Addendum 2_Attachment 4.pdf

PDF 4 MB Posted

Attached to
Intrusion and Fire Alarms
Solicitation number
13060-0-2025-BP
Issued by
Dane County, Mattoon Village, Wisconsin

About this file

This file contains electrical construction drawings for the State Street Campus Garage Mixed-Use project in Madison, Wisconsin, specifically showing power and systems layouts across multiple floors (Lower Level through P6). The drawings, prepared by JDR Engineering Inc, detail the electrical and low voltage systems installations including power distribution, lighting controls, surveillance cameras, access control, data/communications infrastructure, and fire alarm components across different zones of the facility.

The drawings provide comprehensive technical specifications for electrical contractors, including conduit routing, junction box locations, power supply requirements, and mounting details for various systems. Key components shown include elevator power and controls, emergency power distribution, generator connections, lighting control panels, security camera placements, access control rough-ins, and data cabinet locations. The drawings incorporate detailed general notes covering power systems, access control, and low voltage systems requirements, with specific keyed notes providing additional installation guidance for contractors. Multiple revisions are documented between May 2023 and November 2024, indicating ongoing design refinements through the construction document phase.

View the file

Other files

File Type Posted
Addendum 2_Attachment 5.pdf PDF
Addendum 2_Attachmen 1.pdf PDF
13060 Addendum 1.pdf PDF
13060 Addendum 2.pdf PDF
Addendum 2_Attachment 2.pdf PDF
13060-0-2025-BP Intrustion and Fire Alarms.pdf PDF
13060 Summary.pdf PDF
Addendum 2_Attachment 3.pdf PDF
13060-Form D2.xlsx XLSX spreadsheet
13060-Appendix C.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ƨ

S

15cd

M

M

H H H

H

H

HH

H H

S

110cd

S

110cd

S

110cd

S

110cd

S

110cd

S

110cd

S

110cd

S

110cd

S

110cd

S 15cdƧ

C

C

M

M

M

M

M

NEMA 4X

GW

H

S

110cd

C S

C R

-P

C R

CR-P

CR

M

B B

C C

D D

E E

F F

A A

ELEVATOR LOBBY

STAIR 01

0S01

GUH-1a

EWH-2

9'-0" AFF

CAM-FE

DA-1-La

EWH-1

HPU-1

SE-1

SP-4

SP-1

P2

APPROXIMATE EMERGENCY

POWER FIRE PUMP CONDUIT

ROUTING - FROM GENERATOR

ROOM TO FIRE PUMP ROOM

APPROXIMATE CONDUIT

ROUTING - FROM GENERATOR

ROOM TO GENERATOR

BYPASS SWITCHES

L-1A-24

OL-1A-7 DPS-0S01-1

R1

R1

R1

R1

R1

P50

S1

EWH-21

CAM-4S

7'-0" AFF

PENDANT MOUNT

WALL MOUNT

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.

2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS

IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH

DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.

CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.

3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH

ARCHITECTURAL PLANS.

4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

P - PARKING UTILITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

H - HOUSING

* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT

FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/

REQUIREMENTS WITH PHASE 2 CONTRACTOR.

5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

B - BUS TERMINAL

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE

FOLLOWING PORTIONS OF THE BUILDING:

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE

FINAL LOCATION/REQUIREMENTS WITH OWNER.

EC - ELEVATOR CAMERAS (P9117-PV)

2S - 2 SENSOR CAMERAS (P4707-PLVE)

4S - 4 SENSOR CAMERAS (P3735-PLE)

FE - FISHEYE CAMERAS (M4317-PLVE)

FC - FIXED CAMERAS (P3267-LVE)

P - 180 DEG PANORAMIC (P3818-PVE)

POWER GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT

PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT

SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN

AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL

AND SECURITY DEVICES.

3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO

ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER

TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH

BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY

RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES

SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE

ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED

AND WIRE BY ACCESS CONTROL CONTRACTOR.

4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER

AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF

ANY DEVICES.

5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE

PROVIDED AND INSTALLED BY THE ACCESS CONTROL

CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO

ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST

CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM

CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.

LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION

REQUIREMENTS OF IEEE 1202.

6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND

ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL

CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.

7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO

CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"

DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR

CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE

DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.

REFER TO SPECIFICATION DIVISION 28.

ACCESS CONTROL GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT

LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING

(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE

SPACES.

3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A

BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE

CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX

REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES

6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR

COMPUTER USE.

4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH

OWNER.

5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL

ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND

DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON

ELECTRICAL DRAWINGS.

SYSTEMS GENERAL NOTES:

DRJ

ENGINEERING, INC.

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

N

PROJECT MANAGER

PROJECT NUMBER

KEY PLAN

SHEET INFORMATION

PROJECT INFORMATION

ISSUANCE AND REVISIONS

E

D

C

B

A

21 654 7

321 654 7

E

D

C

B

A

ZONE A

ZONE B

JDR Project No: 22.0249

STATE STREET

CAMPUS GARAGE

MIXED-USE

LOWER LEVEL -

ZONE A - PHASE 1 -

POWER/SYSTEMS

EP1000-A-1

720448

415 N. LAKE STREET

MADISON, WI 53715

© 2022 Eppstein Uhen Architects, Inc.

SCALE: 1/8" = 1'-0"EP1000-A-1

1 LOWER LEVEL - ZONE A - PHASE 1 - POWER/SYSTEMS

(KEYED NOTES PER PROJECT)

KEYED NOTES

P2 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE

FROM BELOW SLAB VERTICAL TO 1ST FLOOR GENERATOR ROOM

FOR FIRE PUMP FEED. (1) 2-1/2" PVC. COORDINATE FINAL CONDUIT

ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.

P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER

FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION

BOX LOCATION WITH ACCESS CONTROL SUPPLIER.

R1 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. ELECTRICAL

CONTRACTOR TO PROVIDE AND INSTALL 1-1/2" SLEEVE THROUGH

SHEAR WALL. COORDINATE FINAL CONDUIT ROUTING WITH PHASE 2

ELECTRICAL CONTRACTOR.

S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR

TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE

EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER

SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.

