Addendum 2 - Advertised_.pdf
PDF 4 MB Posted
- Attached to
- DMV Alexandria CSC HVAC Replacement
- Solicitation number
- IFB-126089
- Issued by
- Alexandria City, Virginia
About this file
Addendum 2 - DMV Alexandria CSC HVAC Replacement
This addendum pertains to the Virginia Department of Motor Vehicles' solicitation for HVAC system removal and replacement at the DMV Alexandria Customer Service Center. The project scope encompasses complete removal and replacement of existing HVAC systems, including air handling units, air-cooled condensing units, a gas-fired boiler, hot water pumps, piping, ductwork, and controls integrated into a direct digital control (DDC) system with BACnet architecture. Work also includes demolition, new equipment installation per detailed mechanical and electrical specifications, refrigerant recovery and reclamation, through-penetration firestop assemblies, system testing and balancing, and as-built documentation. The mandatory pre-bid conference was rescheduled to October 7, 2026, at 11:00 a.m. at 2681 Mill Road, Alexandria, VA 22314. Bids are due October 27, 2026, at 2:00 p.m., with public bid opening scheduled for October 28, 2026, at 2:00 p.m. via Microsoft Teams. Substantial Completion is due May 6, 2027, with Notice to Proceed on or before November 25, 2026, and Final Completion required within 30 days thereafter. The contract is awarded on a lump-sum basis.
Bidders must be registered as eVA vendors and hold a valid Virginia Class A, B, or C contractor license. A Small Business Procurement Plan indicating proposed small business participation is required as a condition of bid responsiveness. A bid bond equal to 5% of the bid amount is required for bids exceeding $500,000. Prevailing wage applies under Code of Virginia 2.2-4321.3 due to contract value exceeding $250,000. All work must comply with Virginia's 2021 Uniform Statewide Building Code, the 2020 National Electrical Code, and the Virginia Energy Conservation Code Chapter 4. Equipment specifications include A2L flammable refrigerants with required safety controls per ASHRAE standards. The building remains occupied during construction, requiring the contractor to coordinate temporary heating and cooling systems. Written questions are due by 4:00 p.m. October 14, 2026, to Procurement Officer II Brenda L. Williams at brenda.williams@dmv.virginia.gov. Bid documents are available from RFS Architects pc at 261 West Bute Street, Norfolk, Virginia, for $50 per paper set plus $70 shipping. Bidders must acknowledge receipt of Addendum 1.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 23, 2026
ADDENDUM NO. 2 TO ALL BIDDERS:
IFB No.: IFB-126089 Reference: 154-B5154-004 Title: DMV Alexandria CSC HVAC Replacement Commodity: 03167, 91017, 91450 Dated: 10-27-2026 Location: Department of Motor Vehicles CSC
2681 Mill Road, Alexandria, VA 22314 IFB Due: October 27, 2026 @ 2:00PM (REVISED DATE: November 2, 2026)
Invitation for Bid (IFB) to be received electronically through eVA
Note: Revised Closing and Opening Dates: (See Attached NOTICE OF INVITATION FOR BIDS (IFB)-
REVISED
Closing Date: November 2, 2026 Opening Date: November 3, 2026
I. Changes Made to IFB-126089 reference project 154-B5154-004
1. Changes to Drawings Item # 1 G001 - Title Sheet (See Revision Attached), Item #2 M001 - General Notes Legends & Schedules (See Revision Attached) and Item #3 MD101 - Demolition Plan – First Floor (See Revision Attached).
2. Changes to Specifications Item #4 -Table of Contents (See Revision Attached), Item # 5 - Notice of Invitation for Bids (IFB) (See Revision Attached), Item #6 - Bid Form (See Revision Attached), and Item #7 Section 011000 -Summary (See Revision Attached).
II. Pre-Bid Agenda and Project Calendar (See Revision Attached)
III. Pre-Bid Attendance (Attached)
IV. Pre-Bid Questions (Attached)
Respectfully, Brenda L. Williams Procurement Officer, II brenda.williams@dmv.virginia.gov
Note: A signed acknowledgment of this addendum must be received at the location indicated in the Project Manual Bid Form page 3 either prior to the bid due date and hour or attached to your bid. Signature on this addendum does not substitute for your signature on the original bid document or the acknowledgement on the Bid Form page 3. The original bid document must be signed.
Name of Firm
Signature/Title Date
ADDENDUM NO. 2
DMV Alexandria CSC- HVAC Replacement
Project Code: 154-B5154-004 October 16, 2026
Owner: Architect:
Commonwealth of Virginia RFS Architects pc Department of Motor Vehicles 261 West Bute Street Facilities Services and Planning Norfolk, VA 23510 2300 West Broad Street Richmond, VA 23220
This addendum shall be considered part of the Drawings and Specifications for DMV Alexandria CSC HVAC Replacement though it had been issued at the same time and incorporated integrally with such Drawings and Specifications. Wherein provisions of the following Addendum differ from the provisions of the original Drawings and Specifications, the provisions of this Addendum shall govern and take precedence.
All parties are hereby notified that they are to make any adjustments in their proposals which they deem necessary on account of this Addendum. It will be considered that the proposal is submitted with full knowledge of all modifications and changes specified herein. This Addendum shall become a component of the Contract Documents.
Addendum No. 2 shall consist of two pages and attachments.
DRAWINGS:
ITEM NO. 1 G001 – TITLE SHEET
REVISION: Remove existing G001 – Title Sheet from drawing set and replace with attached G001- Title Sheet (Revision 1, 10/16/2026).
ITEM NO. 2 M001 – GENERAL NOTES, LEGENDS & SCHEDULES
REVISION: Remove existing M001 – General Notes, Legends & Schedules from drawing set and replace with attached M001-General Notes, Legends & Schedules (Revision 1, 10/16/2026).
ITEM NO. 3 MD101 – DEMOLITION PLAN – FIRST FLOOR
REVISION: Remove existing MD101 – Demolition Plan – First Floor from drawing set and replace with attached MD101-Demolition Plan – First Floor (Revision 1, 10/16/2026).
ADDENDUM NO. 2
DMV Alexandria CSC- HVAC Replacement
Project Code: 154-B5154-004 October 16, 2026
SPECIFICATIONS:
ITEM NO. 4 TABLE OF CONTENTS
REVISION: Remove existing Table of Contents in its entirety and replace with attached TABLE OF CONTENTS - Revised 10-16-2026.
ITEM NO. 5 NOTICE OF INVITATION FOR BIDS (IFB)
REVISION: Remove existing Notice of Invitation for Bids (IFB) in its entirety and replace with attached NOTICE OF INVITATION FOR BIDS (IFB)-REVISED.
ITEM NO. 6 BID FORM
REVISION: Remove existing Bid Form in its entirety and replace with attached BID FORM -
REVISED.
ITEM NO. 7 SECTION 011000 - SUMMARY
REVISION: Remove existing Section 011000- Summary in its entirety and replace with attached Section 011000- Summary (Revised 10-16-26).
Attachments: Drawings:
G001 – Title Sheet (Revision 1, 10/16/2026) M001 – General Notes, Legends & Schedules (Revision 1, 10/16/2026) MD101 – Demolition Plan – First Floor (Revision 1, 10/16/2026)
Specifications:
TABLE OF CONTENTS (Revised 10-16-26)
NOTICE OF INVITATION FOR BIDS (IFB)- REVISED
BID FORM- REVISED
Section 011000- Summary (Revised 10-16-26)
Pre-Bid Meeting Agenda- 2 Pages (10-07-2026)-REVISED Pre-Bid Meeting Sign-In Sheets- 4 Pages (10-07-2026) Pre-Bid Question List- 2 Pages (10-16-2026)
END OF ADDENDUM NO. 2
PR
O
JE
C
T C
O D
E
R
FS
J O
B
O F
D A
TE
DESCRIPTION
REVISIONS
DATE DMV ALEXANDRIA CSC - HVAC REPLACEMENT
2681 MILL ROAD
ALEXANDRIA, VA 22314
-0
/2
8/ 26 27
TITLE SHEET
GE
NE
RA
L N
OT
ES
DE
MO
LIT
IO
N
EX
IS
TI
NG
H
VA
C
PI
PI
NG
, D
UC
TW
OR
K, A
ND
E
QU
IP
ME
NT
S
HO
W N
IS
B
AS
ED
O N
EX
IS
TI
NG
PL
AN
S
AN
D
FI
EL
D
OB
SE
RV
AT
IO
N
W
IT
HO
UT
D
EM
OL
IT
IO
N.
A
FT
ER
D
EM
OL
IT
IO
N, A
NY
CL
AR
IF
IC
AT
IO
N
RE
QU
IR
ED
T O
DE
TE
RM
IN
E
SC
OP
E
OF
W
OR
K
SH
AL
L B E
BR
OU
GH
T
TO
T
HE
AT
TE
NT
IO
N
OF
T
HE
A
RC
HI
TE
CT
TH
E
CO
NT
RA
CT
OR
S
HA
LL
V
IS
IT
T
HE
JO
B
SI
TE
A
ND
T
HO
RO
UG
HL
Y
FA
MI
LIA
RI
ZE
H
IM
SE
LF
W
IT
H
TH
E
EX
IS
TI
NG
C
ON
DI
TI
ON
S.
DR
AW
IN
GS
D O
NO
T
SH
OW
E
VE
RY
E
XI
ST
IN
G
PI
PE
, C
ON
DU
IT
, D
UC
T, E
TC
. C
ON
TR
AC
TO
R
SH
AL
L T
AK
E
CA
RE
T O
RE
MO
VE
O
NL
Y
IT
EM
S
RE
QU
IR
ED
T
O
BE
R
EM
OV
ED
A
ND
V
ER
IF
Y
PI
PE
S, D
UC
TS
, E
TC
. B
EF
OR
E
RE
MO
VA
L.
