Add 1 4a. 15 AF 66-R1 FA441820R0010 B.419.xlsx

XLSX spreadsheet 61 KB Posted

Attached to
Repair Munitions Facility B419 Federal contract opportunity
Solicitation number
FA441820R0010
Issued by
Department of the Air Force Air Mobility Command

About this file

This submittal register outlines product data, material samples, test reports, qualifications, and other documentation required from the contractor for the Repair Munitions Facility, B419 project at Joint Base Charleston - Weapons Station in Goose Creek, South Carolina. The contractor shall provide personnel, equipment, tools, materials and supervision to complete the project with an anticipated performance time of 450 calendar days. The submittal items cover requirements for various construction activities including site plans, safety plans, drawings, specifications, testing and inspection reports, warranties, as-built documentation, operations and maintenance manuals, and training. The contractor must submit the listed documentation at the stages specified to obtain necessary approvals prior to proceeding with the work.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Munitions Facility B419, newest first.
File Type Posted
Site Visit Roster B419 FA441820R0010 20200507.pdf PDF
B419 As Built Drawings.pdf PDF
B419 Asbestos and LBP Addendum 2017.pdf PDF
B419 Q and A 1 FA441820R0010 20200519.pdf PDF
Add 1 3a. HERCULES_BiParting_Electric_Submittal_Drawing_v2_USA_FA441820R0010 B.419.pdf PDF
Add 1 2c. Addendum 1 Spec Section 08 13 73 FA441820R0010 B.419.pdf PDF
06 Green Procurement Form.pdf PDF
Add 1 2b Addendum 1 Spec Section 07 84 00 FA441820R0010 B.419.pdf PDF
Solicitation - FA441820R0010 2020043002.pdf PDF
Add 1 1b. Addendum 1 Dwg 28 of 70 A600 Door Schedule and Frame Elevations REV02 FA441820R0010 B.419.pdf PDF
Add 1 1a. 01 of 70_T001_Title Sheet_FA441820R0010_B.419.pdf PDF
17 SPECS 419-Combined-Rev 2020-02-27.pdf PDF
07 Lead-Asbestos Report NOV 2016.pdf PDF
Add 1 1c. Addendum 1 Dwg 52 of 70 - M101 - First Floor HVAC Ductwork Renovation Plan REV01 Fm ADC Eng Dtd 2020_FA441820R0010 B.419.pdf PDF
Add 1 2a. 15321.TOC_Addendum 1_FA441820R0010 B.419.pdf PDF
17 Drawings B 419-R1-2017-08-25.pdf PDF
Add 1 3b. HERCULES_Tech_Spec_Brochure_BiParting_Sliding_Door_FA441820R0010 B.419.pdf PDF
SC20190022 Wage Determination 20200103.pdf PDF
Add 1 FA441820R0010 B.419 2020043002.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

SUBMITTAL REGISTERCONTRACT NO.
DKGV-1051461
TITLE AND LOCATIONCONTRACTOR
Repair Munitions Facility, B.419
ACTIVITY NOTRANSMITTAL NOSPEC SECTDESCRIPTION OF ITEM SUBMITTEDPARAGRAPH #CLASSIFICATION
GOVT OR A/E REVIEWCONTRACTOR
SCHEDULE DATESCONTRACTOR
ACTIONAPPROVING AUTHORITYRETURNED TO CONTR/
DATE RCD FRM APPV AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYACTION CODEDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD ROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERACTION CODEDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 11 00SD-01 - Outage Requests1.6.2G
01 11 00SD-01 - Road Closure Requests1.6.2G
01 11 00SD-01 - Work Clearance1.6G
01 14 00SD-01 - List of Contact Personnel1.2.1.1G
01 30 00SD-01 - Resume for the proposed Superintendent1.5.2G
01 30 00SD-04 - Color Boards1.2G
01 32 16.00 20SD-01 - Qualifications1.2G
01 32 16.00 20SD-01 - Baseline Project Schedule1.3G
01 32 16.00 20SD-01 - Initial Contract Progress Report (AF IMT 3065)1.4.1G
01 32 16.00 20SD-01 - Initial Contract Progress Schedule (AF IMT 3064)1.4.2G
01 32 16.00 20SD-07 - Monthly Project Schedule Updates1.3.3G
01 32 16.00 20SD-07 - Monthly Contract Progress Reports (AF IMT 3065)1.4.1G
01 32 16.00 20SD-07 - Monthly Contract Progress Schedules (AF IMT 3064)1.4.2G
01 33 00SD-01 - Submittal Register1.7G
01 35 26SD-01 - Accident Prevention Plan (APP)1.6G
01 35 26SD-01 - Activity Hazard Analysis (AHA)1.7G
01 35 26SD-01 - Crane Critical Lift Plan1.6.1.1G
01 35 26SD-01 - Proof of qualifications for Crane Operators1.5.1.3G
01 35 26SD-06 - Notifications and Reports1.11
01 35 26SD-06 - Accident Reports1.11.2G
01 35 26SD-06 - Crane Reports1.11.3
01 35 26SD-07 - Confined Space Entry Permit1.8.1
01 35 26SD-07 - Hot Work Permit1.8.1
01 35 26SD-07 - License Certificates1.13
01 45 00SD-01 - QC Plan1.6G
01 50 00SD-01 - Construction Site Plan1.3G