DATE DESCRIPTION

05-05-2023 SCHEMATIC DESIGN PH1

07-28-2023 DETAILED DESIGN PH1

10-02-2023 CONSTRUCTION DOCUMENTS PH 1

03-28-2024 PH1_CB04

07-11-2024 PH1_CB08

10-11-2024 PH1_CB10

15cd Ƨ

M

M

M

G W

H H H

S

110cd

S

110cd S

110cd

Ƨ

S

75cd

M

Ƨ

CR-P CR

DC

C

H

S

110cd

HS

110cd

M A

N W

A Y

S

U M

P E

Q U

IP

M

E N

T

H A

T C

H

E Q

U

IP

M E

N T

H A

T C

H S

IT

E

P R

O P

E R

T Y

L

IN

E

IN

C

O M

IN

G

E L E

C T

R

IC

A L

X F

M R

X F

M R

X F

M R

X F

M R

' E

L B

O W

M O

D U

L U

S

' E

L B

O W

M O

D U

L U

S V

L T

G R

D

C

G

FI

GFI

GFI

M

M

M

M

N E

M A

X

H

CS

S

110cd

S

110cd

S

30cd

S

30cd

S

15cd

CR-P

CR

CR-P

CR

CR-P

CR

F S

T S

F F

G G

H H

I I

J J

K K

ELEC. VAULT

EVC-C6

GUH-1b

GUH-1c

EWH-6

ELEVATOR 03

0E03

EVC-C5

CITY STORAGE

BIKE STORAGE

ELEVATOR LOBBY

STAIR 03

0S03

OHD-004-2

APPROXIMATE CITY

HOUSE POWER CONDUIT

ROUTING - TO CITY

ELECTRICAL ROOM

CAM-4S

CAM-FE

WAP-C

WAP-C

WAP-C

APPROXIMATE HOUSING

RESIDENTIAL POWER

CONDUIT ROUTING - TO

HOUSING ELECTRICAL ROOM

EVC-C4

EVC-C3EVC-C2EVC-C1

EWH-7

EWH-5

EF-1

SP-2

APPROXIMATE EMERGENCY

POWER FIRE PUMP CONDUIT

ROUTING - FROM GENERATOR

ROOM TO FIRE PUMP ROOM

P3

P5

S1

DA-1-Lb

L-1A-26

L-1A-41

OL-1A-11

OL-1A-11

OL-1A-11

OL-1A-9

DPS-0S03-1

DO-C

BAS-P0-1

P50

P44

P30

P4

P54

P55

PENDANT MOUNT

9'-0" AFF

PENDANT MOUNT

9'-0" AFF

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.

2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS

IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH

DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.

CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.

3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH

ARCHITECTURAL PLANS.

4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

P - PARKING UTILITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

H - HOUSING

* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT

FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/

REQUIREMENTS WITH PHASE 2 CONTRACTOR.

5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

B - BUS TERMINAL

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE

FOLLOWING PORTIONS OF THE BUILDING:

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE

FINAL LOCATION/REQUIREMENTS WITH OWNER.

EC - ELEVATOR CAMERAS (P9117-PV)

2S - 2 SENSOR CAMERAS (P4707-PLVE)

4S - 4 SENSOR CAMERAS (P3735-PLE)

FE - FISHEYE CAMERAS (M4317-PLVE)

FC - FIXED CAMERAS (P3267-LVE)

P - 180 DEG PANORAMIC (P3818-PVE)

POWER GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT

PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT

SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN

AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL

AND SECURITY DEVICES.

3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO

ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER

TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH

BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY

RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES

SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE

ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED

AND WIRE BY ACCESS CONTROL CONTRACTOR.

4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER

AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF

ANY DEVICES.

5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE

PROVIDED AND INSTALLED BY THE ACCESS CONTROL

CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO

ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST

CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM

CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.

LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION

REQUIREMENTS OF IEEE 1202.

6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND

ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL

CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.

7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO

CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"

DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR

CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE

DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.

REFER TO SPECIFICATION DIVISION 28.

ACCESS CONTROL GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT

LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING

(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE

SPACES.

3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A

BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE

CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX

REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES

6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR

COMPUTER USE.

4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH

OWNER.

5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL

ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND

DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON

ELECTRICAL DRAWINGS.

SYSTEMS GENERAL NOTES:

DRJ

ENGINEERING, INC.

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

N

PROJECT MANAGER

PROJECT NUMBER

KEY PLAN

SHEET INFORMATION

PROJECT INFORMATION

ISSUANCE AND REVISIONS

E

D

C

B

A

21 654 7

321 654 7

E

D

C

B

A

ZONE A

ZONE B

JDR Project No: 22.0249

STATE STREET

CAMPUS GARAGE

MIXED-USE

LOWER LEVEL -

ZONE B - PHASE 1 -

POWER/SYSTEMS

EP1000-B-1

720448

415 N. LAKE STREET

MADISON, WI 53715

© 2022 Eppstein Uhen Architects, Inc.

SCALE: 1/8" = 1'-0"EP1000-B-1

1 LOWER LEVEL - ZONE B - PHASE 1 - POWER/SYSTEMS

(KEYED NOTES PER PROJECT)

KEYED NOTES

P3 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE

FROM BELOW SLAB VERTICAL TO 1ST FLOOR FIRE PUMP ROOM FOR

FIRE PUMP FEED. (1) 2-1/2" PVC. COORDINATE FINAL CONDUIT

ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.

P4 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE

FROM BELOW SLAB VERTICAL TO 1ST FLOOR HOUSING ELECTRICAL

ROOM FOR RESIDETIAL SERVICE. (12) 5"C. COORDINATE FINAL

CONDUIT ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.

P5 ELECTRICAL CONTRACTOR TO PROVIDE ELECTRICAL CONNECTION

AND ASSOCIATED CONTROLS TO NEW OVERHEAD DOOR.

P30 PHASE 2 CONDUIT TO BE INSTALLED IN PHASE 1. CONCRETE ENCASE

FROM BELOW SLAB VERTICAL TO 1ST FLOOR HOUSING ELECTRICAL

ROOM FOR HOUSE SERVICE. (3) 5"C. COORDINATE FINAL CONDUIT

ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.

P44 CONCRETE ENCASE FROM BELOW SLAB VERTICAL TO 1ST FLOOR

CITY ELECTRICAL ROOM FOR CITY SERVICE. (8) 4"C. COORDINATE

FINAL CONDUIT ROUTING WITH PHASE 2 ELECTRICAL CONTRACTOR.

P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER

FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION

BOX LOCATION WITH ACCESS CONTROL SUPPLIER.

P54 ELECTRICAL CONTRACTOR TO PROVIDE LOCKABLE JUNCTION BOX

WITH SEALING PROVISIONS, COORDINATE FINAL REQUIREMENTS

WITH MG&E.

P55 APPROXIMATE CONDUIT ROUTING IS SHOWN FOR SCHEMATIC

PURPOSES. CONDUIT INSTALLATION SHALL UTILIZE PVC CONDUIT

WITH LARGE RADIUS SWEEPS TO ENSURE A SINGLE CONDUIT RUN

DOES NOT EXCEED 360 DEGREES OF BEND AND TENSION PULL

CALCULATIONS ARE ADEQUATE TO COMPLETE THE CONDUCTOR

PULL(S).

S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR

TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE

EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER

SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.

