Addendum 1_Final.pdf

PDF 1010 KB Posted

Attached to
Comprehensive Mechanical Systems Maintenance and Repair Services - Bronson Animal Disease Diagnostic
Solicitation number
ITB-16459
Issued by
Leon County, Florida

About this file

This Addendum 1 document, issued by the Florida Department of Agriculture and Consumer Services, Division of Animal Industry, provides clarifications and revised specifications for the solicitation ITB DAI 26 27 17 for Comprehensive Mechanical Systems Maintenance and Repair Services at the Bronson Animal Disease Diagnostic Laboratory in Kissimmee, Florida. The addendum responds to six written questions submitted by potential bidders and replaces Appendix I (Preventative Maintenance Services) and Appendix II (Equipment Included in Service Agreement) in their entirety. Key clarifications include confirmation that no due diligence period will be provided at contract start, that service calls, repair labor, and parts for the Distech building automation system are included in scope, and that the Department will supply all HVAC system air filters. The previous fiscal year data indicates 21 reactive service calls, three compressor replacements over the past three years, and 256 pounds of refrigerant consumption. The revised preventative maintenance schedule specifies three annual visits for most equipment categories, with the Building Automation System requiring six visits annually. The equipment schedule lists 47 distinct mechanical units across five buildings (Buildings 100, 700, 800, 900, and 1000), including split systems, mini split systems, air-cooled chillers, boilers, water heaters, pumps, chilled water air handling units, walk-in coolers, exhaust fans, and a campus-wide Distech building automation system.

The revised equipment appendix provides detailed specifications for each unit, including manufacturer, model, serial number, and equipment age ranging from 2001 to 2025. Preventative maintenance tasks are categorized into Operational Maintenance and Comprehensive Maintenance for each equipment type, with comprehensive maintenance including additional procedures such as belt replacement, coil cleaning, refrigerant calculations, and thermal expansion valve adjustments. Boiler maintenance encompasses gas train component checks, igniter and flame rod inspections, and combustion blower evaluations, while chiller maintenance includes compressor performance checks, refrigerant control adjustments, and annual oil sampling. Building automation system maintenance requires monthly system monitoring, alarm investigation, trend report reviews, software updates, and backup battery replacement. The addendum incorporates these revised specifications into the original ITB and maintains all other terms and conditions of the solicitation unchanged.

View the file

Other files

File Type Posted
Appendix I.pdf PDF
ITB DAI 26 27 17_Final.pdf PDF
REVISED Appendix I.pdf PDF
Appendix II.pdf PDF
Mandatory Site Visit Short List.pdf PDF
Appendix III - CSA.pdf PDF
REVISED Appendix II.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum Date: July 29, 2026

Addendum Number: 1

Solicitation Number: ITB DAI 26 27 17

Solicitation Title: Comprehensive Mechanical Systems Maintenance and Repair Services - Bronson Animal Disease Diagnostic Laboratory

This Addendum provides the Department’s answers to written questions received by the deadline for the above-referenced solicitation.

Additionally, this Addendum replaces Appendix I – Preventative Maintenance (PM) Services in its entirety with Revised Appendix I – Preventative Maintenance (PM) Services, and replaces Appendix II – Equipment Included in Service Agreement in its entirety with Revised Appendix II – Equipment Included in Service Agreement, and are attached hereto.

Question Number

Question Answer

What is the total volume of reactive service call for the previous year?

There was a total of 21 calls during the 2025-2026 fiscal year.

What is the number of compressor replacements completed over the last three (3) years?

There was a total of three (3) compressor replacements within the past three (3) years.

What is the total refrigerant used for the previous year?

The Department used 256 lbs. of refrigerant in the previous year.

Will there be a ‘due diligence’ period at the start of the contract to notify the customer of pre-existing issues?

There will be no due diligence period.

Can quotes be provided on items needing repair prior to coverage beginning?

The Department seeks competitive bids for the complete scope of work as outlined in the ITB, including attachments and appendices.

Are service calls, repair labor, and repair parts included for the Distech building automation system?

Yes. Service calls, repair labor, and repair parts are included for the Distech building automation system.

Can you confirm the customer is supplying all air filters including those for the chilled water AHU?

The Department will provide all HVAC system air filters. Please refer to Section 1.2, Scope of Work, of the ITB.

BID NUMBER: ITB DAI 26 27 17

REVISED APPENDIX I

PREVENTATIVE MAINTENANCE (PM) SERVICES

PM Service Frequency Minimum Visits per Year

Equipment Number of Systems Comprehensive Service Operational Service

Package Units 3 1 3

Split Systems 5 1 3

Walk-In Cooler 1 1 3

Mini Split Systems 5 1 3

Air Cooled Chillers 4 1 3

Boilers 3 1 3

Pumps 2 1 3

Chiller Air Handling Units 6 1 3

Controls System 1 0 2

Water Heater 4 1 3

Exhaust Fans 7 1 3

Building Automation

(DISTECH)

1 1 6

Package Units, Split Systems, & Walk-in Cooler

Operational Maintenance

• Install customer-provided filters during scheduled maintenance visits.

• Clean drain lines and condensate pans.

• Clean all pressurization sensors.

• Inspect evaporator and condenser coils for obstruction and dirt.

• Test all contactors and starters.

• Confirm proper operation of condensate flow.

• Test and record all compressor and motor amperages.

• Test and record return and supply temperatures.

• Lubricate fan bearings.

• Check blower motor belts and adjust or replace as required.

• Clean condensate pumps.

• Check operation controls and safety controls.

• Check thermal expansion valve for proper superheat.

• Check electrical connections for any signs of wear or overheating.

• Tighten all electrical connections.

• Visually leak check all refrigerant piping.

• Observe overall condition and report any deficiencies that are discovered.

• Provide written report and XOI vision share links.

Comprehensive Maintenance

• Perform all items listed in Operational inspections.

• Replace all belts on the blower motor, if applicable.

• Clean all metal inlet screen filters.

• Calculate subcool/superheat refrigerant line temperatures.

• Tighten set screws on fan assembly locking collars.

• In-place cleaning of condenser coils.

• In-place cleaning of the surface of evaporator coils, if accessible.

• Check thermal expansion valve sensing bulb for proper security and insulation.

• Energy Wheel Cleaning for both RTUs on building 1000 annual cleaning. Vendor will document proper reinstallation.

Mini Splits

Operational Maintenance

• Clean and wash all air filters.

• Clean drain lines and condensate pans.

• Inspect evaporator and condenser coils for obstruction and dirt.

• Test all contactors and starters.

• Confirm proper operation of condensate flow.

• Test and record all amperages.

• Test and record return and supply temperatures.

• Check operation controls and safety controls.

• Clean condensate pumps.

• Check thermal expansion valve for proper superheat.

• Check electrical connections for any signs of wear or overheating.

• Tighten all electrical connections.

• Observe overall condition and report any deficiencies that are discovered.

• Provide written report and XOI vision share links.

Comprehensive Maintenance

• Perform all items listed in Operational inspections.

• Tighten set screws on fan assembly locking collars.

• In-place cleaning of condenser coils.

• In-place cleaning of the surface of evaporator coils, if accessible.

• Check thermal expansion valve sensing bulb for proper security and insulation, if accessible.

Exhaust Fans & Supply Fans

Operational Maintenance

• Adjust or belt tension as needed.

• Lubricate bearings, if applicable.

• Test motor amperages.

• Test all starters and contactors.

• Check operation controls and safety controls.

• Inspect electrical connections for any signs of wear or overheating; tighten as needed.

• Observe overall condition and report any deficiencies that are discovered.

Comprehensive Maintenance

• Perform all items listed in Operational inspections.

• Replace belts.

Boilers

Operational Maintenance

• Check operation and calibration of gas train components.

• Check igniter and flame rod assembly.

• Check pilot and burner orifices as required.

• Check combustion blower.

• Check for water leaks.

• Check burner operation sequence.

• Check operating and safety controls.

• Check and tighten all electrical connections.

• Check starters and contactors for wear.

• Lubricate all motors and fan bearings.

• Check safety relief valve.

• Check gauges for accuracy.

• Check low water cutoff control.

• Check / adjust water feed valve.

• Check circulator pump operation.

• Check expansion tank(s).

• Observe overall condition and report any deficiencies that are discovered.

• Provide written report and XOI vision share links.

Comprehensive Maintenance

• Adjust igniter and flame rod assembly.

• Clean pilot and burner orifices as required.

• Clean combustion blower and check efficiency.

• Adjust low water cutoff control.

• Clean the heat sink with dry nitrogen.

Air Cooled Chillers

Operational Maintenance

• Check performance of compressor, condenser, and evaporator.

• Check and adjust refrigerant controls.

• Check and adjust safety controls.

• Assure that the power supply to the chiller is secured at the main disconnect.

• Check equipment for any signs of leaks.

• Check and ensure proper refrigerant charge.

• Check compressor for proper oil levels.

• Check for excess noise or vibration.

• Check operation of automatic controls.

• Check the condition of electrical controls and wiring.

• Check and record operating conditions.

• Observe overall condition and report any deficiencies that are discovered.

Comprehensive Maintenance

• Perform all tasks listed in the Operational inspections.

• Inspect and calibrate operating controls.

• Clean condenser coils.

• Inspect all safety controls.

• Torque all electrical contacts.

• Megohm chiller motor and oil pump.

• Wipe down the exterior of the chiller and remove any debris from the chiller area.

• Observe overall condition and report any deficiencies that are discovered.

• Take oil sample for analysis (performed once during operating season).

Chilled Water AHUs

Operational Maintenance

• Purchase and replace all pre-filters (excludes final/HEPA filters unless stated otherwise).

• Lubricate fan bearings.

• Clean drain lines and pans.

• Insect blower wheel operation.

• Insect starter contactors and connections.

• Inspect evaporator and condenser coils for obstruction and dirt.

• Confirm proper condensate flow.

• Check blower motor belts and adjust as required.

• Tighten electrical connections.

• If unit has a VFD, inspect all connections.

• Check operation controls and safety controls.

• Verify proper system pressures and temperatures.

• Observe overall condition and report any deficiencies that are discovered.

• Provide written report and XOI vision share links.

Comprehensive Maintenance

• Perform all items listed in Operational inspections.

• Replace all belts on the blower motor, if applicable.

• Tighten set screws on fan assembly locking collars.

• In-place cleaning of the surface of evaporator coils, if accessible.

• Clean the heat sink with dry nitrogen.

• Check programming.

• Check all internal parts for wear.

• Observe overall condition and report any deficiencies that are discovered.

Pumps

Operational Maintenance

• Verify pumps are operating properly.

• Verify proper pump rotation.

• Inspect seals for any signs of leakage.

• Verify pumps are securely mounted.

• Verify there is no abnormal noise during pump operation.

• Check pump bearings and fittings for proper lubrication. Lubricate as necessary.

• Check temperature and pressures on pump gauges and record readings.

• Check expansion tank for proper operating level, verify operating pressures.

• Inspect the starter contacts and wiring for any signs of wear or overheating.

• Verify Variable Frequency Drives are operating properly and set points are set per manufacturer’s recommendations (if applicable).

• Observe overall condition and report any deficiencies that are discovered.

Comprehensive Maintenance

• All steps performed in Operational inspection.

• Test changeover operation of pump package (if applicable).

• Check for proper voltage and amperage draw on pump motors.

• Check electrical connections (tighten as necessary), contacts and fuses.

• Clean VFD interior and change filters (if necessary).

• Observe overall condition and report any deficiencies that are discovered.

Building Automation Systems (DISTECH)

Operational Maintenance

• Log into systems

• Check all dashboards for alarms.

• Print alarm reports.

• Investigate and correct any alarms.

• Review automation trend reports to identify any trends indicating possible equipment failure.

• Verify all systems are automating efficiently.

• Document any adjustments made to Automation Systems.

• Make adjustments to ensure consistent temperatures, humidity, airflows, water temperatures and building pressures as required for laboratory operations.

Comprehensive Maintenance

• Perform any system and software updates as required.

• Review all graphics and setpoints are reporting correctly.

• Review any system audit trails, note adjustments corresponding to service records.

• Check electrical connections (tighten as necessary)

• Replace back up batteries for controls.

[REMAINDER OF PAGE LEFT BLANK INTENTIONALLY]

REVISED APPENDIX II

EQUIPMENT INCLUDED IN SERVICE AGREEMENT

Equipment Building ID Equipment

ID

Equipment

Make Model

Equipment Serial Number

Equipment Age

Split System – 7.5 Tons BLD 100 UNIT 1 CARRIER 38ARZ007---501 5103G10055 2003

Split System – 4 Tons BLD 100 UNIT 2 PAYNE PH14NB048-A 2917X88791 2017

Package Unit – 4 Tons BLD 100 RTU 1 CARRIER 282105-100 1296Y6217 2025

Split System – 2.5 Tons BLD 100 RTU 2 DAIKIN DSH0603D0000013AA 2410150412 2001

Air Cooled Chillers – 80 Tons BLD 100 CHILLER 1 CARRIER 30RAP0805FB00314 0117Q85156 2017

Chilled Water AHUs BLD 100 AHU 1 CARRIER 39MW10W02486 5016U36967 2016

Chilled Water AHUs BLD 100 AHU 2 CARRIER 39MN10W0 781897 2016

Chilled Water AHUs BLD 100 AHU 3 CARRIER 2V781897 5016U3696 2016

Split System – 5 Tons BLD 100 UNIT 3 CARRIER FB4CNF060T00AD 2113A88536 2013

Split System – 7 Tons BLD 100 UNIT 4 CARRIER 40RUQA08A2A6 5114U07443 2014

Water Heater BLD 100 WH 1 LOCHINVAR SNR126-065 NA 2018

Refrigeration System BLD 700 RU 1 HEATCRAFT BST040M6C T08M06227 2011

Air Cooled Chillers –110 Tons BLD 700 CHILLER 1 YORK YCAL0114EC46XC 2NTM002557 2022

