Addendum 2_Attachment 4.pdf
PDF 4 MB Posted
- Attached to
- Intrusion and Fire Alarms
- Solicitation number
- 13060-0-2025-BP
- Issued by
- Dane County, Mattoon Village, Wisconsin
About this file
This file contains electrical construction drawings for the State Street Campus Garage Mixed-Use project in Madison, Wisconsin, specifically showing power and systems layouts across multiple floors (Lower Level through P6). The drawings, prepared by JDR Engineering Inc, detail the electrical and low voltage systems installations including power distribution, lighting controls, surveillance cameras, access control, data/communications infrastructure, and fire alarm components across different zones of the facility.
The drawings provide comprehensive technical specifications for electrical contractors, including conduit routing, junction box locations, power supply requirements, and mounting details for various systems. Key components shown include elevator power and controls, emergency power distribution, generator connections, lighting control panels, security camera placements, access control rough-ins, and data cabinet locations. The drawings incorporate detailed general notes covering power systems, access control, and low voltage systems requirements, with specific keyed notes providing additional installation guidance for contractors. Multiple revisions are documented between May 2023 and November 2024, indicating ongoing design refinements through the construction document phase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2_Attachment 5.pdf | ||
| Addendum 2_Attachmen 1.pdf | ||
| 13060 Addendum 1.pdf | ||
| 13060 Addendum 2.pdf | ||
| Addendum 2_Attachment 2.pdf | ||
| 13060-0-2025-BP Intrustion and Fire Alarms.pdf | ||
| 13060 Summary.pdf | ||
| Addendum 2_Attachment 3.pdf | ||
| 13060-Form D2.xlsx | XLSX spreadsheet | |
| 13060-Appendix C.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ƨ
S
15cd
M
M
H H H
H
H
HH
H H
S
110cd
S
110cd
S
110cd
S
110cd
S
110cd
S
110cd
S
110cd
S
110cd
S
110cd
S 15cdƧ
C
C
M
M
M
M
M
NEMA 4X
GW
H
S
110cd
C S
C R
-P
C R
CR-P
CR
M
B B
C C
D D
E E
F F
A A
ELEVATOR LOBBY
STAIR 01
0S01
GUH-1a
EWH-2
9'-0" AFF
CAM-FE
DA-1-La
EWH-1
HPU-1
SE-1
SP-4
SP-1
P2
APPROXIMATE EMERGENCY
POWER FIRE PUMP CONDUIT
ROUTING - FROM GENERATOR
ROOM TO FIRE PUMP ROOM
APPROXIMATE CONDUIT
ROUTING - FROM GENERATOR
ROOM TO GENERATOR
BYPASS SWITCHES
L-1A-24
OL-1A-7 DPS-0S01-1
R1
R1
R1
R1
R1
P50
S1
EWH-21
CAM-4S
7'-0" AFF
PENDANT MOUNT
WALL MOUNT
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.
2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS
IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH
DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.
CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.
3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
P - PARKING UTILITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
H - HOUSING
* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT
FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/
REQUIREMENTS WITH PHASE 2 CONTRACTOR.
5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
B - BUS TERMINAL
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE
FOLLOWING PORTIONS OF THE BUILDING:
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE
FINAL LOCATION/REQUIREMENTS WITH OWNER.
EC - ELEVATOR CAMERAS (P9117-PV)
2S - 2 SENSOR CAMERAS (P4707-PLVE)
4S - 4 SENSOR CAMERAS (P3735-PLE)
FE - FISHEYE CAMERAS (M4317-PLVE)
FC - FIXED CAMERAS (P3267-LVE)
P - 180 DEG PANORAMIC (P3818-PVE)
POWER GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT
PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT
SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN
AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL
AND SECURITY DEVICES.
3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO
ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER
TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH
BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY
RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES
SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE
ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED
AND WIRE BY ACCESS CONTROL CONTRACTOR.
4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER
AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF
ANY DEVICES.
5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE
PROVIDED AND INSTALLED BY THE ACCESS CONTROL
CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO
ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST
CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM
CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.
LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION
REQUIREMENTS OF IEEE 1202.
6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND
ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.
7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO
CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"
DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR
CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE
DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.
REFER TO SPECIFICATION DIVISION 28.
ACCESS CONTROL GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT
LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING
(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE
SPACES.
3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A
BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE
CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX
REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES
6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR
COMPUTER USE.
4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH
OWNER.
5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL
ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND
DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON
ELECTRICAL DRAWINGS.
SYSTEMS GENERAL NOTES:
DRJ
ENGINEERING, INC.
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
N
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
ZONE A
ZONE B
JDR Project No: 22.0249
STATE STREET
CAMPUS GARAGE
MIXED-USE
LOWER LEVEL -
ZONE A - PHASE 1 -
POWER/SYSTEMS
EP1000-A-1
720448
415 N. LAKE STREET
MADISON, WI 53715
© 2022 Eppstein Uhen Architects, Inc.
SCALE: 1/8" = 1'-0"EP1000-A-1
1 LOWER LEVEL - ZONE A - PHASE 1 - POWER/SYSTEMS
(KEYED NOTES PER PROJECT)
KEYED NOTES
P2 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE
FROM BELOW SLAB VERTICAL TO 1ST FLOOR GENERATOR ROOM
FOR FIRE PUMP FEED. (1) 2-1/2" PVC. COORDINATE FINAL CONDUIT
ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.
P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER
FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION
BOX LOCATION WITH ACCESS CONTROL SUPPLIER.
R1 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. ELECTRICAL
CONTRACTOR TO PROVIDE AND INSTALL 1-1/2" SLEEVE THROUGH
SHEAR WALL. COORDINATE FINAL CONDUIT ROUTING WITH PHASE 2
ELECTRICAL CONTRACTOR.
S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR
TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE
EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER
SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.
