This document is an Addendum to the Bidding Documents for the Barry State Game Area - New Pole Barn project, issued by the Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division in Michigan.
The addendum outlines changes to the project scope, including the removal of an existing garage structure and concrete by DNR staff, as well as modifications to the drawings, such as the addition of a new shallow trench footing design, changes to the depth of the post footings, and the inclusion of different insulation rigid boards. The addendum also reschedules the mandatory pre-bid meeting, extends the deadline for submitting questions and bids, and schedules a post-bid interview. The Geo-Technical Report is now provided to the contractors for their use and information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 751-22020.JLM_Pre-Bid Sign-in Sheet.pdf | ||
| Advertisement 22020.pdf | ||
| Drawings 22020_Part2.pdf | ||
| Addendum 4.pdf | ||
| 751-22020.JLM_Barry SGA_Geotech Report.pdf | ||
| Addendum 2 Bid Summary.pdf | ||
| Addendum 2.pdf | ||
| Specifications 22020.pdf | ||
| Addendum 1 Drawings.pdf | ||
| Drawings 22020_Part1.pdf | ||
| Addendum 3.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
1/11/2024
PROJECT NAME
Barry State Game Area – New Pole Barn
FILE NUMBER
751/22020.JLM
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Josiah Meyers
BID OPENING DATE:
2/7/2024
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. MANDATORY PRE-BID MEETING HAS BEEN RESCHEDULED FOR:
Friday, January 26TH at 2:00pm
2. ACCEPTING QUESTIONS/BID RFI’s UNTIL:
Friday, February 2nd, 2024 at 2:00pm.
3. NEW BID DUE DATE:
Wednesday, February 7th, 2024 at 2:00pm.
4. NEW POST BID INTERVIEW DATE:
Friday, February 9th, 2024 at 2:00pm.
5. Modifications to Scope:
The existing garage structure and concrete has been removed by DNR staff and will no longer be required by the
Contractor as part of the contract.
6. Modifications to Drawings (See attached drawings) A101:
Added a new shallow trench footing design to plan.
Added #5 bars to plan.
Changed depth dimension of post footing.
Added (2) different insulation rigid boards for foundation insulation protection.
A102:
Added “approved equal” to notes.
A201:
Added “approved equal” to notes.
Changed footing graphics.
A301:
Added “approved equal” to notes.
Added new shallow trench footing design to section.
Added #5 bars to section.
Changed depth dimension of post footing.
Added (2) different insulation rigid boards for foundation insulation protection.
Added “unfaced” in stud cavity Batt. Insulation note.
A302:
Added “approved equal” to notes.
Added new shallow trench footing design to section.
Added #5 bars to section.
Changed depth dimension of post footing.
Added (2) different insulation rigid boards for foundation insulation protection.
Added “unfaced” in stud cavity Batt. Insulation note.
Added ‘kraft’ to attic insulation note A401:
Added “approved equal” to notes.
Added new shallow trench footing design to section.
Added #5 bars to section.
Changed depth dimension of post footing.
Added (2) different insulation rigid boards for foundation insulation protection.
Added “unfaced” in stud cavity Batt. Insulation note A501:
Added (2) different insulation rigid boards for foundation insulation protection.
Added new shallow trench footing design to section.
7. See attached Geo-Technical Report Providing Geo-Technical Report to Contractors for their use and information.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Karl Ruiter DATE: 1/11/2024
APPROVED BY:
PROJECT DIRECTOR: Josiah Myers DATE: 1/11/2024