RE
MO
VA
L O
F
IT
EM
S
SH
AL
L I
NC
LU
DE
A
SS
OC
IA
TE
D
HA
NG
ER
S, A
NC
HO
R
BO
LT
S
AN
D
OT
HE
R
AP
PU
RT
EN
AN
CE
S.
W
HE
RE
S
UC
H
RE
MO
VA
L R
ES
UL
TS
IN
O
PE
N
HO
LE
S, V
OI
DS
O R
EX
PO
SU
RE
O F
DA
MA
GE
D
SU
RF
AC
ES
, T
HE
C
ON
TR
AC
TO
R
SH
AL
L B E
RE
SP
ON
SI
BL
E
FO
R
RE
PA
IR
IN
G
AN
D
FI
NI
SH
IN
G
TH
E
SU
RF
AC
E
TO
M
AT
CH
A
DJ
AC
EN
T
CO
ND
IT
IO
NS
. T
HI
S W
OR
K
SH
AL
L B E
CO
OR
DI
NA
TE
D
W
IT
H
AR
CH
IT
EC
TU
RA
L F
IN
IS
H
SC
HE
DU
LE
S
W
HE
RE
A
PP
LIC
AB
LE
BU
ILD
IN
G
IS
T
O
RE
MA
IN
O
CC
UP
IE
D
DU
RI
NG
C
ON
ST
RU
CT
IO
N.
R
EM
OV
AL
O
R
SH
UT
-D
OW
N
OF
E
QU
IP
ME
NT
T
HA
T
AF
FE
CT
S
AN
Y
OC
CU
PI
ED
A
RE
A'
S
AI
R
CO
ND
IT
IO
NI
NG
O
R
HE
AT
IN
G
SH
AL
L O
NL
Y
BE
D
ON
E
AS
A
PP
RO
VE
D
OR
T
EM
PO
RA
RY
A
IR
C
ON
DI
TI
ON
IN
G
OR
H
EA
TI
NG
SH
AL
L B E
PR
OV
ID
ED
A T
CO
NT
RA
CT
OR
'S
E
XP
EN
SE
. T
HI
S
MA
Y
RE
QU
IR
E
NI
GH
T
AN
D
W
EE
KE
ND
W
OR
K
TO
K
EE
P
BU
ILD
IN
G
IN
O
PE
RA
TI
ON
RE
MO
VE
E
XI
ST
IN
G
DU
CT
W
OR
K
AN
D
PI
PI
NG
N
OT
T O
BE
R
EU
SE
D.
AL
L M
AT
ER
IA
LS
R
EM
OV
ED
U
ND
ER
D
EM
OL
IT
IO
N, N
OT
T
O
BE
R
EL
OC
AT
ED
O
R
DE
SI
GN
AT
ED
TO
B
E
TU
RN
ED
O
VE
R
TO
T
HE
O W
NE
R, S
HA
LL
B
EC
OM
E
TH
E
PR
OP
ER
TY
O
F
TH
E
CO
NT
RA
CT
OR
, U
NL
ES
S
OT
HE
RW
IS
E
NO
TE
D, A
ND
S
HA
LL
B
E
RE
MO
VE
D
CO
MP
LE
TE
LY
F
RO
M
TH
E
SI
TE
W
HE
RE
C
EI
LIN
GS
A
RE
R
EM
OV
ED
T
O
SU
PP
OR
T
TH
E
ME
CH
AN
IC
AL
W
OR
K
OU
TL
IN
ED
IN
TH
ES
E
CO
NT
RA
CT
D
OC
UM
EN
TS
, C
ON
TR
AC
TO
R
SH
AL
L I
NC
LU
DE
T
HE
C
OS
T
TO
TE
MP
OR
AR
ILY
S
UP
PO
RT
A
ND
R
EI
NS
TA
LL
A
LL
C
EI
LIN
G
MO
UN
TE
D
DE
VI
CE
S
IN
T
HE
N
EW
O
R
RE
IN
ST
AL
LE
D
CE
ILI
NG
S, IN
CL
UD
IN
G
BU
T
NO
T
LIM
IT
ED
T
O, G
RI
LL
ES
, R
EG
IS
TE
RS
A
ND
DI
FF
US
ER
S, LI
GH
TS
, F
IR
E
AL
AR
M
DE
VI
CE
S, C
AM
ER
AS
, E
XI
T
SI
GN
S, W
IR
EL
ES
S
AC
CE
SS
PO
IN
TS
, E
TC
GE
NE
RA
L I
TE
MS
GE
NE
RA
L N
OT
ES
O N
TH
IS
D
RA
W
IN
G
AR
E
AP
PL
IC
AB
LE
T O
EA
CH
H
VA
C
DR
AW
IN
G
OF
T
HI
S
SE
T.
S
EE
E
AC
H
DR
AW
IN
G
FO
R
SP
EC
IF
IC
N
OT
ES
A
PP
LIC
AB
LE
T O
TH
AT
D
RA
W
IN
G.
O
VE
RH
EA
D
PI
PI
NG
IN
S
PA
CE
S W
IT
HO
UT
H
UN
G
CE
ILI
NG
S
SH
AL
L B E
RU
N
AS
C
LO
SE
T O
RO
OF
D
EC
K
OR
S
TR
UC
TU
RE
A
BO
VE
, A S
PR
AC
TI
CA
L, AS
C
LO
SE
T
O
PA
RA
LL
EL
JO
IS
TS
A S
PO
SS
IB
LE
A
ND
A
BO
VE
LI
GH
TI
NG
F
IX
TU
RE
S
TO
C
ON
CE
AL
P
IP
IN
G.
OV
ER
HE
AD
P
IP
IN
G
IN
S
PA
CE
S W
IT
H
CE
ILI
NG
S
SH
AL
L B E
CO
NC
EA
LE
D
UN
LE
SS
O
TH
ER
W
IS
E
NO
TE
D.
CO
NT
RA
CT
OR
S
HA
LL
V
ER
IF
Y
RE
QU
IR
ED
R
EF
RI
GE
RA
NT
P
IP
E
SI
ZE
S
AN
D
QU
AN
TI
TI
ES
W
IT
H
EQ
UI
PM
EN
T
MA
NU
FA
CT
UR
ER
F
OR
T
HE
IN
DI
CA
TE
D
IN
ST
AL
LA
TI
ON
CO
OR
DI
NA
TE
LO
CA
TI
ON
A
ND
IN
ST
AL
LA
TI
ON
O
F
EQ
UI
PM
EN
T
W
IT
H
OT
HE
R
TR
AD
ES
DO
N
OT
S
CA
LE
D
RA
W
IN
GS
. S
EE
A
RC
HI
TE
CT
UR
AL
D
RA
W
IN
GS
F
OR
E
XA
CT
LO
CA
TI
ON
S
OF
DO
OR
S, W
IN
DO
W S, E
TC
TH
ER
MO
ST
AT
S
AN
D
SE
NS
OR
S
SH
AL
L B E
LO
CA
TE
D
IN
T
HE
R
OO
MS
IN
DI
CA
TE
D.
IN
ST
AL
L A T
AP
PR
OX
. 4
6" A
BO
VE
F
IN
IS
H
FL
OO
R
TO
M
AT
CH
T
HE
H
EI
GH
T
OF
W
AL
L S W
IT
CH
ES
O
R
OT
HE
R
W
AL
L M
OU
NT
ED
D
EV
IC
ES
PI
PI
NG
IN
SU
LA
TI
ON
S
HA
LL
B
E
RU
N
CO
NT
IN
UO
US
LY
T
HR
OU
GH
N
ON
-R
AT
ED
F
LO
OR
S, W
AL
LS
, R
OO
F
AN
D
PA
RT
IT
IO
NS
, U
NL
ES
S
OT
HE
RW
IS
E
IN
DI
CA
TE
D.
NO
P
IP
IN
G
SH
AL
L B
E
SM
AL
LE
R
TH
AN
3/
4" U
NL
ES
S
OT
HE
RW
IS
E
NO
TE
D.
FO
R
PI
PE
S
IZ
ES
N
OT
IN
DI
CA
TE
D
ON
P
LA
NS
, S
EE
F
LO
W D
IA
GR
AM
S.
PR
OV
ID
E
UN
IO
N
OR
F
LA
NG
ED
C
ON
NE
CT
IO
NS
A T
EA
CH
P
IE
CE
O
F
EQ
UI
PM
EN
T
AN
D
ON
B
OT
H
SI
DE
S
OF
C
ON
TR
OL
V
AL
VE
S
AN
D
PR
ES
SU
RE
R
EG
UL
AT
IN
G
VA
LV
ES
. P
RO
VI
DE
S
HU
T-
OF
F
VA
LV
ES
O
N
BO
TH
S
ID
ES
O F
AU
TO
MA
TI
C
VA
LV
ES
RE
LIE
F
VA
LV
E
PI
PI
NG
S
HA
LL
B E
EX
TE
ND
ED
T O
TH
E
NE
AR
ES
T
FL
OO
R
DR
AI
N.
CO
RR
EC
T
SE
TT
IN
G
ON
B
AL
AN
CI
NG
F
IT
TI
NG
S
SH
AL
L B
E
PE
RM
AN
EN
TL
Y
MA
RK
ED
LO
CA
TE
A
ND
S
IZ
E
CO
NC
RE
TE
P
AD
S
AN
D
CU
RB
S
FO
R
ME
CH
AN
IC
AL
E
QU
IP
ME
NT
IN
AC
CO
RD
AN
CE
W
IT
H
AC
TU
AL
E
QU
IP
ME
NT
P
UR
CH
AS
ED
TH
RO
UG
H-
PE
NE
TR
AT
IO
N
FI
RE
ST
OP
A
SS
EM
BL
IE
S
PR
OV
ID
E
UL
LI
ST
ED
T
HR
OU
GH
-P
EN
ET
RA
TI
ON
A
SS
EM
BL
IE
S
FO
R
FI
RE
R
AT
ED
P
AR
TI
TI
ON
S, W
AL
LS
, A
ND
F
LO
OR
S.