DATE DESCRIPTION

05-05-2023 SCHEMATIC DESIGN PH1

07-28-2023 DETAILED DESIGN PH1

10-02-2023 CONSTRUCTION DOCUMENTS PH 1

03-28-2024 PH1_CB04

04-24-2024 PH1_CB05

07-19-2024 PH1_CB09

GSCP

30cd

H

M

M

M

MM

GFI

NEMA 4X

GFI

NEMA 4X

M Ƨ

S

110cd

GFI

Ƨ

CR-P

CR

CR-P

CR

CR-P

CR

CR-P

CR

H

S

110cd

H

S

75cd S

15cd

S

15cd

S

15cd

S

110cd

S

110cd

S

110cd

C

C

CR-H

CR

C R

-P

C R

C R

-H

C R

NEMA 4X

NEMA 4X

NEMA 4X

NEMA 4XNEMA 4X

FA

C

P

FA

A P

M

G

M

CR-P

CR

H

CM

AN SI RR

C

S

MMMMMM

CM

SCP

C R

-P

C R

M

M

D C

D C D C

J J

DC

D C

DC

D C

D C

M

M

C

C C

C C

B B

C C

D D

E E

F F

A A

RESIDENT PARKING

TLT

192 BUS WAITING-INTERIOR

STAIR 01

1S01

GENERATOR

ELEVATOR 01

1E01

GUH-1d

BUS

WAITING-EXTERIOR

TLT

MAINTENANCE

EWH-8

ERV-1

ERH-1a

ERH-1b

WHR-1

ATS-EM

ATS-SB

LH-1A

TL-1A

LL-1AOL-1A

TO-1A

OH-1A

LF-1a LF-1b

LF-1c x3

PS-P-1a

ELEVATOR 02

1E02

ELEVATOR LOBBY

RESIDENT PARKING

OFFICE

TLT

185A

PS-B-1a PS-B-1bWAP-B

CAM-FC

CAM-2S

WAP-B

DA-1-1a

WAP-B

DO-B

DO-B

DO-C

WHR-2

FCU-1

FIRE COMMAND

CENTER

L-BT-2 L-BT-2

L-BT-4 L-BT-4L-BT-4

L-BT-6

L-BT-6

L-BT-6

L-BT-10

L-BT-8

L-BT-8

L-BT-8

S2

S3

S4

S5

S6

S7

S8

S9

S10

S1

P6

P6 P6

P6

P6

P6

P6

P7

GENERATOR

P8 P9 P10 P11 P12 P13

P14

P15

P16 P17

MPOE

LH-1B

P34

OL-1A-15

S11

OL-1A-17

OL-1A-17

DO-190 DO-192

ERH-2a

ERH-2bERH-2cERH-2dERH-2eERH-2f

ECBS-1

SDS-1

SDS-2

S13

S14

LL-1A-1 LL-1A-3

DO-B DO-B

DO-C

CP-2

CP-1

S21 S21

HT-1-BT

P52

EWH-22

EDH-1

CAM-FC

WALL MOUNT

7'-0" AFF

CAM-FC

WALL MOUNT

7'-0" AFF

CAM-P

BOTTOM OF DECK MOUNT

BOTTOM OF DECK MOUNT

CAM-FC

WALL MOUNT

7'-0" AFF

PENDANT MOUNT

9'-0" AFF

CAM-EC

CEILING MOUNT

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.

2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS

IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH

DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.

CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.

3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH

ARCHITECTURAL PLANS.

4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

P - PARKING UTILITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

H - HOUSING

* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT

FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/

REQUIREMENTS WITH PHASE 2 CONTRACTOR.

5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

B - BUS TERMINAL

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE

FOLLOWING PORTIONS OF THE BUILDING:

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE

FINAL LOCATION/REQUIREMENTS WITH OWNER.

EC - ELEVATOR CAMERAS (P9117-PV)

2S - 2 SENSOR CAMERAS (P4707-PLVE)

4S - 4 SENSOR CAMERAS (P3735-PLE)

FE - FISHEYE CAMERAS (M4317-PLVE)

FC - FIXED CAMERAS (P3267-LVE)

P - 180 DEG PANORAMIC (P3818-PVE)

POWER GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT

PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT

SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN

AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL

AND SECURITY DEVICES.

3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO

ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER

TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH

BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY

RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES

SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE

ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED

AND WIRE BY ACCESS CONTROL CONTRACTOR.

4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER

AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF

ANY DEVICES.

5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE

PROVIDED AND INSTALLED BY THE ACCESS CONTROL

CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO

ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST

CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM

CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.

LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION

REQUIREMENTS OF IEEE 1202.

6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND

ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL

CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.

7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO

CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"

DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR

CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE

DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.

REFER TO SPECIFICATION DIVISION 28.

ACCESS CONTROL GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT

LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING

(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE

SPACES.

3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A

BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE

CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX

REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES

6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR

COMPUTER USE.

4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH

OWNER.

5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL

ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND

DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON

ELECTRICAL DRAWINGS.

SYSTEMS GENERAL NOTES:

DRJ

ENGINEERING, INC.

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

N

PROJECT MANAGER

PROJECT NUMBER

KEY PLAN

SHEET INFORMATION

PROJECT INFORMATION

ISSUANCE AND REVISIONS

E

D

C

B

A

21 654 7

321 654 7

E

D

C

B

A

ZONE A

ZONE B

JDR Project No: 22.0249

STATE STREET

CAMPUS GARAGE

MIXED-USE

1ST FLR - ZONE A -

PHASE 1 -

POWER/SYSTEMS

EP1001-A-1

720448

415 N. LAKE STREET

MADISON, WI 53715

© 2022 Eppstein Uhen Architects, Inc.

SCALE: 1/8" = 1'-0"EP1001-A-1

1 1ST FLR - ZONE A - PHASE 1 - POWER/SYSTEMS

(KEYED NOTES PER PROJECT)

KEYED NOTES

P6 ALL ELECTRICAL AND LOW VOLTAGE CONDUIT IN THIS AREA TO BE

CONCEALED WITHIN CMU WALLS. COORDINATE FINAL CONDUIT

ROUTING WITH GC.

P7 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 400KW DIESEL GENERATOR WITH BELLY TANK

SIZED FOR 12 HOURS OF RUNTIME. ALL FUSES/BREAKERS FOR NEC

695/700/701 BRANCHES SHALL BE SELECTIVELY COORDINATED WITH

DOWNSTREAM OVER CURRENT PROTECTION DEVICES.

P8 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 4-WIRE, 600A PANEL "OH-1A". PROVIDE FUSED

COORDINATION PANEL EQUAL TO BUSSMAN QSCP SERIES.

P9 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V PRIMARY, 208Y/120V SECONDARY, 75 KVA TRANSFORMER

"TO-1A".

P10 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

208Y/120V, 3-PHASE, 4-WIRE, 225A PANEL "OL-1A". PROVIDE FUSED

COORDINATION PANEL EQUAL TO BUSSMAN QSCP SERIES.

P11 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 4-WIRE, 400A BUS, 300A TRIP PANEL "LH-1A".

PROVIDE FUSED COORDINATION PANEL EQUAL TO BUSSMAN QSCP

SERIES.

P12 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V PRIMARY, 208Y/120V SECONDARY, 30 KVA TRANSFORMER

"TL-1A".

P13 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

208Y/120V, 3-PHASE, 4-WIRE, 100A PANEL "LL-1A". PROVIDE FUSED

COORDINATION PANEL EQUAL TO BUSSMAN QSCP SERIES.

P14 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 4-WIRE, 600A, AUTOMATIC TRANSFER SWITCH

"ATS-SB".

P15 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 4-WIRE, 300A, AUTOMATIC TRANSFER SWITCH

"ATS-EM".

P16 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 600A, NEMA 3RX, TEMPORARY GENERATOR

MAINTENANCE BYPASS SWITCH "SBMBS-1" WITH CAM-LOCKS

SUITABLE FOR TEMPORARY GENERATOR CONNECTION AND LOAD

BANK TESTING.

P17 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 300A, NEMA 3RX, TEMPORARY GENERATOR

MAINTENANCE BYPASS SWITCH "EMBS-1" WITH CAM-LOCKS

SUITABLE FOR TEMPORARY GENERATOR CONNECTION AND LOAD

BANK TESTING.