DATE DESCRIPTION
05-05-2023 SCHEMATIC DESIGN PH1
07-28-2023 DETAILED DESIGN PH1
10-02-2023 CONSTRUCTION DOCUMENTS PH 1
03-28-2024 PH1_CB04
07-11-2024 PH1_CB08
10-11-2024 PH1_CB10
15cd Ƨ
M
M
M
G W
H H H
S
110cd
S
110cd S
110cd
Ƨ
S
75cd
M
Ƨ
CR-P CR
DC
C
H
S
110cd
HS
110cd
M A
N W
A Y
S
U M
P E
Q U
IP
M
E N
T
H A
T C
H
E Q
U
IP
M E
N T
H A
T C
H S
IT
E
P R
O P
E R
T Y
L
IN
E
IN
C
O M
IN
G
E L E
C T
R
IC
A L
X F
M R
X F
M R
X F
M R
X F
M R
' E
L B
O W
M O
D U
L U
S
' E
L B
O W
M O
D U
L U
S V
L T
G R
D
C
G
FI
GFI
GFI
M
M
M
M
N E
M A
X
H
CS
S
110cd
S
110cd
S
30cd
S
30cd
S
15cd
CR-P
CR
CR-P
CR
CR-P
CR
F S
T S
F F
G G
H H
I I
J J
K K
ELEC. VAULT
EVC-C6
GUH-1b
GUH-1c
EWH-6
ELEVATOR 03
0E03
EVC-C5
CITY STORAGE
BIKE STORAGE
ELEVATOR LOBBY
STAIR 03
0S03
OHD-004-2
APPROXIMATE CITY
HOUSE POWER CONDUIT
ROUTING - TO CITY
ELECTRICAL ROOM
CAM-4S
CAM-FE
WAP-C
WAP-C
WAP-C
APPROXIMATE HOUSING
RESIDENTIAL POWER
CONDUIT ROUTING - TO
HOUSING ELECTRICAL ROOM
EVC-C4
EVC-C3EVC-C2EVC-C1
EWH-7
EWH-5
EF-1
SP-2
APPROXIMATE EMERGENCY
POWER FIRE PUMP CONDUIT
ROUTING - FROM GENERATOR
ROOM TO FIRE PUMP ROOM
P3
P5
S1
DA-1-Lb
L-1A-26
L-1A-41
OL-1A-11
OL-1A-11
OL-1A-11
OL-1A-9
DPS-0S03-1
DO-C
BAS-P0-1
P50
P44
P30
P4
P54
P55
PENDANT MOUNT
9'-0" AFF
PENDANT MOUNT
9'-0" AFF
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.
2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS
IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH
DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.
CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.
3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
P - PARKING UTILITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
H - HOUSING
* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT
FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/
REQUIREMENTS WITH PHASE 2 CONTRACTOR.
5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
B - BUS TERMINAL
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE
FOLLOWING PORTIONS OF THE BUILDING:
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE
FINAL LOCATION/REQUIREMENTS WITH OWNER.
EC - ELEVATOR CAMERAS (P9117-PV)
2S - 2 SENSOR CAMERAS (P4707-PLVE)
4S - 4 SENSOR CAMERAS (P3735-PLE)
FE - FISHEYE CAMERAS (M4317-PLVE)
FC - FIXED CAMERAS (P3267-LVE)
P - 180 DEG PANORAMIC (P3818-PVE)
POWER GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT
PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT
SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN
AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL
AND SECURITY DEVICES.
3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO
ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER
TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH
BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY
RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES
SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE
ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED
AND WIRE BY ACCESS CONTROL CONTRACTOR.
4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER
AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF
ANY DEVICES.
5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE
PROVIDED AND INSTALLED BY THE ACCESS CONTROL
CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO
ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST
CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM
CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.
LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION
REQUIREMENTS OF IEEE 1202.
6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND
ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.
7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO
CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"
DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR
CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE
DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.
REFER TO SPECIFICATION DIVISION 28.
ACCESS CONTROL GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT
LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING
(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE
SPACES.
3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A
BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE
CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX
REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES
6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR
COMPUTER USE.
4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH
OWNER.
5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL
ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND
DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON
ELECTRICAL DRAWINGS.
SYSTEMS GENERAL NOTES:
DRJ
ENGINEERING, INC.
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
N
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
ZONE A
ZONE B
JDR Project No: 22.0249
STATE STREET
CAMPUS GARAGE
MIXED-USE
LOWER LEVEL -
ZONE B - PHASE 1 -
POWER/SYSTEMS
EP1000-B-1
720448
415 N. LAKE STREET
MADISON, WI 53715
© 2022 Eppstein Uhen Architects, Inc.
SCALE: 1/8" = 1'-0"EP1000-B-1
1 LOWER LEVEL - ZONE B - PHASE 1 - POWER/SYSTEMS
(KEYED NOTES PER PROJECT)
KEYED NOTES
P3 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE
FROM BELOW SLAB VERTICAL TO 1ST FLOOR FIRE PUMP ROOM FOR
FIRE PUMP FEED. (1) 2-1/2" PVC. COORDINATE FINAL CONDUIT
ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.
P4 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE
FROM BELOW SLAB VERTICAL TO 1ST FLOOR HOUSING ELECTRICAL
ROOM FOR RESIDETIAL SERVICE. (12) 5"C. COORDINATE FINAL
CONDUIT ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.
P5 ELECTRICAL CONTRACTOR TO PROVIDE ELECTRICAL CONNECTION
AND ASSOCIATED CONTROLS TO NEW OVERHEAD DOOR.
P30 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE
FROM BELOW SLAB VERTICAL TO 1ST FLOOR HOUSING ELECTRICAL
ROOM FOR HOUSE SERVICE. (3) 5"C. COORDINATE FINAL CONDUIT
ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.
P44 CONCRETE ENCASE FROM BELOW SLAB VERTICAL TO 1ST FLOOR
CITY ELECTRICAL ROOM FOR CITY SERVICE. (8) 4"C. COORDINATE
FINAL CONDUIT ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.
P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER
FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION
BOX LOCATION WITH ACCESS CONTROL SUPPLIER.
P54 ELECTRICAL CONTRACTOR TO PROVIDE LOCKABLE JUNCTION BOX
WITH SEALING PROVISIONS, COORDINATE FINAL REQUIREMENTS
WITH MG&E.
P55 APPROXIMATE CONDUIT ROUTING IS SHOWN FOR SCHEMATIC
PURPOSES. CONDUIT INSTALLATION SHALL UTILIZE PVC CONDUIT
WITH LARGE RADIUS SWEEPS TO ENSURE A SINGLE CONDUIT RUN
DOES NOT EXCEED 360 DEGREES OF BEND AND TENSION PULL
CALCULATIONS ARE ADEQUATE TO COMPLETE THE CONDUCTOR
PULL(S).
S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR
TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE
EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER
SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.