R
EV
IE
W
A
RC
HI
TE
CT
UR
AL
D
RA
W
IN
GS
F
OR
F
IR
E
PA
RT
IT
IO
N
LO
CA
TI
ON
S
AN
D
UL
LI
ST
IN
GS
HO
T
W
AT
ER
P
IP
IN
G
PR
OV
ID
E
MI
NI
MU
M
PI
TC
H
SU
FF
IC
IE
NT
T O
IN
SU
RE
A
DE
QU
AT
E
VE
NT
IN
G
AN
D
DR
AI
NA
GE
PR
OV
ID
E
MA
NU
AL
A
IR
V
EN
TS
A T
HI
GH
P
OI
NT
S
OF
S
YS
TE
M.
PR
OV
ID
E
1/2 " D
RA
IN
V
AL
VE
S
AN
D
CA
PP
ED
C
ON
NE
CT
IO
NS
A
T
LO
W P
OI
NT
S
IN
P
IP
IN
G
SY
ST
EM
S
FO
R
DR
AI
NI
NG
SH
EE
T
ME
TA
L
PR
OV
ID
E
AC
CE
SS
D
OO
RS
IN
D
UC
TW
OR
K
W
HE
RE
IN
DI
CA
TE
D
OR
R
EQ
UI
RE
D
FO
R
AC
CE
SS
TO
S
YS
TE
M
CO
MP
ON
EN
TS
IN
CL
UD
IN
G
TH
E
FO
LL
OW
IN
G:
DA
MP
ER
M
OT
OR
S
AN
D/
OR
M
OT
OR
O
PE
RA
TE
D
DA
MP
ER
S
HU
MI
DI
FI
FI
LT
BO
TH
S
ID
ES
O F
HE
AT
IN
G
AN
D
CO
OL
IN
G
CO
ILS
FA
N
BE
AR
IN
GS
E
NC
LO
SE
D
IN
D
UC
TS
O R
PL
EN
UM
FI
RE
D
AM
PE
RS
A
ND
S
MO
KE
D
AM
PE
RS
SM
OK
E
DE
TE
CT
OR
s
A2 L P
IP
IN
G
RE
QU
IR
EM
EN
TS
RE
FR
IG
ER
AN
T
PI
PI
NG
LO
CA
TE
D
IN
A
RE
AS
O
TH
ER
T
HA
N
TH
E
RO
OM
O
R
SP
AC
E
W
HE
RE
T
HE
RE
FR
IG
ER
AT
IN
G
EQ
UI
PM
EN
T
IS
LO
CA
TE
D
SH
AL
L B E
LA
BE
LE
D.
T
HE
P
ER
MA
NE
NT
P
IP
E
LA
BE
LS
S
HA
LL
B E
LO
CA
TE
D
AT
IN
TE
RV
AL
S
NO
T
EX
CE
ED
IN
G
F
EE
T.
M
IN
IM
UM
T
EX
T
SH
AL
L B E
1/2
IN
CH
A
ND
S
HA
LL
IN
DI
CA
TE
T
HE
R
EF
RI
GE
RA
NT
D
ES
IG
NA
TI
ON
A
ND
S
AF
ET
Y
GR
OU
P
CL
AS
SI
FI
CA
TI
ON
O F
RE
FR
IG
ER
AN
T
US
ED
IN
T
HE
P
IP
IN
G
SY
ST
EM
A
ND
IN
CL
UD
E
"D
AN
GE
R-
- R
IS
K
OF
F
IR
E
OR
E
XP
LO
SI
ON
. F
LA
MM
AB
LE
R
EF
RI
GE
RA
NT
RE
FR
IG
ER
AN
T
PI
PI
NG
U
SE
D
W
IT
H
GR
OU
P
A2 L R
EF
RI
GE
RA
NT
S
AN
D
LO
CA
TE
D
IN
CO
NC
EA
LE
D
LO
CA
TI
ON
S W
HE
RE
T
UB
IN
G
IS
IN
ST
AL
LE
D
IN
S
TU
DS
, J
OI
ST
S, R
AF
TE
RS
O R
SI
MI
LA
R
ME
MB
ER
S
PA
CE
S, A
ND
LO
CA
TE
D
LE
SS
T
HA
N
1- 1/2
IN
CH
ES
F
RO
M
TH
E
NE
AR
ES
T
ED
GE
O F
TH
E
ST
RU
CT
UR
AL
M
EM
BE
R, S
HA
LL
B E
CO
NT
IN
UO
US
LY
P
RO
TE
CT
ED
B
Y
SH
IE
LD
PL
AT
ES
. P
RO
TE
CT
IV
E
ST
EE
L S
HI
EL
D
PL
AT
ES
S
HA
LL
H
AV
E
A
MI
NI
MU
M
TH
IC
KN
ES
S
OF
0.
IN
CH
NO
. 1 6 G
AG
E)
A
ND
S
HA
LL
C
OV
ER
T
HE
A
RE
A
OF
T
HE
T
UB
E
PL
US
T
HE
A
RE
A
EX
TE
ND
IN
G
NO
T
LE
SS
T
HA
N
2 I
NC
HE
S
BE
YO
ND
B
OT
H
SI
DE
S
OF
T
HE
T
UB
E.
MA
IN
TE
NA
NC
E
EQ
UI
PM
EN
T W
IT
H
FI
LT
ER
S
SH
AL
L B E
IN
ST
AL
LE
D
SO
T
HA
T
FI
LT
ER
S
CA
N
BE
E
AS
ILY
RE
MO
VE
D
AN
D
RE
PL
AC
ED
EQ
UI
PM
EN
T
IN
ST
AL
LE
D
AB
OV
E
CE
ILI
NG
S
SH
AL
L B
E
MO
UN
TE
D
AP
PR
OX
. 1 2"
A
BO
VE
C
EI
LIN
G (U
ON
) F
OR
M
AI
NT
EN
AN
CE
A
CC
ES
S.
IN
ST
AL
L P
IP
E
RU
NS
A T
LE
AS
T 6"
A
BO
VE
C
EI
LIN
G
TI
LE
S.
W
HE
RE
P
RA
CT
IC
AL
IN
ST
AL
L
VA
LV
ES
, A
ND
O
TH
ER
M
AI
NT
AI
NA
BL
E
DE
VI
CE
S
LO
W E
NO
UG
H
TO
R
EA
CH
W
IT
H
A 6'
LA
DD
ER
PR
OV
ID
E
AC
CE
SS
T
O
AN
Y
IN
SP
EC
TI
ON
O R
MA
IN
TA
IN
AB
LE
D
EV
IC
E, E
QU
IP
ME
NT
, E
TC
AC
CE
SS
O
R
AC
CE
SS
D
OO
R
SH
AL
L B
E
OF
A
DE
QU
AT
E
SI
ZE
T
O W
OR
K
ON
D
EV
IC
E.
EX
AM
IN
E
MA
NU
FA
CT
UR
ER
'S
LI
TE
RA
TU
RE
T O
DE
TE
RM
IN
E
RE
CO
MM
EN
DE
D
CL
EA
RA
NC
ES
TH
ES
E
CL
EA
RA
NC
ES
, IN
A
DD
IT
IO
N
TO
M
IN
IM
UM
C
LE
AR
AN
CE
S
RE
QU
IR
ED
B Y
TH
E
NA
TI
ON
AL
EL
EC
TR
IC
AL
C
OD
E, S
HA
LL
B
E
ES
TA
BL
IS
HE
D
AN
D
MA
IN
TA
IN
ED
. T
HI
S
AP
PL
IE
S
TO
N
EW
A
ND
EX
IS
TI
NG
E
QU
IP
ME
NT
IM
PA
CT
ED
B
Y
TH
IS
P
RO
JE
CT
A
S W
EL
L.
TH
E
CO
NT
RA
CT
OR
S
HA
LL
B E
RE
SP
ON
SI
BL
E
FO
R
CO
OR
DI
NA
TI
NG
T
HE
SE
R
EQ
UI
RE
ME
NT
S
W
IT
H
AL
L O
TH
ER
T
RA
DE
S.
IF
T
HI
S
CO
NT
RA
CT
OR
S
HO
UL
D
EL
EC
T
TO
P
RO
PO
SE
A
NY
E
QU
IP
ME
NT
T
HA
T
HA
S
DI
FF
ER
EN
T
TE
ST
IN
G, A
DJ
US
TI
NG
, A
ND
B
AL
AN
CI
NG
(T
AB
AI
RS
ID
E
AN
D
W
AT
ER
SI
DE
T
AB
S
HA
LL
B E
PE
RF
OR
ME
D
ON
A
LL
D
UC
TE
D
AN
D
NO
N-
DU
CT
ED
HV
AC
S
YS
TE
MS
. N
ON
-D
UC
T
HV
AC
S
YS
TE
MS
, IN
CL
UD
E, B
UT
A
RE
N
OT
LI
MI
TE
D
TO
, U
NI
T
HE
AT
ER
S, C
AB
IN
ET
U
NI
T
HE
AT
ER
S, B
AS
EB
OA
RD
H
EA
TE
RS
, D
UC
TL
ES
S
MI
NI
-S
PL
IT
S, DE
ST
RA
TI
FI
CA
TI
ON
F
AN
S, LA
RG
E
CE
ILI
NG
F
AN
S, IN
FR
AR
ED
S
PA
CE
H
EA
TE
RS
, A
IR
CU
RT
AI
NS
, E
TC
. I T
SH
AL
L B E
TH
E
RE
SP
ON
SI
BI
LIT
Y
OF
T
HE
T
AB
C
ON
TR
AC
TO
R
TO
DE
TE
RM
IN
E
AP
PR
OP
RI
AT
E
TE
ST
IN
G, A
DJ
US
TI
NG
A
ND
B
AL
AN
CI
NG
P
RO
CE
DU
RE
S
FO
R
SY
ST
EM
S
NO
T
LIS
TE
D
BY
T
HE
P
RO
CE
DU
RA
L S
TA
ND
AR
DS
C
ER
TI
FY
IN
G
BO
DY
(N
EB
B, A
AB
C, ET
C.