P34 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

480Y/277V, 3-PHASE, 4-WIRE, 100A PANEL "LH-1B". PROVIDE SQUARE

D POWERLINK LIGHTING CONTROL PANEL TO FEED PARKING

GARAGE LIGHTING. PROVIDE SUBNET CABLE FROM MASTER PANEL

"H-1B" LOCATED IN CITY ELECTRICAL ROOM.

P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING

PIPING. COORDINATE EXACT LOCATION WITH PC.

S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR

TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE

EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER

SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.

S2 PROVIDE AND INSTALL ELEVATOR TWO-WAY COMMUNICATION BASE

STATION AND POWER SUPPLY. CONNECT TO CALL STATIONS AND

PROVIDE PHONE CONNECTIONS TO RESPECTIVE FLOORS AS

REQUIRED. COORDIANTE EXACT LOCATION OF ARA CONTROL PANEL

WITH AHJ/FIRE MARSHALL. TWO WAY ELEVATOR COMMUNICATION

SHALL HAVE PROVISIONS/CAPABILITIES TO EXPAND/INTEGRATE

PHASE 2 DEVICES. COORDINATE EXACT REQUIREMENTS WITH

PHASE 2 ELECTRICAL CONTRACTOR.

S3 PROVIDE AND INSTALL FIRE ALARM CONTROL PANEL SYSTEM WITH

VOICE EVACUATION CAPABILITIES. COORDINATE EXACT LOCATION

OF FIRE ALARM CONTROL PANEL, FIRE ALARM ANNUNCIATOR PANEL,

ETC. WITH AHJ/FIRE MARSHALL. FIRE ALARM SYSTEM SHALL HAVE

PROVISIONS/CAPABILITIES TO EXPAND/INTEGRATE PHASE 2

DEVICES. COORDINATE EXACT REQUIREMENTS WITH PHASE 2

ELECTRICAL CONTRACTOR.

S4 PROVIDE AND INSTALL CONTROL RELAY(S) AS REQUIRED FOR

ELEVATOR RECALL SWITCHES. COORDINATE EXACT LOCATION OF

ELEVATOR RECALL SWITCHES WITH AHJ/FIRE MARSHALL.

COORDINATE ROUGH-IN REQUIREMENTS WITH PHASE 2 ELECTRICAL

CONTRACTOR.

S5 PROVIDE AND INSTALL ANNUNCIATORS FOR

WATERFLOW/SPRINKLER VALVES.

S6 PROVIDE AND INSTALL HEAD END CONTROLS FOR ACCESS CONTROL

DOOR UNLOCKING SYSTEM. COORDINATE FINAL LOCATION WITH

ACCESS CONTROL VENDOR. COORDINATE ROUGH-IN

REQUIREMENTS WITH PHASE 2 ELECTRICAL CONTRACTOR.

S7 FIRE PUMP STATUS INDICATOR TO BE PROVIDED AS PART OF PHASE

2 WORK. COORDINATE ROUGH-IN REQUIREMENTS WITH PHASE 2

ELECTRICAL CONTRACTOR.

S8 PROVIDE AND INSTALL DEDICATED ELEVATOR PHONE LINE TO THIS

APPROXIMATE LOCATION FOR FIRE DEPARTMENT USE.

S9 PUBLIC SAFETY BI-DIRECTIONAL AMPLIFIER/DISTRIBUTED ANTENNA

SYSTEM TO BE PROVIDED AS PART OF PHASE 2 WORK. COORDINATE

ROUGH-IN REQUIREMENTS WITH PHASE 2 ELECTRICAL

CONTRACTOR.

S10 PROVIDE AND INSTALL NEW GENERATOR STATUS INDICATOR,

REMOTE ANNUNCIATOR PANEL.

S11 PROVIDE AND INSTALL TYPICAL GROUND BUS BAR(TGB) 1/4"X2"X24"

WITH A #6 COPPER GROUND CONDUCTOR FROM BUILDING SERVICE

GROUND.

S13 SMOKE CONTROL PANEL FOR STAIRWELL PRESSURIZATION TO BE

PROVIDED AS PART OF PHASE 2 WORK. COORDINATE ROUGH-IN

REQUIREMENTS WITH PHASE 2 ELECTRICAL CONTRACTOR.

S14 PROVIDE AND INSTALL FIRE ALARM CELLULAR DIAL AND FIRE ALARM

DOCUMENT BOX. COORDINATE ROUGH-IN REQUIREMENTS WITH

PHASE 2 ELECTRICAL CONTRACTOR.

S21 PROVIDE AND INSTALL JUNCTION BOX FOR DOOR OPERATOR PUSH

BUTTON. CONFIRM FINAL LOCATION WITH DOOR HARDWARE

VENDOR.

DATE DESCRIPTION

05-05-2023 SCHEMATIC DESIGN PH1

07-28-2023 DETAILED DESIGN PH1

10-02-2023 CONSTRUCTION DOCUMENTS PH 1

11-02-2023 PH1_AD02

03-28-2024 PH1_CB04

06-25-2024 PH1_CB07

07-11-2024 PH1_CB08

S 15cd

30cd

Ƨ

S

110cd

H

Ƨ

S

30cd

S

15cd

H S

30cd

GFI

46"

C R

-H

C R

CR-H

CR

CR-H

CR

CR-P

CR

H

S

110cd

H

S

110cd

S

110cd

H

S

110cd

H

C R

-P

C R

CR-P

CR

C R

-P

C R

CR-P

CR

M

M

M

M

M

M

M

NEMA 4X

GFI

H

CS

DC

DC-H

M

D C

D C

D C

DC

D C

D C

D C

J

JC

C

C

C

C N

AC

N

AC

S

15cd

S

60cd

C R

-P

C R

CR-P

CR

Ƨ

C R

-C

C R

ACP ACP

M

M

OS

LC

DC

D C

F F

G G

H H

I I

J J

K K

ELEVATOR 03

1E03

RESIDENT PARKING

FIRE PUMP & WATER/

SPRINKLER SERVICE

EVR-1

EVR-2

EVR-3

EVR-4

HOUSING ELECTRICAL

ROOM

CITY OFFICE

EXIT PASSAGE

PS-P-1b x3

DO-C

WAP-C

RC-G-1b

RC-EX-1a

DS-1S-1c

DS-1D-1b

DS-1S-1d

RC-G-1d

RC-EX-1b

RC-ES-1b RC-G-1c

RC-G-1a

RC-ES-1a

RC-CM

WAP-C

DS-1S-1a

DS-1D-1a

DS-1S-1b

WAP-C

DA-1-1b

EWH-10

ERV-2

HPU-3

HPU-4

MAU-1

WHR-3FCU-3

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

DS-2-1a

L-TB

L-TB-1

PS-P-1c

S1

P6

P6

MPOE

EP1001-B-1

P35

OL-1A-19

OL-1A-19

OL-1A-19 OL-1A-21

OL-1A-21

L-1A-42

L-1A-30

DO-C

DO-C

DO-C DO-C DO-C

DO-C

DO-C

DO-C

DO-C

DO-C

DO-C

DO-C

P49

P49

P49

P49

P49

P49

P49

P49

P49

P49

HT-1-1 HT-1-2

P52

P52

CP-3

E9000-1

LFS-1a

LFS-1b

DO-150-1

S21

S21

CAM-FC

PENDANT MOUNT

10'-0" AFF

CAM-FC

PENDANT MOUNT

10'-0" AFF

CAM-FC

PENDANT MOUNT

10'-0" AFF

CAM-4S

PENDANT MOUNT

9'-0" AFF

CAM-FE

PENDANT MOUNT

9'-0" AFF

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.

