A1. NMMC Art Framing_PWS for RFQ.docx
DOCX document 53 KB Posted
- Attached to
- Professional Art Framing Services for the National Museum of the Marine Corps - updated 6/17/26 with Q&A
- Solicitation number
- M0026426Q0094
- Issued by
-
United States Marine Corps
About this file
This is a Performance Work Statement (PWS) for professional art framing services for the National Museum of the Marine Corps (NMMC). The NMMC maintains a collection of over 13,000 fine art pieces spanning from the mid-19th century to present day, including works by nationally and internationally recognized artists on various substrates (paper, canvas, wood, metal, and Masonite) ranging from 1.5" x 2" to 5'6" x 10'6" in dimensions. The Government intends to award an Indefinite Delivery Indefinite Quantity (IDIQ) contract with a five-year ordering period under which individual Task Orders will be issued. This is a small business set-aside solicitation with performance beginning August 1, 2026, through July 31, 2031.
The Contractor must provide professional custom framing services meeting Professional Picture Framers of America (PPFA) and museum standards, including framing of canvas works, original works on paper with acid-free mat board and UV-coated museum Plexi, stretching canvas giclee prints onto stretcher bars, and installing "D" rings for suspension systems. All materials must be archival quality and museum grade with climate-controlled facility requirements (50-60% relative humidity, 68-72°F ± 5%). The Contractor must complete an intake meeting within 25 days of award, deliver framed works within 15 days of pickup, provide 48-hour availability for touch-ups, and handle transportation with appropriate protective packaging. Personnel must have minimum five years' professional framing experience with mid-sized to large museum collections and demonstrate professional development in conservation methods. The pricing structure is Firm-Fixed Price (FFP) with line items for various frame types, sizes, materials (fillets, Plexi, mat boards, stretcher bars), and hourly touch-up rates, with the Contractor responsible for all travel and material costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Professional Art Framing National Museum of the Marine Corps (NMMC)
1. Background The National Museum of the Marine Corps (NMMC), hereafter known as the NMMC, has a collection of fine art that represents over two (2) centuries of both eye-witness accounts and artistic interpretations of the visual history of the United States Marine Corps (USMC), hereafter known as the USMC. The 13,000+ piece collection includes works by nationally and internationally recognized artists. Much of the collection includes works on paper and stretched canvas. Some works are painted on wood, metal, Masonite, and other substrates. The dimensions of the works range from 1.5” tall x 2” wide to over 5’6” tall x 10’6” wide. The paintings in the collection range in age from the mid-19th century to the present day. The Art Collection’s rationale has as its primary focus fine art that documents the creation and history of the Continental Marines and USMC and continues to grow, adding several hundred works per year.
1. Scope This requirement is for professional custom framing for the NMMC’s fine art collection and fine art reproductions on both paper and canvas.
The Government intends to award an Indefinite Delivery Indefinite Quantity (IDIQ) contract with this requirement with a 5-year ordering period during which individual Task Orders may be issued/awarded under the master IDIQ contract. The Contractor shall perform services as identified in each Task Order.
1. Performance Requirements
2. The Contractor shall be available for an intake meeting within twenty-five (25) days from award of contract to review the types of works to be framed including both fine art and fine art prints on canvas and/or paper, corner samples currently held by the NMMC and to provide 8-ply corner samples of acid-free mat board.
2. The Contractor shall provide custom art framing for original works of art and fine art prints on canvas and/or paper. Custom framing shall include the following:
1. The Contractor shall frame works on canvas.
1. The Contractor shall frame original works on paper with appropriate 8-ply or 4-ply acid free mat board and non-reflective, UV-coated, museum Plexi.
1. The Contractor shall put canvas giclée prints onto stretcher bars and replace removable archival backing board for stabilization
1. The Contractor shall install “D” rings on the back of the framed works at 3 to 3.5 inches from the top of the frame to all the works of art, allowing the works to be suspended from the NMMC’s hanging wire system. There shall also be “D” rings with attached picture wire further down the frame to permit the work to be hung from hooks on the wall.
1. All framing work shall meet the Professional Picture Framers of America (PPFA) and museum standards.
4. The Contractor shall redo all rejected work in accordance with PPFA and museum standards. All rejected work shall be corrected within ten (10) business days unless otherwise specified by the Technical Point of Contact (TPOC).
1. All frames must have an archival backing board approved by the TPOC and be easily disassembled and reassembled as needed.
1. If a selected molding is discontinued, then the Contractor shall make an alternative recommendation regarding the molding similar in style and without additional cost to the original selection.
1. All materials shall be archival quality and museum grade. All glazing on original works of art shall be non-reflective, UV-coated, museum Plexi unless otherwise specified by the TPOC. Spacers may be required to be installed to protect the artwork from coming into direct contact with the glazing, as required.
1. The contractor shall be available within 48 hours to perform touch-ups on frames as needed at the NMMC Museum Support Facility (MSF) or in the NMMC art gallery.
1. The Contractor shall pick up and transport the works of art and giclée prints from the NMMC or MSF and then deliver the framed works to the MSF.
9. The Contractor shall prepare works for safe transport: wrapped in glassine and/or plastic, covered corrugated cardboard and/or wrapped with bubble wrap, to be delivered in a closed vehicle with environmental controls, including air conditioning and heating to protect the artworks during transport.
1. Applicable Information and/or Documents
3. Government Technical Point of Contact (TPOC): TPOC contact information to be provided to the Contractor at time of award.
3.1. Period of Performance: The Government intends to award an Indefinite Delivery Indefinite Quantity contract (IDIQ) for this requirement with a 5-year ordering period during which individual task orders may be issued/awarded under the master IDIQ contract. The ordering period for the base year shall begin upon the date of contract award.
3. Place of Performance/Delivery Address: All framing work shall be conducted at the Contractor’s facility. The Contractor shall pick up the works of art and fine art prints on canvas and/or paper from the NMMC art collection located at the MSF and deliver to either the MSF or main NMMC building.
NMMC Museum Support Facility (MSF) 17001 Interstate Dr. Ste. 130 Dumfries, VA 22026-2121
National Museum of the Marine Corps (NMMC) 1775 Semper Fidelis Way Triangle, VA 22172
3. List of Deliverables:
| Deliverable Name |
| Description |
| Frequency or Required Date |
| Method of Delivery |
| Framed artworks and/or fine art prints on canvas or fine art paper. |
| Style and sizes of frames established by each individual Task Order |
| 15 days after picking up works of art |
| Deliver to TPOC for inspection at MSF |
3. Hours of Operation: The Contractor shall provide support services for art framing Monday through Friday between the COE operations hours of 0900-1600. The Contractor shall conduct business as necessary to meet the requirements of this PWS. The Contractor may be required to adjust its work schedules to accommodate art framing requests.
3. Contractor Personnel / Qualifications:
5. The Contractor shall provide proof of having a minimum of five (5) years’ experience as a professional framer and have a history of working with mid-sized to large fine art museum collections.
5. The Contractor shall show evidence of professional development regarding conservation methods in framing and mounting and hinging works on paper. This proof will either be in class work such as the Master Certified Picture Framer exam through the Picture Framers Association of America (PPFA) or other experience and coursework.
3. Travel: The Government intends to award a Firm-Fixed Price (FFP) contract type. The Contractor is responsible for all travel/per diem related expenses required to perform this contract. Any anticipated travel costs in the performance of this contract shall be included as part of the quoted rate(s). Any travel matters associated with the performance of this contract are the sole responsibility of the Contractor. The Government shall not have any financial responsibility other than paying for the FFP on each line item.
3. Government Property: NMMC artwork requiring transportation services to the Contractor’s facility for framing services are considered Government property. Upon transfer to the Contractor, artifact transfer documentation is required for NMMC records and accountability. The NMMC Registrar will provide the Contractor with a temporary custody receipt or loan agreement for all artworks to be framed.
3. Government Facility Access: The Contractor must possess a current valid state driver’s license and/or form of government approved official identification containing a personal photograph. The identification is required for security purposes to access active military installations.
3. Specifications:
9. The Contractor’s framing facility shall maintain appropriate climate and humidity controls providing a stable environment for NMMC property meeting the following requirements: 50-60% relative humidity and 68-72 degrees Fahrenheit with plus or minus 5% fluctuation.
0. The Contractor and contractor’s framing facility are subject to site visit and inspection by the TPOC at any time during the duration of the contract. Each site visit shall be coordinated with the Contractor.
9. For purposes of completing the Pricing Table below, NMMC denotes the following size ranges for small, medium, and large works of art:
1. Small: not to exceed 18” x 20”
1. Medium: larger than 18” x 20” but not to exceed 30” x 36”
1. Large: larger than 30” x 36” but not to exceed 40” x 60”
1. Pricing Table
Framing of Fine Art
TASK PRICING TABLE
| BILLABLE TASK |
| ORDERING PERIOD |
| Year 1 |
| Year 2 |
| Year 3 |
| Year 4 |
| Year 5 |
| 1 |
| Site Visit, per PWS Section 3.1 (NTE one 8-hr business day per each) |
| 2 |
| “L” shaped 1” neutral wood frame, small sized work (per linear foot) |
| 3 |
| “L” shaped 1.5” neutral wood frame, medium sized work (per linear foot) |
| 4 |
| “L” shaped 2” neutral wood frame, large sized work (per linear foot) |
| 5 |
| 1” plain wood frame, small sized work (per linear foot) |
| 6 |
| 1 ½” plain wood frame, medium sized work (per linear foot) |
| 7 |
| 2” plain wood frame, large sized work (per linear foot) |
| 8 |
| 1” carved wood frame, small sized work (per linear foot) |
| 9 |
| 1 ½” carved wood frame, medium sized work (per linear foot) |
| 10 |
| 2” carved wood frame, large sized work (per linear foot) |
| 11 |
| 3” carved wood frame, medium sized work (per linear foot) |
| 12 |
| 3” carved wood frame, large sized work (per linear foot) |
| 13 |
| 1” embellished wood frame, small sized work (per linear foot) |
| 14 |
| 1 ½” embellished wood frame, medium sized work (per linear foot) |
| 15 |
| 2” embellished wood frame, medium sized work (per linear foot) |
| 16 |
| 2 1/2” embellished wood frame, medium sized work (per linear foot) |
| 17 |
| 2” embellished wood frame, large sized work (per linear foot) |
| 18 |
| 3” embellished wood frame, large sized work (per linear foot) |
| 19 |
| 1” ornate wood frame, small sized work (per linear foot) |
| 20 |
| 1 ½” ornate wood frame, medium sized work (per linear foot) |
| 21 |
| 2” ornate wood frame, medium sized work (per linear foot) |
| 22 |
| 2 ½” ornate wood frame, large sized work (per linear foot) |
| 23 |
| 3” ornate wood frame, large sized work (per linear foot) |
| 24 |
| Fillet, small sized work (per linear foot) |
| 25 |
| Fillet, medium sized work (per linear foot) |
| 26 |
| Fillet, large sized work (per linear foot) |
| 27 |
| Non-glare UV-Plexi, small sized work, see PWS 3.2.2 (per square inch) |
| 28 |
| Non-glare UV-Plexi, medium sized work, see PWS 3.2.2 (per square inch) |
| 29 |
| Non-glare UV-Plexi, large sized work, see PWS 3.2.2 (per square inch) |
| 30 |
| Standard Plexi, small sized work, see PWS 3.2.2 (per square inch) |
| 31 |
| Standard Plexi, medium size work, see PWS 3.2.2 (per square inch) |
| 32 |
| Standard Plexi, large size work, see PWS 3.2.2 (per square inch) |
| 33 |
| Stretching and stretcher bars, small sized print on canvas, see PWS 3.2.3 (per each) |
| 34 |
| Stretching and stretcher bars, medium sized print on canvas, see PWS 3.2.3 (per each) |
| 35 |
| Stretching and stretcher bars, large sized print on canvas, see PWS 3.2.3 (per each) |
| 36 |
| 8-ply acid free mat, small sized work on paper, see 3.2.2 (per mat) |
| 37 |
| 8-ply acid free mat, medium sized work on paper, see 3.2.2 (per mat) |
| 38 |
| 8-ply acid free mat, large sized work on paper, see 3.2.2 (per mat) |
| 39 |
| 4-ply acid free mat, small sized work on paper, see 3.2.2 (per mat) |
| 40 |
| 4-ply acid free mat, medium sized work on paper, see 3.2.2 (per mat) |
| 41 |
| 4-ply acid free mat, large sized work on paper, see 3.2.2 (per mat) |
| 42 |
| Two sets of “D” rings and picture wire on back of framed work, see PWS 3.2.4 (per each) |
| 43 |
| Touch-up damaged frames, see PWS 3.2.9 (hourly rate) |
Note to Contractor:
· Contractor must include the cost of any materials in their firm-fixed rates to include those involving framing and matting, for example.
· All Per Each unit pricing assumes not-to-exceed (NTE) Per Each pricing for the specified billable task.
(End of PWS)
DISTRIBUTION: DoW COMMUNITY ONLY
File details come from the government source that posted it. Updated .