T
UO
N
UN
LE
SS
O
TH
ER
W
IS
E
NO
TE
D
W
AL
L T
HE
RM
OS
TA
T/
TE
MP
ER
AT
UR
E
SE
NS
OR
BA
CK
DR
AF
T
DA
MP
ER
VO
LU
ME
D
AM
PE
R
FI
RE
/ S
MO
KE
D
AM
PE
R [12
0 V
OL
T]
SM
OK
E
DE
TE
CT
OR
FI
RE
D
AM
PE
R
(V
ER
TI
CA
L)
FI
RE
D
AM
PE
R
(H
OR
IZ
ON
TA
L)
MO
TO
RI
ZE
D
DA
MP
ER
S F/
S
M
BD
D
RE
FR
IG
ER
AN
T
LIQ
UI
D
PI
PI
NG
RE
FR
IG
ER
AN
T
SU
CT
IO
N
PI
PI
NG
RSRL
HO
T
W
AT
ER
S
UP
PL
Y
PI
PI
NG
HO
T
W
AT
ER
R
ET
UR
N
PI
PI
NG
HW
R
HW
S
°FØ
PH
AS
E/
DI
AM
ET
ER
DE
GR
EE
F
AH
RE
NH
EI
T
L-
LO
UV
ER
D
ES
IG
NA
TI
ON
PU
MP
D
ES
IG
NA
TI
ON
RE
TU
RN
A
IR
F
AN
D
ES
IG
NA
TI
ON
RE
HE
AT
C
OI
L D
ES
IG
NA
TI
ON
UN
IT
H
EA
TE
R
DE
SI
GN
AT
IO
N
SU
PP
LY
F
AN
D
ES
IG
NA
TI
ON
UH
-1
SF
-1
P-
RH
C-
RA
F-
BO
ILE
R
DE
SI
GN
AT
IO
N
AI
R
HA
ND
LIN
G
UN
IT
D
ES
IG
NA
TI
ON
EX
HA
US
T
FA
N
DE
SI
GN
AT
IO
N
EF
-1
B-
AH
U-
PO
IN
T
OF
D
EM
OL
IT
IO
N
LIM
IT
PO
IN
T
OF
C
ON
NE
CT
IO
N
NE
W
T O
EX
IS
TI
NG
NE
W
W
OR
K
NO
TE
D
ES
IG
NA
TI
ON
DE
MO
LIT
IO
N
NO
TE
D
ES
IG
NA
TI
ON
LE
GE
ND
A
ND
A
BB
RE
VI
AT
IO
NS
AI
R
CO
OL
ED
C
ON
DE
NS
ER
D
ES
IG
NA
TI
ON
SH
EE
T W
HE
RE
S
HO
W N/
CU
T
AC
C-
DE
TA
IL/
RI
SE
R/
EN
LA
RG
ED
P
LA
N
EX
TE
RN
AL
S
TA
TI
C
PR
ES
SU
RE
EN
TE
RI
NG
W
AT
ER
T
EM
PE
RA
TU
RE
LE
AV
IN
G
W
AT
ER
T
EM
PE
RA
TU
RE
LE
AV
IN
G
AI
R
TE
MP
ER
AT
UR
E
MA
X
OV
ER
CU
RR
EN
T
PR
OT
EC
TI
ON
B
RI
TI
SH
T
HE
RM
AL
U
NI
TS
P
ER
H
OU
R
W
ET
B
UL
B
TE
MP
ER
AT
UR
E
MA
XI
MU
M
MA
X
PI
PE
T
UR
NI
NG
D
OW
N
D
CO
ND
EN
SA
TE
D
RA
IN
DI
RE
CT
IO
N
OF
F
LO
W
W G
W
BSA
W
AT
ER
G
AU
GE
SU
PP
LY
A
IR
OAMO
CP
MC
A
MI
N
MB
H
OU
TS
ID
E
AI
R
MI
N
CI
RC
UI
T
AM
PA
CI
TY
MI
NI
MU
M
PR
ES
SU
RE
G
AU
GE
W
/ G
AU
GE
C
OC
K
UN
IO
N
FL
EX
IB
LE
P
IP
E
CO
NN
EC
TO
R
TH
ER
MO
ME
TE
R
PI
PE
T
UR
NI
NG
U P
ST
RA
IN
ER
GA
S
RE
GU
LA
TO
R/
ST
EA
M
TR
AP
LW
T
HP LA
T
GP
M
HO
RS
EP
OW
ER
GA
LL
ON
S
PE
R
MI
NU
TE
FL
A
ES
P
EW
T
ET
R
FU
LL
LO
AD
A
MP
S
EX
IS
TI
NG
T O
RE
MA
IN
AB
OV
E
FI
NI
SH
ED
F
LO
OR
CU
BI
C
FE
ET
P
ER
M
IN
UT
E
EN
TE
RI
NG
A
IR
T
EM
PE
RA
TU
RE
DE
CI
BE
LS
BA
LA
NC
IN
G
VA
LV
E
CH
EC
K
VA
LV
E db EA T
ELEACF
M
AP
PR
OX
EX
HA
US
T
AI
R
EL
EV
AT
IO
N
AP
PR
OX
IM
AT
EL
Y
AF
F
AP
D
AI
R
PR
ES
SU
RE
D
RO
P
(T
YP
TY
PI
CA
L
DR
Y
BU
LB
T
EM
PE
RA
TU
RE
DB HD
HE
AD
IN
IN
CH
NO
IS
E
CR
IT
ER
IA
NC OB
D
OP
PO
SE
D
BL
AD
E
DA
MP
ER
SE
ER
SE
AS
ON
AL
E
NE
RG
Y
EF
FI
CI
EN
CY
R
AT
IN
G
TS
P
TO
TA
L S
TA
TI
C
PR
ES
SU
RE
VO
LT
V
SE
NS
SE
NS
IB
LE
CA
LC
CA
LC
UL
AT
ED
W
AT
T W
CU
RR
EN
T
SE
NS
IN
G
RE
LA
Y
CS
R
LE
AV
IN
G
DR
Y
BU
LB
T
EM
PE
RA
TU
RE
LD
B
LE
AV
IN
G
W
ET
B
UL
B
TE
MP
ER
AT
UR
E
LW
B
EN
TE
RI
NG
D
RY
B
UL
B
TE
MP
ER
AT
UR
E
ED
B
EW
B
EN
TE
RI
NG
W
ET
B
UL
B
TE
MP
ER
AT
UR
E
1 1
EN
ER
GY
C
OD
E
CO
MP
LIA
NC
E
PA
TH
AS
HR
AE
.1
VE
CC
C
HA
PT
ER
- P
RE
SC
RI
PT
IV
E
VE
CC
C
HA
PT
ER
- P
ER
FO
RM
AN
CE
CO
NT
RA
CT
OR
S
HA
LL
P
RO
VI
DE
A N
AP
PR
OP
RI
AT
E
LIS
TE
D
TH
RO
UG
H-
PE
NE
TR
AT
IO
N
FI
RE
S
TO
PP
IN
G
AS
SE
MB
LY
A T
EA
CH
P
EN
ET
RA
TI
ON
O F
FI
RE
R
AT
ED
C
ON
ST
RU
CT
IO
N
(I.
E.
W
AL
LS
A
ND
S
LA
BS
, E
TC
FI
RE
S
TO
PP
IN
G
OF
D
UC
T
PE
NE
TR
AT
IO
NS
T
HR
OU
GH
R
AT
ED
A
SS
EM
BL
IE
S
AR
E
ON
LY
P
ER
MI
TT
ED
W
HE
N
FI
RE
A
ND
/ O
R
SM
OK
E
DA
MP
ER
S
AR
E
NO
T
RE
QU
IR
ED
. S
LE
EV
ES
S
HA
LL
O
NL
Y
BE
P
ER
MI
TT
ED
W
HE
RE
IN
DI
CA
TE
D
IN
T
HE
C
ON
TR
AC
TO
R
SE
LE
CT
ED
T
HR
OU
GH
-P
EN
ET
RA
TI
ON
F
IR
E
ST
OP
PI
NG
AS
SE
MB
LY
. R
EF
ER
T
O
AR
CH
IT
EC
TU
RA
L D
RA
W
IN
GS
F
OR
LO
CA
TI
ON
O F
AL
L R
AT
ED
A
SS
EM
BL
IE
S
AN
D
AS
SO
CI
AT
ED
U
L D
ES
IG
NA
TI
ON
S.
D
EV
IC
ES
IN
ST
AL
LE
D
RE
CE
SS
ED
W
IT
HI
N
FI
RE
R
AT
ED
CO
NS
TR
UC
TI
ON
(I
.E . L
IG
HT
S W
IT
CH
ES
, R
EC
EP
TA
CL
ES
, IC
E
MA
KE
R
BO
XE
S, E
TC
AR
E
ON
LY
PE
RM
IT
TE
D W
HE
N
AN
A
PP
RO
VE
D
LIS
TE
D
FI
RE
S
TO
PP
IN
G
SY
ST
EM
E
XI
ST
S
FO
R
TH
E
AP
PL
IC
AT
IO
N.
