Addendum_02_RFQ_260009B001_2026-04-14.pdf
PDF 124 KB Posted
- Solicitation number
- S-24800-00016475
- Issued by
- Clackamas County, Oregon
About this file
This is Addendum 2 to Request for Quotation (RFQ) 260009B001 issued by the Oregon Military Department's Camp Rilea Armed Forces Training Center in Warrenton, Oregon. The addendum provides clarification regarding the cementitious urethane flooring system specification for enlisted barracks restroom and shower areas in Buildings 7023 and 7024. The RFQ does not prescribe a specific thickness for the resinous flooring system; instead, it establishes performance-based requirements for a cementitious urethane system suitable for continuously wet restroom and shower environments. Offerors are responsible for proposing a complete flooring system, including appropriate thickness, that meets the performance requirements outlined in the RFQ and is installed in accordance with manufacturer recommendations. The addendum requires all prospective offerors to acknowledge receipt and understanding of this clarification and submit the acknowledgment with their quotes.
This addendum clarifies that system thickness shall be determined by the manufacturer's requirements to achieve the specified performance characteristics, ensuring that contractors design systems appropriate for the intended wet environment application. All other terms and provisions of the original RFQ remain in full force and effect. Offerors must initial the acknowledgment section of the addendum to confirm they have read, understood, and considered the clarifications in preparing their quotations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OREGON MILITARY DEPARTMENT
CAMP RILEA ARMED FORCES TRAINING CENTER
DEPARTMENT OF PUBLIC WORKS
91204 RILEA OREGON RD.
WARRENTON, OREGON 97146-7268
Addendum 2 – RFQ 260009B001 Page 1 of 1
April 14, 2026
SUBJECT: Addendum Number 2 to RFQ 260009B001 – Camp Rilea Enlisted Barracks Flooring Replacement – Buildings 7023 and 7024, Warrenton, Oregon, OregonBuys Bid # S-24800-00016475.
TO ALL PROSPECTIVE OFFERORS AND ALL OTHERS CONCERNED
1. This Addendum Number 2 is issued to provide clarification regarding the specified resinous flooring system.
Except as clarified by this Addendum Number 2, all the terms and provisions of the RFQ remain in full force and effect.
2. Clarification No. 2 – Flooring System Thickness
The Request for Quotes (RFQ) does not prescribe a specific thickness for the cementitious urethane flooring system.
The flooring system specified in the RFQ is a performance-based cementitious urethane (urethane concrete) system intended for wet restroom and shower environments.
Offerors are responsible for proposing a complete flooring system, including system thickness, that meets the performance requirements outlined in the RFQ.
The proposed system shall be suitable for continuously wet restroom and shower environments and shall be installed in accordance with the manufacturer’s recommendations.
System thickness shall be as required by the manufacturer to achieve the specified performance characteristics of the flooring system.
3. This Addendum must be acknowledged and submitted with the Quote.
By acknowledging this Addendum, the Offeror confirms that it has read and understands the clarifications provided herein and has considered them in the preparation of its Quote.
Offeror: Initial here ____________
File details come from the government source that posted it. Updated .