01 50 00SD-01 - Traffic Control Plan3.4.1G
01 50 00SD-03 - Backflow Preventers1.4
01 50 00SD-06 - Backflow Preventer Tests2.2.4
01 50 00SD-07 - Backflow Tester1.4.1
01 50 00SD-07 - Backflow Preventers1.4
01 54 00.00 31SD-03 - Affirmative Procurement Reporting Form1.5.2.1G
01 57 19.00 31SD-01 - Preconstruction Survey1.7.1G
01 57 19.00 31SD-01 - Regulatory Notifications1.8.3G
01 57 19.00 31SD-01 - Environmental Protection Plan1.5G
01 57 19.00 31SD-01 - Dirt and Dust Control Plan1.6G
01 57 19.00 31SD-06 - Disposal Requirements3.9.2
01 57 19.00 31SD-06 - Erosion and Sediment Control Inspection Reports3.4
01 57 19.00 31SD-06 - Storm Water Inspection Reports for General Permit3.4
01 57 19.00 31SD-06 - Solid Waste Disposal Report1.8.4G
01 57 19.00 31SD-07 - Contractor 40 CFR employee training records1.8.2G
01 57 19.00 31SD-11 - Waste Determination Documentation1.8
01 57 19.00 31SD-11 - Waste Determination Documentation3.7.2
01 57 19.00 31SD-11 - Disposal Documentation for Hazardous and Regulated Waste1.8.1
01 57 19.00 31SD-11 - Contractor 40 CFR Employee Training Records1.8.2
01 57 19.00 31SD-11 - Solid Waste Disposal Permit1.7.2
01 57 19.00 31SD-11 - Solid Waste Disposal Report1.8.4
01 57 19.00 31SD-11 - Hazardous Waste/Debris Management3.7.2
01 57 19.00 31SD-11 - Regulatory Notifications1.8.3
01 57 20.00 31SD-01 - Material Safety Data Sheets (MSDS)1.4.1
01 57 20.00 31SD-06 - Monthly Green Procurement1.8
01 57 20.00 31SD-06 - Annual Green Procurement1.8
01 57 20.00 31SD-06 - Monthly Recycling Report1.3
01 57 20.00 31SD-06 - Annual Recycling Report1.3
01 74 19.00 31SD-01 - Construction Waste Management Plan1.3.3G
01 78 00SD-03 - Warranty Management Plan1.5.1
01 78 00SD-03 - Warranty Tags1.5.4
01 78 00SD-03 - Spare Parts Data1.4
01 78 00SD-08 - Preventative Maintenance3.9
01 78 00SD-08 - Condition Monitoring (Predictive Testing)3.9
01 78 00SD-08 - Inspection Schedules3.9
01 78 00SD-08 - Posted Instructions1.5.1
01 78 00SD-10 - Operation and Maintenance Manuals3.7G
01 78 00SD-11 - As-Built Drawings3.1G
01 78 00SD-11 - Record Drawings3.3G
01 78 00SD-11 - As-Built Record of Equipment and Materials3.6
01 78 00SD-11 - Final Approved Shop Drawings3.4
01 78 00SD-11 - Construction Contract Specifications3.5
01 78 00SD-11 - Interim DD FORM 13543.10G
01 78 00SD-11 - Checklist for DD FORM 13543.10G
01 78 00SD-11 - Final DD Form 13543.10G
02 41 00SD-01 - Demolition Plan1.2.1G
02 41 00SD-01 - Existing Conditions1.10
02 41 00SD-07 - Notification1.6G
02 41 00SD-11 - Receipts3.2.2
02 65 00SD-01 - Work Plan1.5.3G
02 65 00SD-01 - Site Safety and Health Plan1.5.3.1G
02 65 00SD-01 - Excavation and Material Handling Plan1.5.3.2G
02 65 00SD-01 - Tank and Piping Removal And Disposal Plan1.5.3.3G
02 65 00SD-01 - Spill and Discharge Control Plan1.5.3.4G
02 65 00SD-01 - Qualifications1.5.1G
02 65 00SD-01 - State Licensed Transporter3.12.3
02 65 00SD-06 - Backfill Material2.1
02 65 00SD-06 - Soil Examination, Testing, and Analysis3.10
02 65 00SD-06 - Backfilling3.11G
02 65 00SD-11 - Salvage Rights3.12.4G
02 65 00SD-11 - Disposal / Recycling Manifests For Tank & Ancillary EquipmentG
07 60 00SD-02 - Copings3.1.9G
07 84 00SD-02 - Firestopping System2.1G
07 84 00SD-03 - Firestopping Materials2.2G
07 84 00SD-06 - Inspection3.3G
07 84 00SD-07 - Firestopping Materials2.2
07 92 00SD-03 - Sealants2.1G
07 92 00SD-03 - Primers2.2G
07 92 00SD-03 - Bond Breakers2.3G
07 92 00SD-03 - Backstops2.4G
07 92 00SD-03 - Field Adhesion3.1G
07 92 00SD-07 - Indoor Air Quality1.4.1G
08 13 73SD-02 - Sliding Metal Doors1.7G
08 13 73SD-03 - Sliding Doors2.2G
08 13 73SD-03 - Electric WorkG
08 13 73SD-03 - Submit wiring diagrams for motors and controls
08 13 73SD-07 - Fabrication Drawings1.4G
08 13 73SD-07 - Installation Drawings1.4G
08 13 73SD-07 - Design Analysis and Calculations1.2.1G
08 13 73SD-07 - Sliding Door Assemblies1.2.1G
08 13 73SD-07 - Hardware and Accessories1.2.1G
08 13 73SD-10 - Sliding Door, Data Package 2G
09 51 00SD-02 - Approved Detail Drawings1.2G
09 51 00SD-03 - Suspension System2.2G
09 51 00SD-03 - Acoustical Units2.1G
09 51 00SD-04 - Acoustical Units2.1G
09 51 00SD-04 - Acoustic Ceiling Tiles2.1.1G
09 51 00SD-07 - Acoustical Units2.1G
09 51 00SD-07 - Acoustic Ceiling Tiles2.1.1G
09 90 00SD-03 - Coating2.1G
09 90 00SD-03 - Manufacturer's Technical Data Sheets2.1G