DATE DESCRIPTION
05-05-2023 SCHEMATIC DESIGN PH1
07-28-2023 DETAILED DESIGN PH1
10-02-2023 CONSTRUCTION DOCUMENTS PH 1
03-28-2024 PH1_CB04
04-24-2024 PH1_CB05
07-19-2024 PH1_CB09
GSCP
30cd
H
M
M
M
MM
GFI
NEMA 4X
GFI
NEMA 4X
M Ƨ
S
110cd
GFI
Ƨ
CR-P
CR
CR-P
CR
CR-P
CR
CR-P
CR
H
S
110cd
H
S
75cd S
15cd
S
15cd
S
15cd
S
110cd
S
110cd
S
110cd
C
C
CR-H
CR
C R
-P
C R
C R
-H
C R
NEMA 4X
NEMA 4X
NEMA 4X
NEMA 4XNEMA 4X
FA
C
P
FA
A P
M
G
M
CR-P
CR
H
CM
AN SI RR
C
S
MMMMMM
CM
SCP
C R
-P
C R
M
M
D C
D C D C
J J
DC
D C
DC
D C
D C
M
M
C
C C
C C
B B
C C
D D
E E
F F
A A
RESIDENT PARKING
TLT
192 BUS WAITING-INTERIOR
STAIR 01
1S01
GENERATOR
ELEVATOR 01
1E01
GUH-1d
BUS
WAITING-EXTERIOR
TLT
MAINTENANCE
EWH-8
ERV-1
ERH-1a
ERH-1b
WHR-1
ATS-EM
ATS-SB
LH-1A
TL-1A
LL-1AOL-1A
TO-1A
OH-1A
LF-1a LF-1b
LF-1c x3
PS-P-1a
ELEVATOR 02
1E02
ELEVATOR LOBBY
RESIDENT PARKING
OFFICE
TLT
185A
PS-B-1a PS-B-1bWAP-B
CAM-FC
CAM-2S
WAP-B
DA-1-1a
WAP-B
DO-B
DO-B
DO-C
WHR-2
FCU-1
FIRE COMMAND
CENTER
L-BT-2 L-BT-2
L-BT-4 L-BT-4L-BT-4
L-BT-6
L-BT-6
L-BT-6
L-BT-10
L-BT-8
L-BT-8
L-BT-8
S2
S3
S4
S5
S6
S7
S8
S9
S10
S1
P6
P6 P6
P6
P6
P6
P6
P7
GENERATOR
P8 P9 P10 P11 P12 P13
P14
P15
P16 P17
MPOE
LH-1B
P34
OL-1A-15
S11
OL-1A-17
OL-1A-17
DO-190 DO-192
ERH-2a
ERH-2bERH-2cERH-2dERH-2eERH-2f
ECBS-1
SDS-1
SDS-2
S13
S14
LL-1A-1 LL-1A-3
DO-B DO-B
DO-C
CP-2
CP-1
S21 S21
HT-1-BT
P52
EWH-22
EDH-1
CAM-FC
WALL MOUNT
7'-0" AFF
CAM-FC
WALL MOUNT
7'-0" AFF
CAM-P
BOTTOM OF DECK MOUNT
BOTTOM OF DECK MOUNT
CAM-FC
WALL MOUNT
7'-0" AFF
PENDANT MOUNT
9'-0" AFF
CAM-EC
CEILING MOUNT
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.
2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS
IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH
DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.
CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.
3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
P - PARKING UTILITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
H - HOUSING
* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT
FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/
REQUIREMENTS WITH PHASE 2 CONTRACTOR.
5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
B - BUS TERMINAL
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE
FOLLOWING PORTIONS OF THE BUILDING:
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE
FINAL LOCATION/REQUIREMENTS WITH OWNER.
EC - ELEVATOR CAMERAS (P9117-PV)
2S - 2 SENSOR CAMERAS (P4707-PLVE)
4S - 4 SENSOR CAMERAS (P3735-PLE)
FE - FISHEYE CAMERAS (M4317-PLVE)
FC - FIXED CAMERAS (P3267-LVE)
P - 180 DEG PANORAMIC (P3818-PVE)
POWER GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT
PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT
SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN
AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL
AND SECURITY DEVICES.
3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO
ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER
TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH
BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY
RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES
SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE
ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED
AND WIRE BY ACCESS CONTROL CONTRACTOR.
4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER
AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF
ANY DEVICES.
5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE
PROVIDED AND INSTALLED BY THE ACCESS CONTROL
CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO
ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST
CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM
CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.
LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION
REQUIREMENTS OF IEEE 1202.
6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND
ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.
7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO
CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"
DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR
CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE
DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.
REFER TO SPECIFICATION DIVISION 28.
ACCESS CONTROL GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT
LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING
(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE
SPACES.
3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A
BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE
CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX
REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES
6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR
COMPUTER USE.
4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH
OWNER.
5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL
ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND
DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON
ELECTRICAL DRAWINGS.
SYSTEMS GENERAL NOTES:
DRJ
ENGINEERING, INC.
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
N
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
ZONE A
ZONE B
JDR Project No: 22.0249
STATE STREET
CAMPUS GARAGE
MIXED-USE
1ST FLR - ZONE A -
PHASE 1 -
POWER/SYSTEMS
EP1001-A-1
720448
415 N. LAKE STREET
MADISON, WI 53715
© 2022 Eppstein Uhen Architects, Inc.
SCALE: 1/8" = 1'-0"EP1001-A-1
1 1ST FLR - ZONE A - PHASE 1 - POWER/SYSTEMS
(KEYED NOTES PER PROJECT)
KEYED NOTES
P6 ALL ELECTRICAL AND LOW VOLTAGE CONDUIT IN THIS AREA TO BE
CONCEALED WITHIN CMU WALLS. COORDINATE FINAL CONDUIT
ROUTING WITH GC.
P7 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 400KW DIESEL GENERATOR WITH BELLY TANK
SIZED FOR 12 HOURS OF RUNTIME. ALL FUSES/BREAKERS FOR NEC
695/700/701 BRANCHES SHALL BE SELECTIVELY COORDINATED WITH
DOWNSTREAM OVER CURRENT PROTECTION DEVICES.
P8 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 4-WIRE, 600A PANEL "OH-1A". PROVIDE FUSED
COORDINATION PANEL EQUAL TO BUSSMAN QSCP SERIES.
