIR TEMPERATURE
OCC OCCUPIED
OFCI OWNER FURNISHED/
CONTRACTOR INSTALLED
OSA OUTSIDE AIR
PD PRESSURE DROP
PH PHASE
PPH POUNDS per HOUR PSI POUNDS per SQUARE INCH PSIG POUNDS per SQUARE INCH GAUGE
RA RETURN AIR
ABBREVIATIONS
EQUIPMENT ABBREVIATIONS
HP HEAT PUMP
HX HEAT EXCHANGER
L LOUVER
MAU MAKE UP AIR UNIT
MZ MULTI-ZONE
OAH OUTSIDE AIR HOOD
OBD OPPOSED BLADE DAMPER
OSAL OUTSIDE AIR LOUVER
P PUMP
PF PREFILTER
RF RETURN FAN
RH RELIEF HOOD
RTU ROOF TOP UNIT
SA SOUND ATTENUATOR
SF SUPPLY FAN
SG SUPPLY GRILLE
ST STORAGE TANK
TU TERMINAL UNIT
UH UNIT HEATER
VD VOLUME DAMPER
FLEXIBLE DUCT RUNOUT TO
DIFFUSER/GRILLE
(E) EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECM ELECTRONICALLY COMMUTATED MOTOR
EER ENERGY EFFICIENCY RATIO
EG EXHAUST GRILLE
EMS ENERGY MANAGEMENT SYSTEM
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
°F DEGREES FAHRENHEIT
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FT WC FEET WATER COLUMN
GALV GALVANIZED
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HEIGHT
HP HORSEPOWER
HR HEAT RECOVERY
HVAC HEATING, VENTILATING,
& AIR CONDITIONING
HZ HERTZ (CYCLES PER SECOND)
IAQ INDOOR AIR QUALITY
IN INCHES
IN WC INCHES WATER COLUMN
RAT RETURN AIR TEMPERATURE
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RLA RUNNING LOAD AMPS
RS REFRIGERANT SUCTION
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SUPPLY DIFFUSER
SEER SEASONAL ENERGY EFFICIENCY RATIO
SP STATIC PRESSURE
SS STAINLESS STEEL
TEMP TEMPERATURE
TDH TOTAL DYNAMIC HEAD
TP TOTAL PRESSURE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
V VOLT
VFD VARIABLE FREQUENCY DRIVE
VP VELOCITY PRESSURE
VSD VARIABLE SPEED DRIVE
W WATTS
WB WET BULB
WPD WATER PRESSURE DROP
WC WATER COLUMN
WG WATER GAUGE
ROOM MARKER
ROOM NAME
AHU-12 TYPE - NUMBER
MITERED WITH TURNING VANES
(RECTANGULAR, ROUND, OR OVAL)
MITERED WITHOUT TURNING VANES
(RECTANGULAR OR ROUND)
RADIUS
(RECTANGULAR OR ROUND)
STRAIGHT BRANCH
(RECTANGULAR, ROUND, OR OVAL)
12ø
12/6
SYMBOL ABBREV. DESCRIPTION
G(*) NATURAL GAS (*=SUPPLY PRESSURE)
DV
BV
BFV
CHV
GV
GBV
RV
SRV
SSV
TPS
PIPING UP
PIPING DOWN
DIRECTION OF SLOPE
CAPPED PIPE
PIPE REDUCING FITTING:
CONCENTRIC, ECCENTRIC
DIRECTION OF FLOW
DRAIN VALVE WITH
HOSE CONNECTION
UNION
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
GLOBE VALVE
FLEXIBLE PIPE CONNECTION
WYE STRAINER
RELIEF VALVE
SAFETY RELIEF VALVE
(HYDRONIC)
STEAM SAFETY VALVE
TEMPERATURE/PRESSURE
SAFETY VALVE
THERMOMETER
F FIRE SPRINKLER SUPPLY
CW POTABLE COLD WATER
HW POTABLE HOT WATER
HWR POTABLE HOT WATER RETURN
TW POTABLE TEMPERED HOT WATER
NP NON-POTABLE COLD WATER
W SANITARY WASTE
PW
GW
D
OD
PUMPED WASTE
GREASE WASTE
V VENT
DRAIN
OVERFLOW DRAIN
PIPING
FUEL
FIRE PROTECTION
PLUMBING
PUMP
FD
FAN
FLOOR DRAIN
VALVES & FITTINGS
E
X
P
I
R
E
S : 12
J
A
N
1, DIGITALLY SIGNED
RE
GI
STERED PROFESSIONALENGINEER# 59,544
OREGONP
A
U L
E . F O O
K
Preliminary -
Not for
Construction
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4.23.2025
wilson-architecture.com | 541-912-0878
M331CW
Mechanical Schedules
E X X
E X
X X
X
DW
DWB
DWH
EF3
EF2
EF1
DUPLEX OUTLET MOUNTED AT +18"
UNLESS OTHERWISE NOTED
X
E
EXST OUTLET TO REMAIN
EXST DUPLEX TO BE REMOVED
POWER
X
EXST FOURPLEX TO BE REMOVED
EF1
BRANCH CIRCUIT PANEL
EXHAUST FAN ELECTRICAL CONNECTION
AND DISCONNECT SWITCH
J
DISCONNECT SWITCH
MOTOR CONNECTION
JUNCTION BOX FOR EQUIPMENT
CONNECTION
RANGE OUTLET NEMA 5-50R
CW1Electrical Plan
SE
Electrical Plan - SE
GENERAL NOTES - ELECTRICAL PLAN
a. ---
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4.25.2025
wilson-architecture.com | 541-912-0878
E311.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
0.
E2
3.
E1
120.E4
120.E1
120.E310 4.
E1
6.
E1
8.
E1
9.
E1
H5.E1114.E1
5.
E1
H 4.
E1
ROOM 2
102.E1
STORAGE
BOILER BLDG
ROOM 4
103.1
4.
E2
ROUTE NEW FEEDER TO
PANEL K IN ATTIC SPACE.
NEW 300/3 ENCLOSED
CIRCUIT BREAKER TAP
SWITCHBOARD BUS TO
FEED NEW BREAKER.
EXISTING 800 AMP MAIN
DISTRIBUTION PANEL.
NEW PANEL K
K-17
K-15
K-13
GFI
K-29 K-27
K-25
K-25
K-23
+42"
TRAP
PRIMER
OUTLET
K-23
K-21
GFI
+42"
GFI
TRAP
PRIMER
OUTLET
K-21
GFI
K-21+42"
K-21 +42"
GFI
K-19 K-19
GFI GFI
K-14
K-17K-19
K-7
K-20:22:24
K-8:10:12 J
J
K-2:4:6
J
K-1:3:5 LEGEND - ELECTRICAL PLAN
K-33:35:37
U-2A
MAU-1
1400 LBS
K-9:11 R1
EXP 6/30 /2025
James Krumsick
/JK
4/28/2025
B B B
B
B B
B
BBB
CC
A
A
SX
1x4, NEW
2x4, LED NEW
2x4, EXST
OS
OS WALL-MOUNTED OCCUPANCY
SENSOR
CEILING-MOUNTED OCCUPANCY
SENSOR
DEMO SWITCH
CW1Lighting Plan
SE
Lighting Plan - SE
Middle School
8'4'2''0'
1/4" = 1'-0"
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4.25.2025
wilson-architecture.com | 541-912-0878
E321.3
ROOM 3
KITCHEN
ROOM 4
PRODUCE
ROOM
LOUNGE
H5
SE HALL
RR
CLOSET
JAN
H2
SOUTH HALL
H1
MAIN HALL
H4
NE HALL
SWS
SWS
ROOM 2
STORAGE
BOILER BLDG
KEYNOTES - LIGHTING PLAN
1. EXST LIGHT TO REMAIN.
2. REMOVE EXISTING LIGHT FIXTURES. EXTEND SWITCHED
CIRCUIT TO NEW FIXTURE LOCATION.
3. REPLACE EXISTING LIGHT FIXTURE WITH NEW STRIP
FIXTURE.
4. NEW LIGHT FIXTURE.
5. REPLACE EXISTING SWITCH WITH WALL
SWITCH/OCCUPANCY SENSOR.
6. INSTALL NEW CEILING MOUNTED OCCUPANCY SENSOR
CONTROLLING SWITCHED ROOM CIRCUITS.
1 4
4 4
LEGEND - LIGHTING PLAN
OS5
EXP 6/30 /2025
James Krumsick
CW1One Line Diagram One Line Diagram
PROJECT: 25031
MS Community Kitchen Mapleton School District
Construction Documents
REVISIONS:
CHECKED:
DATE: 4.23.2025
wilson-architecture.com | 541-912-0878
E330
NTS
EXP 6/30 /2025
James Krumsick
| Sheets and Views |
| T1 |
File details come from the government source that posted it. Updated .