IF
A N
AP
PR
OV
ED
LI
ST
ED
F
IR
E
ST
OP
PI
NG
S
YS
TE
M
IS
N
OT
A
VA
ILA
BL
E, T
HE
C
ON
TR
AC
TO
R
SH
AL
L
BR
IN
G
TH
E
CO
ND
IT
IO
N
TO
T
HE
A
TT
EN
TI
ON
O
F
TH
E A/
E
FO
R
RE
SO
LU
TI
ON
P
RI
OR
T
O
PR
OC
EE
DI
NG
W
IT
H W
OR
K.
FI
RE
S
TO
PP
IN
G
NO
TE
PI
PE
C
AP
PE
D
EL
EC
TR
IC
U
NI
T
HE
AT
ER
D
ES
IG
NA
TI
ON
EU
H-
DU
CT
LE
SS
S
PL
IT
S
YS
TE
M
DE
SI
GN
AT
IO
N
DS
S-
RE
LIE
F
HO
OD
D
ES
IG
NA
TI
ON
RH
-1
IN
TA
KE
H
OO
D
DE
SI
GN
AT
IO
N
IH
-1
CL
EA
NO
UT
CO
BA
LL
V
AL
VE
P R
O
JE
C T
C O
D E
R F S J
O B
O F
D A
T E
DESCRIPTION
REVISIONS
NO.DATE
2681 MILL ROAD
ALEXANDRIA, VA 22314
-0
#2
GENERAL NOTES, LEGENDS & SCHEDULES
1ADDENDUM - 210/16/2026
PE
RF
OR
M
AN
A
IR
SI
DE
A
ND
W
AT
ER
SI
DE
P
RE
-B
AL
AN
CE
(A
IR
FL
OW
, G
PM
LE
AV
IN
G
AI
R
TE
MP
ER
AT
UR
ES
, H
OT
W
AT
ER
S
UP
PL
Y/
RE
TU
RN
TE
MP
ER
AT
UR
ES
, H
OT
W
AT
ER
C
OI
L W
AT
ER
SI
DE
P
RE
SS
UR
E
DR
OP
EX
TE
RN
AL
S
TA
TI
C
PR
ES
SU
RE
, A
ND
T
OT
AL
S
TA
TI
C
PR
ES
SU
RE
) O N
AL
L A
IR
HA
ND
LE
RS
IN
W
OR
K
AR
EA
P
RI
OR
T O
AN
Y
DE
MO
LIT
IO
N W
OR
K.
P
ER
FO
RM
A N
AI
RS
ID
E
PR
E-
BA
LA
NC
E
ON
T
HE
A
SS
OC
IA
TE
D
DI
FF
US
ER
A
ND
R
ET
UR
N
AI
R
TE
RM
IN
AL
S
FO
R
AL
L A
IR
H
AN
DL
ER
S
AN
D
RE
PO
RT
A
NY
O
BS
TR
UC
TI
ON
S
OR
DE
FI
CI
EN
CI
ES
T
O
TH
E
AR
CH
IT
EC
T.
P
ER
FO
RM
A W
AT
ER
SI
DE
P
RE
-B
AL
AN
CE
(G
PM
A
ND
F
OO
T
OF
H
EA
D) O
N
AL
L P
UM
PS
IN
W
OR
K
AR
EA
P
RI
OR
T O
AN
Y
DE
MO
LIT
IO
N W
OR
K.
P
ER
FO
RM
A W
AT
ER
SI
DE
P
RE
-B
AL
AN
CE
(P
RE
SS
UR
E
DR
OP
A
ND
LE
AV
IN
G W
AT
ER
T
EM
PE
RA
TU
RE
) O F
TH
E
BO
ILE
R.
S
UB
MI
T
PR
E-
BA
LA
NC
E
RE
PO
RT
T O
AR
CH
IT
EC
T
FO
R
RE
VI
EW
P
RI
OR
T
O
ST
AR
T
OF
DE
MO
LIT
IO
N.
PR
E-
TA
B
NO
TE
CU
-4
CU
-2
CU
-3
DS
S, E
TR
FT
R, E
TR
FT
R, E
TR
CU
H, E
TR
CUH, ETR
UH
, E
TR
x1
6 R A x1
6, ET
R x1
6, ET
R x1 6, ET
R x1
4, ET
R x1
0, ET
R
"Ø
, E
TR
"Ø
, E
TR
x1
0, ET
R x1 0, ET
R
16x12, ETR x1
0, ET
R
"Ø , E
TR
"Ø , E
TR
"Ø
, E
TR
"Ø
, E
TR
x1
2, ET
R x1 2, ET
R x1
2, ET
R
"Ø
, E
TR
"Ø
, E
TR
"Ø
, E
TR
x1
4, ET
R x1 4, ET
R x1
4, ET
R x1 6, ET
R
"Ø
, E
TR
"Ø
, E
TR
x1
2, ET
R x1
4, ET
R x1
4, ET
R x1 6, ET
R x1
4, ET
R x1
0, ET
R
6x 8, ET
R x1
4 R A x6
, E
TR
x2
2 R A
"Ø
, E
TR
14x18, ETR 12x12, ETR
8" Ø, E
TR
6x6, ETR
8x 8, ET
R
8x 6, ET
R
8x10, ETR x6
, E
TR
8"Ø
"Ø
, E
TR
"Ø
, E
TR
"Ø
, E
TR
8" Ø, E
TR
6" Ø, E
TR
6x
, E
TR
8" Ø, E
TR
8" Ø, E
TR
24x14, ETR
8x
, E
TR
x1
0, ET
R x1
4, ET
R x1
0, ET
R x1 0, ET
R
6x 6, ET
R
HW
S/
HW
R, E
TR
EX
IS
TI
NG
ME
CH
AN
IC
AL
EX
IS
TI
NG
EL
EC
TR
IC
AL
6x
, E
TR
(T
YP
2)
EX
IS
TI
NG
ST
OR
AG
E
EX
IS
TI
NG
SE
CU
RI
TY
TE
LL
ER
S
IN
FO
RM
AT
IO
N
EX
IS
T.
VE
ST
IB
UL
E
EX
IS
T.
VE
ST
IB
UL
E
EX
IS
TI
NG
ME
N'
S
RO
OM
TE
ST
IN
G
AS
SI
ST
MG
R.
EX
IS
TI
NG
LO
UN
GE
8" Ø
8" Ø
EX
IS
TI
NG
CO
MP
UT
ER
RO
OM
LO
BB
Y / W
AI
TI
NG
AR
EA
DS
S, E
TR
FT
R, E
TR
FT
R, E
TR
CU
H, E
TR
CUH, ETR
UH
, E
TR
24x14, ETR x1
6, ET
R x1
6, ET
R x1 6, ET
R x1
4, ET
R x1
0, ET
R
"Ø
, E
TR
"Ø
, E
TR
x1
0, ET
R x1 0, ET
R
16x12, ETR 8x12, ETR
8" Ø, E
TR
8" Ø, E
TR
x1
0, ET
R x1 0, ET
R x1
0, ET
R x1 0, ET
R
"Ø
, E
TR
"Ø
, E
TR
"Ø
, E
TR
"Ø
, E
TR
x1
2, ET
R x1 2, ET
R x1
2, ET
R
"Ø
, E
TR
"Ø
, E
TR
"Ø
, E
TR
x1
4, ET
R x1 4, ET
R x1
4, ET
R x1 6, ET
R x1
6, ET
R
"Ø
, E
TR
"Ø
, E
TR
x1
2, ET
R x1
4, ET
R x1
4, ET
R x1 6, ET
R x1
4, ET
R x1
0, ET
R
8x
, E
TR
6x 8, ET
R
6Ø , E
TR
x1
4 R A
(T
YP
2)
8" Ø
CU
-1 x1
8, ET
R x2
2 R A
UP
T
O
14x18, ETR 12x12, ETR
8x
, E
TR
8" Ø, E
TR
x1
0, ET
R26 x1
8 S A
8" Ø, E
TR
6x6, ETR
6x 6, ET
R
8x 6, ET
R
6x 8, ET
R8x10, ETR x6
, E
TR
8x
, E
TR
8" Ø, E TR8x 6, "Ø
, E
TR
"Ø
, E
TR
"Ø
, E
TR
6" Ø, E
TR
6x
, E
TR
8" Ø, E
TR
8" Ø, E
TR
8x
, E
TR
x6
, E
TR
"Ø
, E
TR
8x 8, ET
R x1
0, ET
R x1
4, ET
R x1
0, ET
R x1 0, ET
R
8x 6, ET
R
6x 6, ET
R x1
2, ET
R
8" Ø
HW
S/
HW
R, E
TR
LO
BB
Y / W
AI
TI
NG
AR
EA
EX
IS
TI
NG
W
OM
EN
'S
R
OO
M
TE
ST
IN
G
EX
IS
T.
LE
O
FF
IC
E
EX
IS
TI
NG
CO
RR
ID
OREX
IS
TI
NG
ME
N' S
RO
OM
EX
IS
TI
NG
W
OM
EN
'S
R
OO
M
EX
IS
T.