P9 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V PRIMARY, 208Y/120V SECONDARY, 75 KVA TRANSFORMER
"TO-1A".
P10 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
208Y/120V, 3-PHASE, 4-WIRE, 225A PANEL "OL-1A". PROVIDE FUSED
COORDINATION PANEL EQUAL TO BUSSMAN QSCP SERIES.
P11 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 4-WIRE, 400A BUS, 300A TRIP PANEL "LH-1A".
PROVIDE FUSED COORDINATION PANEL EQUAL TO BUSSMAN QSCP
SERIES.
P12 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V PRIMARY, 208Y/120V SECONDARY, 30 KVA TRANSFORMER
"TL-1A".
P13 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
208Y/120V, 3-PHASE, 4-WIRE, 100A PANEL "LL-1A". PROVIDE FUSED
COORDINATION PANEL EQUAL TO BUSSMAN QSCP SERIES.
P14 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 4-WIRE, 600A, AUTOMATIC TRANSFER SWITCH
"ATS-SB".
P15 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 4-WIRE, 300A, AUTOMATIC TRANSFER SWITCH
"ATS-EM".
P16 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 600A, NEMA 3RX, TEMPORARY GENERATOR
MAINTENANCE BYPASS SWITCH "SBMBS-1" WITH CAM-LOCKS
SUITABLE FOR TEMPORARY GENERATOR CONNECTION AND LOAD
BANK TESTING.
P17 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 300A, NEMA 3RX, TEMPORARY GENERATOR
MAINTENANCE BYPASS SWITCH "EMBS-1" WITH CAM-LOCKS
SUITABLE FOR TEMPORARY GENERATOR CONNECTION AND LOAD
BANK TESTING.
P34 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
480Y/277V, 3-PHASE, 4-WIRE, 100A PANEL "LH-1B". PROVIDE SQUARE
D POWERLINK LIGHTING CONTROL PANEL TO FEED PARKING
GARAGE LIGHTING. PROVIDE SUBNET CABLE FROM MASTER PANEL
"H-1B" LOCATED IN CITY ELECTRICAL ROOM.
P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING
PIPING. COORDINATE EXACT LOCATION WITH PC.
S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR
TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE
EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER
SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.
S2 PROVIDE AND INSTALL ELEVATOR TWO-WAY COMMUNICATION BASE
STATION AND POWER SUPPLY. CONNECT TO CALL STATIONS AND
PROVIDE PHONE CONNECTIONS TO RESPECTIVE FLOORS AS
REQUIRED. COORDIANTE EXACT LOCATION OF ARA CONTROL PANEL
WITH AHJ/FIRE MARSHALL. TWO WAY ELEVATOR COMMUNICATION
SHALL HAVE PROVISIONS/CAPABILITIES TO EXPAND/INTEGRATE
PHASE 2 DEVICES. COORDINATE EXACT REQUIREMENTS WITH
PHASE 2 ELECTRICAL CONTRACTOR.
S3 PROVIDE AND INSTALL FIRE ALARM CONTROL PANEL SYSTEM WITH
VOICE EVACUATION CAPABILITIES. COORDINATE EXACT LOCATION
OF FIRE ALARM CONTROL PANEL, FIRE ALARM ANNUNCIATOR PANEL,
ETC. WITH AHJ/FIRE MARSHALL. FIRE ALARM SYSTEM SHALL HAVE
PROVISIONS/CAPABILITIES TO EXPAND/INTEGRATE PHASE 2
DEVICES. COORDINATE EXACT REQUIREMENTS WITH PHASE 2
ELECTRICAL CONTRACTOR.
S4 PROVIDE AND INSTALL CONTROL RELAY(S) AS REQUIRED FOR
ELEVATOR RECALL SWITCHES. COORDINATE EXACT LOCATION OF
ELEVATOR RECALL SWITCHES WITH AHJ/FIRE MARSHALL.
COORDINATE ROUGH-IN REQUIREMENTS WITH PHASE 2 ELECTRICAL
CONTRACTOR.
S5 PROVIDE AND INSTALL ANNUNCIATORS FOR
WATERFLOW/SPRINKLER VALVES.
S6 PROVIDE AND INSTALL HEAD END CONTROLS FOR ACCESS CONTROL
DOOR UNLOCKING SYSTEM. COORDINATE FINAL LOCATION WITH
ACCESS CONTROL VENDOR. COORDINATE ROUGH-IN
REQUIREMENTS WITH PHASE 2 ELECTRICAL CONTRACTOR.
S7 FIRE PUMP STATUS INDICATOR TO BE PROVIDED AS PART OF PHASE
2 WORK. COORDINATE ROUGH-IN REQUIREMENTS WITH PHASE 2
ELECTRICAL CONTRACTOR.
S8 PROVIDE AND INSTALL DEDICATED ELEVATOR PHONE LINE TO THIS
APPROXIMATE LOCATION FOR FIRE DEPARTMENT USE.
S9 PUBLIC SAFETY BI-DIRECTIONAL AMPLIFIER/DISTRIBUTED ANTENNA
SYSTEM TO BE PROVIDED AS PART OF PHASE 2 WORK. COORDINATE
ROUGH-IN REQUIREMENTS WITH PHASE 2 ELECTRICAL
CONTRACTOR.
S10 PROVIDE AND INSTALL NEW GENERATOR STATUS INDICATOR,
REMOTE ANNUNCIATOR PANEL.
S11 PROVIDE AND INSTALL TYPICAL GROUND BUS BAR(TGB) 1/4"X2"X24"
WITH A #6 COPPER GROUND CONDUCTOR FROM BUILDING SERVICE
GROUND.
S13 SMOKE CONTROL PANEL FOR STAIRWELL PRESSURIZATION TO BE
PROVIDED AS PART OF PHASE 2 WORK. COORDINATE ROUGH-IN
REQUIREMENTS WITH PHASE 2 ELECTRICAL CONTRACTOR.
S14 PROVIDE AND INSTALL FIRE ALARM CELLULAR DIAL AND FIRE ALARM
DOCUMENT BOX. COORDINATE ROUGH-IN REQUIREMENTS WITH
PHASE 2 ELECTRICAL CONTRACTOR.
S21 PROVIDE AND INSTALL JUNCTION BOX FOR DOOR OPERATOR PUSH
BUTTON. CONFIRM FINAL LOCATION WITH DOOR HARDWARE
VENDOR.
