Addendum-1-MMS_Kitchen-WA-25-05-14.pdf

PDF 6 MB Posted

Attached to
Community Kitchen Construction
Solicitation number
S-P20015-00013726
Issued by
Lane County, Mcminnville City, Oregon

About this file

Addendum 1 for the Mapleton School District's Middle School Community Kitchen project, prepared by Wilson Architecture on May 14, 2025, modifies the original project manual, specifications, and drawings for the renovation. The addendum includes updates from a pre-bid meeting held on May 8, 2025, with potential prime bidders Joseph Muller Construction and Ordell Construction. Key modifications involve changes to plumbing, mechanical, and electrical sheets, including the addition of a new section for access doors and panels, updates to domestic water piping specialties, sanitary waste interceptors, HVAC provisions, and automatic controls. The document also details revisions to multiple project drawings, such as the demo floor plan, floor plan, roof plan, and finish schedule.

The addendum specifies technical details for floor and wall-mounted access units, including specific manufacturers like Acudor Products Inc., and provides installation guidelines. Notably, no product substitutions have been submitted or approved to date. The attachments include the pre-bid meeting sign-up sheet, specification section 08 3100 for access doors and panels, and replacement sheets for various project drawings. The changes appear to be part of a comprehensive kitchen improvement project that involves modifying existing spaces, upgrading infrastructure, and ensuring precise technical specifications are met for the renovation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1

Client: Mapleton School District

Project: MS Community Kitchen

Date: May 14, 2025

To: Interested Bidder

Prepared by: Curt Wilson, AIA; Principal, Wilson Architecture

This Addendum modifies the Project Manual, Specifications, and Drawings as follows:

1. General Information

1.1. The Pre-Bid Meeting was held on 5/8/2025. The meeting sign-up sheet is attached to this document.

1.2. Potential Prime Bidders

a. Joseph Muller Construction Joe Muller 5Muller@comcast.net.

b. Ordell Construction Erik Stolle estolle@ordellconstruction.com

1.3. Addendum 1 will be issued on 5/15/2025 and will include modifications to some on the Plumbing, Mechanical and Electrical sheets.

2. Changes to the Project Manual

2.1. Section 00 0110 – Table of Contents

a. Add “08 3100 Access Doors and Panels”

2.2. Section 08 3100—Access Doors and Panels

a. Add this section to the Project Manual.

• This section includes the floor access door and wall access panel.

2.3. Section – 22 1119 Domestic Water Piping Specialties

a. Item 1: ADD paragraph 2.9 as follows:

2.9 OUTLET BOXES

A. Icemaker Outlet Boxes (IMB-1):

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Guy Gray Manufacturing Co., Inc.

b. IPS Corporation.

c. LSP Products Group, Inc.

d. Oatey.

e. Precision Plumbing Products, Inc.

Addendum 1 Mapleton School District

MS Community Kitchen

Wilson Architecture 5/14/2025 Page 2

2. Mounting: Recessed.

3. Material and Finish: Enameled-steel or epoxy-painted-steel box and faceplate.

4. Faucet: Valved fitting complying with ASME A112.18.1. Include NPS 1/2 or smaller copper tube outlet.

5. Supply Shutoff Fitting: NPS 1/2 gate, globe, or ball valve and NPS 1/2 copper, water tubing.

b. Item 2: ADD paragraph 3.1 E as follows:

E. Install outlet boxes recessed in wall or surface mounted on wall. Install 2-by-4-inch fire-retardant-treated-wood blocking, wall reinforcement between studs.

2.4. Section –22 1323 Sanitary Waste Interceptors

a. Item 1: ADD 2.1 A 13 as follows:

13. Lid Material: Cast iron, H20 rated.

2.5. Section 23 0500 General HVAC Provisions

a. Item 1: Delete 2.11 “Cooking Exhaust Range Hood” from section.

b. Item 2: Delete 3.4 “Installation from section.

2.6. Section – 23 0922 General Automatic Controls for HVAC– -

a. Item - 1: Revise Acceptable Control Manufacturers from Distech, Reliable or Approved to

Pelican

b. Item – 2: Add cellular gateway to products for remote connectivity.

3. Changes to the Drawings

3.1. Sheet D311.3 – Demo Floor Plan - SE

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Opening in existing floor framing for new

3.2. Sheet A311.3 – Floor Plan - SE

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Location of new crawl space access door and reference to detail.