JA
NI
TO
R
AS
ST
MA
NA
GE
R
MA
NA
GE
R
OP
EN
OF
FI
CE
EX
IS
TI
NG
CL
OS
ET
AS
ST
MA
NA
GE
R
EX
IS
TI
NG
ME
CH
AN
IC
AL
EX
IS
TI
NG
EL
EC
TR
IC
AL
TE
LL
ER
S x1 x1
(T
YP
2)
8x
ET
R
6x
8x
8x
FT
R, E
TR
FT
R, E
TR
6x
8" Ø
UP
T
O
AH
U-
6A10
2 12
RS
/R
L
RS/RL
RS/RL
RS/RL
AB
AN
DO
N
BE
LO
W G
RA
DE
AB
AN
DO
N
BE
LO
W G
RA
DE
AH
U-
3, ET
R
UP
T
O
AH
U- 3, ET
R
UP
T
O
AH
U- 3, ET
R
UP
T
O
AH
U- 1 , E
TR
UP
T
O
AH
U- 2, ET
R
RS
/R
L
RS
/R
L
(T
YP
(T
YP
(T
YP
(T
YP
P R
O
JE
C T
C O
D E
R F S J
O B
O F
D A
T E
DESCRIPTION
REVISIONS
NO.DATE
2681 MILL ROAD
ALEXANDRIA, VA 22314
-0
#2
GR
AP
HI
C
SC
AL
E( S)
DE
MO
LIT
IO
N
PL
AN
FI
RS
T
FL
OO
R
SC
AL
E:
3/
1' -0
DEMOLITION PLAN - FIRST FLOOR
1 2 3 4 5 6 7
RE
MO
VE
O
UT
DO
OR
C
ON
DE
NS
IN
G
UN
IT
, R
EF
RI
GE
RA
NT
P
IP
IN
G
TO
G
RA
DE
AN
D
CA
P, A
ND
A
LL
A
SS
OC
IA
TE
D
AP
PU
RT
EN
AN
CE
S
CO
MP
LE
TE
RE
MO
VE
O
UT
DO
OR
C
ON
DE
NS
IN
G
UN
IT
A
ND
S
TO
RE
F
OR
R
EL
OC
AT
IO
N.
RE
MO
VE
R
EF
RI
GE
RA
NT
P
IP
IN
G
TO
G
RA
DE
A
ND
C
AP
. R
EM
OV
E
AL
L
AS
SO
CI
AT
ED
A
PP
UR
TE
NA
NC
ES
C
OM
PL
ET
E.
RE
MO
VE
G
AS
-F
IR
ED
B
OI
LE
R.
D
IS
CO
NN
EC
T
HW
S/
HW
R
PI
PI
NG
, G
AS
P
IP
IN
G, AN
D
VE
NT
A
ND
R
EM
OV
E
ON
LY
A
S
RE
QU
IR
ED
T
O
RE
PL
AC
E
BO
ILE
R.
RE
FE
R
TO
B
OI
LE
R
DE
MO
LIT
IO
N
AN
D
NE
W W
OR
K
DI
AG
RA
MS
RE
MO
VE
IN
LIN
E
HW
P
UM
P.
D
IS
CO
NN
EC
T
HW
S/
HW
R
PI
PI
NG
A
ND
R
EM
OV
E
ON
LY
A
S
RE
QU
IR
ED
T
O
RE
PL
AC
E
PU
MP
. R
EF
ER
T O
BO
ILE
R
DE
MO
LIT
IO
N
AN
D
NE
W
W
OR
K
DI
AG
RA
MS
RE
MO
VE
Z
ON
E
MO
TO
RI
ZE
D
DA
MP
ER
, S
UP
PO
RT
S, C
ON
TR
OL
W
IR
IN
G, A
ND
AS
SO
CI
AT
ED
A
PP
UR
TE
NA
NC
ES
C
OM
PL
ET
E.
P
RE
P
DU
CT
W
OR
K
FO
R
NE
W
CO
NN
EC
TI
ON
IN
T
HE
N
EW
W
OR
K
PH
AS
E.
RE
MO
VE
Z
ON
E
TH
ER
MO
ST
AT
A
ND
C
ON
TR
OL
W
IR
IN
G
CO
MP
LE
TE
RE
MO
VE
E
XI
ST
IN
G
TR
AN
E
CO
NT
RO
L P
AN
EL
A
ND
C
ON
TR
OL
W
IR
IN
G
CO
MP
LE
TE
NO
TE
S
TH
IS
S
HE
ET
3/1 6"
1'
-0 "0'
5'
RE
FR
IG
ER
AN
T
RE
CL
AI
M
NO
TE
RE
FR
IG
ER
AN
T
RE
CO
VE
RY
N
OT
E:
RE
FR
IG
ER
AN
T
FR
OM
E
XI
ST
IN
G
ME
CH
AN
IC
AL
S
YS
TE
MS
S
HA
LL
B E
RE
CO
VE
RE
D
AN
D
RE
CY
CL
ED
F
OR
R
EC
LA
IM
. E
QU
IP
ME
NT
C
AP
AB
LE
O F
PU
LL
IN
G
A
VA
CU
UM
O F
LE
SS
T
HA
N
M
IC
RO
NS
O
F
ME
RC
UR
Y S
HA
LL
B E
US
ED
T O
RE
CO
VE
R
RE
FR
IG
ER
AN
T.
M
EC
HA
NI
CA
L S
YS
TE
MS
S
HA
LL
N
OT
B E
OP
EN
ED
T
O
AT
MO
SP
HE
RE
UN
TI
L A
LL
R
EF
RI
GE
RA
NT
IS
F
UL
LY
R
EC
OV
ER
ED
. T
HE
C
ON
TR
AC
TO
R
SH
AL
L
PR
OV
ID
E
CO
NT
AI
NE
RS
F
OR
T
HE
S
TO
RA
GE
O
F
TH
E
RE
FR
IG
ER
AN
T.
R
EF
RI
GE
RA
NT
SH
AL
L B
EC
OM
E
TH
E
PR
OP
ER
TY
O
F
TH
E
CO
NT
RA
CT
OR
RE
FR
IG
ER
AN
T
FR
OM
E
XI
ST
IN
G
ME
CH
AN
IC
AL
S
YS
TE
M
(C U-
4) S
HA
LL
B E
RE
CO
VE
RE
D
AN
D
RE
CY
CL
ED
F
OR
R
EC
LA
IM
. E
QU
IP
ME
NT
C
AP
AB
LE
O F
PU
LL
IN
G
A
VA
CU
UM
O F
LE
SS
T
HA
N
M
IC
RO
NS
O
F
ME
RC
UR
Y
SH
AL
L B
E
US
ED
T
O
RE
CO
VE
R
RE
FR
IG
ER
AN
T.
M
EC
HA
NI
CA
L S
YS
TE
MS
S
HA
LL
N
OT
B
E
OP
EN
ED
T O
AT
MO
SP
HE
RE
F
OR
D
EM
OL
IT
IO
N
UN
TI
L A
LL
R
EF
RI
GE
RA
NT
IS
F
UL
LY
R
EC
OV
ER
ED
TH
E
CO
NT
RA
CT
OR
S
HA
LL
P
RO
VI
DE
C
ON
TA
IN
ER
S
FO
R
TH
E
ST
OR
AG
E
OF
T
HE
RE
FR
IG
ER
AN
T.
R
EU
SE
R
EF
RI
GE
RA
NT
A
FT
ER
O
UT
DO
OR
U
NI
T
IS
R
EL
OC
AT
ED
CU
-4
N
OT
E:
PR
IO
R
TO
R
EM
OV
AL
, V
ER
IF
Y
CU
-4
IS
O
PE
RA
TI
ON
AL
A
ND
P
RO
VI
DE
W
RI
TT
EN
CO
NF
IR
MA
TI
ON
IN
CL
UD
IN
G
AN
D
EF
IC
IE
NC
IE
S.
PE
RF
OR
M
AN
A
IR
SI
DE
A
ND
W
AT
ER
SI
DE
P
RE
-B
AL
AN
CE
(A
IR
FL
OW
, G
PM
LE
AV
IN
G
AI
R
TE
MP
ER
AT
UR
ES
, H
OT
W
AT
ER
S
UP
PL
Y/
RE
TU
RN
T
EM
PE
RA
TU
RE
S, HO
T
W
AT
ER
C
OI
L W
AT
ER
SI
DE
P
RE
SS
UR
E
DR
OP
, E
XT
ER
NA
L S
TA
TI
C
PR
ES
SU
RE
, A
ND
T
OT
AL
S
TA
TI
C
PR
ES
SU
RE
) O N
AL
L A
IR
H
AN
DL
ER
S
IN
W
OR
K
AR
EA
P
RI
OR
T
O
AN
Y
DE
MO
LIT
IO
N
W
OR
K.
P
ER
FO
RM
A
N
AI
RS
ID
E
PR
E-
BA
LA
NC
E
ON
T
HE
A
SS
OC
IA
TE
D
DI
FF
US
ER
A
ND
R
ET
UR
N
AI
R
TE
RM
IN
AL
S
FO
R
AL
L A
IR
HA
ND
LE
RS
A
ND
R
EP
OR
T
AN
Y
OB
ST
RU
CT
IO
NS
O R
DE
FI
CI
EN
CI
ES
T O
TH
E
AR
CH
IT
EC
T.
P
ER
FO
RM
A
W
AT
ER
SI
DE
P
RE
-B
AL
AN
CE
(G
PM
A
ND
F
OO
T
OF
H
EA
D)
ON
A
LL
P
UM
PS
IN
W
OR
K
AR
EA
P
RI
OR
T
O
AN
Y
DE
MO
LIT
IO
N
W
OR
K.
P
ER
FO
RM
A
W
AT
ER
SI
DE
P
RE
-B
AL
AN
CE
(P
RE
SS
UR
E
DR
OP
A
ND
LE
AV
IN
G
W
AT
ER
TE
MP
ER
AT
UR
E) O
F
TH
E
BO
ILE
R.
S
UB
MI
T
PR
E-
BA
LA
NC
E
RE
PO
RT
T
O
AR
CH
IT
EC
T
FO
R
RE
VI
EW
P
RI
OR
T O
ST
AR
T
OF
D
EM
OL
IT
IO
N.