DATE DESCRIPTION
05-05-2023 SCHEMATIC DESIGN PH1
07-28-2023 DETAILED DESIGN PH1
10-02-2023 CONSTRUCTION DOCUMENTS PH 1
11-02-2023 PH1_AD02
03-28-2024 PH1_CB04
06-25-2024 PH1_CB07
07-11-2024 PH1_CB08
S 15cd
30cd
Ƨ
S
110cd
H
Ƨ
S
30cd
S
15cd
H S
30cd
GFI
46"
C R
-H
C R
CR-H
CR
CR-H
CR
CR-P
CR
H
S
110cd
H
S
110cd
S
110cd
H
S
110cd
H
C R
-P
C R
CR-P
CR
C R
-P
C R
CR-P
CR
M
M
M
M
M
M
M
NEMA 4X
GFI
H
CS
DC
DC-H
M
D C
D C
D C
DC
D C
D C
D C
J
JC
C
C
C
C N
AC
N
AC
S
15cd
S
60cd
C R
-P
C R
CR-P
CR
Ƨ
C R
-C
C R
ACP ACP
M
M
OS
LC
DC
D C
F F
G G
H H
I I
J J
K K
ELEVATOR 03
1E03
RESIDENT PARKING
FIRE PUMP & WATER/
SPRINKLER SERVICE
EVR-1
EVR-2
EVR-3
EVR-4
HOUSING ELECTRICAL
ROOM
CITY OFFICE
EXIT PASSAGE
PS-P-1b x3
DO-C
WAP-C
RC-G-1b
RC-EX-1a
DS-1S-1c
DS-1D-1b
DS-1S-1d
RC-G-1d
RC-EX-1b
RC-ES-1b RC-G-1c
RC-G-1a
RC-ES-1a
RC-CM
WAP-C
DS-1S-1a
DS-1D-1a
DS-1S-1b
WAP-C
DA-1-1b
EWH-10
ERV-2
HPU-3
HPU-4
MAU-1
WHR-3FCU-3
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
DS-2-1a
L-TB
L-TB-1
PS-P-1c
S1
P6
P6
MPOE
EP1001-B-1
P35
OL-1A-19
OL-1A-19
OL-1A-19 OL-1A-21
OL-1A-21
L-1A-42
L-1A-30
DO-C
DO-C
DO-C DO-C DO-C
DO-C
DO-C
DO-C
DO-C
DO-C
DO-C
DO-C
P49
P49
P49
P49
P49
P49
P49
P49
P49
P49
HT-1-1 HT-1-2
P52
P52
CP-3
E9000-1
LFS-1a
LFS-1b
DO-150-1
S21
S21
CAM-FC
PENDANT MOUNT
10'-0" AFF
CAM-FC
PENDANT MOUNT
10'-0" AFF
CAM-FC
PENDANT MOUNT
10'-0" AFF
CAM-4S
PENDANT MOUNT
9'-0" AFF
CAM-FE
PENDANT MOUNT
9'-0" AFF
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.
2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS
IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH
DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.
CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.
3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
P - PARKING UTILITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
H - HOUSING
* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT
FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/
REQUIREMENTS WITH PHASE 2 CONTRACTOR.
5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
B - BUS TERMINAL
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE
FOLLOWING PORTIONS OF THE BUILDING:
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE
FINAL LOCATION/REQUIREMENTS WITH OWNER.
EC - ELEVATOR CAMERAS (P9117-PV)
2S - 2 SENSOR CAMERAS (P4707-PLVE)
4S - 4 SENSOR CAMERAS (P3735-PLE)
FE - FISHEYE CAMERAS (M4317-PLVE)
FC - FIXED CAMERAS (P3267-LVE)
P - 180 DEG PANORAMIC (P3818-PVE)
POWER GENERAL NOTES:
SWBD-HC
H-1A
T-1A
L-1A
T-L-DP1BWAP-C
DO-C
DO-C
ACP-P ACP-C
TF-1
FCU-4
SW-1a
SW-1b
SW-2
H-BT
L-BT
T-BT
S11
S11
H-1B
S12
P18
P19
P20
P21
P22
P31
P32
P33
L4
T-L-DP1C
L-1B
DP-1B
DP-1C
T-L-DP1A
DP-1A
P23
P24
P25
P26
P27
P28
P29
L-1A-35
OL-1A-26
OL-1A-26
OL-1A-28 OL-1A-30
S15
S15
S17
S17
S18
S16
S12
S12
S12
H-LA
P51
P48
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT
PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT
SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN
AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL
AND SECURITY DEVICES.
3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO
ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER
TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH
BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY
RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES
SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE
ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED
AND WIRE BY ACCESS CONTROL CONTRACTOR.
4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER
AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF
ANY DEVICES.
5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE
PROVIDED AND INSTALLED BY THE ACCESS CONTROL
CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO
ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST
CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM
CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.
LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION
REQUIREMENTS OF IEEE 1202.
6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND
ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.
7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO
CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"
DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR
CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE
DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.
REFER TO SPECIFICATION DIVISION 28.
ACCESS CONTROL GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT
LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING
(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE
SPACES.
3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A
BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE
CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX
REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES
6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR
COMPUTER USE.
4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH
OWNER.
5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL
ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND
DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON
ELECTRICAL DRAWINGS.
SYSTEMS GENERAL NOTES:
DRJ
ENGINEERING, INC.
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
N
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
ZONE A
ZONE B
JDR Project No: 22.0249
STATE STREET
CAMPUS GARAGE
MIXED-USE
1ST FLR - ZONE B -
PHASE 1 -
POWER/SYSTEMS
EP1001-B-1
720448
415 N. LAKE STREET
MADISON, WI 53715
© 2022 Eppstein Uhen Architects, Inc.
SCALE: 1/8" = 1'-0"EP1001-B-1
1 1ST FLR - ZONE B - PHASE 1 - POWER/SYSTEMS SCALE: 1/4" = 1'-0"EP1001-B-1
2 ENLARGED CITY ELEC/DEMARK ROOM
(KEYED NOTES PER PROJECT)
KEYED NOTES.
L4 ELECTRICAL CONTRACTOR TO PROVIDE SQUARE D POWERLINK NF3500G4 CONTROLLER TO
CONTROL PARKING GARAGE LIGHTING. FINAL SEQUENCING/SCHEDULING TO BE
COORDINATED WITH OWNER.