09 90 00SD-03 - Sealant3.2.5
09 90 00SD-04 - Color1.9G
09 90 00SD-07 - Applicator's qualifications1.3G
09 90 00SD-07 - Qualification Testing laboratory for coatings1.4.1.2G
09 90 00SD-08 - Application instructions3.3.1G
09 90 00SD-08 - Mixing3.7.2
09 90 00SD-08 - Manufacturer's Material Safety Data Sheets1.7.2G
09 90 00SD-10 - Coatings:2.1G
10 21 13SD-02 - Fabrication Drawings1.2G
10 21 13SD-02 - Installation Drawings3.2G
10 21 13SD-03 - Cleaning and Maintenance Instructions1.2G
10 21 13SD-03 - Anchoring Devices and Fasteners2.1.1G
10 21 13SD-03 - Hardware and Fittings2.1.3G
10 21 13SD-03 - Panel and Pilaster Brackets2.1.2
10 21 13SD-03 - Door Hardware2.1.4G
10 21 13SD-03 - Pilaster Shoes2.4G
10 21 13SD-04 - Colors and Finishes2.6G
10 21 13SD-07 - Warranty1.6G
10 28 13SD-03 - Finishes2.1.2G
10 28 13SD-03 - Accessory Items2.2G
10 28 13SD-04 - Finishes2.1.2G
10 28 13SD-04 - Accessory Items2.2G
10 28 13SD-07 - Accessory Items2.2
21 13 00.00 40SD-01 - Record of Existing Conditions1.2
21 13 00.00 40SD-02 - Supporting Elements2.2.2G
21 13 00.00 40SD-02 - Sprinkler Heads2.2.3G
21 13 00.00 40SD-03 - Aboveground Piping Materials2.2.1G
21 13 00.00 40SD-03 - Sprinkler Heads2.2.3G
21 13 00.00 40SD-03 - Materials2.3G
21 13 00.00 40SD-03 - Supporting Elements2.2.2G
21 13 00.00 40SD-03 - Equipment and Performance Data2.1G
21 13 00.00 40SD-05 - Design Analysis and CalculationsPart 2G
21 13 00.00 40SD-06 - Pressure Tests3.3.6
21 13 00.00 40SD-06 - Air Tests3.3.3
21 13 00.00 40SD-06 - Drainage Tests3.3.3
22 00 00SD-02 - Plumbing System3.9.1G
22 00 00SD-03 - Fixtures2.4G
22 00 00SD-03 - Flush Valve Urinals2.4.1G
22 00 00SD-03 - Flush Tank Water Closets2.4.3G
22 00 00SD-03 - Wall Hung Lavatories2.4.4G
22 00 00SD-03 - Service Sinks2.4.5G
22 00 00SD-03 - Water Heaters2.6G
22 00 00SD-03 - Welding1.5.1
22 00 00SD-03 - Vibration-Absorbing Features3.4G
22 00 00SD-03 - Plumbing System3.9.1
22 00 00SD-06 - Tests, Flushing and Disinfection3.9
22 00 00SD-10 - Plumbing System3.9.1G
22 05 48.00 20SD-02 - Inertia Bases2.7
22 05 48.00 20SD-02 - Machinery Bases2.6
22 05 48.00 20SD-02 - Platforms2.6
22 05 48.00 20SD-02 - Rails2.6
22 05 48.00 20SD-02 - Saddles2.6
22 05 48.00 20SD-03 - Isolators2.3
22 05 48.00 20SD-03 - Flexible Connectors2.8
22 05 48.00 20SD-03 - Flexible Duct Connectors2.9
22 05 48.00 20SD-03 - Pipe Guides2.11
22 05 48.00 20SD-03 - Seismic Snubbers2.1
22 05 48.00 20SD-03 - Vertical Stops3.1.3
22 05 48.00 20SD-03 - Thrust Restraints2.12
22 05 48.00 20SD-03 - Inertia Bases2.7
22 05 48.00 20SD-03 - Machinery Bases2.6
22 05 48.00 20SD-03 - Machinery Foundations and Subbases3.1.13
22 05 48.00 20SD-03 - Platforms2.6
22 05 48.00 20SD-03 - Rails2.6
22 05 48.00 20SD-03 - Saddles2.6
22 05 48.00 20SD-03 - Machinery Manufacturer's Sound Data1.4.2
22 05 48.00 20SD-05 - Inertia Bases2.7
22 05 48.00 20SD-05 - Machinery Bases2.6
22 05 48.00 20SD-05 - Platforms2.6
22 05 48.00 20SD-05 - Rails2.6
22 05 48.00 20SD-05 - Saddles2.6
22 05 48.00 20SD-05 - Each item of Machinery1.4.3
22 05 48.00 20SD-05 - Each item of Machinery Over 300 Pounds1.4.4
22 05 48.00 20SD-06 - Seismic Snubbers2.1
22 05 48.00 20SD-06 - Equipment Vibration Tests3.2.3.1
22 05 48.00 20SD-06 - Equipment Sound Level Tests3.2.3.2
22 05 48.00 20SD-06 - Protected Spring Isolators2.4
22 05 48.00 20SD-08 - Vibration and Noise Isolation Components3.1.1
22 05 48.00 20SD-08 - Seismic Protection Components2.13
22 15 14.00 40SD-02 - Installation Drawings2.1
22 15 14.00 40SD-03 - Equipment and Performance Data2.1.1G
22 15 14.00 40SD-03 - Underground Piping Materials2.3.1G
22 15 14.00 40SD-03 - Aboveground Piping Materials2.3.2G
22 15 14.00 40SD-03 - Piping Specialties2.2.1G
22 15 14.00 40SD-03 - Supporting Elements2.4.2G
22 15 14.00 40SD-03 - Air Compressors2.2.2G
22 15 14.00 40SD-03 - Valves2.2.3G
22 15 14.00 40SD-03 - Accessories3.1.2.1G
22 15 14.00 40SD-03 - Miscellaneous Materials2.4.1G
22 15 14.00 40SD-03 - Vibration Isolation3.1.2.6G
22 15 14.00 40SD-05 - Design Analysis and Calculations2.1.1G
22 15 14.00 40SD-06 - Hydrostatic Testing3.2.1.1G
22 15 14.00 40SD-06 - Compressed Air Systems Testing3.2.1G
22 15 14.00 40SD-06 - Valve-Operating Tests3.2.1.1G
22 15 14.00 40SD-06 - Drainage Tests3.2.1.1G
22 15 14.00 40SD-06 - Pneumatic Testing3.2.1.1
