Access_Requirements.pdf

PDF 887 KB Posted

Attached to
Asset Protection - Concrete
Solicitation number
913-0213-26
Issued by
Tehama County, California

About this file

This is an Access Requirements diagram for the Solano County Asset Protection – Concrete project, detailing vehicle and pedestrian access points across ten county property locations including Union Avenue, Clay Street, Delaware Street, and Texas Street facilities. The diagram establishes three categories of vehicle access points: Category A Critical Emergency Vehicle Access Points that must remain open 24 hours per day, 7 days per week with immediate mitigation required for any disruptions; Category B Important Operational Vehicle Access Points requiring minimum two-week notice before disruption with potential alternate access provisions; and Category C Major Traffic Access Ways requiring minimum three-week notice, traffic control plans, and encroachment permits. Additionally, the diagram identifies three categories of pedestrian access points: Category 1 Major public and staff entry points requiring three-week notice and an Accessible Alternate Pedestrian Access Plan; Category 2 Secure staff entry points requiring two-week notice with a possible requirement for an Accessible Alternate Pedestrian Access Plan; and Category 3 Possible egress points requiring two-week notice and potential fire marshal-approved alternate exit plans.

The document specifically maps critical facilities including the Solano Justice Center, Hall of Justice North and South Wings, Solano County Emergency Services, Solano Detention Facility, Sheriff Professional Standards, Communications Center, Cogeneration Plant, and the Solano Coroner's Office, with identified access points such as sally ports, loading bays, staff entrances, court entries, and maintenance areas. Contractors performing concrete masonry work under this Asset Protection Project must coordinate all construction activities with these access requirements to ensure continuous emergency vehicle operations and building occupant access throughout the 231-calendar-day construction period.

View the file

Other files

File Type Posted
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA LITE

AREA LITE

NO

PARKING

RESERVED

RESERVED

NO

PARKING

RESERVED

NO

PARKING

NO

PARKING

NO

PARKING

NO

PA

RK

IN

G

NO

PARKING

NO

PARKING

NO

PARKING

NO

PARKING

B

BB

B

B

B

B

B

B

B

B

B

B

B

B

B

BB

B

B

B

B

B

B

B

B

B

B

BB

B

B

NO

PA

RK

IN

G

NO

PARKING

NO

PARKING

CR

IC

C R

IC IC

IC

IC

C R

C R

C R

CR

IC

IC

CR

C R

C R

C R

CR

IC

IC

IC

IC

CR

C R

CR

C R

C R

CR

C R

C R

CONSTRUCTION

PHASING

X:

\1

\1

4.

\T

EC

H \C

AD

\P

AR

KI

N G

L O

T

IM

PR

O

VE

M

EN

TS

\G -0

C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

.D W

G

/2

1/

:4 9:

P

M

SHEET CONTENTS

or l

00 60 120

Vehicle Access Points

A Critical Emergency Vehicle Access Point.

Must remain open to large vehicle access 24 hours a day, 7 days a week. Any disruption to vehicle access route will require immediate mitigation.

B Important Operational Vehicle Access Point. Contractor to provide minimum 2 week notice prior to any activities disrupting access or vehicle route. Alternate access provisions by contractor may be required

C Major Traffic Access Way. Contractor to provide minimum 3 week notice prior to any activity disrupting access. A traffic control plan & encroachment permits are required.

Pedestrian Access Points

1 Major public & staff entry point. Contractor to provide minimum 3 week notice prior to any construction activities disrupting access. An Accessible Alternate Pedestrian Access Plan will be required.

2 Secure Staff entry point. Contractor to provide minimum 2 week notice prior to any activities disrupting access. An Accessible Alternate Pedestrian Access Plan may be required.

3 Possible egress point. Contractor to provide minimum 2 week notice prior to any activities disrupting egress. An alternate exit plan with fire marshal approval may be required.

501 Texas Co-Op Extension / Sheriff Investigations

600 Union Ave Hall of Justice North Wing

600 Union Ave Hall of Justice South Wing

530 Union Ave Solano Justice Center 530 Clay St

Solano County Emergency Services

500 Union Ave Solano Detention Facility

512 Clay St Sheriff Professional Standards

500 Clay St Communications

501 Delaware St Cogeneration Plant

512 Clay St Emergency Services Vehicle Storage

520 Clay st Solano Coroner's Office

Delaware Street

A

A

B

JCDF Sally Port Entrance

Coroner Sally Port Entrance

JCDF

Loading Bay

A JCDF Sally Port Entrance

B OES &

Facilities Vehicles

B

OES &

Facilities Vehicles

B Cogen Loading Bay

C

Washington Street C

Clay Street C

Access Requirements

B

Court Maintenance Area

B Judges Parking

B Sheriff Response Vehicle Parking

B Sheriff Response Vehicle Parking

OES Entry

Office of Professional Standards2 Staff

Entrance

2 Communications

Court Entry

1 Court Entry

1 JCDF

Entry

B Loading Bay

Coop & Sheriff Investigations

B

Maintenance Access

2 Maintenance

2 Maintenance

JCDF

Release Point

B Loading Bay

Staff Entry

2 Staff

Entry

B

Loading Bay

2 Staff Entry

B Loading Bay

2 Staff Entrance

2 Staff Entrance

2 Staff Entrance

A Sally Port

2 Staff Entrance

Staff Entrance

2 Staff Entrance

Staff Entrance 3

File details come from the government source that posted it. Updated .