2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS

IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH

DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.

CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.

3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH

ARCHITECTURAL PLANS.

4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

P - PARKING UTILITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

H - HOUSING

* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT

FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/

REQUIREMENTS WITH PHASE 2 CONTRACTOR.

5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

B - BUS TERMINAL

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE

FOLLOWING PORTIONS OF THE BUILDING:

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE

FINAL LOCATION/REQUIREMENTS WITH OWNER.

EC - ELEVATOR CAMERAS (P9117-PV)

2S - 2 SENSOR CAMERAS (P4707-PLVE)

4S - 4 SENSOR CAMERAS (P3735-PLE)

FE - FISHEYE CAMERAS (M4317-PLVE)

FC - FIXED CAMERAS (P3267-LVE)

P - 180 DEG PANORAMIC (P3818-PVE)

POWER GENERAL NOTES:

SWBD-HC

H-1A

T-1A

L-1A

T-L-DP1BWAP-C

DO-C

DO-C

ACP-P ACP-C

TF-1

FCU-4

SW-1a

SW-1b

SW-2

H-BT

L-BT

T-BT

S11

S11

H-1B

S12

P18

P19

P20

P21

P22

P31

P32

P33

L4

T-L-DP1C

L-1B

DP-1B

DP-1C

T-L-DP1A

DP-1A

P23

P24

P25

P26

P27

P28

P29

L-1A-35

OL-1A-26

OL-1A-26

OL-1A-28 OL-1A-30

S15

S15

S17

S17

S18

S16

S12

S12

S12

H-LA

P51

P48

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT

PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT

SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN

AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL

AND SECURITY DEVICES.

3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO

ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER

TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH

BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY

RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES

SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE

ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED

AND WIRE BY ACCESS CONTROL CONTRACTOR.

4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER

AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF

ANY DEVICES.

5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE

PROVIDED AND INSTALLED BY THE ACCESS CONTROL

CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO

ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST

CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM

CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.

LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION

REQUIREMENTS OF IEEE 1202.

6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND

ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL

CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.

7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO

CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"

DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR

CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE

DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.

REFER TO SPECIFICATION DIVISION 28.

ACCESS CONTROL GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT

LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING

(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE

SPACES.

3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A

BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE

CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX

REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES

6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR

COMPUTER USE.

4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH

OWNER.

5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL

ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND

DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON

ELECTRICAL DRAWINGS.

SYSTEMS GENERAL NOTES:

DRJ

ENGINEERING, INC.

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

N

PROJECT MANAGER

PROJECT NUMBER

KEY PLAN

SHEET INFORMATION

PROJECT INFORMATION

ISSUANCE AND REVISIONS

E

D

C

B

A

21 654 7

321 654 7

E

D

C

B

A

ZONE A

ZONE B

JDR Project No: 22.0249

STATE STREET

CAMPUS GARAGE

MIXED-USE

1ST FLR - ZONE B -

PHASE 1 -

POWER/SYSTEMS

EP1001-B-1

720448

415 N. LAKE STREET

MADISON, WI 53715

© 2022 Eppstein Uhen Architects, Inc.

SCALE: 1/8" = 1'-0"EP1001-B-1

1 1ST FLR - ZONE B - PHASE 1 - POWER/SYSTEMS SCALE: 1/4" = 1'-0"EP1001-B-1

2 ENLARGED CITY ELEC/DEMARK ROOM

(KEYED NOTES PER PROJECT)

KEYED NOTES.

L4 ELECTRICAL CONTRACTOR TO PROVIDE SQUARE D POWERLINK NF3500G4 CONTROLLER TO

CONTROL PARKING GARAGE LIGHTING. FINAL SEQUENCING/SCHEDULING TO BE

COORDINATED WITH OWNER.

P6 ALL ELECTRICAL AND LOW VOLTAGE CONDUIT IN THIS AREA TO BE CONCEALED WITHIN CMU

WALLS. COORDINATE FINAL CONDUIT ROUTING WITH GC.

P18 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE,

3000A SWITCHBOAD "SWBD-HC".

P19 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 250A

PANEL "H-1A".

P20 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V

SECONDARY, 75 KVA TRANSFORMER "T-1A".

P21 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 225A

PANEL "L-1A".

P22 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 125A

PANEL "H-1B". PROVIDE SQUARE D POWERLINK LIGHTING CONTROL PANEL TO FEED

PARKING GARAGE LIGHTING. PROVIDE SUBNET CABLE TO SLAVE PANELS "LH-1B" LOCATED

IN GENERATOR ROOM, AND "H-LA" LOCATED IN CITY ELECTRICAL ROOM.

P23 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V

SECONDARY, 300 KVA TRANSFORMER "T-L-DP1A".

P24 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 800A

DISTRIBUTION PANEL "DP-1A".

P25 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 400A

PANEL "L-1B".

P26 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V

SECONDARY, 300 KVA TRANSFORMER "T-L-DP1B".

P27 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 800A

DISTRIBUTION PANEL "DP-1B".

P28 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V

SECONDARY, 300 KVA TRANSFORMER "T-L-DP1C".

P29 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 800A

DISTRIBUTION PANEL "DP-1C".

P31 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 125A

PANEL "H-BT" TO FEED BUS TERMINAL.

P32 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V PRIMARY, 208Y/120V

SECONDARY, 30 KVA TRANSFORMER "T-BT".

P33 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 208Y/120V, 3-PHASE, 4-WIRE, 100A

PANEL "L-BT" TO FEED BUS TERMINAL.

P35 ELECTRICAL CONTRACTOR TO PROVIDE 208V/1P, 125A FEEDER TO PRE-FABRICATED TICKET

BOOTH. 208V/1P, 125A, 3W LOAD CENTER PROVIDED BY OTHERS.

P48 SWITCHBOAD "SWBD-HC" TO BE PROVIDED WITH INTEGRAL METER WITH AUXILIARY

CONTACT TO TIE INTO BAS MONITORIING SYSTEM. COORDINATE BAS CONNECTION WITH

OWNER CONTROL GROUP.

P49 ELECTRICAL CONTRACTOR TO PROVIDE 1-1/2" SLEEVE PENETRATION FOR ELECTRIC

VEHICLE CHARGER. PROVIDE SLEEVE CAP FOR FUTURE ELECTRIC VEHICLE CHARGER

LOCATIONS. COORDINATE FINAL SLEEVE LOCATION WITH OWNER/GC.

P51 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW 480Y/277V, 3-PHASE, 4-WIRE, 100A

PANEL "H-LA". PROVIDE SQUARE D POWERLINK LIGHTING CONTROL PANEL. PROVIDE

SUBNET CABLE FROM MASTER PANEL "H-1B" LOCATED IN CITY ELECTRICAL ROOM. PROVIDE

INTEGRAL METER WITH AUXILIARY CONTACT TO TIE INTO BAS MONITORIING SYSTEM FOR

SHARED LOWER LEVEL EQUIPMENT.