P6 ALL ELECTRICAL AND LOW VOLTAGE CONDUIT IN THIS AREA TO BE CONCEALED WITHIN CMU
WALLS. COORDINATE FINAL CONDUIT ROUTING WITH GC.
P18 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE,
3000A SWITCHBOAD "SWBD-HC".
P19 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 250A
PANEL "H-1A".
P20 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V
SECONDARY, 75 KVA TRANSFORMER "T-1A".
P21 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 225A
PANEL "L-1A".
P22 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 125A
PANEL "H-1B". PROVIDE SQUARE D POWERLINK LIGHTING CONTROL PANEL TO FEED
PARKING GARAGE LIGHTING. PROVIDE SUBNET CABLE TO SLAVE PANELS "LH-1B" LOCATED
IN GENERATOR ROOM, AND "H-LA" LOCATED IN CITY ELECTRICAL ROOM.
P23 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V
SECONDARY, 300 KVA TRANSFORMER "T-L-DP1A".
P24 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 800A
DISTRIBUTION PANEL "DP-1A".
P25 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 400A
PANEL "L-1B".
P26 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V
SECONDARY, 300 KVA TRANSFORMER "T-L-DP1B".
P27 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 800A
DISTRIBUTION PANEL "DP-1B".
P28 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V
SECONDARY, 300 KVA TRANSFORMER "T-L-DP1C".
P29 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 800A
DISTRIBUTION PANEL "DP-1C".
P31 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 125A
PANEL "H-BT" TO FEED BUS TERMINAL.
P32 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V
SECONDARY, 30 KVA TRANSFORMER "T-BT".
P33 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 100A
PANEL "L-BT" TO FEED BUS TERMINAL.
P35 ELECTRICAL CONTRACTOR TO PROVIDE 208V/1P, 125A FEEDER TO PRE-FABRICATED TICKET
BOOTH. 208V/1P, 125A, 3W LOAD CENTER PROVIDED BY OTHERS.
P48 SWITCHBOAD "SWBD-HC" TO BE PROVIDED WITH INTEGRAL METER WITH AUXILIARY
CONTACT TO TIE INTO BAS MONITORIING SYSTEM. COORDINATE BAS CONNECTION WITH
OWNER CONTROL GROUP.
P49 ELECTRICAL CONTRACTOR TO PROVIDE 1-1/2" SLEEVE PENETRATION FOR ELECTRIC
VEHICLE CHARGER. PROVIDE SLEEVE CAP FOR FUTURE ELECTRIC VEHICLE CHARGER
LOCATIONS. COORDINATE FINAL SLEEVE LOCATION WITH OWNER/GC.
P51 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 100A
PANEL "H-LA". PROVIDE SQUARE D POWERLINK LIGHTING CONTROL PANEL. PROVIDE
SUBNET CABLE FROM MASTER PANEL "H-1B" LOCATED IN CITY ELECTRICAL ROOM. PROVIDE
INTEGRAL METER WITH AUXILIARY CONTACT TO TIE INTO BAS MONITORIING SYSTEM FOR
SHARED LOWER LEVEL EQUIPMENT.
P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING PIPING. COORDINATE
EXACT LOCATION WITH PC.
S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR TWO WAY
COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE EXACT LOCATION WITH OWNER.
CONNECT TO BASE STATION POWER SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND
CENTER.
S11 PROVIDE AND INSTALL TYPICAL GROUND BUS BAR(TGB) 1/4"X2"X24" WITH A #6 COPPER
GROUND CONDUCTOR FROM BUILDING SERVICE GROUND.
S12 PROVIDE AND INSTALL TELECOMMUNICATIONS TERMINAL BOARD, 4'X8'X3/4" A-C GRADE
FIRE-RATED PLYWOOD ON ALL WALLS. EXPOSED SIDE OF PLYWOOD SHALL BE SMOOTH.
MOUNT VERTICALLY WITH TOP OF PLYWOOD AT 8'-6" AFF.
S15 PROVIDE AND INSTALL 4-POST, LOCKABLE DATA RACK ENCLOSURE EQUAL TO HUBBELL
#H3N4742. REFER TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE
FINAL LAYOUT/REQUIREMENTS WITH OWNER.
S16 PROVIDE AND INSTALL POWER SUPPLY/CONTROL PANELS ON PLYWOOD BACKBOARD.
REFER TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE FINAL
LAYOUT/REQUIREMENTS WITH OWNER.
S17 PROVIDE AND INSTALL FIBER SWITCH EQUAL TO CISCO 9500 SERIES WITH 48 PORTS. REFER
TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE FINAL
LAYOUT/REQUIREMENTS WITH OWNER.
S18 PROVIDE AND INSTALL COPPER SWITCH EQUAL TO CISCO 9300X SERIES WITH 48 PORTS.
REFER TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE FINAL
LAYOUT/REQUIREMENTS WITH OWNER.
S21 PROVIDE AND INSTALL JUNCTION BOX FOR DOOR OPERATOR PUSH BUTTON. CONFIRM FINAL
LOCATION WITH DOOR HARDWARE VENDOR.
DATE DESCRIPTION
05-05-2023 SCHEMATIC DESIGN PH1
07-28-2023 DETAILED DESIGN PH1
10-02-2023 CONSTRUCTION DOCUMENTS PH 1
11-02-2023 PH1_AD02
03-28-2024 PH1_CB04
05-21-2024 PH1_CB06
M
H
H H
H
S
110cd
S
110cd
S
110cd
Ƨ
S
15cd
S 15cd
H
C R
-H
C R
C R
-H
C R
CC
C C
S
110cd
S
110cd
H
H
S
110cd S
110cd
CR-CCR
M
NEMA 4X
M
C S
ƧƧ
NEMA 4X NEMA 4X
C R
-P
C R
D C
D C
DC
C
R -P
C R
M
M C
B B
C C
D D
E E
F F
A A
ELEVATOR LOBBY
STAIR 01
2S01
EVR-P2-14
EVR-P2-13
EVR-P2-12 EVR-P2-5
EVR-P2-6
EVR-P2-7
EF-2
EF-P2-2
L-P2
DA-1-2a
AHU-1
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
SW-3-P2-1
SW-3-P2-2
IDF CABINET #1
EF-P2-1
PS-P-2a
L-P2-34
DPS-2S01-1
P38
BAS-P2-2
DO-C
DO-C
BAS-P2-1
P49
P49
P49
P49 P49 P49
P49
P49
P49
P49
P49
P49
P49P49
P49
P49 P49
DO-C
S19S20
S20
P50
S1
L-P2-42 L-P2-42
HT-P2-1
HT-P2-2
P52
P52
EWH-17
EWH-23
EV CONDUIT
SLEEVE
P49
CAM-FE
WALL MOUNT
7'-0" AFF
CAM-2S CAM-2S
CAM-2SCAM-2S
PENDANT MOUNT PENDANT MOUNT
PENDANT MOUNTPENDANT MOUNT
9'-0" AFF 9'-0" AFF
9'-0" AFF9'-0" AFF
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.