22 15 14.00 40SD-07 - Underground Piping Materials2.3.1
22 15 14.00 40SD-07 - Aboveground Piping Materials2.3.2
22 15 14.00 40SD-07 - Supporting Elements2.4.2
22 15 14.00 40SD-07 - Valves2.2.3
22 15 14.00 40SD-07 - Miscellaneous Materials2.4.1
22 15 14.00 40SD-10 - Operation and Maintenance Manuals3.4G
23 00 00SD-02 - Detail Drawings1.4.5G
23 00 00SD-03 - Metallic Flexible Duct2.8.1.1
23 00 00SD-03 - Insulated Nonmetallic Flexible Duct Runouts2.8.1.2
23 00 00SD-03 - Duct Connectors2.8.1.2
23 00 00SD-03 - Duct Access Doors2.8.2G
23 00 00SD-03 - Manual Balancing Dampers2.8.3G
23 00 00SD-03 - Diffusers2.8.5.1
23 00 00SD-03 - Registers and Grilles2.8.5.2
23 00 00SD-03 - Centrifugal Type Power Roof Ventilators2.9.1.1
23 00 00SD-03 - Air- Curtain Fans2.9.1.2
23 00 00SD-03 - Ceiling Exhaust Fans2.9.1.3
23 00 00SD-03 - Air Handling Units2.1G
23 00 00SD-03 - Constant Volume, Single Duct Terminal Units2.11.1.1G
23 00 00SD-03 - Reheat Units2.11.1.2G
23 00 00SD-03 - Test Procedures1.4.6
23 00 00SD-03 - Diagrams1.2.1.2G
23 00 00SD-06 - Performance Tests3.11G
23 00 00SD-06 - Damper Acceptance Test3.9G
23 00 00SD-07 - Bolts1.4.1
23 00 00SD-07 - Ozone Depleting Substances1.4.3
23 00 00SD-08 - Manufacturer's Installation Instructions3.2
23 00 00SD-08 - Operation and Maintenance Training3.13.2
23 00 00SD-10 - Operation and Maintenance Manuals3.13.1G
23 00 00SD-10 - Manual Balancing Dampers2.8.3G
23 00 00SD-10 - Centrifugal Type Power Roof Ventilators2.9.1.1G
23 00 00SD-10 - Air- Curtain Fans2.9.1.2G
23 00 00SD-10 - Ceiling Exhaust Fans2.9.1.3G
23 00 00SD-10 - Air Handling Units2.1G
23 00 00SD-10 - Constant Volume, Single Duct Terminal Units2.11.1.1G
23 00 00SD-10 - Reheat Units2.11.1.2G
23 05 15SD-01 - Material, Equipment, and Fixture Lists1.2G
23 05 15SD-02 - Record Drawings1.2G
23 05 15SD-02 - Connection Diagrams1.2G
23 05 15SD-02 - Coordination Drawings1.2G
23 05 15SD-02 - Fabrication Drawings1.2G
23 05 15SD-02 - Installation Drawings3.1G
23 05 15SD-03 - Pipe and Fittings2.1G
23 05 15SD-03 - Piping Specialties2.2G
23 05 15SD-03 - Valves2.3G
23 05 15SD-03 - Miscellaneous Materials2.4G
23 05 15SD-03 - Supporting Elements2.5G
23 05 15SD-03 - Equipment Foundation Data1.2G
23 05 15SD-04 - Manufacturer's Standard Color Charts1.2G
23 05 15SD-05 - Pipe and Fittings2.1G
23 05 15SD-05 - Piping Specialties2.2G
23 05 15SD-05 - Valves2.3G
23 05 15SD-06 - Hydrostatic Tests3.1G
23 05 15SD-06 - Air Tests3.1G
23 05 15SD-06 - Valve- Operating Tests3.1G
23 05 15SD-06 - Drainage Tests3.1G
23 05 15SD-06 - Pneumatic Tests3.1G
23 05 15SD-06 - Non- Destructive Electric Tests3.1
23 05 15SD-06 - System Operation Tests3.1G
23 05 15SD-07 - Record of Satisfactory Field Operation1.4.2G
23 05 15SD-07 - List of Qualified Permanent Service Organizations1.4.3G
23 05 15SD-07 - Listing of Product Installations1.2G
23 05 15SD-07 - Records of Existing Conditions1.2G
23 05 15SD-07 - Surface Resistance3.1G
23 05 15SD-07 - Shear and Tensile Strengths3.1G
23 05 15SD-07 - Temperature Ratings3.1G
23 05 15SD-07 - Bending Tests3.1G
23 05 15SD-07 - Flattening Tests3.1G
23 05 15SD-07 - Transverse Guided Weld Bend Tests3.1G
23 05 15SD-10 - Operation and Maintenance Manuals3.11G
23 05 48.00 40SD-02 - Installation Drawings1.2G
23 05 48.00 40SD-02 - Outline Drawings1.2G
23 05 48.00 40SD-03 - Equipment and Performance Data1.2G
23 05 48.00 40SD-03 - Isolators2.2.8G
23 05 48.00 40SD-06 - Type of Isolator2.4G
23 05 48.00 40SD-06 - Type of Base2.4G
23 05 48.00 40SD-06 - Allowable Deflection2.4G
23 05 48.00 40SD-06 - Measured Deflection2.4G
23 05 93SD-02 - TAB Schematic Drawings and Report Forms1.3.3G
23 05 93SD-03 - Equipment and Performance Data1.3G
23 05 93SD-03 - TAB Related HVAC SubmittalsG
23 05 93SD-06 - Completed Pre-Final DALT Report3.3.5G
23 05 93SD-06 - Certified Final DALT Report3.3.8G
23 05 93SD-07 - Independent TAB Agency and Personnel Qualifications1.5.1G
23 05 93SD-07 - DALT and TAB Submittal and Work ScheduleG
23 05 93SD-07 - TAB Pre- Field Engineering ReportG
23 07 00SD-02 - MICA Plates3.2.2.4G
23 07 00SD-02 - Pipe Insulation Systems2.3
23 07 00SD-02 - Pipe Insulation Systems3.2
23 07 00SD-02 - Duct Insulation Systems3.3
23 07 00SD-02 - Equipment Insulation Systems3.4
23 07 00SD-03 - Pipe Insulation Systems2.3G
23 07 00SD-03 - Pipe Insulation Systems3.2G
23 07 00SD-03 - Duct Insulation Systems3.3G
23 07 00SD-03 - Equipment Insulation Systems3.4G
23 07 00SD-04 - Thermal Insulation2.2.1.3G
23 07 00SD-04 - Display Samples3.1.1G
23 07 00SD-08 - Pipe Insulation Systems2.3G
23 07 00SD-08 - Pipe Insulation Systems3.2G
23 07 00SD-08 - Duct Insulation Systems3.3G
23 07 00SD-08 - Equipment Insulation Systems3.4G
23 09 00SD-02 - DDC Contractor Design Drawings3.3G
23 09 00SD-02 - Draft As- Built Drawings3.3G
23 09 00SD-02 - Final As- Built Drawings3.3G
23 09 00SD-03 - Programming Software1.8G
23 09 00SD-03 - Controller Application ProgramsG
23 09 00SD-03 - Configuration SoftwareG
23 09 00SD-03 - Manufacturer's Product Data2.2G
23 09 00SD-06 - Existing Conditions Report3.1.1
23 09 00SD-06 - Start- Up Testing Report3.5.2G
23 09 00SD-06 - PVT Procedures3.6.1G
23 09 00SD-06 - PVT Report3.6.3G
23 09 00SD-06 - Pre- Construction Quality Control (QC) Checklist1.9.1G
23 09 00SD-06 - Post- Construction Quality Control (QC) Checklist1.9.2G
23 09 00SD-10 - Operation and Maintenance (O&M) Instructions3.7G
23 09 00SD-10 - Training Documentation3.9.1G
23 09 00SD-11 - Enclosure Keys2.5G
23 09 00SD-11 - Password Summary Report3.2.6.1G
23 09 00SD-11 - Closeout Quality Control (QC) Checklist1.9.3G
23 31 13.00 40SD-01 - Material, Equipment, and Fixture ListsPart 2G
23 31 13.00 40SD-01 - Records of Existing Conditions2.1.1G
23 31 13.00 40SD-02 - Connection Diagrams2.1G
23 31 13.00 40SD-02 - Offset Fitting Configurations2.2.1G
23 31 13.00 40SD-03 - Equipment and Performance Data2.1.1
23 31 13.00 40SD-03 - Galvanized Steel Ductwork Materials2.3.1G
23 31 13.00 40SD-03 - Brazing Materials2.3.2
23 31 13.00 40SD-03 - Mill-Rolled Reinforcing and Supporting Materials2.3.3
23 31 13.00 40SD-03 - Round Sheet Metal Duct Fittings2.2.1G
23 31 13.00 40SD-03 - Turning Vanes2.2.4G
23 31 13.00 40SD-03 - Flexible Connectors2.2.6G
23 31 13.00 40SD-03 - Flexible Duct Materials2.2.9
23 31 13.00 40SD-03 - Power Operated Dampers2.2.12G
23 31 13.00 40SD-03 - Gravity Backdraft and Relief Dampers2.2.11G
23 31 13.00 40SD-03 - Manual Volume Dampers2.2.10G
23 31 13.00 40SD-05 - Design Analysis and Calculations2.1.1G
23 31 13.00 40SD-06 - Ductwork Leakage Tests3.4.1G
23 31 13.00 40SD-07 - Listing of Product Installations1.3
23 31 13.00 40SD-07 - Galvanized Steel Ductwork Materials2.3.1
23 31 13.00 40SD-07 - Brazing Materials2.3.2
23 31 13.00 40SD-07 - Mill-Rolled Reinforcing and Supporting Materials2.3.3
23 31 13.00 40SD-07 - Round Sheet Metal Duct Fittings2.2.1
23 31 13.00 40SD-07 - Turning Vanes2.2.4
23 31 13.00 40SD-07 - Dampers2.2.5
23 31 13.00 40SD-07 - Flexible Connectors2.2.6
23 31 13.00 40SD-10 - Operation and Maintenance Manuals3.5.1G
23 31 13.00 40SD-10 - Power Operated Dampers2.2.12G
23 31 13.00 40SD-11 - Record Drawings3.5.2G
23 52 00SD-02 - Detail Drawings1.5G
23 52 00SD-03 - Materials and Equipment2.2.1G
23 52 00SD-03 - Spare Parts1.5
23 52 00SD-03 - Water Treatment System2.15G
23 52 00SD-03 - Boiler Water Treatment2.15G
23 52 00SD-03 - Heating System Tests3.8
23 52 00SD-03 - Fuel System Tests3.11
23 52 00SD-03 - Welding1.3
23 52 00SD-03 - Qualifications3.8
23 52 00SD-03 - Field Instructions3.1
23 52 00SD-06 - Heating System Tests3.8
23 52 00SD-06 - Fuel System Tests3.11
23 52 00SD-06 - Water Treatment Testing3.8.1
23 52 00SD-07 - Bolts2.10.8.3
23 52 00SD-07 - Continuous Emissions Monitoring2.10.1
23 52 00SD-07 - Energy Star2.2.3
23 52 00SD-10 - Operation and Maintenance Instructions3.1G
23 52 00SD-10 - Water Treatment System2.15G
23 64 26SD-03 - Grooved Mechanical Connections For Steel2.2.2.4G
23 64 26SD-03 - Grooved Mechanical Connections For Copper2.4.3G
23 64 26SD-03 - Calibrated Balancing Valves2.5.8G
23 64 26SD-03 - Automatic Flow Control Valves2.5.9G
23 64 26SD-03 - Pump Discharge Valve2.5.10
23 64 26SD-03 - Water Temperature Mixing Valve2.5.11G
23 64 26SD-03 - Water Temperature Regulating Valves2.5.12G
23 64 26SD-03 - Water Pressure Reducing Valve2.5.13
23 64 26SD-03 - Pressure Relief Valve2.5.14
23 64 26SD-03 - Combination Pressure and Temperature Relief Valves2.5.15
23 64 26SD-03 - Expansion Joints2.6.9G
23 64 26SD-03 - Pumps2.7G
23 64 26SD-03 - Combination Strainer and Pump Suction Diffuser2.6.3
23 64 26SD-03 - Expansion Tanks2.8
23 64 26SD-03 - Air Separator Tanks2.9
23 64 26SD-03 - Water Treatment Systems2.1G
23 64 26SD-06 - Piping Welds NDE Report3.1.1.3
23 64 26SD-06 - Pressure Tests Reports3.5.2G
23 64 26SD-06 - Condenser Water Quality Test Reports3.5.3G
23 64 26SD-06 - Condenser Water Quality Test Reports3.5.3G
23 64 26SD-06 - One- Year Inspection Report For Cooling Water3.7G
23 64 26SD-07 - Employer's Record Documents (For Welding)3.1.1.1
23 64 26SD-07 - Welding Procedures and Qualifications3.1.1.2
23 64 26SD-08 - Lesson plan for the Instruction Course3.6G
23 64 26SD-10 - Water Treatment Systems2.1G
23 64 26SD-10 - Calibrated Balancing Valves2.5.8G
23 64 26SD-10 - Automatic Flow Control Valves2.5.9G
23 64 26SD-10 - Pump Discharge Valve2.5.10G
23 64 26SD-10 - Water Temperature Mixing Valve2.5.11G
23 64 26SD-10 - Water Temperature Regulating Valves2.5.12G
23 64 26SD-10 - Water Pressure Reducing Valve2.5.13G
23 64 26SD-10 - Pressure Relief Valve2.5.14G
23 64 26SD-10 - Combination Pressure and Temperature Relief Valves2.5.15G
23 64 26SD-10 - Expansion Joints2.6.9G
23 64 26SD-10 - Pumps2.7G
23 64 26SD-10 - Combination Strainer and Pump Suction Diffuser2.6.3G
23 64 26SD-10 - Expansion Tanks2.8G
23 64 26SD-10 - Air Separator Tanks2.9G
23 65 00SD-03 - Cooling Towers2.6G
23 65 00SD-03 - Demonstrations3.1G
23 65 00SD-03 - Verification of Dimensions1.5.1G
23 65 00SD-06 - Packaged Cooling Tower - Installation Instructions3.2G
23 65 00SD-06 - Packaged Cooling Tower - Field Acceptance Test Plan3.3.1G
23 65 00SD-06 - Packaged Cooling Tower - Field Acceptance Test Report3.4G
23 65 00SD-07 - Service Organization2.2
23 65 00SD-07 - Cooling Tower2.6.1.11
23 65 00SD-07 - Remote Evaporatively-Cooled Condensers2.7
23 65 00SD-08 - Packaged Cooling Tower - Installation Instructions3.2
23 65 00SD-08 - Remote Evaporatively-Cooled Condensers2.7
23 65 00SD-10 - Operation and Maintenance Manuals3.1
23 65 00SD-10 - Remote Evaporatively-Cooled Condensers2.7
23 65 00SD-11 - Energy Efficient Equipment for Cooling Towers2.1.1
23 73 13.00 40SD-02 - Installation Drawings3.1G
23 73 13.00 40SD-02 - Fabrication and Connection Drawings2.1G
23 73 13.00 40SD-03 - Equipment and Performance Data2.1G
23 73 13.00 40SD-03 - Sample Warranty1.3.2G
23 73 13.00 40SD-03 - Coating Specimen2.2.2G
23 73 13.00 40SD-03 - Final Test Reports3.2.3G
23 73 13.00 40SD-07 - Listing of Product Installations1.3G
23 73 13.00 40SD-07 - Certificates of Conformance1.3.1G
23 73 13.00 40SD-07 - Unit Cabinet2.2.2G
23 73 13.00 40SD-07 - Fan2.2.3G
23 73 13.00 40SD-07 - Drain Pans2.2.4G
23 73 13.00 40SD-07 - Insulation2.2.5G
23 73 13.00 40SD-07 - Spare Parts2.1G
23 73 13.00 40SD-10 - Operation and Maintenance Manuals3.3.1G
23 73 13.00 40SD-11 - Warranty1.5G
23 81 00.00 20SD-02 - Field-Assembled Refrigerant Piping2.6.2
23 81 00.00 20SD-02 - Control System Wiring Diagrams1.4.2
23 81 00.00 20SD-03 - Heat Pumps2.1
23 81 00.00 20SD-03 - Air Conditioners2.2
23 81 00.00 20SD-03 - Filters2.3
23 81 00.00 20SD-03 - Thermostats2.2.10
23 81 00.00 20SD-03 - Refrigerant1.5
23 81 00.00 20SD-03 - Refrigerant Piping and Accessories2.6
23 81 00.00 20SD-03 - Coatings for Finned Tube Coils2.4
23 81 00.00 20SD-06 - Salt-Spray Tests2.8.1
23 81 00.00 20SD-06 - Start-Up and Initial Operational Tests3.8.3
23 81 00.00 20SD-08 - Heat Pumps2.1
23 81 00.00 20SD-08 - Air Conditioners2.2
23 81 00.00 20SD-08 - Filters2.3
23 81 00.00 20SD-08 - Thermostats2.2.10
23 81 00.00 20SD-08 - Refrigerant Piping and Accessories2.6
23 81 00.00 20SD-10 - Heat Pumps2.1
23 81 00.00 20SD-10 - Air Conditioners2.2
23 81 00.00 20SD-10 - Filters2.3
23 81 00.00 20SD-10 - Thermostats2.2.10
23 81 00.00 20SD-11 - Posted Operating Instructions1.4.4
23 82 00.00 20SD-03 - Unit Heaters2.1
23 82 00.00 20SD-10 - Unit Heaters2.1
23 82 19.00 40SD-01 - Material, Equipment, and Product Installation Lists1.3G
23 82 19.00 40SD-02 - Fabrication Drawings2.2G
23 82 19.00 40SD-02 - Installation Drawings3.1G
23 82 19.00 40SD-03 - Equipment and Performance Data2.2G
23 82 19.00 40SD-03 - Coils2.2G
23 82 19.00 40SD-03 - Casing2.2G
23 82 19.00 40SD-03 - Enclosure2.2G
23 82 19.00 40SD-03 - Motors2.2G
23 82 19.00 40SD-03 - Fan2.2G
23 82 19.00 40SD-03 - Drain Pans2.2G
23 82 19.00 40SD-03 - Filters2.2G
23 82 19.00 40SD-03 - Controls2.2G
23 82 19.00 40SD-03 - Vibration Isolation2.2G
23 82 19.00 40SD-04 - Manufacturer's Standard Color Chart2.2G
23 82 19.00 40SD-07 - Listing of Product Installations1.3G
23 82 19.00 40SD-07 - Certificates of Conformance2.2G
23 82 19.00 40SD-10 - Operation and Maintenance Manuals3.3G
26 05 48.00 10SD-02 - Lighting Fixtures in Buildings3.2
26 05 48.00 10SD-02 - Equipment Requirements1.3
26 05 48.00 10SD-03 - Lighting Fixtures in Buildings3.2G
26 05 48.00 10SD-03 - Equipment Requirements1.3G
26 05 48.00 10SD-03 - Contractor Designed Bracing1.2.4G
26 08 00SD-06 - Acceptance tests and inspections3.1G
26 08 00SD-07 - Qualifications1.4.1G
26 08 00SD-07 - Acceptance test and inspections procedure1.4.3G
26 09 23.00 40SD-03 - Installation Drawings3.1G
26 09 23.00 40SD-03 - Lighting Contactor2.2.2G
26 09 23.00 40SD-03 - Occupancy Sensors2.2.3G
26 09 23.00 40SD-06 - System Operation Tests3.2
26 09 23.00 40SD-10 - Lighting Control System, Data Package 53.3
26 20 00SD-02 - Panelboards2.13G
26 20 00SD-02 - Wireways2.21G
26 20 00SD-02 - Marking strips3.1.6.1G
26 20 00SD-03 - Receptacles2.12G
26 20 00SD-03 - Circuit breakers2.13.1G
26 20 00SD-03 - Switches2.1G
26 20 00SD-03 - Enclosed circuit breakers2.14G
26 20 00SD-03 - Motor controllers2.16G
26 20 00SD-03 - Manual motor starters2.17G
26 20 00SD-06 - 600- volt wiring test3.5.2G
26 20 00SD-06 - Grounding system test3.5.3G
26 20 00SD-07 - Fuses2.11G
26 20 00SD-10 - Electrical Systems1.5.1G
26 24 16.00 40SD-03 - Panelboards1.3G
26 24 16.00 40SD-03 - Directory Card and Holder2.1.2
26 24 16.00 40SD-06 - Continuity Tests3.2
26 24 16.00 40SD-06 - Insulation Tests3.2G
26 24 16.00 40SD-07 - Statements1.4G
26 24 16.00 40SD-08 - Panelboards1.3G
26 29 23SD-02 - Schematic diagrams1.5.1G
26 29 23SD-02 - Interconnecting diagrams1.5.2G
26 29 23SD-02 - Installation drawings1.5.3G
26 29 23SD-03 - Variable frequency drives2.1G
26 29 23SD-03 - Wires and cables2.3
26 29 23SD-03 - Equipment schedule1.5.4
26 29 23SD-06 - VFD Test3.2.1
26 29 23SD-06 - Performance Verification Tests3.2.2
26 29 23SD-06 - Endurance Test3.2.3
26 29 23SD-08 - Installation instructions1.5.5
26 29 23SD-09 - VFD Factory Test Plan2.5.1G
26 29 23SD-09 - Factory test results1.5.6
26 29 23SD-10 - Variable frequency drives2.1
26 51 00SD-03 - LED lighting fixtures1.6.1G
26 51 00SD-03 - Photocell switch2.4G
26 51 00SD-03 - Power hook fixture hangers2.5G
26 51 00SD-03 - Exit signs2.6G
26 51 00SD-03 - Emergency lighting equipment2.7G
26 51 00SD-03 - Occupancy sensors2.8G
26 51 00SD-03 - Energy Efficiency1.6.3.3
26 51 00SD-04 - Lighting fixtures3.1.1G
26 51 00SD-06 - Operating test3.3
26 51 00SD-10 - Lighting Control System1.4.1G
26 51 00SD-10 - Operational Service1.8
27 10 00SD-02 - Telecommunications drawings1.6.1.1G
27 10 00SD-02 - Telecommunications Space Drawings1.6.1.2G
27 10 00SD-03 - Telecommunications cabling2.3G
27 10 00SD-03 - Telecommunications outlet/connector assemblies2.5G
27 10 00SD-03 - Spare Parts1.10.3G
27 10 00SD-06 - Telecommunications cabling testing3.5.1G
27 10 00SD-07 - Telecommunications Contractor1.6.2.1G
27 10 00SD-07 - Key Personnel1.6.2.2G
27 10 00SD-07 - Manufacturer Qualifications1.6.2.3G
27 10 00SD-07 - Test plan1.6.3G
27 10 00SD-09 - Factory reel tests2.9.1G
27 10 00SD-10 - Telecommunications cabling and pathway system1.10.1G
27 10 00SD-11 - Record Documentation1.10.2G
28 05 26.00 40SD-01 - Grounding Systems3.7.2
28 05 26.00 40SD-02 - Record Drawings1.4
28 05 26.00 40SD-03 - Ground Rods2.1
28 05 26.00 40SD-03 - Ground Wires2.2
28 05 26.00 40SD-03 - Connectors and Fasteners2.3
28 05 26.00 40SD-03 - Bonding3.6
28 05 26.00 40SD-06 - Bond Resistance Test3.7.1
28 05 26.00 40SD-06 - Ground Resistance Tests3.7.2
28 05 26.00 40SD-06 - Continuity Isolation Test3.7.3
28 05 26.00 40SD-08 - Grounding Systems3.7.2
28 31 76SD-02 - Amplifiers1.8G
28 31 76SD-02 - Device Operation1.8G
28 31 76SD-02 - Final As Built Drawings1.8G
28 31 76SD-02 - Operation & Maintanance Manuals & Instructions1.8G
28 31 76SD-02 - Riser Diagram1.8G
28 31 76SD-02 - Shop Drawings1.8G
28 31 76SD-02 - Wiring Diagrams1.8G
28 31 76SD-03 - Battery Charger, Wiring, Cable1.8G
28 31 76SD-03 - Electromagnetic Door Holder, Transmitter & Housing1.8G
28 31 76SD-03 - FAS & MNS Fireware, FACP & MNS Panel1.8G
28 31 76SD-03 - Monitor Module, Relay Control & Mini-module1.8G
28 31 76SD-03 - Notification Appliance Circuit (NAC) & NAC Extender1.8G
28 31 76SD-03 - Smoke & Heat Detector/Sensor1.8G
28 31 76SD-03 - Water Flow Detector & Tamper Switch1.8G
28 31 76SD-05 - Design Data1.8G
28 31 76SD-06 - Test Reports1.8G
28 31 76SD-07 - Certfications1.8G
28 31 76SD-09 - Manufacture's Field Reports1.8G
31 00 00SD-01 - Shoring3.5G
31 00 00SD-01 - Dewatering Work Plan1.4.2G
31 00 00SD-03 - Utilization of Excavated Materials3.9G
31 00 00SD-06 - Testing3.17
31 00 00SD-06 - Borrow Site Testing2.1
31 00 00SD-07 - Testing3.17
32 11 24SD-03 - Aggregates2.1.1
32 11 24SD-06 - Gradation3.6.2.1
32 11 24SD-06 - Gradation3.6.2.1
32 11 24SD-06 - Bearing ratio2.1.1
32 11 24SD-06 - Liquid limit2.1.1
32 11 24SD-06 - Plasticity index2.1.1
32 11 24SD-06 - Percentage of wear2.1.1
32 11 24SD-06 - Dry weight2.1.1
32 11 24SD-06 - Density3.6.2.3
32 11 24SD-06 - Density3.6.2.3
32 11 24SD-06 - Smoothness3.6.2.2
32 11 24SD-06 - Thickness3.6.2.5
32 12 10SD-06 - Sampling and Testing3.7
32 12 16SD-03 - Mix Design2.2G
32 12 16SD-03 - Quality Control3.6G
32 12 16SD-03 - Material Acceptance3.7G
32 12 16SD-06 - QC Monitoring3.6.3.3
32 12 16SD-06 - Asphalt Pavement2.1
32 12 16SD-06 - Intermediate Course2.1.1
32 12 16SD-06 - Surface Course2.1.2
32 12 16SD-07 - Testing Laboratory3.2
32 92 23SD-03 - Fertilizer2.4
32 92 23SD-06 - Topsoil composition tests2.2.3
32 92 23SD-07 - sods2.1
33 52 10SD-02 - Grounding and Bonding2.2.5G
33 52 10SD-02 - Pipe Hangers and Supports2.5.9
33 52 10SD-03 - Carbon Steel Pipe2.4.1G
33 52 10SD-03 - Fiberglass Reinforced Plastic (FRP) Pipe2.4.2G
33 52 10SD-03 - Exterior Containment Piping System2.4.3G
33 52 10SD-03 - Pressure Gauge2.5.8G
33 52 10SD-03 - Flexible Ball Joint2.5.11G
33 52 10SD-03 - Bellows Expansion Joint2.5.12G
33 52 10SD-03 - Swing Type Check Valve2.6.1G
33 52 10SD-03 - Wafer Type Check Valve2.6.2G
33 52 10SD-03 - Ball Valve2.6.3G
33 52 10SD-03 - Plug Valve (PTFE Sleeved Tapered Type)2.6.5G
33 52 10SD-03 - Plug Valve (Double Block and Bleed Type)2.6.6G
33 52 10SD-03 - Globe Valve2.6.4G
33 52 10SD-03 - Pressure Relief Valve2.6.7G
33 52 10SD-03 - Pressure\Vacuum Relief Valve2.6.8G
33 52 10SD-03 - Foot Valve2.6.9G
33 52 10SD-03 - Tank Overfill Prevention Valve2.6.10G
33 52 10SD-03 - Submersible Pump2.7.1G
33 52 10SD-03 - Pump Control Panel2.7.2G
33 52 10SD-06 - Exterior Coating Holiday Test3.3.1.1
33 52 10SD-06 - Preliminary Pneumatic Test3.3.1.2
33 52 10SD-06 - Final Pneumatic Test3.3.1.3
33 52 10SD-06 - Hydrostatic Test3.3.1.4
33 52 10SD-06 - Exterior Containment Piping Tests3.3.1.5
33 52 10SD-07 - Contractor Qualifications1.4.1G
33 52 10SD-07 - Licensed Personnel1.4.2.1
33 52 10SD-07 - Demonstrations3.4
33 52 10SD-08 - Flexible Ball Joint2.5.11
33 52 10SD-08 - Bellows Expansion Joint2.5.12
33 52 10SD-10 - Flexible Ball Joint2.5.11G
33 52 10SD-10 - Bellows Expansion Joint2.5.12G
33 52 10SD-10 - Swing Type Check Valve2.6.1G
33 52 10SD-10 - Wafer Type Check Valve2.6.2G
33 52 10SD-10 - Ball Valve2.6.3G
33 52 10SD-10 - Plug Valve (PTFE Sleeved Tapered Type)2.6.5G
33 52 10SD-10 - Plug Valve (Double Block and Bleed Type)2.6.6G
33 52 10SD-10 - Globe Valve2.6.4G
33 52 10SD-10 - Pressure Relief Valve2.6.7G
33 52 10SD-10 - Pressure\Vacuum Relief Valve2.6.8G
33 52 10SD-10 - Foot Valve2.6.9G
33 52 10SD-10 - Tank Overfill Prevention Valve2.6.10G
33 52 10SD-10 - Submersible Pump2.7.1G
33 56 10SD-02 - Grounding and Bonding2.3.2
33 56 10SD-03 - Underground Storage Tank2.4G
33 56 10SD-03 - Automatic Level Alarm System2.6G
33 56 10SD-03 - Tank Gauges2.7G
33 56 10SD-03 - Manway Containment Sump2.8G
33 56 10SD-05 - Anchor Pad Calculations2.4G
33 56 10SD-06 - Underground Storage Tank Tightness Tests3.2.1G
33 56 10SD-06 - Tank Manufacturer's Tests3.2.2
33 56 10SD-06 - Tank Fill Tests3.4
33 56 10SD-07 - Contractor Qualifications1.4.1G
33 56 10SD-07 - Permitting1.4.2.1
33 56 10SD-07 - Registration1.4.2.2
33 56 10SD-07 - Licensed Personnel1.4.2.3
33 56 10SD-07 - Demonstrations3.3
33 56 10SD-08 - Underground Storage Tank2.4
33 56 10SD-08 - Automatic Level Alarm System2.6
33 56 10SD-08 - Tank Gauges2.7
33 56 10SD-10 - Underground Storage Tank2.4
33 56 10SD-10 - Automatic Level Alarm System2.6
33 56 10SD-10 - Tank Gauges2.7

Submittal Register, Dec 2019 Page &P of &N

File details come from the government source that posted it. Updated .