PR
E-
TA
B
NO
TE
1ADDENDUM - 210/16/2026
DMV Alexandria CSC- HVAC Replacement Project Code: 154-B5154-004
TABLE OF CONTENTS (Revised 10-16-26) TOC - 1
TABLE OF CONTENTS:
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DGS-30-256 NOTICE OF INVITATION TO BID (REVISED)
CO-7A INSTRUCTIONS TO BIDDERS
DGS-30-272 PREBID QUESTION FORM
DGS-30-220 BID FORM (REVISED)
CO-10.2 STANDARD BID BOND FORM **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-090
CO-7 COMMONWEALTH OF VIRGINIA GENERAL CONDITIONS OF THE
CONSTRUCTION CONTRACT
DMV-26-0001 VIRGINIA DEPARTMENT OF LABOR AND INDUSTRY WAGE
DETERMINATION DECISION
CO-9 CONTRACT BETWEEN OWNER AND CONTRACTOR **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-064
CO-9A WORKERS COMPENSATION INSURANCE CERTIFICATE **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-076
CO-10 STANDARD PERFORMANCE BOND **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-084
CO-10.1 STANDARD LABOR AND MATERIAL PAYMENT BOND **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-088
CO-11 CHANGE ORDER BLANK **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-092
GC-1 CHANGE ORDER ESTIMATE (GENERAL CONTRACTOR) **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-200
SC-1 CHANGE ORDER ESTIMATE (SUBCONTRACTOR) **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-204
SS-1 CHANGE ORDER ESTIMATE (SUB-SUBCONTRACTOR) **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-208
CO-12 SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENT **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-104
CO-13 AFFIDAVIT OF PAYMENT OF CLAIMS **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-108
CO-13.1 CERTIFICATE OF COMPLETION BY ARCHITECT/ENGINEER **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-112
CO-13.1A CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY A/E **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-116
CO-13.2 CERTIFICATE OF COMPLETION BY CONTRACTOR **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-136
CO-13.2A CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY
CONTRACTOR **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-140
TABLE OF CONTENTS (Revised 10-16-26) TOC - 2
DGS-30-364 SUBMITTAL REGISTER FORMAT **
https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-364
DGS-30-384 VENDOR eVA REGISTRATION REQUIREMENTS** https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-384
000115 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY (Revised 10-16-26)
014200 REFERENCES
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
DIVISION 03 - CONCRETE
032000 CONCRETE REINFORCING
033053 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
055000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
061600 SHEATHING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
073000 REPAIR OF EXTERIOR INSULATION AND FINISH (EIFS) ASSEMBLIES
079200 JOINT SEALANTS
DIVISION 09 - FINISHES
092900 GYPSUM BOARD
095113 ACOUSTICAL PANEL CEILINGS
099114 EXTERIOR PAINTING (MPI STANDARDS)
099124 INTERIOR PAINTING (MPI STANDARDS)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230000 MECHANICAL AND PLUMBING GENERAL PROVISIONS
230500 MECHANICAL BASIC MATERIALS AND METHODS
230513 COMMON MOTOR AND CONTROLLER REQUIREMENTS FOR HVAC AND
PLUMBING EQUIPMENT
230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
230518 ESCUTCHEONS FOR HVAC PIPING
230519 METERS AND GAGES FOR HVAC PIPING
230523 GENERAL-DUTY VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
TABLE OF CONTENTS (Revised 10-16-26) TOC - 3
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
230900 INSTRUMENTATION AND CONTROL FOR HVAC
232113 HYDRONIC PIPING
232123 HYDRONIC PUMPS
233113 METAL DUCTS
235239 FIRE-TUBE BOILERS
236200 PACKAGED COMPRESSOR AND CONDENSER UNITS
237313 MODULAR INDOOR CENTRAL-STATION AIR HANDLING UNITS
DIVISION 26 - ELECTRICAL
260500 ELECTRICAL GENERAL PROVISIONS
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
262726 WIRING DEVICES
262813 FUSES
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
262900 MOTORS AND MOTOR CONTROL
265100 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
283100 EXISTING ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM
** Refer to hyperlink to download form from the DGS Forms Center
END OF TABLE OF CONTENTS
DGS-30-256
(Rev. 07/26)
Notice of Invitation for Bids Page 1 of 1
NOTICE OF
INVITATION FOR BIDS (IFB)-REVISED
Sealed bids are invited for the construction of DMV Alexandria CSC-HVAC Replacement, Project Code: 154-B5154- 004 at Alexandria, VA.
The project is generally described as repair work for the Customer Service Center. Work includes, but is not limited to, the removal and replacement of existing HVAC system.
Sealed bids will be received electronically through eVA at the Department of Motor Vehicles, Facilities Services and Planning, 2300 West Broad Street, Richmond, VA 23320. The deadline for submitting bids is 2:00 P.M. sharp, as determined by the Bid Officer, on November 02, 2026.
The bids will be opened publicly and read aloud beginning at 2:00 P.M., on November 03, 2026, virtually at the following: https://teams.microsoft.com/meet/22311605551895?p=FROw3YXLnnSuIf0ina
Microsoft Teams Meeting ID: Meeting ID: 223 116 055 518 95# Passcode: zU2T5gi7 Dial in by phone +1 434-230-0065, 730221796# Phone conference ID: 730 221 796# Join on a video conferencing device Tenant key: commonwealthofvirginia@m.webex.com Video ID: 117 666 569 7
A Bid Bond is required.
eVA Vendor Registration: The bidder or offeror shall be a registered vendor in eVA. See the attached eVA Vendor Registration Requirements.
Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and § 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids.
A pre-bid conference will be held at 2681 Mill Road, Alexandria, VA 22314 at 11:00 a.m., on October 7, 2026.
Attendance shall be mandatory for those submitting a bid.
The contract shall be awarded on a lump sum basis as follows: the Total Base Bid Amount including any properly submitted and received bid modifications plus such successive Additive Bid Items as the Owner in its discretion decides to award in the manner set forth in Paragraph 12 of the Instructions to Bidders. ‘Notice of Award’ or ‘Notice of Intent to Award’ will be posted on eVA, Virginia Department of General Services’ central electronic procurement website, at https://eva.virginia.gov.
Contractor registration is required in accordance with §§54.1-1100 et. seq. of the Code of Virginia. See the Invitation for Bids for additional qualification requirements.
All executive branch agencies are directed to advance Executive Order 35, dated July 3, 2019.
The Invitation for Bids for the above project, including the drawings and the specifications containing the information necessary for bidding, may be obtained from the office of RFS Architects pc, 261 West Bute Street, Norfolk, VA 23510, Telephone (757) 627-2791.
A deposit of $50.00 for each set of the Invitation for Bids documents will be required as a guarantee of the safe return of the documents within ten days after the bid opening. A non-refundable shipping charge of $70.00 per set is required for all sets requiring shipment.
Copies of the Invitation for Bids documents, including the plans and the specifications, will also be available for inspection at the following locations:
RFS Architects pc Norfolk, VA
Gary Hobson, Dept. of Motor Vehicles Deputy Director of Planning and Design
Attachment: eVA Vendor Registration Requirements
Standard Bid Form Format Page 1 of 4
DGS-30-220 Standard Bid Form Format (Rev. 07/26)
BID FORM-REVISED
DATE: 11-02-2026
PROJECT: DMV Alexandria CSC- HVAC Replacement
2681 Mill Road Alexandria, VA 22314
Project Code: 154-B5154-004
To: Commonwealth of Virginia
Department of Motor Vehicles Facilities Services and Planning 2300 West Broad Street Richmond, VA 23220
In compliance with and subject to your Invitation for Bids and the documents therein specified, all of which are incorporated herein by reference, the undersigned bidder proposes to furnish all labor, equipment, and materials and perform all work necessary for construction of this project, in accordance with the Plans and Specifications dated 08/28/26, and the Addenda noted below, as prepared by RFS Architects pc, 261 West Bute Street, Norfolk, VA 23520 for the consideration of the following amount:
BASE BID (including the following parts but excluding work in Additive Bid Items):
PART A.
Lump sum price for construction of the building within a perimeter extending 5 feet from the walls of the building & all work in existing drive-thru lane and mechanical curb, complete and in accordance with the Plans and Specifications:
PART A = ________________________________________ Dollars ($ ).
TOTAL BASE BID AMOUNT (Sum of PART A) IS:
_______________________________________________________ DOLLARS ($ )
Contract award will be based on the TOTAL BASE BID AMOUNT shown above (including any properly submitted bid modifications) plus as many Additive Bid Items taken in sequence as the Owner in its discretion decides to award. In the event of a conflict between the amount written in words and the numerals, the amount written in words shall take precedence.
The bidder has relied upon the following public historical climatological records:
NOAA (National Centers for Environmental Information) for Alexandria, VA.
Code of Virginia, § 2.2-4376.2 shall be applicable to the Work of the Contract.
Standard Bid Form Format Page 2 of 4
The undersigned understands that time is of the essence and agrees that the date for Substantial Completion of the entire project shall be on or before 06/25/27 based on a Notice authorizing Work to proceed on or before 12/11/26, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.
Standard Bid Form Format Page 3 of 4
Acknowledgment is made of receipt of the following Addenda:
If notice of acceptance of this bid is given to the undersigned within 30 days after the date of opening of bids, or any time thereafter before this bid is withdrawn, the undersigned will execute and deliver a contract in the prescribed form (Commonwealth of Virginia Contract Between Owner and Contractor, Form CO-9) within 10 days after the contract has been presented to him for signature. The required payment and performance bonds, on the forms prescribed, shall be delivered to the Owner along with the signed Contract.