2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS
IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH
DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.
CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.
3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
P - PARKING UTILITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
H - HOUSING
* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT
FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/
REQUIREMENTS WITH PHASE 2 CONTRACTOR.
5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
B - BUS TERMINAL
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE
FOLLOWING PORTIONS OF THE BUILDING:
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE
FINAL LOCATION/REQUIREMENTS WITH OWNER.
EC - ELEVATOR CAMERAS (P9117-PV)
2S - 2 SENSOR CAMERAS (P4707-PLVE)
4S - 4 SENSOR CAMERAS (P3735-PLE)
FE - FISHEYE CAMERAS (M4317-PLVE)
FC - FIXED CAMERAS (P3267-LVE)
P - 180 DEG PANORAMIC (P3818-PVE)
POWER GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT
PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT
SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN
AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL
AND SECURITY DEVICES.
3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO
ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER
TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH
BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY
RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES
SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE
ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED
AND WIRE BY ACCESS CONTROL CONTRACTOR.
4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER
AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF
ANY DEVICES.
5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE
PROVIDED AND INSTALLED BY THE ACCESS CONTROL
CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO
ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST
CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM
CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.
LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION
REQUIREMENTS OF IEEE 1202.
6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND
ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.
7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO
CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"
DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR
CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE
DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.
REFER TO SPECIFICATION DIVISION 28.
ACCESS CONTROL GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT
LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING
(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE
SPACES.
3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A
BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE
CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX
REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES
6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR
COMPUTER USE.
4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH
OWNER.
5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL
ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND
DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON
ELECTRICAL DRAWINGS.
SYSTEMS GENERAL NOTES:
DRJ
ENGINEERING, INC.
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
N
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
ZONE A
ZONE B
JDR Project No: 22.0249
STATE STREET
CAMPUS GARAGE
MIXED-USE
P2 FLR - ZONE A -
PHASE 1 -
POWER/SYSTEMS
EP1002-A-1
720448
415 N. LAKE STREET
MADISON, WI 53715
© 2022 Eppstein Uhen Architects, Inc.
SCALE: 1/8" = 1'-0"EP1002-A-1
1 P2 FLR - ZONE A - PHASE 1 - POWER/SYSTEMS
(KEYED NOTES PER PROJECT)
KEYED NOTES
P38 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW
208Y/120V, 3-PHASE, 4-WIRE, 400A PANEL "L-P2". PROVIDE PANEL
WITH FEED THRU LUG PROVISIONS.
P49 ELECTRICAL CONTRACTOR TO PROVIDE 1-1/2" SLEEVE PENETRATION
FOR ELECTRIC VEHICLE CHARGER. PROVIDE SLEEVE CAP FOR
FUTURE ELECTRIC VEHICLE CHARGER LOCATIONS. COORDINATE
FINAL SLEEVE LOCATION WITH OWNER/GC.
P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER
FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION
BOX LOCATION WITH ACCESS CONTROL SUPPLIER.
P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING
PIPING. COORDINATE EXACT LOCATION WITH PC.
S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR
TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE
EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER
SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.
S19 PROVIDE AND INSTALL WALL MOUNTED DATA CABINET. REFER TO
DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE
FINAL LAYOUT/REQUIREMENTS WITH OWNER. PROVIDE AND INSTALL
(1) 2" PVC CONDUIT WITH (1) 24CT FIBER CABLE ROUTED TO IDF BOX,
AND (1) 2" PVC CONDUIT FOR FUTURE FIBER CABLE.
S20 PROVIDE AND INSTALL FIBER SWITCH EQUAL TO CISCO
IE-9320-24P4X WITH 24 PORTS. REFER TO DIVISION 27 SPECIFICATION
FOR ALL REQUIREMENTS. COORDINATE FINAL
LAYOUT/REQUIREMENTS WITH OWNER.
DATE DESCRIPTION
05-05-2023 SCHEMATIC DESIGN PH1
07-28-2023 DETAILED DESIGN PH1
10-02-2023 CONSTRUCTION DOCUMENTS PH 1
03-28-2024 PH1_CB04
07-11-2024 PH1_CB08
MM
H
H
S
110cd
H H
S
110cd
S
110cd
S
110cd
Ƨ S
15cd
S 15cd
Ƨ
C R
-H
C R
C
CC
CC
H
H
S
110cd S
110cd
CR-CCR
N E
M A
X
MM
H
CS
CR-P
CR
CR-P
CR
M
DC
D C
J
J
F F
G G
H H
I I
J J
K K
PUBLIC PARKING
ELEVATOR 03
2E03
EVR-P2-12 EVR-P2-5
EVR-P2-4
EVR-P2-3
EVR-P2-1
EVR-P2-8
EVR-P2-9
EVR-P2-11
EVR-P2-10
EF-P2-5
EF-P2-6
STAIR 03
2S03
CAM-2S CAM-2S
CAM-FE
DA-1-2b
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
SW-3-P2-1
SW-3-P2-2
IDF CABINET #1
EF-P2-3
EF-P2-4
PS-P-2b
EVR-P2-2
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
S1
L-P2-36
DPS-2S03-1
DO-C
BAS-P2-3
P49
P49
P49 P49
P49
P49
P49
P49
P49
P49
P49 P49 P49 P49
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
P49
P49
P49
P49
P49
P49
P49
P49
P49 P49
P49 P49
DO-C
S19S20
S20
P50
HT-P2-3
HT-P2-4
P52
P52
SF-1
MEP
DO-250-1
S21
S21
ELEVATOR LOBBY
EVC-P2-1
CAM-2SCAM-2S
PENDANT MOUNTPENDANT MOUNT
9'-0" AFF9'-0" AFF
PENDANT MOUNT PENDANT MOUNT
9'-0" AFF 9'-0" AFF
PENDANT MOUNT
9'-0" AFF
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.
