Addendum 2.pdf
PDF 131 KB Posted
- Solicitation number
- RFQ - 171 - 240000000136
- Issued by
- Barry County, Michigan
About this file
This document is Addendum No. 2 issued by the Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Barry State Game Area - New Pole Barn project, File Number 751/22020.JLM. The addendum provides clarifications and modifications to the project specifications, including details on cash allowances, bid alternates, the bid summary form, a pre-bid conference sign-in sheet, and responses to pre-bid questions regarding temporary fencing, building permits, electrical wiring, and truss attachments.
The addendum updates the bid opening date to February 7, 2024 at 2 pm. The project is located in Barry County, Michigan and involves the construction of a new pole barn. Bidders are required to acknowledge the addendum as part of their bid submission, and the addendum will become part of the contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 751-22020.JLM_Pre-Bid Sign-in Sheet.pdf | ||
| Advertisement 22020.pdf | ||
| Drawings 22020_Part2.pdf | ||
| Addendum 4.pdf | ||
| 751-22020.JLM_Barry SGA_Geotech Report.pdf | ||
| Addendum 2 Bid Summary.pdf | ||
| Specifications 22020.pdf | ||
| Addendum 1.pdf | ||
| Addendum 1 Drawings.pdf | ||
| Drawings 22020_Part1.pdf | ||
| Addendum 3.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
2/5/2024
PROJECT NAME
Barry State Game Area – New Pole Barn
FILE NUMBER
751/22020.JLM
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Josiah Meyers
BID OPENING DATE:
2/7/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Clarifications to Specification Section 01 020 Allowances:
• 1.1 Cash Allowances $5,500 allowance is intended to be used to cover costs associated for Great Lakes Energy electrical service changes should the need arise during the course of construction.
• 1.2 Provisional/Contingency Allowances Contractor to include a contingency allowance of $10,000 to match the bid form.
2. Clarification to Bid Alternate #1
• Elimination of all insulation to include R19 unfaced batt insulation in exterior walls including 2x6 framing between columns, R5 Hunter XCI 286 rigid insulation on outside of exterior walls, and R49 Kraft faced batt insulation in attic.
3. Issues a new Bid Summary form (R 03/22) which must be used by Bidders for submission of bids.
• Updated to include the Cash Allowance line item referenced above from Section 01 020 Allowances additional space for Bid Addenda acknowledgements, clarification to the project scope of work and updated Bid Opening Date of February 7th, 2024 at 2pm.
• See attached
4. Issues the Mandatory Pre-Bid Conference sign-in sheet
• See attached
5. Pre-Bid Meeting question #1
• Q. Is temporary fencing required?
• A. No, temporary fencing isn’t required.
6. Pre-Bid Meeting question #2
• Q. Who issues, or obtains the building permit?
• A. All permits will be issued from LARA. This includes the building permit. PSC has provided plans and specs to the Bureau of Construction Codes Plan Review division. Once approved the plans will be provided to the Contractor with a BCC project number, Contractor then references that number for all permit activities including scheduling of inspections.
7. Pre-Bid Meeting question #3
• Q. Can we use Romex electrical wire?
• A. Romex is acceptable for electrical wiring as long as it is in conduit. Note that all electrical wiring, including low voltage control wire, is to be in EMT conduit.
8. Pre-Bid Meeting question #4
• Q. Regarding Spec Section 06 175.3.1.K, it states that joists are not to be drilled through. But the detail for the angled supports says to drill through and attach to supports to each truss with bolts. Please advise.
• The spec section refers primarily to drilling through trusses to run conduit, or other such items, which is not acceptable. In the case of the angled supports, the truss designer/fabricator should understand that the supports will need to be attached to the trusses and take that into consideration during design/fabrication.
9. Pre-Bid Meeting question #5
• Q. Spec Section 01 030.2.(b) refers to a mechanical gate installation, is that part or this project?
• No, this project does not involve the installation of a mechanical gate, please disregard this reference.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Karl Ruiter DATE: 1/29/2024
APPROVED BY:
PROJECT DIRECTOR: Josiah Myers DATE: 1/29/2024
File details come from the government source that posted it. Updated .