Immigration Reform and Control Act of 1986: The undersigned certifies that it does not and shall not during the performance of the Contract for this project violate the provisions of the Federal Immigration Reform and Control Act of 1986, which prohibits employment of illegal aliens, or knowingly employ an unauthorized alien as defined in the Federal Immigration Reform and Control Act of 1986.
DISQUALIFICATION OF CONTRACTORS: By signing this bid or proposal, the undersigned certifies that this Bidder or any officer, director, partner or owner is not currently barred from bidding on contracts by any Agency of the Commonwealth of Virginia, or any public body or agency of another state, or any agency of the federal government, nor is this Bidder a subsidiary or affiliate of any firm/corporation that is currently barred from bidding on contracts by any of the same. We have attached an explanation of any previous disbarment(s) and copies of notice(s) of reinstatement(s).
Either the undersigned or one of the following individuals, if any, is authorized to modify this bid prior to the deadline for receipt of bids by writing the modification and signing their name on the face of the bid, on the envelope in which it is enclosed, on a separate document, or on a document which is telefaxed to the Owner:
I certify that the firm name given below is the true and complete name of the bidder and that the bidder is legally qualified and licensed by the Virginia Department of Professional and Occupational Regulation, Board for Contractors, to perform all Work included in the scope of the Contract.
Virginia License No.: ______________ Bidder: ______________________________
(Name of Firm)
Contractor Class: ________________ By:___________________________________ (Signature)
Specialty: _______________________ Valid until: ______________________
FEIN/SSN: _____________________ Title: _______________________________
Standard Bid Form Format Page 4 of 4
If General Partnership (List Partners' Names)
Business Address:
Telephone # ________________________
FAX # _______________________________
If Corporation, affix Corporate Seal & list State of Incorporation
State: _____________________________
(Affix Seal)
Virginia State Corporation Commission ID No.: _______________; or
If Contractor is a foreign business entity not required to be authorized to transact business in the Commonwealth under Titles 13.1 or 50 of the Code of Virginia, or as otherwise required by law, please provide an explanation as to why such entity is not required to be so authorized: ____________________
Contractor’s Proposed Small Business Participation: % _____________________ (required) [Contractor insert percentage]
SUMMARY (Revised 10-16-26) 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Division 00 Procurement and Contracting Requirements: CO-7 Commonwealth of Virginia General Conditions of the Construction Contract and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Use of Asbestos or Asbestos Containing Materials.
4. Work performed by Owner.
5. Contractor's use of site and premises.
6. Coordination with occupants.
7. Work restrictions.
8. Specification and Drawing conventions.
1.3 DEFINITIONS
A. Work Package: A group of specifications, drawings, and schedules prepared by the design team to describe a portion of the Project Work for pricing, permitting, and construction.
1.4 PROJECT INFORMATION
A. Project Identification:
DMV Alexandria CSC- HVAC Replacement, Project Code: 154-B5154-004.
1. Project Location: 2681 Mill Road, Alexandria, VA 22314.
B. Owner: Department of Motor Vehicles, 2300 West Broad Street, Richmond, VA 23220.
1. Owner's Representative: Gary Hobson, VA Department of Motor Vehicles, Deputy Director of Planning & Design, (804) 629-0246, Gary.Hobson@dmv.virginia.gov.
C. Architect: Jeremy M. Jones, AIA, RFS Architects pc, 261 West Bute Street, Norfolk, VA 23510, (757) 627-2791, jeremyj@rfsarchitects.com.
1. Architect's Project Manager: Jeremy M. Jones, AIA, RFS Architects pc, 261 West Bute Street, Norfolk, VA 23510, (757) 627-2791, jeremyj@rfsarchitects.com.
SUMMARY (Revised 10-16-26) 011000 - 2
D. Architect's Consultants: Architect has retained the following design professionals, who have prepared designated portions of the Contract Documents:
1. Plumbing/Mechanical/Electrical: PACE Collaborative, P.C., 7814 Carousel Lane, Suite 200, Richmond, VA 23294.
a. Plumbing/Mechanical/Electrical Representative: Keith Neubert, P.E., RCDD, LEED AP, (804) 270-7222, keithn@pace-pme.com.
1.5 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:
1. The Work involves the replacement of the existing HVAC system in an existing DMV Customer Service Center and other Work indicated in the Contract Documents.
a. Repair Work primarily includes the removal and replacement of existing HVAC system (Replace-In- Kind).
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.6 USE OF ASBESTOS OR ASBESTOS CONTAINING MATERIALS
A. The use of any materials which contain asbestos in concentrations greater than 1% shall be prohibited in any new construction or renovations.
1.7 WORK PERFORMED BY OWNER
A. Cooperate fully with Owner, so work may be carried out smoothly, without interfering with or delaying Work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.
B. Preceding Work: Owner will perform the following construction operations at Project site.
Those operations are scheduled to be substantially complete before Work under this Contract begins.
1. Removal of all equipment, furniture and miscellaneous items in the area of work.
C. Concurrent Work: Owner will perform the following construction operations at Project site.
Those operations will be conducted simultaneously with Work under this Contract.
1. Installation of special equipment: Security system.
D. Subsequent Work: Owner will perform the following additional work at site after Substantial Completion. Completion of that work will depend on successful completion of preparatory Work under this Contract.
SUMMARY (Revised 10-16-26) 011000 - 3
1. Continuation of the installation of special equipment under separate contracts.
1.8 CONTRACTOR'S USE OF SITE AND PREMISES
A. Unrestricted Use of Site: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.
B. Limits on Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.
Do not use these areas for parking or for storage of materials.
C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
1.9 COORDINATION WITH OCCUPANTS
A. Partial Owner Occupancy: Owner will occupy the premises starting from the Notice to Proceed through 05/30/2027 during which time the Contractor will have limited use of the Project Site.
The Customer Service Center will be fully occupied with staff and open to the public during this time. The Customer Service Center will close between 05/31/2027 and 06/25/2027 wherein the Contractor will have full use of the Project Site (Not open to the public or DMV staff).
Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.
2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.
1.10 WORK RESTRICTIONS
A. Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.
SUMMARY (Revised 10-16-26) 011000 - 4
1.11 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.
3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.
4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 00 Procurement and Contracting Requirements: CO-7 Commonwealth of Virginia General Conditions of the Construction Contract applies to the Work of all Sections in the Specifications.
C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled on Drawings and published as part of the U.S. National CAD Standard.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
Pre-Bid Meeting Agenda (Revised) DMV Alexandria CSC HVAC Replacement
Project Code: 154-B5154-004 Meeting Scheduled: October 7, 2026 @ 11:00am
1) Fill out Attendee Sign-In sheet (all pertinent data for formal issue of Addendums)
2) Introductions of Agency Representatives and A/E.
3) Notice of Invitation for Bids
Pre-bid meeting attendance: mandatory.
Bid bond is required.
4) Instructions to Bidder Bidders must familiarize themselves with existing site conditions.
No oral explanation of dwgs and spec will be made now or at contract award.
5) Bidders must use the “Pre-Bid Question Form”
Submit before 4:00 pm on 10/14/2026 to allow a sufficient time for an addendum to reach all bidders before the submission of their bids.
6) Bids:
Bids due Electronically thru eVA at 2:00 pm on
11/02/2026 at the Department of Motor Vehicles, Facilities Services and Planning, 2300 West Broad Street, Richmond, VA 23220.
The bidder or offeror shall be a registered vendor in eVA.
7) Bid Form:
Building Substantial Completion: 06/25/2027 based on a Notice to Proceed on or before 12/11/2026.
Acknowledge addendums on the bid form (page 3).
Final Completion: 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.
NOTE: Contractor’s Proposed Small Business Participation: %__ (Contractor insert percentage) Must be filled out even if percentage is 0%.
7) General Conditions (CO-7)
8) Concurrent Work:
Installation of special equipment: Computers and security system.
9) Repair Work includes, but is not limited to, the removal & replacement of existing HVAC equipment units in attic, exterior compressors, HVAC electrical controls, and any repair work involved in replacement installation.
10) Questions?
Pre-Bid Meeting Agenda (Revised) DMV Alexandria CSC HVAC Replacement
Project Code: 154-B5154-004 Meeting Scheduled: October 7, 2026 @ 11:00am
261 West Bute Street Norfolk, VA 23510
Phone 757.627.2791 Fax 757.627.5774 www.rfsarchitects.com
PREBID QUESTIONS
Project: DMV Alexandria CSC HVAC Replacement Project Code: 154-B5154-004
Date: October 16, 2026
Prebid Question Forms Submitted:
1. Question referencing Specifications Section 230900, page 2, paragraph 2.2, A:
Will Delta Controls by ATS Engineered Services be considered as an acceptable controls manufacturer?
Response:
Per the project specifications, Delta Controls is not an allowable manufacturer.
2. Question referencing Mechanical Drawings:
Could you please clarify the scope and sequence for the loose motorized dampers and temperature sensors?
Response:
Please refer to notes 5 and 6 on MD101 for demolition scope of the motorized dampers and temperature sensors. Please refer to notes 6 and 7 on M101 for new work scope. See M703 for controls of the zone motorized dampers.
3. Question referencing Pre-Bid Meeting:
Could you please share the subject project pre-bid meeting agenda/sign-in sheet.
Response:
The requested information will be issued as Addendum No. 1 through eVA.
4. Question referencing Mechanical Drawings:
Will a Pre-Tab Balance Report be required prior to demolition?
Response:
Refer to Addendum No. 1 Drawings M001 Revision 1 & MD101 Revision 1 (10/16/26) for clarification.
Prepared by: Jeremy Jones, AIA
Cc: Gary Hobson Brenda Williams
File details come from the government source that posted it. Updated .