P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING PIPING. COORDINATE

EXACT LOCATION WITH PC.

S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR TWO WAY

COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE EXACT LOCATION WITH OWNER.

CONNECT TO BASE STATION POWER SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND

CENTER.

S11 PROVIDE AND INSTALL TYPICAL GROUND BUS BAR(TGB) 1/4"X2"X24" WITH A #6 COPPER

GROUND CONDUCTOR FROM BUILDING SERVICE GROUND.

S12 PROVIDE AND INSTALL TELECOMMUNICATIONS TERMINAL BOARD, 4'X8'X3/4" A-C GRADE

FIRE-RATED PLYWOOD ON ALL WALLS. EXPOSED SIDE OF PLYWOOD SHALL BE SMOOTH.

MOUNT VERTICALLY WITH TOP OF PLYWOOD AT 8'-6" AFF.

S15 PROVIDE AND INSTALL 4-POST, LOCKABLE DATA RACK ENCLOSURE EQUAL TO HUBBELL

#H3N4742. REFER TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE

FINAL LAYOUT/REQUIREMENTS WITH OWNER.

S16 PROVIDE AND INSTALL POWER SUPPLY/CONTROL PANELS ON PLYWOOD BACKBOARD.

REFER TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE FINAL

LAYOUT/REQUIREMENTS WITH OWNER.

S17 PROVIDE AND INSTALL FIBER SWITCH EQUAL TO CISCO 9500 SERIES WITH 48 PORTS. REFER

TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE FINAL

LAYOUT/REQUIREMENTS WITH OWNER.

S18 PROVIDE AND INSTALL COPPER SWITCH EQUAL TO CISCO 9300X SERIES WITH 48 PORTS.

REFER TO DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE FINAL

LAYOUT/REQUIREMENTS WITH OWNER.

S21 PROVIDE AND INSTALL JUNCTION BOX FOR DOOR OPERATOR PUSH BUTTON. CONFIRM FINAL

LOCATION WITH DOOR HARDWARE VENDOR.

DATE DESCRIPTION

05-05-2023 SCHEMATIC DESIGN PH1

07-28-2023 DETAILED DESIGN PH1

10-02-2023 CONSTRUCTION DOCUMENTS PH 1

11-02-2023 PH1_AD02

03-28-2024 PH1_CB04

05-21-2024 PH1_CB06

M

H

H H

H

S

110cd

S

110cd

S

110cd

Ƨ

S

15cd

S 15cd

H

C R

-H

C R

C R

-H

C R

CC

C C

S

110cd

S

110cd

H

H

S

110cd S

110cd

CR-CCR

M

NEMA 4X

M

C S

ƧƧ

NEMA 4X NEMA 4X

C R

-P

C R

D C

D C

DC

C

R -P

C R

M

M C

B B

C C

D D

E E

F F

A A

ELEVATOR LOBBY

STAIR 01

2S01

EVR-P2-14

EVR-P2-13

EVR-P2-12 EVR-P2-5

EVR-P2-6

EVR-P2-7

EF-2

EF-P2-2

L-P2

DA-1-2a

AHU-1

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

SW-3-P2-1

SW-3-P2-2

IDF CABINET #1

EF-P2-1

PS-P-2a

L-P2-34

DPS-2S01-1

P38

BAS-P2-2

DO-C

DO-C

BAS-P2-1

P49

P49

P49

P49 P49 P49

P49

P49

P49

P49

P49

P49

P49P49

P49

P49 P49

DO-C

S19S20

S20

P50

S1

L-P2-42 L-P2-42

HT-P2-1

HT-P2-2

P52

P52

EWH-17

EWH-23

EV CONDUIT

SLEEVE

P49

CAM-FE

WALL MOUNT

7'-0" AFF

CAM-2S CAM-2S

CAM-2SCAM-2S

PENDANT MOUNT PENDANT MOUNT

PENDANT MOUNTPENDANT MOUNT

9'-0" AFF 9'-0" AFF

9'-0" AFF9'-0" AFF

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.

2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS

IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH

DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.

CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.

3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH

ARCHITECTURAL PLANS.

4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

P - PARKING UTILITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

H - HOUSING

* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT

FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/

REQUIREMENTS WITH PHASE 2 CONTRACTOR.

5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

B - BUS TERMINAL

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE

FOLLOWING PORTIONS OF THE BUILDING:

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE

FINAL LOCATION/REQUIREMENTS WITH OWNER.

EC - ELEVATOR CAMERAS (P9117-PV)

2S - 2 SENSOR CAMERAS (P4707-PLVE)

4S - 4 SENSOR CAMERAS (P3735-PLE)

FE - FISHEYE CAMERAS (M4317-PLVE)

FC - FIXED CAMERAS (P3267-LVE)

P - 180 DEG PANORAMIC (P3818-PVE)

POWER GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT

PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT

SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN

AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL

AND SECURITY DEVICES.

3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO

ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER

TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH

BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY

RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES

SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE

ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED

AND WIRE BY ACCESS CONTROL CONTRACTOR.

4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER

AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF

ANY DEVICES.

5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE

PROVIDED AND INSTALLED BY THE ACCESS CONTROL

CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO

ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST

CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM

CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.

LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION

REQUIREMENTS OF IEEE 1202.

6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND

ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL

CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.

7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO

CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"

DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR

CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE

DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.

REFER TO SPECIFICATION DIVISION 28.

ACCESS CONTROL GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT

LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING

(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE

SPACES.

3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A

BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE

CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX

REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES

6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR

COMPUTER USE.

4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH

OWNER.

5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL

ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND

DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON

ELECTRICAL DRAWINGS.

SYSTEMS GENERAL NOTES:

DRJ

ENGINEERING, INC.

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

N

PROJECT MANAGER

PROJECT NUMBER

KEY PLAN

SHEET INFORMATION

PROJECT INFORMATION

ISSUANCE AND REVISIONS

E

D

C

B

A

21 654 7

321 654 7

E

D

C

B

A

ZONE A

ZONE B

JDR Project No: 22.0249

STATE STREET

CAMPUS GARAGE

MIXED-USE

P2 FLR - ZONE A -

PHASE 1 -

POWER/SYSTEMS

EP1002-A-1

720448

415 N. LAKE STREET

MADISON, WI 53715

© 2022 Eppstein Uhen Architects, Inc.

SCALE: 1/8" = 1'-0"EP1002-A-1

1 P2 FLR - ZONE A - PHASE 1 - POWER/SYSTEMS

(KEYED NOTES PER PROJECT)

KEYED NOTES

P38 ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL NEW

208Y/120V, 3-PHASE, 4-WIRE, 400A PANEL "L-P2". PROVIDE PANEL

WITH FEED THRU LUG PROVISIONS.

P49 ELECTRICAL CONTRACTOR TO PROVIDE 1-1/2" SLEEVE PENETRATION

FOR ELECTRIC VEHICLE CHARGER. PROVIDE SLEEVE CAP FOR

FUTURE ELECTRIC VEHICLE CHARGER LOCATIONS. COORDINATE

FINAL SLEEVE LOCATION WITH OWNER/GC.

P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER

FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION

BOX LOCATION WITH ACCESS CONTROL SUPPLIER.

P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING

PIPING. COORDINATE EXACT LOCATION WITH PC.

S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR

TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE

EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER

SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.

S19 PROVIDE AND INSTALL WALL MOUNTED DATA CABINET. REFER TO

DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE

FINAL LAYOUT/REQUIREMENTS WITH OWNER. PROVIDE AND INSTALL

(1) 2" PVC CONDUIT WITH (1) 24CT FIBER CABLE ROUTED TO IDF BOX,

AND (1) 2" PVC CONDUIT FOR FUTURE FIBER CABLE.

S20 PROVIDE AND INSTALL FIBER SWITCH EQUAL TO CISCO

IE-9320-24P4X WITH 24 PORTS. REFER TO DIVISION 27 SPECIFICATION

FOR ALL REQUIREMENTS. COORDINATE FINAL

LAYOUT/REQUIREMENTS WITH OWNER.

DATE DESCRIPTION

05-05-2023 SCHEMATIC DESIGN PH1

07-28-2023 DETAILED DESIGN PH1

10-02-2023 CONSTRUCTION DOCUMENTS PH 1

03-28-2024 PH1_CB04

07-11-2024 PH1_CB08

MM

H

H

S

110cd

H H

S

110cd

S

110cd

S

110cd

Ƨ S

15cd

S 15cd

Ƨ

C R

-H

C R

C

CC

CC

H

H

S

110cd S

110cd

CR-CCR

N E

M A

X

MM

H

CS

CR-P

CR

CR-P

CR

M

DC

D C

J

J

F F

G G

H H

I I

J J

K K

PUBLIC PARKING

ELEVATOR 03

2E03

EVR-P2-12 EVR-P2-5

EVR-P2-4

EVR-P2-3

EVR-P2-1

EVR-P2-8

EVR-P2-9

EVR-P2-11

EVR-P2-10

EF-P2-5

EF-P2-6

STAIR 03

2S03

CAM-2S CAM-2S

CAM-FE

DA-1-2b

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

SW-3-P2-1

SW-3-P2-2

IDF CABINET #1

EF-P2-3

EF-P2-4

PS-P-2b

EVR-P2-2

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

S1

L-P2-36

DPS-2S03-1

DO-C

BAS-P2-3

P49

P49

P49 P49

P49

P49

P49

P49

P49

P49

P49 P49 P49 P49

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

P49

P49

P49

P49

P49

P49

P49

P49

P49 P49

P49 P49

DO-C

S19S20

S20

P50

HT-P2-3

HT-P2-4

P52

P52

SF-1

MEP

DO-250-1

S21

S21

ELEVATOR LOBBY

EVC-P2-1

CAM-2SCAM-2S

PENDANT MOUNTPENDANT MOUNT

9'-0" AFF9'-0" AFF

PENDANT MOUNT PENDANT MOUNT

9'-0" AFF 9'-0" AFF

PENDANT MOUNT

9'-0" AFF

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS, AND DETAILS.

2. THE CONTRACTOR MAY INSTALL UP TO THREE (3) CURRENT CARRYING CONDUCTORS

IN A CONDUIT. LOADINGS ARE BASED ON THWN INSULATION, 40°C AMBIENT WITH

DERATINGS FOR TEMPERATURE AND UP TO THREE (3) CONDUCTORS IN A CONDUIT.

CONTACT THE ENGINEER FOR WIRING IN OTHER CONDITIONS.

3. VERIFY ALL MOUNTING HEIGHTS OF DEVICES ABOVE MILLWORK WITH

ARCHITECTURAL PLANS.

4. ACCESS CONTROL SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

P - PARKING UTILITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

H - HOUSING

* PHASE 1 CONTRACTOR TO PROVIDE ROUGH-IN BOX AND CONDUIT

FOR PHASE 2 INSTALLATION. COORDINATE FINAL LOCATION/

REQUIREMENTS WITH PHASE 2 CONTRACTOR.

5. LOW VOLTAGE DATA SYMBOLS SHOWN HAVE SUFFIXES SERVING THE FOLLOWING

PORTIONS OF THE BUILDING:

B - BUS TERMINAL

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

C - CITY

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS.

COORDINATE FINAL LOCATION/REQUIREMENTS WITH OWNER.

6. LOW VOLTAGE SURVEILLANCE SYMBOLS SHOWN HAVE SUFFIXES SERVING THE

FOLLOWING PORTIONS OF THE BUILDING:

* REFER TO DIVISION 27 SPECIFICATIONS FOR FINAL REQUIREMENTS. COORDINATE

FINAL LOCATION/REQUIREMENTS WITH OWNER.

EC - ELEVATOR CAMERAS (P9117-PV)

2S - 2 SENSOR CAMERAS (P4707-PLVE)

4S - 4 SENSOR CAMERAS (P3735-PLE)

FE - FISHEYE CAMERAS (M4317-PLVE)

FC - FIXED CAMERAS (P3267-LVE)

P - 180 DEG PANORAMIC (P3818-PVE)

POWER GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. DIVISION 26 CONTRACTOR SHALL PROVIDE ALL CONDUIT

PATHWAYS, BACKBOXES, JUNCTION BOXES, DISCONNECT

SWITCHES AND BRANCH/ FEEDER CONDUCTORS AS SHOWN

AND/OR SPECIFIED TO ALLOW INSTALLATION OF DOOR CONTROL

AND SECURITY DEVICES.

3. DOOR HARDWARE DEVICES INCLUDING BUT NOT LIMITED TO

ELECTRIC STRIKES, ELECTRONIC LOCKS, ELECTRIC POWER

TRANSFER, ELECTRIC HINGES, DOOR MOTOR OPERATORS, PUSH

BUTTONS, KEY SWITCHES, CONTROLLERS, EMERGENCY

RELEASE BUTTONS, DOOR OPERATOR AND POWER SUPPLIES

SHALL BE PROVIDED BY THE GENERAL CONTRACTOR AND THE

ACCESS CONTROL CONTRACTOR. DEVICES SHALL BE INSTALLED

AND WIRE BY ACCESS CONTROL CONTRACTOR.

4. COORDINATE ALL REQUIREMENTS AT EACH DOOR WITH OWNER

AND CONSTRUCTION MANAGER PRIOR TO THE INSTALLATION OF

ANY DEVICES.

5. LOW VOLTAGE ACCESS CONTROL SYSTEM CABLING SHALL BE

PROVIDED AND INSTALLED BY THE ACCESS CONTROL

CONTRACTOR. CABLE INSTALLATION SHALL UTILIZE CONDUIT TO

ACCESSIBLE CEILING AND J-HOOK TYPE SUPPORT TO NEAREST

CABLE TRAY SYSTEM. ACCESS CONTROL AND SECURITY SYSTEM

CABLING SHALL BE SEPARATELY BUNDLED WITHIN CABLE TRAYS.

LOW VOLTAGE CABLING SHALL MEET FLAME PROPAGATION

REQUIREMENTS OF IEEE 1202.