3.3. Sheet A329.3

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Roofing improvements and detail references updated for new roof penetrations.

3.4. Sheet A360

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

Addendum 1 Mapleton School District

MS Community Kitchen

Wilson Architecture 5/14/2025 Page 3

• Floor assemblies revised for underlayment thickness.

3.5. Sheet A361

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• New details 5 and 6 added.

3.6. Sheet A362

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• New detail 3 added.

3.7. Sheet A370 – Finish Schedule

a. Replace previously issued sheet with the attached sheet. The following items have been addressed on this sheet.

• Keynotes addressing current flooring improvements in adjacent rooms added.

4. Approved Product Substitutions

4.1. No product substitutions submitted nor approved to date.

End of Addendum

5. Attachments

5.1. Pre-Bid Meeting Sign up Sheet

5.2. Spec Section 08 3100

5.3. Replacement sheets as noted above

1 2

2 2

Master Version (Project Name) 08 3100

Mapleton School District ACCESS DOORS AND PANELS

Added 5/14/2025 Add 1 PAGE 1 of 3

SECTION 08 3100

ACCESS DOORS AND PANELS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Floor Access Doors

1.2 RELATED REQUIREMENTS

A. Section 01 2000 – Price and Payment Procedures: Pay application process, change procedures.

B. Section 01 3000 – Administrative Requirements: Submittal review procedures.

C. Section 01 6000 – Product Requirements: Substitution request procedures.

D. Section 01 7000 – Execution and Closeout Requirements: Closeout procedures.

1.3 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data

1. Provide sizes, types, finishes, hardware, scheduled locations, and details of adjoining work.

C. Manufacturer’s Instructions

1. Indicate installation requirements.

1.4 QUALITY ASSURANCE

A. Qualifications

1. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years of documented experience.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Acceptance at Site

1. Deliver materials in original packages, containers or bundles bearing brand name and identification of manufacturer or supplier.

B. Storage

1. Store materials inside under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic and other causes.

1.6 PROJECT RECORD DOCUMENTS

A. Record actual locations of each access unit.

PART 2 PRODUCTS

2.1 PRODUCT GENERAL REQUIREMENTS

Added 5/14/2025 Add 1 PAGE 2 of 3

A. Manufacturer

1. Acudor Products Inc.

2. Babcock-Davis.

3. Barco Manufacturing.

4. Cierra Products.

5. Dur-Red Products.

6. Karp Associates, Inc.

7. Milcor, Inc.

8. Uponor Ltd.

9. Substitutions: See Section 01 6000 – Product Requirements.

10. Products as listed by Acudor Products Inc.

2.2 FLOOR ACCESS DOOR UNITS

A. Description

1. Material

a. Aluminum.

2. Finish

a. Mill finish with bituminous coating applied to exterior of frame.

3. Frame

a. Angle frame fabricated from aluminum extrusion with integral 1" anchor flange on three sides and welded anchor straps on the hinge side

4. Door/Panel

a. 1/4" smooth aluminum plate reinforced for live load of 150 lb/sq. ft. Extruded edging is welded to door panel, providing a 1/8" recess.

5. Hinge and Opening Devices

a. Extruded aluminum hinges are welded to inside of door panel and pivot on stainless steel pins. Hold open arm with red Vinyl grip allow automatic opening.

b. Door panel to open to 90 degrees, locking door in open position, and allowing for easy control when closing door panel. Stainless steel torsion bars provide lift assistance. Available with electrical actuators, operated by wall mounted push button switch, and remote control.

c. Stainless steel slamlock with a fixed inside handle, removable outside handle, and removable threaded plug.

B. Dimensions

1. 24 in. by 30 in.

C. Product

1. “FT-8040” by Acudor

Added 5/14/2025 Add 1 PAGE 3 of 3

2.3 WALL-MOUNTED UNITS

A. Description

1. Material

a. Steel.

2. Finish

a. Stainless Steel

3. Door/Panel

a. Continuous, concealed hinge, standard duty, with tool-operated spring or cam lock and no handle.

b. Tool-operated spring or cam lock; no handle.

4. Wall Mounting Criteria

a. Provide surface-mounted face frame and door surface flush with frame surface.

B. Dimensions

1. 18 in. wide by 24 in. high

C. Product

1. “UF-5000” by Acudor

PART 3 EXECUTION

3.1 EXAMINATION

A. Site Verification of Conditions

1. Verify that rough openings are correctly sized and located.

3.2 INSTALLATION

A. Install units in accordance with manufacturer's instructions.

B. Install frames plumb and level in openings, and secure units rigidly in place.

C. Position units to provide convenient access to concealed equipment when necessary.

END OF SECTION

T

I

CW1Demo Floor Plan

SE

Demo Floor Plan - SE

GENERAL NOTES - DEMO PLAN

a. SEE SHEET A360 FOR ASSEMBLIES.

b. CAREFULLY REMOVE AND SALVAGE FOR POSSIBLE

RE-USE HORIZONTAL WOOD TRIM ON WALLS TO BE

COVERED BY NEW WOOD FRAMING.

c. SEE SHEET A311.3 AND A360 FOR DESCRIPTION OF EXST

WALL SYSTEM COMPONENTS TO REMAIN.

d. SEE SHEET G021 FOR PHOTOS OF EXST CONDITIONS.

Middle School

8'4'2''0'

1/4" = 1'-0"

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

D311.3

ROOM 3

KITCHEN

ROOM 4

PRODUCE

ROOM

LOUNGE

H5

SE HALL

RR

CLOSET

JAN

H2

SOUTH HALL

H1

MAIN HALL

H4

NE HALL

SWS

SWS

ROOM 2

STORAGE

BOILER BLDG

2B A361

1B A361

KEYNOTES - DEMO PLAN

1. DEMO DOOR, OPENING FOR NEW FRAME.

2. DEMO WHITEBOARD TRIM

3. EXST ELEC PANEL, SEE E311.3.

4. EXST FLOOR SYSTEM WITH EXPOSED DIAGONAL

SHEATHING.

5. EXST WINDOWS TO REMAIN

6. EXST STUD WALL TO REMAIN, DEMO WALL FINISH ON EAST

SIDE OF WALL.

7. EXST ABANDONDED FIRE HOSE CABINET.

8. DEMO FLOOR FOR CRAWL SPACE ACCESS.

A362

5TYP

A362

ADD 1

ADD 1

ADD 01 - 5/14/2025

DW

DWB

DWH

T

T

CW1Floor Plan

SE

Floor Plan - SE

GENERAL NOTES - FLOOR PLAN

a. SEE SHEET A360 FOR ASSEMBLIES.

b. DIMENSIONS TO FACE OF FRAMING U.N.O.

Middle School

8'4'2''0'

1/4" = 1'-0"

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A311.3

22'-0"

'-0

"103

ROOM 3

KITCHEN

ROOM 4

PRODUCE

ROOM

LOUNGE

H5

SE HALL

RR

CLOSET

JAN

H2

SOUTH HALL

H1

MAIN HALL

H4

NE HALL

SWS

SWS

0.

E2

3.

E1

120.E4

120.1

120.E310 4.

E1

6.

E1

8.

E1

9.

E1

H5.E1114.E1

5.

E1

H 4.

E1

ROOM 2

102.E1

103.1

STORAGE

BOILER BLDG

4.

E2

32'-0"

'-0

/2

9' -5

/8

13'-4 1/8"

'-0

/2

2A A361

1A A361

A351

IA 4.24 W0.0

FIN FINFIN FIN

FI

N

FI

N

FI

N

FI

N

FINFIN

FI

N

FI

N

FI

N

4' -1

1/

2"

2' -0

C

LE

A

R

A371

A371

A371

A360

A362

KEYNOTES - FLOOR PLAN

1. SEE INTERIOR ELEVATIONS FOR LOCATION OF WALL

REPAIR.

2. FRP PANEL

3. RESIDENTIAL OVEN, BY OWNER

4. COMMERCIAL RANGE - FUTURE

5. FRIDGE, BY OWNER

6. DISHWASHER, SEE PLUMBING

7. SINK, SEE PLUMBING

8. APPROXIMATE LOCATION OF EXST SEPTIC TANK, FIELD

VERIFY.

9. DOMESTIC WATER HEATER, SEE PLUMBING

10. GREASE INTERCEPTOR, SEE PLUMBING

11. THERMOSTAT

12. EXST HVAC RETURN

13. ELECTRICAL PANEL

14. FEC

15. EXST CRAWL SPACE ACCESS

16. 24x36 CRAWL SPACE ACCESS

TYP

A351

6"

FI

N

6" FIN

A360

A360

A362

EA 4.24 W1

EB 4.24 W1

IB 4.24 W0.0

F.A

F.A

F.A1

F.A1

A360

A360

A360

EB 4.24 W1

TYP AT EXTERIOR WALL

TYP OF

RED

A361

SIM

A361

ADD 01 - 5/14/2025

EF3

EF1

RH1

EF2

CW1Roof Plan

SE

Roof Plan - SE

GENERAL NOTES - ROOF PLAN

a. ---

Middle School

8'4'2''0'

1/4" = 1'-0"

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A329.3

A362

A362

(E) U-1A

(E) U-1B

(E) U-2(E) U-3

EXST 14"∅ ROOF VENT WITH

EXISTING 14∅ EXHAUST VENT

EXST 8"∅ ROOF VENT WITH

EXISTING 8∅ EXHAUST VENT

A362

A362

EXST ROOF VENT, TYP.

ADD 01 - 5/14/2025

ADD 1

ADD 1

ADD 1

ADD 1

REPLACEMENT SHINGLE,

CRICKET, TYP

EXST LATH AND PLASTER

PLASTER ASSEMBLY PER

1A4.24W0.0.

WALL CORE ELEMENT

4.24 2x4 3 1/2" 24" O.C.

# STUD SIZE SPACING

FIRE RATING

.0 NOT RATED

Field VerifySTUD SIZE & SPACING

0 NONE

2x4 @ 24" O.C.

EXST WOOD STUDS

IA4.24W0.0

EXST WD STUD - EXST LATH AND PLASTER

INTERIOR WALL ASSEMBLY

EXST PLASTER BROWN

COAT

EXST PLASTER SCRATCH

COAT

WALL CORE ELEMENT

4.24 2x4 3 1/2" 24" O.C.

# STUD SIZE SPACING

FIRE RATING

.0 NOT RATED

STUD SIZE & SPACING

0 NONE

NOTE: SPACING OF EXST

STUDS ASSUMED. FIELD

VERIFY.

EXST WOOD LATH

EXST WOOD STUDS

IB4.24W0.0

EXST WD STUD - EXST L&P - NEW FURRING

INTERIOR WALL ASSEMBLY

Field Verify

6"

GYP BOARD

FRP WHERE SCHEDULED

1x4 FLAT @ 24" O.C.

EXST LATH AND PLASTER

PLASTER ASSEMBLY PER

1A4.24W0.0.

Field Verify

EXST SIDING SYSTEM -

FIELD VERIFY

EXST WOOD STUDS

EXST WD STUD - EXST L&P - NEW FURRING

6"

GYP BOARD

FRP WHERE SCHEDULED

EXTERIOR WALL ASSEMBLY EB4.24W1

SIDING TYPE

1 EXST WOOD LAP SIDING -

SUBSTRATE TO BE

DETERMINED.

# STUD SIZE SPACING

4.24 2x4 3 1/2" 24" 0.C.

STUD SIZE & SPACING

NOTE: SPACING OF EXST

STUDS ASSUMED. FIELD

VERIFY.

NOTE: SPACING OF EXST

STUDS ASSUMED. FIELD

VERIFY.

BATT INSULATION (R-21)

VAPOR BARRIER

VAPOR BARRIER

EXST LATH AND PLASTER

PLASTER ASSEMBLY PER

1A4.24W0.0.

Field Verify

EXST SIDING SYSTEM -

FIELD VERIFY

EXST WOOD STUDS

EXST WD STUD - EXST L&P - NEW FURRING

EXTERIOR WALL ASSEMBLY EA4.24W1

SIDING TYPE

1 EXST WOOD LAP SIDING -

SUBSTRATE TO BE

DETERMINED.

# STUD SIZE SPACING

4.24 2x4 3 1/2" 24" 0.C.

STUD SIZE & SPACING

NOTE: SPACING OF EXST

STUDS ASSUMED. FIELD

VERIFY.

Wall Assemblies Section1 1/2" = 1'-0"

PLYWOOD UNDERLAYMENT (5/8")

FLOORING PER SCHEDULE

Floor Assembly F.A Flooring Covering - Underlayment - Exst Wood Structure

FLOOR ASSEMBLIES

EXST WOOD BEAM

EXST 2" x 7 1/4" FLOOR JOIST @ 16' O.C.