2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS
IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH
DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.
CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.
3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
P - PARKING UTILITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
H - HOUSING
* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT
FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/
REQUIREMENTS WITH PHASE 2 CONTRACTOR.
5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING
PORTIONS OF THE BUILDING:
B - BUS TERMINAL
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
C - CITY
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.
COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.
6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE
FOLLOWING PORTIONS OF THE BUILDING:
* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE
FINAL LOCATION/REQUIREMENTS WITH OWNER.
EC - ELEVATOR CAMERAS (P9117-PV)
2S - 2 SENSOR CAMERAS (P4707-PLVE)
4S - 4 SENSOR CAMERAS (P3735-PLE)
FE - FISHEYE CAMERAS (M4317-PLVE)
FC - FIXED CAMERAS (P3267-LVE)
P - 180 DEG PANORAMIC (P3818-PVE)
POWER GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT
PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT
SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN
AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL
AND SECURITY DEVICES.
3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO
ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER
TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH
BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY
RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES
SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE
ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED
AND WIRE BY ACCESS CONTROL CONTRACTOR.
4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER
AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF
ANY DEVICES.
5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE
PROVIDED AND INSTALLED BY THE ACCESS CONTROL
CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO
ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST
CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM
CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.
LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION
REQUIREMENTS OF IEEE 1202.
6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND
ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL
CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.
7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO
CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"
DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR
CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE
DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.
REFER TO SPECIFICATION DIVISION 28.
ACCESS CONTROL GENERAL NOTES:
1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,
AND DETAILS.
2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT
LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING
(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE
SPACES.
3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A
BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE
CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX
REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES
6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR
COMPUTER USE.
4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH
OWNER.
5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL
ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND
DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON
ELECTRICAL DRAWINGS.
SYSTEMS GENERAL NOTES:
DRJ
ENGINEERING, INC.
5525 NOBEL DRIVE
SUITE 110
MADISON, WI 53711
ph: 608.277.1728 fax: 608.271.7046
N
PROJECT MANAGER
PROJECT NUMBER
KEY PLAN
SHEET INFORMATION
PROJECT INFORMATION
ISSUANCE AND REVISIONS
E
D
C
B
A
21 654 7
321 654 7
E
D
C
B
A
ZONE A
ZONE B
JDR Project No: 22.0249
STATE STREET
CAMPUS GARAGE
MIXED-USE
P2 FLR - ZONE B -
PHASE 1 -
POWER/SYSTEMS
EP1002-B-1
720448
415 N. LAKE STREET
MADISON, WI 53715
© 2022 Eppstein Uhen Architects, Inc.
SCALE: 1/8" = 1'-0"EP1002-B-1
1 P2 FLR - ZONE B - PHASE 1 - POWER/SYSTEMS
(KEYED NOTES PER PROJECT)
KEYED NOTES
P49 ELECTRICAL CONTRACTOR TO PROVIDE 1-1/2" SLEEVE PENETRATION
FOR ELECTRIC VEHICLE CHARGER. PROVIDE SLEEVE CAP FOR
FUTURE ELECTRIC VEHICLE CHARGER LOCATIONS. COORDINATE
FINAL SLEEVE LOCATION WITH OWNER/GC.
P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER
FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION
BOX LOCATION WITH ACCESS CONTROL SUPPLIER.
P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING
PIPING. COORDINATE EXACT LOCATION WITH PC.
S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR
TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE
EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER
SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.
S19 PROVIDE AND INSTALL WALL MOUNTED DATA CABINET. REFER TO
DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE
FINAL LAYOUT/REQUIREMENTS WITH OWNER. PROVIDE AND INSTALL
(1) 2" PVC CONDUIT WITH (1) 24CT FIBER CABLE ROUTED TO IDF BOX,
AND (1) 2" PVC CONDUIT FOR FUTURE FIBER CABLE.
S20 PROVIDE AND INSTALL FIBER SWITCH EQUAL TO CISCO
IE-9320-24P4X WITH 24 PORTS. REFER TO DIVISION 27 SPECIFICATION
FOR ALL REQUIREMENTS. COORDINATE FINAL
LAYOUT/REQUIREMENTS WITH OWNER.
S21 PROVIDE AND INSTALL JUNCTION BOX FOR DOOR OPERATOR PUSH
BUTTON. CONFIRM FINAL LOCATION WITH DOOR HARDWARE
VENDOR.
DATE DESCRIPTION
05-05-2023 SCHEMATIC DESIGN PH1
07-28-2023 DETAILED DESIGN PH1
10-02-2023 CONSTRUCTION DOCUMENTS PH 1
12-19-2023 PH1_CB01
03-28-2024 PH1_CB04
05-21-2024 PH1_CB06
H
H
H H
S
110cd
S
110cd
S
110cd
S
110cd
Ƨ
S
15cd
S 15cd
H
C R
-H
C R
C R
-H
C R
CC
C C
H
S
110cd
H
S
110cd
NEMA 4X
Ƨ
C S
H
NEMA 4X NEMA 4X
C R
-P
C R
CR-CCR
D C
D C
M
C
B B
C C
D D
E E
F F
A A
ELEVATOR LOBBY
STAIR 01
3S01
EF-P3-1
EF-P3-2
L-P3
CAM-2S CAM-2S
CAM-2S CAM-2S
DA-1-3a
H-P3
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EVR-P3-14
EVR-P3-13 EVR-P3-6
EVR-P3-7
EVR-P3-12 EVR-P3-5
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
EV CONDUIT
SLEEVE
PS-P-3a
L-P3-34
DPS-3S01-1
P39
P40
BAS-P3-1
DO-C
P49
P49
P49
P49
P49 P49 P49
P49
P49
P49
P49
P49
P49P49
P49P49
P49
P49
DO-C
DRY VALVE
P50
S1
L-P3-42 L-P3-42
HT-P3-2
HT-P3-1
P52
P52
SW-3-P3-1
SW-3-P3-2
IDF CABINET #4S20
S20
S19
EWH-18
EV CONDUIT
SLEEVE
P49
EV CONDUIT
SLEEVE
P49
PENDANT MOUNT PENDANT MOUNT
PENDANT MOUNT PENDANT MOUNT
9'-0" AFF 9'-0" AFF
9'-0"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .