Addendum_01_Combined_PDF_Chicopee2011.pdf

PDF 2 MB Posted

Attached to
Chicopee Armory Renovations General Contractor Bids
Solicitation number
S124834-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is an addendum to the contract drawings and specifications for the Massachusetts Army National Guard (MAANG) Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The addendum includes changes to the table of contents, specifications, and project drawings. Key changes include the addition of new sections for roof accessories, signage, and HVAC instrumentation and controls, as well as revisions to sections on windows, gypsum board, resilient tile flooring, vaults, and mechanical systems. The addendum also includes various sketches and drawings to clarify the changes. The overall project involves the rehabilitation of the Chicopee Armory.

The document does not provide details on pricing, set asides, incumbents, funding sources, or other commercial terms. It focuses solely on the technical specifications and drawings for the rehabilitation project.

View the file

Other files

File Type Posted
AE121-10090.pdf PDF
ED101-10090.pdf PDF
Sub_Bid_Result_Chicopee_2011.xls XLS spreadsheet
AE102-10090.pdf PDF
Business_Reference_Form_GC_Chicopee2011.doc DOC document
230719_hvac_pipe_ins.pdf PDF
EP651-10090.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Electrical.doc DOC document
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Metal_Windows.doc DOC document
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
014000_FL-QUALITY_REQUIREMENTS.pdf PDF
236313_air_cooled_condensers.pdf PDF
AE311-10090.pdf PDF
020800_Asbestos_Technical_Specifications.pdf PDF
E-601-10090.pdf PDF
230001-HVAC_FSB.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Resilient_Floors.doc DOC document
017900_FL-DEMONSTRATION_AND_TRAINING.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
AE401-10090.pdf PDF
SF502-10090.pdf PDF
070002-ROOFING_AND_FLASHING_FSB.pdf PDF
265100_Lighting_Fixtures.pdf PDF
030130_FL-MAINTENANCE_OF_CAST-IN-PLACE_CONCRETE.pdf PDF
220001-PLUMBING-FSB.pdf PDF
013100_FL-PROJECT_MANAGEMENT_AND_COORDINATION.pdf PDF
238900_Louvers_and_Vents.pdf PDF
SF101-10090.pdf PDF
016000_FL-PRODUCT_REQUIREMENTS.pdf PDF
M-651-10090.pdf PDF
GI001-10090.pdf PDF
Ch_149_FORM_FOR_GENERAL_BID_MIL_Chicopee2011.doc DOC document
093000_FL-TILING_v1.pdf PDF
088000_FL-GLAZING_v1.pdf PDF
081113_FL-HOLLOW_METAL_DOORS_AND_FRAMES_v1.pdf PDF
231123_fuel_gas_piping.pdf PDF
PL101-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
224000_plumbing_fixtures_JPB.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
220100_plumbing_requirements_JPB.pdf PDF
232113_hydronic_piping.pdf PDF
EL101-10090.pdf PDF
232300_refrigerant_piping.pdf PDF
General_Bid_Tabulation_Chicopee_2011.xls XLS spreadsheet
220500_plumbing_materials_JPB.pdf PDF
262413_Switchboards.pdf PDF
092216_FL-NON-STRUCTURAL_META_FRAMING_v1.pdf PDF
X-100_SURVEY_CONTROL_PLAN.pdf PDF
AE611-10090.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAANG Chicopee Armory Rehabilitation MMD Project No. 985101

Chicopee, Massachusetts June 10, 2011

SMRT No. 10090-00 Addendum No. 1 Page 1 of 7

ADDENDUM NO. 1

TO

CONTRACT DRAWINGS AND SPECIFICATIONS

May 20, 2011

Massachusetts Army National Guard

Chicopee Armory Rehabilitation

SMRT PROJECT NO. 10090-00

The specifications and drawings are amended herein. This addendum consists of 51 pages. These items replace original items previously issued or are to be added to the Bidding and Construction

Documents as indicated.

Bidders are required to acknowledge receipt of this addendum on the BID FORM in the space provided. Failure to acknowledge all addenda may cause the bid to be considered not responsive to the invitation, which would require rejection of the Bid.

The Contract Documents for solicitation of Bids for the construction are hereby changed as follows:

PART I – PERTAINING TO THE SPECIFICATIONS:

1. Table of Contents

a. Delete section 03 01 30 MAINTENANCE AND CIP CARE in its entirety.

b. Add section 07 72 00 ROOF ACCESSORIES in its entirety.

c. Add section 10 14 00 SIGNAGE in its entirety.

d. Delete section 23 01 56 EXPANSION FITTINGS AND LOOPS FOR HVAC

PIPING in its entirety.

e. Delete section 23 11 23 FACILITY NATURAL GAS PIPING in its entirety.

2. Section 01 23 00 ALTERNATES

a. Revise 3.1.B.1. to read: Base Bid: Provide entry doors at Lobby and overhead door and louver at Boiler Room.

b. Revise 3.1.C.1. to read: Base Bid: Select masonry infill and repair at locations indicated on the Drawings including chimney and openings on West Elevation.

3. Section 03 01 30 MAINTENANCE AND CIP CARE

a. Delete section in its entirety.

4. Section 08 51 13 ALUMINUM WINDOWS

a. Add the following at 2.2:

SMRT No. 10090-00 Addendum No. 1 Page 2 of 7

H. Minimum Antiterrorism Performance Criteria: Windows shall meet the performance requirements below:

1. Computational Design Analysis Method: Windows shall resist a static load of 1 lb. per square inch applied perpendicular to the surface of the glazing and frame. Aluminum frame members may be designed based on 0.2% offset yield strength. Deformations shall not exceed l/60 of the unsupported member lengths. Equivalent static design loads for connections of the frames to the surrounding structure, the door hardware, associated internal door and frame connections, and glazing stop connections shall be 10.8 pounds per square inch for glazing panels with a vision area less than or equal to 10.8 square feet, and 4.4 pounds per square inch for glazing panels with a vision area greater than 10.8 square feet but less than or equal to 32 square feet.

(Vision area is defined as the area through which light may be seen.)

Connections and hardware may be designed based on ultimate strength for steel and 0.2% offset yield for aluminum. Ultimate strengths and yield strengths may be increased by a factor of 1.1 over specified values. In addition, all safety factors used in blast-resistant structural design may be removed except for safety factors relating to shear.

2. Standard Airblast Test Method: Each minimum antiterrorism window type shall be tested for evaluation of hazards generated from airblast loading in accordance with ASTM F 1642 by an independent testing agency regularly engaged in blast testing. For proposed windows that are of the same type as the tested system but of different size, the test results may be accepted provided the proposed door and frame size is within the range from 25% smaller to 10% larger in area, than the tested door and frame. Proposed windows of a size outside this range shall required testing to evaluate their hazard rating. Tested may be by shocktube or arena test. The test hall be performed on the entire proposed window, which shall include, but not be limited to, the glazing, it’s framing system and all anchorage devices.

Anchorage of the frame or subframe shall replicate the method of installation to be used for the project. The minimum airblast loading parameters for the test shall be as follows: Peak positive pressure of 5.8 psi and positive phase impulse of 41.1 psi-msec. The hazard rating for the proposed window systems, as determined by the rating criteria of ASTM F 1642, shall not exceed the “Very Low Hazard” rating (i.e. the “No Break,” “No Hazard,”

“minimal Hazard” and “Very Low Hazards” ratings are acceptable. “Low

Hazard” AND “High Hazard” ratings are unacceptable). Results of windows previously tested by test protocols other tha ASTM F 1642 may be accepted provided the required loading, hazard level rating and size limitations stated herein are met.

5. Section 08 71 00 DOOR HARDWARE

a. Revise the final hardware set listed 3.7.C. to read: HWS #10 – Passage Lockset

(Women’s Toilet) (retain information that follows)...

6. Section 09 29 00 GYPSUM BOARD

a. Revise 2.3.C. 1. to read:

1. Core: 5/8 inch, Type X

b. Add the following at 3.3.A.:

SMRT No. 10090-00 Addendum No. 1 Page 3 of 7

1. Moisture and Mold-Resistant Type: Wet areas without tile finish

2. Cementitious Backer Units: at tile finish

c. Revise 3.3.B to read:

B. Single –Layer Application:

d. Revise 3.4.A. to read:

A. Cementitious Backer Units: ANSI A108.11 at location indicated to receive tile.

e. Eliminate 3.4.B. and 3.4.C.

7. Section 096519 RESILIENT TILE FLOORING

a. Revise 3.4.D.1. to read: Apply three coats.

8. Section 10 14 00 SIGNAGE

Add section in its entirety.

9. Section 13 27 00 VAULTS

a. Delete 1.7.B.

b. Revise 2.2.A. to read:

A. General: Listed and labeled for GSA Federal Specification AA-V-2737.

c. Revise 2.2.B.1. to include item e. to read:

1. Custom Vault Corporation

d. Revise 2.2.C. to read:

1. C. Ventilating Ports: Comply with GSA-AA-D -600 with same classification as vault walls. Fabricate ports integral with wall panel. Include eight(8) port vent panels at locations coordinated with mechanical system requirements.

e. Revise 2.3.A. to read:

A. Security Vault Door Assembly: Comply with GSA-AA-D -600, listed and labeled.

1. Door Size 40 inches wide by 78 inches high

f. Revise 2.3.D. to read:

D. Emergency Vault Ventilators: Comply with GSA-AA-D -600 with same classification as vault walls. .

g. Revise 2.4.A. to read:

A. General: Provide hardware components as required for specified GSA listing. .

h. Revise 2.4.E. to read:

E,. Combination Locks for Security Door: GSA approved armory lock LS & G

2937. Electronic type, capable of no fewer than one million possible combinations.

i. Revise 2.4.K.2. to read:

2. Gates: Round or square, vertical, bar grille; with manufacturer’s standard finish.

j. Revise 3.3.C. to read:

C. Lightweight Vault Panels: Connet adjoining vault wall panesl by welding interior side and vertical corners of adjoining panels as required by GSA standards.

1. Five-Sided Construction: Connect vault wall panels to supporting slab by welding continuous 1-1/2 by 1-1/2 inch stell angle to wall panels and bolting angle to supporting slab.

2. Connect vault wall panels to vault ceiling panels at vertical corners by welding.

10. Section 23 01 56 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

a. Delete section in its entirety.

SMRT No. 10090-00 Addendum No. 1 Page 4 of 7

11. Section 23 11 23 FACILITY NATURAL GAS PIPING

a. Delete section in its entirety.

12. Section 23 09 00 HVAC INSTRUMENTATION AND CONTROLS

a. Replace section in its entirety.

13. Section 23 31 13 METAL DUCTS

a. Revise title and footer to read: 23 31 13.

14. Section 23 63 13 AIR-COOLED REFRIGERANT CONDENSERS

a. Add the following: 1.7 WARRANTIES

A. Manufacturer’s standard form in which the manufacturer agrees to repair or replace the compressor that fails in materials or workmanship with a period of five years from date of Substantial Completion.

B. Manufacturer’s standard form in which the manufacturer agrees to repair or replace components that fail in materials or workmanship with a period of one year from date of Substantial Completion.

15. Section 23 73 33 INDIRECT-FIRED H&V UNITS

a. Include 1.6.A. 2 to read:

2. Warranty Period for other components: Fans and other components shall have

Manufacturer’s standard, but not less than five years from date of Substantial

Completion.

PART II – PERTAINING TO THE DRAWINGS:

1. Drawing GI001

a. Abbreviations: Add the following:

DEMO DEMOLITION

EX EXISTING

RE REFERENCE

b. Revise A5 Partition Legend in accordance with sketch A-1

c. Revise the Drawing List as follows:

2. Add C-101 Civil Details

3. Relocate MD101 Mechanical Demolition Plan to proceed M-101

2. Drawing C-100 – Civil Site Plan

a. Replace in its entirety

3. Drawing C-101 – Civil Details

a. Include drawing in its entirety.

