Add 1 2a. 15321.TOC_Addendum 1_FA441820R0010 B.419.pdf
PDF 210 KB Posted
- Attached to
- Repair Munitions Facility B419 Federal contract opportunity
- Solicitation number
- FA441820R0010
About this file
This solicitation is for a firm-fixed price contract to complete repairs to Munitions Facility B419 at Joint Base Charleston - Weapons Station in Goose Creek, South Carolina. The contractor shall provide all personnel, equipment, tools, materials and supervision necessary to complete project DKGV 14-2080. The anticipated period of performance is 450 calendar days. A mandatory site visit is scheduled for May 7, 2020 at 9:00am EST at the Red Bank Visitor Control Center parking lot. Interested parties must RSVP for the site visit by May 5, 2020. The solicitation was issued by the Department of the Air Force Air Mobility Command.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovation of Munitions WS Building at
Joint Base Charleston – Weapons Station Goose Creek, South Carolina
Berkeley County
Specifications
March 3, 2020 Addendum No. 1 Submittal
Project Manager: Greg Jones, P.E.
gregj@adcengineering.com JBC Project No. DKFX 14-2080 ADC Project No. 15321
3/3/2020
Renovation of Munitions WS Building 419 JBC Project No. DKGV 14-2080 March 3, 2020 Addendum No. 1
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16.00 20 PROJECT SCHEDULE AND PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 54 00.00 31 GREEN PROCUREMENT
01 57 19.00 31 TEMPORARY ENVIRONMENTAL CONTROLS (JB CHS-7/2014)
01 57 20.00 31 ENVIRONMENTAL PROTECTION
01 74 19.00 31 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT (JB CHS)
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 01 00.00 ENVIRONMENTAL REPORT
02 41 00 DEMOLITION
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 13 73 SLIDING METAL DOORS
DI VI SI ON 09 - FI NI SHES
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
PROJECT TABLE OF CONTENTS Page 1
Renovation of Munitions WS Building 419 JBC Project No. DKGV 14-2080 March 3, 2020 Addendum No. 1
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 31 13.00 40 METAL DUCTS
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
23 82 19.00 40 FAN COIL UNITS
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 31 76 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
File details come from the government source that posted it. Updated .