EXST 1x6 DIAGONAL SHEATHING

PLYWOOD UNDERLAYMENT BY

OWNER (5/8")

FLOORING BY OWNER

Floor Assembly F.A1 Flooring Covering - Underlayment - Exst Wood Structure

FLOOR ASSEMBLIES

EXST WOOD BEAM

EXST 2" x 7 1/4" FLOOR JOIST @ 16' O.C.

EXST 1x6 DIAGONAL SHEATHING

+13'-6 1/4" ±

T.O. ATTIC FRAMING

+12'-2 1/2"

B.O. PLASTER CEILING

+9'-6"

B.O. CEILING

EXST 2 1/2" x 13 1/4" FLOOR JOIST @ 24" O.C.

EXST 1x6 DIAGONAL SHEATHING

EXST BATT INSULATION, 8"±

EXST SUSPENDED CEILING

SYSTEM SUPPORT WIRE.

EXST CEILING GRID TO REMAIN.

NEW CEILING TILE.

Ceiling Assembly C.1CEILING ASSEMBLIES

Exst Attic Framing - Exst Suspended Ceiling

Ceiling Assembly C.2CEILING ASSEMBLIES

EXST LATH AND PLASTER CEILING

SYSTEM

+10'-0 3/4"

B.O. PLASTER CEILING

EXST 2 x 6 ATTIC/CEILING JOIST @ 24" O.C.

EXST BATT INSULATION, 6"±

EXST LATH AND PLASTER CEILING

SYSTEM

Exst Ceiling/Attic Framing - Plaster Finishe

Ceiling Assembly C.3CEILING ASSEMBLIES

+10'-0 3/4"

B.O. PLASTER CEILING

EXST 2 x 6 ATTIC/CEILING JOIST @ 24" O.C.

EXST BATT INSULATION, 6"±

EXST LATH AND PLASTER CEILING

SYSTEM

Exst Ceiling/Attic Framing - Adhered Ceiling Tile

Floor Assemblies Section1 1/2" = 1'-0"

Ceiling Assemblies Section1 1/2" = 1'-0"

EXST ADHERED 12" x 12" ± CEILING

TILE.

2x4 @ 24" O.C.

BATT INSULATION (R-21)

Top of Wall - Furring Wall Section1 1/2" = 1'-0"

+9'-6"

B.O. CEILING

WALL ASSEMBLY EB4.24W1

5 1/2" x 14" x 3/4"

PLYWOOD STRIPS @ 24"

O.C.

DOUBLE TOP PLATES

(3) ROWS OF (3) 2 1/2"

WOOD SCREWS PER

STRIP.

WALL ASSEMBLY EA4.24W1

2x RIP TO 3" FULL LENGTH OF

WALL.

(2) 4" WOOD SCREWS PER

STUD.

EXST SUSPSENDED

CEILING TILE SYSTEM

CW1

Middle School

Assemblies

WALL ASSEMBLY LEGEND

I C 4 . 24 W 0 . 0 - INTERIOR

FIRE RATING (IN HRS)

WALL CORE ELEMENT

FRAMING MATERIAL

STUD SPACING (ON CENTER)

NOMINAL CORE THICKNESS/STUD DEPTH

ASSEMBLY TYPE

INTERIOR WALL/PARTITION

E A 6 . 24 W 2 - EXTERIOR

SIDING/EXTERIOR FINISH TYPE

FRAMING MATERIAL

STUD SPACING (ON CENTER)

NOMINAL CORE THICKNESS/STUD DEPTH

ASSEMBLY TYPE

EXTERIOR WALL

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A36023

FRP at Window Sill Section1 1/2" = 1'-0"

New Wall - Base Section1 1/2" = 1'-0"

SST A33 CLIP, EVERY

OTHER STUD.

2x4 w/ 4" WOOD SCREW

EVERY EXST STUD

FRP PANEL

FRP OUTSIDE CORNER

TRIM

PLYWOOD, 1/2"

EXST WINDOW SYSTEM

5/16"∅ x 4" LAG BOLT

EVERY OTHER JOIST

(2) 16d EACH STUD

COVE BASE

FRP BOTTOM TRIM

6"

FRP

GYP BOARD

IB4.24W1

IB4.24W1

FLOOR ASSEMBLY A

3'-7 1/2"

T.O. EXST WINDOW

SILL TRIM

FRP PANEL

ADD 1

ADD 01 - 5/14/2025

T

DWH

T

I

Jamb - Door Opening Section1 1/2" = 1'-0"

2 2 2

(E)

(E)

(x)

DIMENSION

POINT PER

PLAN

DEMO AS

NEEDED FOR

NEW

OPENING.