4. Drawing AD101

a. Revise note near column line F/1 to read: Demolish stair, Re: Civil

b. Revise notes near column lines C.1/5 and H/5 to read: “Remove sash operator”

c. Add Demolition Key Note 12 to vestibule west of Womens Toilet 122

d. Key Notes:

2. Add 12 to read: Demolish 9” X 9” floor tile, Re: specification section

020800

SMRT No. 10090-00 Addendum No. 1 Page 5 of 7

3. Add 13 to read: Demolish portion of concrete foundation and floor slab for installation of telephone and electrical service.

4. Add note 14 to read: Provide roof opening for rooftop equipment

5. Drawing AD102

a. Remove Demolition Key Notes in the entirety and substitute Demolition Key

Notes from AD101 as revised per addendum

b. Add note 14 near column lines B/2 and C.9/8

6. Drawing AE101

a. Replace in its entirety

7. Drawing AE102

a. Omit opening in south partition at Mechanical Platform.

8. Drawing AE201

a. Revise Key Note 1 to read:: Window Security Barrier: Operable barrier shall include 12 guage steel main frame supporting woven rod panel fabricated from low carbon, mild steel ¼” diameter rod, woven with 2 inch mesh. A 12 gauge sub-frame shall provide a rigid frame in which the main frame operates.

Provide three concealed electroplated steel hinges per screen. Provide a key lock for each screen with all screens to be keyed alike.. Finish shall be electrostatically applied thermoplastic, polyester powder coating in color to be selected from manufacturer’s standard. Submit shop drawings showing details of attachment to surround materials and elevations showing scope.

Install plumb and level with solid anchoring surface. Adjust to provide for smooth operation. Re: D1/AE621.

9. Drawing AE401 –

a. J1 Soffit Detail: Include note to read: At soffit on column line 8 between column lines G1 & H lines return soffit to bottom of beam such that fascia aligns with face of beam.

b. J5 Wall Section Detail: Revise tag at top leader to read: Ceiling or Beam, Re: AE

10. Drawing AE601 – Finish Schedule

a. J6 Room Finish Schedule and Interior Finish Legend: Revise per Sketch No. A-2.

b. Key Notes: Eliminate 2. In its entirety

11. Drawing AE611

a. Detail A1 Louver Elevations: At louver L1, revise height from Finished Floor to bottom of louver to 10’-0” and revise height of louver to 1’-4 and width of louver to

6’4”.

b. Door Schedule: At door 119 Boiler Room revise size to 6’-4” X 8’-0”.

12. Drawing AE621 –

a. Revise detail D1 per Sketch No. A-3.

13. Drawing SF101

a. Revise the Ceiling Platform Framing Plan A1/SF101 as shown on sketch S1.

b. Revise the Framing Notes A12/SF101 as shown on sketch S2.

SMRT No. 10090-00 Addendum No. 1 Page 6 of 7

14. Drawing SF502 – Structural Details

a. Revise the title at detail A5/SF502 as shown on sketch S3.

b. Add elevation A12/SF502 as shown on sketch S4.

c. Add sections E1/SF502, E4/SF502, E7/SF502, E10/SF502, E14/SF502, and

K1/SF502 as shown on sketches S5, S6, S7, S8, S9, and S10, respectively.

15. Drawing PL101

a. Revise in accordance with sketch P-1: Add MAU Condensate Drainage

b. Revise in accordance with sketch P-2: Add Hub Drain for Dehumidifier

16. Drawing PL501

a. Add detail K1 Hub Drain Detail per sketch P -3

b. Add Detail K4 Condensate Drain Detail per sketch P-4

c. Add Detail K5 Trap Primer Detail per sketch P-5

17. Drawing EP101 – Lower Level Power & Systems Plan

a. Added Keyed Notes to address devices and raceway in the Vault; data jacks in the

Team Rooms and conduits penetrating the foundation as shown on Sketch E-1.

b. Added power of the vault dehumidifier and data jacks in the Team Rooms as shown on Sketch E-2.

c. Revised receptacle locations near Team Room 3 as shown on Sketch E-2.

18. Drawing EL101 – Lower Level Lighting Plan

a. Added light fixtures in the vault as shown on Sketch E-3.

19. Drawing E-601 – Panel Schedules and Lighting Fixture Schedule

a. Added light fixture type "J" as shown on Sketch E-4.

20. Drawing EP651 – One Line Diagrams

a. Items 3 and 4 in the Cable Schedule shall be changed to read: “ Not Used”.

END OF ADDENDUM No. 1

Attachments: Section 07 72 00 ROOF ACCESSORIES

Section 10 14 00 SIGNAGE

Section 23 09 00 HVAC INSTRUMENTATION AND CONTROLS

Sketch No. A-1 Revised Partition Legend

Replacement drawing C-100 – Civil Site Plan

Drawing C-101 Civil Site Details

Replacement drawing AE101.

Sketch No A-2 Finish Revisions

Sketch No A-3 Window Security Barrier

Sketch No. E-1

Sketch No. E-2

Sketch No. E-3

SMRT No. 10090-00 Addendum No. 1 Page 7 of 7

Sketch No. E-4

Sketch No. S-1 Revised Ceiling Platform Framing Plan – A1/SF101

Sketch No. S-2 Revised Framing Notes A12/SF101

Sketch No. S-3 Revised Detail A5/SF502 Title

Sketch No. S-4 Added Detail A12/SF502 Elevation @ Door 119 & Louver L1

Sketch No. S-5 Added Section E1/SF502 Typical Section @MAU Support

Sketch No. S-6 Added Section E4/SF502

Sketch No. S-7 Added Section E7/SF502

Sketch No. S-8 Added Section E10/SF502

Sketch No. S-9 Added Section E14/SF502

Sketch No. S-10 Added Section K1/SF502

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO.985101

CHICOPEE, MASSACHUSETTS ISSUED FOR ADDENDUM #1 - 06/10/11

10090 SIGNAGE 101400 - 1

SECTION 101400

SIGNAGE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Interior Signage.

B. Related Sections include the following:

1. Division 22 Section "Identification for Plumbing Piping and Equipment" for labels, tags, and nameplates for plumbing systems and equipment.

2. Division 23 Section "Identification for HVAC Piping and Equipment" for labels, tags, and nameplates for HVAC systems and equipment.

3. Division 26 Section "Identification for Electrical Systems" for labels, tags, and nameplates for electrical equipment.

4. Division 26 Section "Interior Lighting" for illuminated Exit signs.

1.3 DEFINITIONS

A. ADA-ABA Accessibility Guidelines: U.S. Architectural & Transportation Barriers Compliance

Board's "Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and

Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines."

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Show fabrication and installation details for signs.

1. Show sign mounting heights, locations of supplementary supports to be provided by others, and accessories.

2. Provide message list, typestyles, and graphic elements, including tactile characters and

Braille, and layout for each sign.

C. Samples for Initial Selection: Manufacturer's color charts consisting of actual units or sections of units showing the full range of colors available for the following:

1. Acrylic sheet.

10090 SIGNAGE 101400 - 2

D. Samples for Verification: For each of the following products and for the full range of color, texture, and sign material indicated, of sizes indicated:

1. Acrylic Sheet: 8 by 10 inches for each color required.

E. Sign Schedule: Use same designations indicated on Drawings.

F. Qualification Data: For Installer and fabricator.

1.5 QUALITY ASSURANCE

A. Fabricator Qualifications: Shop that employs skilled workers who custom-fabricate products similar to those required for this Project and whose products have a record of successful in-service performance.

B. Source Limitations for Signs: Obtain each sign type indicated from one source from a single manufacturer.

C. Regulatory Requirements: Comply with applicable provisions in ADA-ABA Accessibility

Guidelines, NFPA 101 Life Safety Code and ICC/ANSI A117.1.

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of signs that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Deterioration of embedded graphic image colors and sign lamination.

2. Warranty Period: Five years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Acrylic Sheet: ASTM D 4802, Category A-1 (cell-cast sheet), Type UVA (UV absorbing).

B. Sign Types

1. Type BB2 and BB4 Room Identification

a. Dimensions: BB2 – 225 mm x 225 mm (9”x9”), BB4 – 75 mm x 225 mm (3”x9”).

b. Typography

1) Room number BB2, BB4: Helvetica medium, 37 mm (1-1/2”) numbers, flush left and accompanying Grade Two Braille.

2) Tenant name BB2: Upper and lower case Helvetica medium, 12 mm (1/2”) capital letter height, flush left.

3) Secondary Information BB2: Upper and lower case Helvetica regular, 12 mm (1/2”) capital letter height, flush left.

10090 SIGNAGE 101400 - 3

a) The insert area for the Type BB2 sign will accommodate four lines with a maximum of 21 characters per line.

2. Type BB7 Service Identification

a. Symbols: Black or red (where appropriate) symbols on white background

b. Dimensions: 225 mm x 150 mm (9”h x 6”w)

c. Typography

1) Service name: upper and lower case Helvetica medium, 16 mm (3/4”) capital letter height, centered on accompanying Grade Two Braille.

2) Message area accommodates max. of 9 characters per line.

C. Proprietary Product Names: Manufacturers names, model numbers, and colors are given to clarify the designers intent and are not intended to limit selection of similar products from acceptable manufacturers.

D. Manufacturers:

Welch Architectural Signage

7 Glascow Road

Scarborough, ME 04074

800-635-3506

ASI Sign Systems, Inc.

3890 W Northwest Highway

Dallas, TX 75220

800-ASI-SPEC

Apco Graphics

388 Grant Street SE

Atlanta, GA 30312

404-688-9000

UNICOR 2/90

5350 Corporate Grove Blvd. SE

Grand Rapids, MI 49512

888-534-5983

Area “B” Signage Schedule

SIGN

NUMBER

ARCHITECT

ROOM

NUMBER SIGN TEXT SIGN TYPE

1 101 Team Room 1 BB2

2 1021 Team Room 2 BB2

3 103 Team Room 31 BB2

4 104 Team Room 4 BB2

10 105 Team Room 5 BB2

11 106 Team Room 6 BB2

12 107 Team Room 7 BB2

13 108 Vault BB2

13 113 ADA Toilet/Shower (USE GRAPHIC/handicapped symbol) BB7

10090 SIGNAGE 101400 - 4

SIGN

NUMBER

ARCHITECT

ROOM

NUMBER SIGN TEXT SIGN TYPE

14 120 SIPRnet BB4

14 121 Electrical Room BB2

15 123 Tel BB4

E. Changeable Message Inserts: Fabricate signs to allow insertion of changeable messages in the form of transparent covers with paper inserts printed by Owner.

1. .

F. Tactile and Braille Sign: Manufacturer's standard process for producing text and symbols complying with ADA-ABA Accessibility Guidelines and with ICC/ANSI A117.1. Text shall be accompanied by Grade 2 Braille. Produce precisely formed characters with square-cut edges free from burrs and cut marks; Braille dots with domed or rounded shape.

1. Panel Material: Opaque acrylic sheet.

2. Raised-Copy Thickness: Not less than 1/32 inch.

G. Colored Coatings for Acrylic Sheet: For copy, background, and frame colors, provide colored coatings, including inks, dyes, and paints, that are recommended by acrylic manufacturers for optimum adherence to acrylic surface and are UV and water resistant for five years for application intended.

1. Color: As selected by Architect from manufacturer's full range.

2.2 FABRICATION

A. General: Provide manufacturer's standard signs of configurations indicated.

1. Mill joints to tight, hairline fit.

2. Preassemble signs in the shop to greatest extent possible. Disassemble signs only as necessary for shipping and handling limitations. Clearly mark units for reassembly and installation, in location not exposed to view after final assembly.

3. Conceal fasteners if possible; otherwise, locate fasteners where they will be inconspicuous.

2.3 FINISHES, GENERAL

A. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

10090 SIGNAGE 101400 - 5

2.4 ACRYLIC SHEET FINISHES

A. Colored Coatings for Acrylic Sheet: For copy, background, and frame colors, provide colored coatings, including inks, dyes, and paints, that are recommended by acrylic manufacturers for optimum adherence to acrylic surface and that are UV and water resistant for five years for application intended.

2.5 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work.

B. Verify that items, including anchor inserts, are sized and located to accommodate signs.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

2.6 INSTALLATION

A. Locate signs and accessories where indicated, using mounting methods of types described and complying with manufacturer's written instructions.

1. Interior Wall Signs: Install signs on walls adjacent to latch side of door where applicable.

Where not indicated or possible, such as double doors, install signs on nearest adjacent walls. Locate to allow approach within 3 inches of sign without encountering protruding objects or standing within swing of door.

B. Wall-Mounted Signs: Comply with sign manufacturer's written instructions except where more stringent requirements apply.

1. Hook-and-Loop Tapes: Mount signs to smooth, nonporous surfaces.

2. Silicone-Adhesive Mounting: Attach signs to irregular, porous, or vinyl-covered surfaces.

3. Mechanical Fasteners: Use non-removable mechanical fasteners placed through predrilled holes. Attach signs with fasteners and anchors suitable for secure attachment to substrate as recommended in writing by sign manufacturer.

2.7 CLEANING AND PROTECTION

A. After installation, clean soiled sign surfaces according to manufacturers’ written instructions.

Protect signs from damage until acceptance by Owner.

END OF SECTION 101400

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101

CHICOPEE, MASSACHUSETTS RE-ISSUED FOR ADDENDUM #1

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-1

SECTION 230900

HVAC INSTRUMENTATION AND CONTROLS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

B. The requirements of Section 230100, “Basic Mechanical Requirements” apply to work defined by this Section.

C. The requirements of Section 230500, “Basic Mechanical Materials and Methods” apply to work defined by the Section.

1.2 SUMMARY

A. This Section includes control equipment for HVAC systems and components, including control components for terminal heating and cooling units not supplied with factory-wired controls.

B. Related Sections include the following:

1. Division 23, Section 230993 "Sequence of Operation" for requirements that relate to this

Section.

2.

1.3 DEFINITIONS

A. DDC: Direct-digital controls.

B. I/O: Input/output.

C. LAN: Local area network.

D. LonWorks: A control network technology platform for designing and implementing interoperable control devices and networks.

E. MS/TP: Master-slave/token-passing.

F. PC: Personal computer.

G. PICS: Protocol Implementation Conformance Statement.

H. PID: Proportional plus integral plus derivative.

I. RTD: Resistance temperature detector.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-2

1.4 SYSTEM DESCRIPTION

A. Control system consists of sensors, indicators, actuators, final control elements, interface equipment, other apparatus, and accessories to control mechanical systems.

1.5 SUBMITTALS

A. Product Data: Include manufacturer's technical literature for each control device. Indicate dimensions, capacities, performance characteristics, electrical characteristics, finishes for materials, and installation and startup instructions for each type of product indicated.

1. Each control device labeled with setting or adjustable range of control.

B. Shop Drawings: Detail equipment assemblies and indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

1. Schematic flow diagrams showing fans, pumps, coils, dampers, valves, and control devices.

2. Wiring Diagrams: Power, signal, and control wiring. Differentiate between manufacturer-installed and field-installed wiring.

3. Details of control panel faces, including controls, instruments, and labeling.

4. Written description of sequence of operation.

5. Schedule of dampers including size, leakage, and flow characteristics.

6. Schedule of valves including leakage and flow characteristics.

7. Trunk cable schematic showing programmable control unit locations and trunk data conductors.

8. Listing of connected data points, including connected control unit and input device.

9. System graphics indicating monitored systems, data (connected and calculated) point addresses, and operator notations.

10. System configuration showing peripheral devices, batteries, power supplies, diagrams, modems, and interconnections.

C. ASHRAE BACnet Statement: PICS for each DDC system component (panel, zone controller, field devices, and operator workstation) proposed.

D. Samples: For each color required, of each type of thermostat cover.

E. Software and Firmware Operational Documentation: Include the following:

1. Software operating and upgrade manuals.

2. Program Software Backup: On a magnetic media or compact disc, complete with data files.

3. Device address list.

4. Printout of software application and graphic screens.

5. Software license required by and installed for DDC workstations and control systems.

F. Software Upgrade Kit: For Owner to use in modifying software to suit future power system revisions or monitoring and control revisions.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-3

G. Field Test Reports: Indicate and interpret test results for compliance with performance requirements.

H. Maintenance Data: For systems to include in maintenance manuals specified in Division 1.

Include the following:

1. Maintenance instructions and lists of spare parts for each type of control device and compressed-air station.

2. Interconnection wiring diagrams with identified and numbered system components and devices.

3. Keyboard illustrations and step-by-step procedures indexed for each operator function.

4. Inspection period, cleaning methods, cleaning materials recommended, and calibration tolerances.

5. Calibration records and list of set points.

I. Qualification Data: For firms and persons specified in "Quality Assurance" Article.

J. Project Record Documents: Record actual locations of control components, including control units, thermostats, and sensors. Revise Shop Drawings to reflect actual installation and operating sequences.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Must have a minimum of 5 years experience in the installation of direct digital control systems. Installer must be either of direct employ by the controls manufacturer or be authorized via contractual relationship with the controls manufacturer. Installers purchasing through distributors are not approved. The installer must have the in-house capability to engineer, program, project manage, start-up and commission as well as service and maintenance of direct digital control systems.

B. Manufacturer Qualifications: A firm experienced in manufacturing automatic temperature-control systems similar to those indicated for this Project and with a record of successful in-service performance.

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

D. Comply with NFPA 90A, "Installation of Air Conditioning and Ventilation Systems."

E. Protocols and Communication: All controls system components shall be capable of communicating to achieve the sequences and derive the appropriate information to meet the intent of these documents and drawings. The control system shall be coordinated with all system components, major pieces of equipment . This shall include the appropriate conversion products to ensure that systems operating with different operating protocols communicate and transfer information freely, correctly and completely.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-4

1.7 DELIVERY, STORAGE, AND HANDLING

A. Factory-Mounted Components: Where control devices specified in this Section are indicated to be factory mounted on equipment, arrange for shipping of control devices to unit manufacturer.

1.8 COORDINATION

A. Coordinate location of thermostats, humidistats, and other exposed control sensors with plans and room details before installation.

B. Coordinate supply of conditioned electrical circuits for control units and operator workstation.

C. Coordinate equipment with Division 26 Section "Panelboards" to achieve compatibility with starter coils and annunciation devices.

D. Coordinate equipment with Division 26 Section "Motor-Control Centers" to achieve compatibility with motor starters and annunciation devices.

1.9 EXCLUSIONS

A. Mercury containing products and materials are not permitted to be used for any of the controls functions indicated herein.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

1. Control Systems Components:

a. Air Monitor Corp.

b. Atkomatic Valve Company, Inc.

c. BEC Controls Corp.

d. Belimo Aircontrols (USA), Inc.

e. CEA Instruments Inc.

f. Channel Products Inc.

g. Condyne Technology, Inc.

h. Delta Controls Inc.

i. DGH Systems, LLC

j. Diversified Electronics, Inc.

k. Ebtron, Inc.

l. Energyline Systems; Industrial Products Group.

m. Enerstat Corp.

n. Erie Controls.

o. Functional Devices Inc.

http://www.specagent.com/LookUp/?ulid=3262&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811850&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811853&mf=04&src=wd

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-5

p. Gems Sensors.

q. General Eastern Instruments, Inc.

r. Greystone Energy Systems Inc.

s. Hayward Industrial Products, Inc.

t. Heat-Timer Corporation.

u. Honeywell International Inc.; Home & Building Control.

v. HyCal Sensing Products.

w. ICM Corp.

x. Intec Controls Corp.

y. Johnson Controls, Inc.; Controls Group.

z. KMC Controls/Kreuter Manufacturing Company.

aa. Landis & Staefa, Inc.

bb. Leslie Controls, Inc.

cc. Magnatrol Valve Corporation.

dd. MAMAC Systems, Inc.

ee. Paragon Electric Co., Inc.

ff. Parker Hannifin Corp.; Skinner Valve Division.

gg. RAM Electronics Corp.

hh. RDF Corporation.

ii. Sauter Controls Corporation.

jj. Sensidyne, Inc.

kk. Siemens Building Technologies, Inc.

ll. Sherwood Products, Inc.

mm. Spence Engineering Company, Inc.

nn. SSAC Inc.

oo. TCS/Basys Controls.

pp. Texas Instruments, Inc.; Commercial Sensors & Controls.

qq. Thunder Scientific Corporation.

rr. Time Mark Corporation.

ss. Tour & Andersson Control, Inc.

tt. TSI Inc.; Environmental Measurements & Controls Div.

uu. Uni-Line North America; Robertshaw Division.

vv. Vaisala, Inc.

ww. Valvcon Corporation.

xx. Vent Products Co., Inc.

2. Electric, Electronic, and DDC Systems:

a. Alerton Inc.

b. Andover Controls Corporation.

c. Automated Logic Corporation.

d. Auto-Matrix, Inc.; Auto-Flow Division.

e. CSI Control Systems International, Inc.

f. Danfoss Automatic Controls.

g. Delta Controls Inc.

h. EDA Controls Corp.

i. Electronic Systems USA, Inc.

j. G C Controls, Inc.

k. Honeywell International Inc.; Home & Building Control.

l. Impact Energy Controls Corp.

m. Johnson Controls, Inc.; Controls Group.

http://www.specagent.com/LookUp/?uid=123456824774&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824776&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824779&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811857&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824782&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811861&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811862&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824790&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811866&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811870&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811845&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811847&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811848&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811850&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811851&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811852&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824776&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811855&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824779&mf=04&src=wd

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-6

n. KMC Controls/Kreuter Manufacturing Company.

o. Landis & Staefa, Inc.

p. Luwa Bahnson Inc.

q. McQuay International.

r. Neles-Jamesbury.

s. Pneuline Controls.

t. Scientific-Atlanta, Inc.; Control Systems Div.

u. Siebe Environmental Controls; Barber-Coleman/Robertshaw Products.

v. Solidyne Corp.

w. TCS/Basys Controls.

x. Teletrol Systems Incorporated.

y. Trane; Worldwide Applied Systems Group

z. Triangle MicroSystems, Inc.

aa. Uni-Line North America; Robertshaw Division.

2.2 DDC EQUIPMENT

A. Application Software: Include the following:

1. Operator system access levels via software password.

2. Database creation and support.

3. Dynamic color graphic displays.

4. Alarm processing.

5. Event processing.

6. Automatic restart of field equipment on restoration of power.

7. Data collection.

8. Maintenance management.

B. Control Units: Modular, comprising processor board with programmable, nonvolatile, random-access memory; local operator access and display panel; integral interface equipment; and backup power source.

1. Units monitor or control each input/output point; process information; execute commands from other control units, devices, and operator stations; and download from or upload to operator station.

2. Stand-alone mode control functions operate regardless of network status. Functions include the following:

a. Global communications.

b. Discrete/digital, analog, and pulse input/output.

c. Monitoring, controlling, or addressing data points.

d. Testing and developing control algorithms without disrupting field hardware and controlled environment.

C. Local Control Units: Modular, comprising processor board with electronically programmable, nonvolatile, read-only memory; and backup power source.

1. Units monitor or control each input/output point; process information; and download from or upload to operator station.

http://www.specagent.com/LookUp/?uid=123456811857&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811859&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824786&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811863&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811866&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811868&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456824792&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456811871&mf=04&src=wd

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-7

2. Stand-alone mode control functions operate regardless of network status. Functions include the following:

a. Discrete/digital, analog, and pulse input/output.

b. Monitoring, controlling, or addressing data points.

D. Include and implement the following capabilities from the control units:

1. Units of Measure: Inch-pound and SI (metric).

2. Programming Application Features: Include trend point, alarm messages, weekly scheduling, and interlocking.

2.3 CONTROL PANELS

A. Local Control Panels: Unitized cabinet with suitable brackets for wall or floor mounting, located adjacent to each system under automatic control. Provide common keying for all panels.

1. Fabricate panels of 0.06-inch thick, furniture-quality steel, or extruded-aluminum alloy, totally enclosed, with hinged doors and keyed lock and with manufacturer's standard shop-painted finish.

2. Panel-Mounted Equipment: Temperature and humidity controllers, relays, and automatic switches; except safety devices. Mount devices with adjustments accessible through front of panel.

3. Door-Mounted Equipment: Flush-mount (on hinged door) manual switches, including damper-positioning switches, changeover switches, thermometers, and gages.

4. Graphics: Color-coded graphic, laminated-plastic displays on doors, schematically showing system being controlled, with protective, clear plastic sheet bonded to entire door.

2.4 SENSORS

A. Electronic Sensors: Vibration and corrosion resistant; for wall, immersion, or duct mounting as required.

1. Thermistor temperature sensors as follows:

a. Accuracy: Plus or minus 0.5 deg F at calibration point.

b. Wire: Twisted, shielded-pair cable.

c. Room Sensors: Match room thermostats, locking cover.

d. Outside-Air Sensors: Watertight inlet fitting, shielded from direct sunlight.

e. Room Security Sensors: Stainless-steel cover plate with insulated back and security screws.

2. Humidity Sensors: Bulk polymer sensor element.

a. Accuracy: 5 percent full range with linear output.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-8

3. Pressure Transmitters: Direct acting for gas, liquid, or steam service; range suitable for system; proportional output 4 to 20 mA.

B. Equipment operation sensors as follows:

1. Status Inputs for Fans: Differential-pressure switch with adjustable range of 0 to 5 inches wg.

2. Status Inputs for Pumps: Differential-pressure switch piped across pump with adjustable pressure-differential range of 8 to 60 psig.

3. Status Inputs for Electric Motors: Current-sensing relay with current transformers, adjustable and set to 175 percent of rated motor current.

C. Electronic Valve/Damper Position Indication: Visual scale indicating percent of travel and 2- to

10-V dc, feedback signal.

D. Occupancy Sensor: Passive infrared, with time delay, daylight sensor lockout, sensitivity control, and 180-degree field of view with vertical sensing adjustment, for flush mounting.

2.5 THERMOSTATS

A. Combination Thermostat and Fan Switches: Line-voltage thermostat with two-, three-, or four-position, push-button or lever-operated fan switch.

1. Label switches "FAN ON-OFF". Mount on single electric switch box.

B. Electric solid-state, microcomputer-based room thermostat with remote sensor.

1. Automatic switching from heating to cooling.

2. Preferential rate control to minimize overshoot and deviation from set point.

3. Set up for four separate temperatures per day.

4. Instant override of set point for continuous or timed period from 1 hour to 31 days.

5. Short-cycle protection.

6. Programming based on weekdays, Saturdays and Sundays.

7. Selection features include deg F or deg C display, 12- or 24-hour clock, keyboard disable, remote sensor, fan on-auto.

8. Battery replacement without program loss.

9. Thermostat display features include the following:

a. Time of day.

b. Actual room temperature.

c. Programmed temperature.

d. Programmed time.

e. Duration of timed override.

f. Day of week.

g. System mode indications include "heating," "off," "fan auto," and "fan on."

C. Low-Voltage, On-Off Thermostats: NEMA DC 3, 24-V, bimetal-operated, mercury-switch type, with adjustable or fixed anticipation heater, concealed set-point adjustment, 55 to 85 deg F set-point range, and 2 deg F maximum differential.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-9

D. Line-Voltage, On-Off Thermostats: Bimetal-actuated, open contact or bellows-actuated, enclosed, snap-switch or equivalent solid-state type, with heat anticipator; listed for electrical rating; with concealed set-point adjustment, 55 to 85 deg F set-point range.

1. Equip thermostats, which control electric heating loads directly, with off position on dial wired to break ungrounded conductors.

2. Selector Switch: Integral, manual on-off-auto.

3. Dead Band: Maximum 2 deg F.

E. Room Thermostat Cover Construction: Manufacturer's standard locking covers.

1. Set-Point Adjustment: Exposed.

2. Set-Point Indication: Exposed.

F. Airstream Thermostats: Two-pipe, fully proportional, single-temperature type, with adjustable set point in middle of range and adjustable throttling range, plug-in test fitting or permanent pressure gage, remote bulb, bimetal rod and tube, or averaging element.

2.6 HUMIDISTATS

A. Room Humidistats: 2-position type with adjustable 2 percent throttling range, 20 to 80 percent operating range, single- or double-pole contacts.

2.7 ACTUATORS

A. Electric Motors: Size to operate with sufficient reserve power to provide smooth modulating action or two-position action.

1. Comply with requirements in Division 23 Section "Motors."

2. Permanent Split-Capacitor or Shaded-Pole Type: Equip spring-return motors with integral spiral-spring mechanism in housings designed for easy removal for service or adjustment of limit switches, auxiliary switches, or feedback potentiometer.

3. Spring-Return Motors for Dampers Larger Than 25 Sq. Ft.: Size for running and breakaway torque of 150 in. x lbf.

B. Electronic Damper Actuators: Direct-coupled type designed for minimum 60,000 full-stroke cycles at rated torque.

1. Dampers: Size for running torque calculated as follows as a minimum, however review actual damper product information for the project and provide manufacturer recommended torque requirements if they exceed these general guidelines. The highest torque requirement shall prevail.

a. Parallel-Blade Damper with Edge Seals: 7 inch-pounds/sq. ft. of damper.

b. Opposed-Blade Damper with Edge Seals: 5 inch-pounds/sq. ft. of damper.

c. Parallel-Blade Damper without Edge Seals: 4 inch-pounds/sq. ft of damper.

d. Opposed-Blade Damper without Edge Seals: 3 inch-pounds/sq. ft. of damper.

e. Dampers with 2 to 3 Inches wg of Pressure Drop or Face Velocities of 1000 to

2500 FPM: Multiply the minimum full-stroke cycles above by 1.5.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-10

f. Dampers with 3 to 4 Inches wg of Pressure Drop or Face Velocities of 2500 to

3000 FPM: Multiply the minimum full-stroke cycles above by 2.0.

2. Coupling: V-bolt and V-shaped, toothed cradle.

3. Overload Protection: Electronic overload or digital rotation-sensing circuitry.

4. Fail-Safe Operation: Mechanical, spring-return mechanism. Provide external, manual gear release on non-spring-return actuators.

5. Power Requirements (Two-Position Spring Return): 24-V ac.

6. Temperature Rating: Minus 22 to plus 122 deg F.

7. Temperature Rating (Smoke Dampers): Minus 22 to plus 250 deg F.

8. Run Time: 12 seconds open, 5 seconds closed.

2.8 DAMPERS

A. Dampers: AMCA-rated, parallel or opposed-blade design; 0.1084-inch minimum, galvanized-steel frames with holes for duct mounting; damper blades shall not be less than 0.0635-inch galvanized steel with maximum blade width of 8 inches. Parallel blade design dampers shall be suitable for two position damper operation. All modulating dampers shall be opposed blade design.

1. Blades shall be secured to 1/2-inch- diameter, zinc-plated axles using zinc-plated hardware, with nylon blade bearings, blade-linkage hardware of zinc-plated steel and brass, ends sealed against spring-stainless-steel blade bearings, and thrust bearings at each end of every blade.

2. Operating Temperature Range: From minus 40 to plus 200 deg F.

3. Edge Seals, Standard Pressure Applications: Closed-cell neoprene.

4. For low-leakage applications, use parallel- or opposed-blade design with inflatable seal blade edging, or replaceable rubber seals, rated for leakage at less than 10 cfm per sq. ft.

of damper area, at differential pressure of 4 inches wg when damper is being held by torque of 50 in. x lbf; when tested according to AMCA 500D.

2.9 CONTROL CABLE

A. Electronic and Fiber-Optic Cable for Control Wiring: As specified in Division 16.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that conditioned power supply is available to control units and operator workstation.

B. Verify that duct-, pipe-, and equipment-mounted devices and wiring and pneumatic piping are installed before proceeding with installation.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-11

3.2 BUILDING FIRE ALARM INTERFACING

A. General: Provide all controls for interfacing the building HVAC systems to the building fire alarm system. The building fire alarm system and smoke detectors are specified in Division 26.

B. The fire-alarm system, as described in Division 16, will send a signal to the DDC system to identify when each designated area is in alarm.

3.3 Upon receipt of the fire alarm signal, the DDC system serving that fire zone shall continue to operate. It shall be automatically shut down only when activated by the smoke detector located in the air handling unit. Both the supply fan and its related return fan shall be shut down by the same sensor.

3.4 INSTALLATION

A. Install equipment level and plumb.

B. Install software in control units and operator workstation. Implement all features of programs to specified requirements and as appropriate to sequence of operation.

C. Connect and configure equipment and software to achieve sequence of operation specified.

D. Verify location of thermostats, humidistats, and other exposed control sensors with plans and room details before installation. Locate equipment at centerline height of 44 inches above the finished floor.

1. Install averaging elements in ducts and plenums in crossing or zigzag pattern.

E. Install guards on thermostats in the following locations:

1. Entrances.

2. Public areas.

3. Where indicated.

F. Install automatic dampers according to Division 15 Section "Duct Accessories."

G. Install damper motors on outside of duct in warm areas, not in locations exposed to outdoor temperatures.

H. Install labels and nameplates to identify control components according to Division 15 Section

"Basic Mechanical Materials and Methods."

I. Install labels and nameplates to identify control components according to Division 15 Section

"Mechanical Identification."

J. Install hydronic instrument wells, valves, and other accessories according to Division 15

Section "Hydronic Piping."

K. Install steam and condensate instrument wells, valves, and other accessories according to

Division 15 Section "Steam and Condensate Piping."

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-12

L. Install refrigerant instrument wells, valves, and other accessories according to Division 15

Section "Refrigerant Piping."

M. Install duct volume-control dampers according to Division 23 Sections specifying air ducts.

N. Install electronic and fiber-optic cables according to Division 26.

3.5 ELECTRICAL WIRING AND CONNECTION INSTALLATION

A. The control contractor shall provide and install all 120V wiring from the electrical panelboards to any electrical panels requiring 120V power.

B. Install raceways, boxes, and cabinets according to Division 26.

C. Install building wire and cable according to Division 26.

D. Install signal and communication cable according to Division 26

1. Conceal cable, except in mechanical rooms and areas where other conduit and piping are exposed.

2. Install exposed cable in raceway.

3. Install concealed cable in raceway.

4. Bundle and harness multi-conductor instrument cable in place of single cables where several cables follow a common path.

5. Fasten flexible conductors, bridging cabinets and doors, along hinge side; protect against abrasion. Tie and support conductors.

6. Number-code or color-code conductors for future identification and service of control system, except local individual room control cables.

E. Connect manual-reset limit controls independent of manual-control switch positions.

Automatic duct heater resets may be connected in interlock circuit of power controllers.

F. Connect hand-off-auto selector switches to override automatic interlock controls when switch is in hand position.

3.6 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.

1. Install piping adjacent to machine to allow service and maintenance.

B. Ground equipment.

1. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.

06/10/11

10090 HVAC INSTRUMENTATION AND CONTROLS 230900-13

3.7 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including piping and electrical connections. Report results in writing.

1. Operational Test: After electrical circuitry has been energized, start units to confirm proper unit operation. Remove malfunctioning units, replace with new units, and retest.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment, and retest.

3. Calibration test electronic controllers by disconnecting input sensors and stimulating operation with compatible signal generator.

B. Replace damaged or malfunctioning controls and equipment.

1. Start, test, and adjust control systems.

2. Demonstrate compliance with requirements, including calibration and testing, and control sequences.

3. Adjust, calibrate, and fine tune circuits and equipment to achieve sequence of operation specified.

C. Verify DDC as follows:

1. Verify software including automatic restart, control sequences, scheduling, reset controls, and occupied/unoccupied cycles.

2. Verify local control units including self-diagnostics.

3.8 SYSTEM ACCEPTANCE

A. The system installation shall be complete in all respects and tested for proper operation prior to…