Air Cooled Chillers – 110 Tons BLD 700 CHILLER 2 YORK QTC3120THE17X 82012M27640 2008

2 Pumps – 7.5HP BLD 700 PUMP 1 WEG 00718E73E218JM 1064032712 2012

2 Pumps – 7.5HP BLD 700 PUMP 2 WEG 00718ET3E213JM-S 1065517968 2012

Mini Split System – 1 Ton BLD 700 UNIT 1 FRIEDRICH PHSR24A3A 2104F03117 2021

Air Handler BLD 700 AHU 4 NORTEK ITF-RDH18 N001806-001 2018

Boiler BLD 700 BOILER 1 LOCHINVAR BWR1-060C-001 B00190 2003

Chilled Water AHUs BLD 900 AHU 5 YORK K6351799 56317X145 2008

Air Cooled Chiller – 15 Ton BLD 800 CHILLER 5 CARRIER 30RAP0185FC21F00 2523Q76254 2024

Walk-in Cooler BLD 900

WALK-IN

COOLER

THERMMAX CCR-2-C-V-R2-0-CD-HG-STD S09-501-1 2009

Equipment Building ID Equipment

ID

Equipment

Make Model

Equipment Serial Number

Equipment Age

Chilled Water AHUs BLD 800 AHU 6 TRAINE K08C3519 K08C35312 2006

Package Unit – 16 Tons BLD 1000 RTU 1 ANNEXAIR ERP-E-16-EW12 3074-01-1118 2019

Package Unit – 7.5 Tons BLD 1000 RTU 2 MODINE MPRO7BE2B2 S1135214310 2019

Mini Split System – 3.5 Ton BLD 1000 RTU 3 MITSUBISHI PUY-A42NKA7 89U02303D 2019

Mini Split System – 1.5 Ton BLD 1000 UNIT 1 MITSUBISHI PUY-A18NKA7 8YU08956A 2018

Mini Split System – 1.5 Ton BLD 1000 UNIT 2 MITSUBISHI PUY-A18NKA7 8YU08955A 2018

Mini Split System – 1.5 Ton BLD 1000 UNIT 3 MITSUBISHI PUY-A18NKA7 7XU04416A 2017

Pump BLD 1000 PUMP 1 BALDOR EM3611T-G F1809200630 2018

Pump BLD 1000 PUMP 2 BALDOR EM3611T-G F1808232949 2018

Boiler BLD 1000 BOILER 1 LOCHINVAR FTX600L 1905113508215 2018

Boiler BLD 1000 BOILER 2 LOCHINVAR FTX600L 1905113508216 2018

Water Heater BLD 1000 WH 1 LOCHINVAR SNR126-065 1847112615162 2018

Water Heater BLD 1000 WH 2 LOCHINVAR SNR126-065 NA 2018

Water Heater BLD 1000 WH 3 LOCHINVAR SNR126-065 NA 2018

Water Heater BLD 1000 WH 4 LOCHINVAR SNR126-065 NA 2018

Exhaust Fan BLD 700 EF-1 PLASTIFER AXJ-FSW1825 19870-1 2023

Exhaust Fan BLD 700 EF-2 PLASTIFER AXJ-FSW1825 19870-2 2023

Exhaust Fan BLD 900 EF-3 .4 GREENBECK VK-MD-BAP 11604618 2009

Exhaust Fan BLD 900 EF- GREENBECK VK-MD-BAP 11604619 2009

Exhaust Fan BLD 100 EF-H COOK 180 CPS S 046SG64676-01-0000701 2016

Exhaust Fan BLD 100 EF-S COOK 180 CPS S 046SG64676-01-0002501 2016

Exhaust Fan BLD 100 EF-V COOK 150 CPS S 046SG64676-01-0004301 2016

Building Automation System (DISTECH) All Campus NA NA NA NA NA

[REMAINDER OF PAGE LEFT BLANK INTENTIONALLY]

This Addendum is hereby incorporated into and made a part of the above noted Invitation to Bid.

All other terms, conditions, and specifications of this Invitation to Bid will remain the same. All questions regarding this Addendum should be submitted in writing to the Procurement Officer at Bids@FDACS.gov or contact the Procurement Office at (850) 617-7180.

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Protests must be filed with the Department’s Agency Clerk. Filings may be made physically at:

Florida Department of Agriculture and Consumer Services The Holland Building

600 South Calhoun Street Tallahassee, Florida 32399 mailto:Bids@FDACS.gov

File details come from the government source that posted it. Updated .