Access_Requirements.pdf

PDF 887 KB Posted

Attached to
Asset Protection - Concrete
Solicitation number
913-0213-26
Issued by
Tehama County, California

About this file

This is an Access Requirements document for Solano County's Asset Protection Project, a multi-location stormwater flood mitigation initiative affecting ten county properties across Union Avenue, Clay Street, Delaware Street, and Texas Street in the greater Solano County area. The document provides a detailed parking lot improvement construction phasing plan that establishes critical vehicle and pedestrian access protocols during construction activities. The plan designates three categories of vehicle access points: Category A Critical Emergency Vehicle Access Points must remain open 24 hours per day, seven days per week with no disruptions permitted; Category B Important Operational Vehicle Access Points require a minimum two-week notice before disruption; and Category C Major Traffic Access Ways require a minimum three-week notice along with traffic control plans and encroachment permits. Additionally, the document identifies three categories of pedestrian access points, including major public and staff entry points requiring three-week notice with accessible alternate pedestrian access plans, secure staff entry points requiring two-week notice, and possible egress points requiring two-week notice with fire marshal approval for alternate exit plans.

The access requirements document serves as an operational framework for the concrete masonry contractor to coordinate construction activities while maintaining essential county services at the justice center complex, detention facility, emergency services, sheriff operations, and other critical municipal functions located at the ten project sites. The document identifies specific access points for various county departments including the Hall of Justice, Solano Justice Center, Emergency Services, Detention Facility, Sheriff's Office, Coroner's Office, and Co-Op Extension, with designated loading bays, sally ports, staff entrances, and vehicle parking areas that must remain accessible throughout the construction period. Contractors must demonstrate comprehensive understanding of these access constraints and submit mitigation plans that balance construction sequencing with uninterrupted public safety and judicial operations.

View the file

Other files

File Type Posted
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Concrete_-_Project_Manual.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA LITE

AREA LITE

NO

PARKING

RESERVED

RESERVED

NO

PARKING

RESERVED

NO

PARKING

NO

PARKING

NO

PARKING

NO

PA

RK

IN

G

NO

PARKING

NO

PARKING

NO

PARKING

NO

PARKING

B

BB

B

B

B

B

B

B

B

B

B

B

B

B

B

BB

B

B

B

B

B

B

B

B

B

B

BB

B

B

NO

PA

RK

IN

G

NO

PARKING

NO

PARKING

CR

IC

C R

IC IC

IC

IC

C R

C R

C R

CR

IC

IC

CR

C R

C R

C R

CR

IC

IC

IC

IC

CR

C R

CR

C R

C R

CR

C R

C R

CONSTRUCTION

PHASING

X:

\1

\1

4.

\T

EC

H \C

AD

\P

AR

KI

N G

L O

T

IM

PR

O

VE

M

EN

TS

\G -0

C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

.D W

G

/2

1/

:4 9:

P

M

SHEET CONTENTS

or l

00 60 120

Vehicle Access Points

A Critical Emergency Vehicle Access Point.

Must remain open to large vehicle access 24 hours a day, 7 days a week. Any disruption to vehicle access route will require immediate mitigation.

B Important Operational Vehicle Access Point. Contractor to provide minimum 2 week notice prior to any activities disrupting access or vehicle route. Alternate access provisions by contractor may be required

C Major Traffic Access Way. Contractor to provide minimum 3 week notice prior to any activity disrupting access. A traffic control plan & encroachment permits are required.

Pedestrian Access Points

1 Major public & staff entry point. Contractor to provide minimum 3 week notice prior to any construction activities disrupting access. An Accessible Alternate Pedestrian Access Plan will be required.

2 Secure Staff entry point. Contractor to provide minimum 2 week notice prior to any activities disrupting access. An Accessible Alternate Pedestrian Access Plan may be required.

3 Possible egress point. Contractor to provide minimum 2 week notice prior to any activities disrupting egress. An alternate exit plan with fire marshal approval may be required.

501 Texas Co-Op Extension / Sheriff Investigations

600 Union Ave Hall of Justice North Wing

600 Union Ave Hall of Justice South Wing

530 Union Ave Solano Justice Center 530 Clay St

Solano County Emergency Services

500 Union Ave Solano Detention Facility

512 Clay St Sheriff Professional Standards

500 Clay St Communications

501 Delaware St Cogeneration Plant

512 Clay St Emergency Services Vehicle Storage

520 Clay st Solano Coroner's Office

Delaware Street

A

A

B

JCDF Sally Port Entrance

Coroner Sally Port Entrance

JCDF

Loading Bay

A JCDF Sally Port Entrance

B OES &

Facilities Vehicles

B

OES &

Facilities Vehicles

B Cogen Loading Bay

C

Washington Street C

Clay Street C

Access Requirements

B

Court Maintenance Area

B Judges Parking

B Sheriff Response Vehicle Parking

B Sheriff Response Vehicle Parking

OES Entry

Office of Professional Standards2 Staff

Entrance

2 Communications

Court Entry

1 Court Entry

1 JCDF

Entry

B Loading Bay

Coop & Sheriff Investigations

B

Maintenance Access

2 Maintenance

2 Maintenance

JCDF

Release Point

B Loading Bay

Staff Entry

2 Staff

Entry

B

Loading Bay

2 Staff Entry

B Loading Bay

2 Staff Entrance

2 Staff Entrance

2 Staff Entrance

A Sally Port

2 Staff Entrance

Staff Entrance

2 Staff Entrance

Staff Entrance 3

File details come from the government source that posted it. Updated .