EXST STUD TO REMAIN

TRIMMER STUD

KING STUD

RM 4

RM 3

EXST FINISH TO REMAIN,

PROTECT

PT

FRP

WALL ASSEMBLY PER PLAN

CONC SLAB

24ga SHT MTL DRIP FLASHING, MIN 2" UP WALL, SLOPE TO DRAIN

TO SINK, AND SET IN SEALANT.

FRP SYSTEM BOTTOM OF

PANEL TRIM

CONTINOUS 2x6 BETWEEN

WALL AND MOP SINK.

SHIM AS REQ'D.

MOP SINK

Flash at B.O. FRP Panel to Mop Sink Section3" = 1'-0"

PLYWOOD UNDERLAYMENT BY

OWNER (5/8")

FLOORING BY OWNER

EXST WOOD BEAM

EXST 2" x 7 1/4" FLOOR JOIST @ 16' O.C.

EXST 1x6 DIAGONAL SHEATHING

EXISTING JOIST BEYOND

2X10 HEADER RIPPED TO SIZE LU28

HANGER, TYP.

FASTEN FLOOR

ACCESS DOOR PER

MANF.

FLOOR ACCESS

DOOR DROP IN

EXST 3/4" x 2 1/2" WOOD

CASING TO REMAIN. FIELD

VERIFY PROFILE.

NOTE: SEE 2/A362 FOR OTHER

INFORMATION PERTAINING TO

THIS DETAIL.

NEW CASING,

MATCH

DIMENSIONS AND

PROFILE OF EXST.

1/4" R.O. GAP

1" WOOD FRAME.

MATCH

DIMENSIONS AND

PROFILE OF EXST.

3/4" WOOD STOP.

MATCH EXST

NEW DOOR. ADJUST SCHEDULED

HEIGHT AS NECESSARY FOR 1/2"

UNDERCUT AT NEW FLOORING.

+7'-2"± ABOVE EXST SHEATHING

R.O. DOOR HEAD

+7'-1 1/4" ABOVE

EXST SHEATHING

B.O. EXST WOOD CASING

NOTE: FLOOR ASSEMBLY BELOW DOOR

TO BE ADDED TO EXST DIAGONAL

SHEATHING IS 5/8" UNDERLAYMENT AND

SHEET VINYL. ASSUME FINISH FLOOR

ELEVATION IS 3/4" ABOVE EXST DIAGONAL

SHEATHING.

Wood Door Frame Section - Head, Jamb Similar3" = 1'-0" CW2

Middle School

DetailsFloor Plan Enlarged Plan

GENERAL NOTES

a. SEE D311.3 & A311.3 FOR APPLICABLE KEYNOTES.

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A361 3/4" = 1'-0"

13/4" = 1'-0" Floor Plan

Enlarged Plan

A. NewB. Demo

A. NewB. Demo

A361

A361

TYP TYP

EB 4.24 W1

GYP BOARD

EXST TRIM

FRP PANEL, TYP

OF RED

EXST WALL

SEE MECH

EXST TRIM

DEMO TRIM

DEMO WALL

FINISH SYSTEM

DEMO FOR DOOR OPENING, SEE

2/A362.

DEMO

CASEWORK,

FIELD VERIFY.

DEMO WALL

SYSTEM

DEMO, SEE

MECH

DEMO SHELVES

DEMO WALL

SYSTEM

EXST TRIM

EXST WALL

DEMO TRIM

EXPOSE EXST

STUD WALL

DEMO WALL

FINISH SYSTEM

SEE MECH

DEMO WALL

DEMO DOOR

EXST TRIM

EXST STUD

WALL

SEE ELEC

EXST

FINISH

PATCH WALL FINISH

DEMO WALL

FINISH

EXST STUD WALL

DEMO TRIM

SEE PLUMBING

2' -0

C

LE

A

R

FRP PANEL, TYP OF

RED

GYP BOARD

EXST STUD WALL

A361

ADD 1

ADD 01 - 5/14/2025

Floor Access Hatch Section1 1/2" = 1'-0"

A361

DOOR

FRAME, SIM

EXHAUST FAN SEE MECHANICAL

CURB BY MANF. MIN 8" ABOVE ROOF

DECK ON LOW SLOPE SIDE FRAME CRICKET ON UP-SLOPE OF

CURB

SHEET METAL

CRICKET FLASHING

UNDER LAP MIN 8"

SELF ADHERED UNDERLAYMENT

SHEET METAL FLASHING LAPPED

UNDER ASPHALT SHINGLE PATCH

SHEET METAL CURB FLASHING

OVERLAPPED METAL TRANSITION

FLASHING

REMOVE ASPHALT SHINGLES AS NEEDED

TO INSTALL CURB. FEATHER IN

REPLACEMENT SHINGLES PER

MANUFACTURER RECOMENDATION

REMOVE ASPHALT SHINGLES

AS NEEDED TO INSTALL

CURB. FEATHER IN

REPLACEMENT SHINGLES

PER MANUFACTURER

RECOMENDATION

SELF ADHERED UNDERLAYMENT

BELOW EXTENT OF REPLACED

SHINGLES, TYP.

CW

Middle School

Details

GENERAL NOTES

a. SEE D311.3 & A311.3 FOR ADDITIONAL INFORMATION.

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A362

1Thru Existing Relite Wall Section3/4" = 1'-0"2Thru Closet

Wall Section3/4" = 1'-0"

A360

SIM

A360

SIM

+4'-6"

T.O. FRP

2x4 FLAT FURRING AT 16"

O.C. AT RECESS AT EXST

RELITE SYSTEM.

SHIM SURFACE OF 2x4 FLAT

TO ALIGN WITH SURFACE OF

1x4 FLAT ABOVE.

REMOVE RELITE CASING AS

NEEDED TO ACCOMODATE

VERTICAL WALL FURRING

EXST RELITE SYSTEM

NOTE: FIELD VERIFY EXST

CONDITIONS, COORDINATE

WITH ARCHITECT IF

CONDITIONS VERIFY FROM

REPRESENTATION IN THESE

DRAWINGS.

IB 4.24 W1

IA 4.24 W0.0 IA 4.24 W0.0

F.A1 F.A F.A F.A

C.2

C.1C.1C.1

A. NewB. DemoA. NewB. Demo

FIELD VERIFY EXST

HEADER, PROTECT.

EXST TRIM TO REMAIN.

DEMO SOFFIT. SEE

INTERIOR ELEVATIONS

FOR EXTENT.

REMOVE EXST STUDS TO

ACCOMODATE NEW

HEADER.

EXST TRIM TO REMAIN.

REMOVE EXST STUDS TO

ACCOMODATE NEW

HEADER AND DOOR

OPENING. PROTECT EXST

LATH AND PLASTER

SYSTEM ON WEST SIDE OF

WALL.

SIMSIM

NEW HEADER. SEE 4/A361

FOR JAMB STUDS. 3/4" WOOD TRIM.

MATCH EXST TRIM

PROFILE.

GYP BOARD AT SOFFIT AND

SIDEWALL.

2x4 SOFFIT FRAMING

AT 16" O.C.

3/4" x 2 1/2" WOOD TRIM. MATCH

EXST WOOD TRIM PROFILE.

WOOD DOOR FRAME. MATCH EXST

DOOR FRAME PROFILE AND

DIMENSIONS.

WOOD DOOR.

EXST TRIM TO REMAIN. EXST TRIM WILL BE CONCEALED.

CONTRACTOR'S CHOICE TO LEAVE IN

PLACE, OR CAREFULLY REMOVE FOR

REUSE IN OTHER AREAS WHERE NEW

TRIM REQUIRED, TYP

IA 4.24 W0.0 SIM

A361

ADD 01 - 5/14/2025

ADD 1

3Cricket Detail Section1-1/2" = 1'-0"

M W

T

DWH

T

T

3' -0

8"

~7"~7"

7' -0

R.O. +1/4" BEYOND

ALL SIDES, TYP

SCHEDULE

FRAME, TYP

SC

H

ED

U

LE

CW1Door and Frame Type

Finish Schedule

GENERAL NOTES - FINISH SCHEDULE

a. --.