6. COORDINATE LOCATIONS OF PATHWAYS, OUTLET BOXES AND

ACCESS CONTROL HARDWARE WITHIN BUILDING WITH GENERAL

CONTRACTOR PRIOR TO INSTALLATION OF ANY DEVICES.

7. ALL SECURITY SYSTEM DEVICES, INCLUDING BUT NOT LIMITED TO

CARD READERS, DOOR POSITION SWITCHES, "REQUEST TO EXIT"

DEVICES, MAGNETIC LOCKS, POWER SUPPLIES, DOOR

CONTROLLERS AND LOW VOLTAGE WIRING BETWEEN THESE

DEVICES AT EACH DOOR ARE PROVIDED BY THE CONTRACTOR.

REFER TO SPECIFICATION DIVISION 28.

ACCESS CONTROL GENERAL NOTES:

1. REFER TO SHEET E0000-1 FOR ALL SYMBOLS, ABBREVIATIONS,

AND DETAILS.

2. ALL LOW VOLTAGE CABLES OR CONDUCTORS OPERATING AT

LESS THAN 50 VOLTS SHALL BE IN ELECTRICAL METAL TUBING

(EMT) WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE

SPACES.

3. TELEPHONE OUTLETS, AND DATA OUTLETS SHALL CONSIST OF A

BACK BOX WITH CONDUIT STUBBED ABOVE THE ACCESSIBLE

CEILING, SEE ROUGH-IN DETAIL. VERIFY SIZE OF BACK BOX

REQUIRED WITH DEVICE TO BE INSTALLED. LOCATE BACK BOXES

6" FROM ADJACENT POWER RECEPTACLE INTENDED FOR

COMPUTER USE.

4. COORDINATE JACK/CABLING REQUIREMENTS AND COLORS WITH

OWNER.

5. COORDINATE LOCATIONS OF DEVICES WITH ARCHITECTURAL

ELEVATIONS AND DETAILS. ARCHITECTURAL ELEVATIONS AND

DETAILS TAKE PRECEDENCE OVER LOCATIONS SHOWN ON

ELECTRICAL DRAWINGS.

SYSTEMS GENERAL NOTES:

DRJ

ENGINEERING, INC.

5525 NOBEL DRIVE

SUITE 110

MADISON, WI 53711

ph: 608.277.1728 fax: 608.271.7046

N

PROJECT MANAGER

PROJECT NUMBER

KEY PLAN

SHEET INFORMATION

PROJECT INFORMATION

ISSUANCE AND REVISIONS

E

D

C

B

A

21 654 7

321 654 7

E

D

C

B

A

ZONE A

ZONE B

JDR Project No: 22.0249

STATE STREET

CAMPUS GARAGE

MIXED-USE

P2 FLR - ZONE B -

PHASE 1 -

POWER/SYSTEMS

EP1002-B-1

720448

415 N. LAKE STREET

MADISON, WI 53715

© 2022 Eppstein Uhen Architects, Inc.

SCALE: 1/8" = 1'-0"EP1002-B-1

1 P2 FLR - ZONE B - PHASE 1 - POWER/SYSTEMS

(KEYED NOTES PER PROJECT)

KEYED NOTES

P49 ELECTRICAL CONTRACTOR TO PROVIDE 1-1/2" SLEEVE PENETRATION

FOR ELECTRIC VEHICLE CHARGER. PROVIDE SLEEVE CAP FOR

FUTURE ELECTRIC VEHICLE CHARGER LOCATIONS. COORDINATE

FINAL SLEEVE LOCATION WITH OWNER/GC.

P50 ELECTRICAL CONTRACTOR TO PROVIDE JUNCTION BOX AND FEEDER

FOR ACCESS CONTROL POWER SUPPLY. COORDINATE JUNCTION

BOX LOCATION WITH ACCESS CONTROL SUPPLIER.

P52 ELECTRICAL CONTRACTOR TO PROVIDE HEAT TRACE FOR PLUMBING

PIPING. COORDINATE EXACT LOCATION WITH PC.

S1 PROVIDE AND INSTALL EMERGENCY CALL DEVICE FOR ELEVATOR

TWO WAY COMMUNICATION. POST SIGNS AT DEVICE. COORDINATE

EXACT LOCATION WITH OWNER. CONNECT TO BASE STATION POWER

SUPPLY LOCATED IN 1ST FLOOR FIRE COMMAND CENTER.

S19 PROVIDE AND INSTALL WALL MOUNTED DATA CABINET. REFER TO

DIVISION 27 SPECIFICATION FOR ALL REQUIREMENTS. COORDINATE

FINAL LAYOUT/REQUIREMENTS WITH OWNER. PROVIDE AND INSTALL

(1) 2" PVC CONDUIT WITH (1) 24CT FIBER CABLE ROUTED TO IDF BOX,

AND (1) 2" PVC CONDUIT FOR FUTURE FIBER CABLE.

S20 PROVIDE AND INSTALL FIBER SWITCH EQUAL TO CISCO

IE-9320-24P4X WITH 24 PORTS. REFER TO DIVISION 27 SPECIFICATION

FOR ALL REQUIREMENTS. COORDINATE FINAL

LAYOUT/REQUIREMENTS WITH OWNER.

S21 PROVIDE AND INSTALL JUNCTION BOX FOR DOOR OPERATOR PUSH

BUTTON. CONFIRM FINAL LOCATION WITH DOOR HARDWARE

VENDOR.

DATE DESCRIPTION

05-05-2023 SCHEMATIC DESIGN PH1

07-28-2023 DETAILED DESIGN PH1

10-02-2023 CONSTRUCTION DOCUMENTS PH 1

12-19-2023 PH1_CB01

03-28-2024 PH1_CB04

05-21-2024 PH1_CB06

H

H

H H

S

110cd

S

110cd

S

110cd

S

110cd

Ƨ

S

15cd

S 15cd

H

C R

-H

C R

C R

-H

C R

CC

C C

H

S

110cd

H

S

110cd

NEMA 4X

Ƨ

C S

H

NEMA 4X NEMA 4X

C R

-P

C R

CR-CCR

D C

D C

M

C

B B

C C

D D

E E

F F

A A

ELEVATOR LOBBY

STAIR 01

3S01

EF-P3-1

EF-P3-2

L-P3

CAM-2S CAM-2S

CAM-2S CAM-2S

DA-1-3a

H-P3

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EVR-P3-14

EVR-P3-13 EVR-P3-6

EVR-P3-7

EVR-P3-12 EVR-P3-5

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

EV CONDUIT

SLEEVE

PS-P-3a

L-P3-34

DPS-3S01-1

P39

P40

BAS-P3-1

DO-C

P49

P49

P49

P49

P49 P49 P49

P49

P49

P49

P49

P49

P49P49

P49P49

P49

P49

DO-C

DRY VALVE

P50

S1

L-P3-42 L-P3-42

HT-P3-2

HT-P3-1

P52

P52

SW-3-P3-1

SW-3-P3-2

IDF CABINET #4S20

S20

S19

EWH-18

EV CONDUIT

SLEEVE

P49

EV CONDUIT

SLEEVE

P49

PENDANT MOUNT PENDANT MOUNT

PENDANT MOUNT PENDANT MOUNT

9'-0" AFF 9'-0" AFF

9'-0"…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .