20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf

PDF 2 MB Posted

Attached to
Asset Protection - Concrete
Solicitation number
913-0213-26
Issued by
Tehama County, California

About this file

This is a preliminary temporary sewer bypass plan drawing prepared for the City of Fairfield and County of Solano in connection with the Justice Campus Asset Protection Project. The drawing, last revised on February 24, 2026, provides horizontal design specifications at a scale of 1"=30' and depicts sanitary sewer bypass provisions necessary to protect county assets during construction activities. The document serves as part of the larger multi-prime Asset Protection Project designed to shield county properties from seasonal stormwater flooding across ten locations including sites on Union Avenue, Clay Street, Delaware Street, and Texas Street. The temporary sewer bypass represents one of several infrastructure protection measures, alongside barrier walls, berms, flood gates, and underground utility reconfiguration, required to maintain essential services during the overall asset protection construction work.

The drawing is designated as preliminary and not for construction use, indicating it requires further development and approval before implementation. As a technical specification document supporting the broader concrete masonry and infrastructure work, this plan must comply with geotechnical investigation findings completed in May 2021 and must be integrated with the approved Issued for Construction drawing sets. The project is federally funded through FEMA Hazard Mitigation Assistance programs, with final FEMA closeout scheduled for January 12, 2027. Contractors performing work involving this temporary bypass system must maintain compliance with all federal procurement standards, prevailing wage requirements under the Davis-Bacon Act, and access management protocols including the maintenance of critical emergency vehicle access points throughout construction activities.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R, S

EP

FE

BR

UA

RY

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Ov erl an d S S

By pa ss P lan .dw g F eb

4,

- 8 :57 am

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

JU

ST

IC

E

CA

MP

US

A

SS

ET

P

RO

TE

CT

IO

N

CI

TY

O F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

SS1

TE

MP

OR

AR

Y

SE

W

ER

B

YP

AS

S

TEMPORARY SEWER BYPASS PLAN

HORIZONTAL: 1"=30'

SANITARY SEWER BYPASS PROVISIONS

File details come from the government source that posted it. Updated .