Middle School

PROJECT: 25031

MS Community Kitchen Mapleton School District

Construction Documents

REVISIONS:

CHECKED:

DATE: 4/28/2025

wilson-architecture.com | 541-912-0878

A370

ROOM 2

FINISH SCHEDULE

IDENTIFICATION

LOCATIONRM #

102 ROOM 2

FLOOR

BASE

FINMAT FINMAT FINMAT

NORTH

FINMAT

EAST

FINMAT

SOUTH

FINMAT

WEST

WALL CEILING

FINMAT

CASEWK

TYPE

NOTES RM #

CASEWORK TYPES

TYPE A

COUNTER: P.LAM

CABINET: P.LAM

H1

SWS

SWS

JAN

LOUNGE

RR

CLOSET

MAIN HALL

ROOM 3 KITCHEN

ROOM 4

SHEET

VINYL

FAC COVE FAC

EXST ACT

FAC

FAC

1/4" = 1'-0"

KEYNOTES - FINISH SCHEDULE

1. THE OWNER IS REPLACING EXISTING FLOORING AND

UNDERLAYMENT IN MOST ROOMS OF THE BUILDING UNDER

A SEPARATE CONTRACT. SEE FLOOR ASSEMBLY FA1 FOR

THE WORK. THIS WORK IS SCHEDULED TO BE COMPLETED

BY THE END OF JUNE 2025, WHICH IS PRIOR TO THE

PLANNED START OF THE KITCHEN PROJECT, THEREFORE IT

IS REFERRED TO AS “EXISTING”.

2. THE NEW FLOORING BY THE OWNER IN ROOM 4 WILL BE

INSTALLED AFTER THE NEW DOOR AND FLOORING IN

ROOM 3 IS INSTALLED.

H4

H5

NE HALL

SE HALL

H2 SOUTH HALL

H1

H4

H5

H2

120 PRODUCE ROOM EXST

PLASTER

DOOR SCHEDULE

IDENTIFICATION PERFORMANCE

FIRE RATING (minute)

DOOR FRAME

LOCATIONMARK

ROOM NAMERM #

SMOKE SOUND

CHARACTERISTICS

DOOR

TYPE FIN.

NOM. DIMENSIONS

WIDTH HEIGHT

NOTES

103.1 103

STATUS

MATER.

FRAME

TYPE FIN.MATER.

HARDWARE

GROUP

MARK

THERMAL

ROOM 3 KITCHEN

ROOM 3 KITCHEN103103.E1 --

NEW WD -- 103.1

ROOM 4104104.E1 --

ROOM 4104104.E2 --

0.

E2

3.

E1

120.E4

120.E1 / 120.1

120.E3

103.1

4.

E1

4.

E2

6.

E1

8.

E1

9.

E1

H5.E1114.E1

H 4.

E1

102.E1

PRODUCE ROOM120120.E1 --

120120.E2 --

120120.E3 --

120120.E4 --

PRODUCE ROOM

PRODUCE ROOM

PRODUCE ROOM

103.E1

104.E1

104.E2

120.E1

120.E2

120.E3

120.E4

EXST

EXST

EXST

DEMO

EXST

EXST

EXST

ROOM 3 KITCHEN

ROOM 4

PRODUCE

ROOM

H1

MAIN HALL

H4

NE HALL

H4H4.E1 --NE HALL H4.E1EXST

4'-0" 7'-0"

ACT

ACT

EXST

EXST

EXST

EXST

EXST

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

GYP

FRP

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

EXST

PLASTER

GYP

FRP

EXST

PLASTER

EXST

PLASTER

3'-0" 7'-0"

3'-0" 7'-0"

2'-0" 7'-0"

54H5.E1 --SE HALL H5.E1EXST 3'-0" 7'-0"

3'-0" 7'-0"

3'-0" 7'-0"

2'-0" 7'-0"

2'-0" 7'-0"

3'-0" 7'-0"

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

NA NA NA NA NA

B

B

A

A

A

B

A

A

A

A

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

WD

PAINT

PAINT

PAINT

NA

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT

PAINT1 1

1 3

1 EXST

1 EXST

1 EXST

1 3

1 2

1 2

1 EXST

1 EXST

EXST

PLASTER

EXST

EXST

PAINT

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

PAINT

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

PRODUCE ROOM120120.1 -- 120.1NEW 3'-0" 7'-0"NA NA NA NA YES B HMHM PAINT PAINT1 4

KEYPLAN

First Floor NTS

Type A Type B

GYP

FRP

PAINT GYP

FRP

PAINT GYP

FRP

PAINT

EXST

SHEET

VINYL

EXST

VINYL

PLANK

SHEET

VINYL

FAC

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

VINYL

PLANK

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

COVE FAC

Door Frame 1

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

EXST

ADD 01 - 5/14/2025

ADD 1

File details come from the government source that posted it. Updated .