A1_-_Collins_Creek_Roof_Replacement_SOW.pdf

PDF 239 KB Posted

Attached to
GRSM, Roof Replacements on 5 Bldgs, NC
Solicitation number
140P5126Q0031
Issued by

About this file

This is a Scope of Work for a roof replacement project at Collins Creek Picnic area within Great Smoky Mountains National Park, North Carolina. The project encompasses replacement of 3,600 square feet of roofing across three structures: Collins Creek Picnic Pavilion (1,800 square feet), Collins Creek Building 414 (900 square feet), and Collins Creek Building 416 (900 square feet). All roofing materials must be CertainTeed Presidential Shake asphalt shingles in Weathered Wood color or comparable alternatives approved by the Contracting Officer's Representative (COR) prior to construction. The contractor is responsible for removing existing asphalt shingles and transporting all materials to an approved waste collection or recycling facility with load tickets provided as proof of disposal.

The contractor must furnish all personnel, equipment, tools, and materials necessary to complete the work, including protection of surrounding structures and landscaping, temporary weatherproofing during non-work hours and inclement weather, addressing rotten decking (limited to 25 percent replacement per structure), installation of ice and water shield, brown aluminum drip edge, new flashing with proper seals, and permanent under-ridge vents or ridge cap fall protection roof anchors installed approximately every 8 feet along the ridge per OSHA 29 CFR 1926.502(d)(15). Work must be completed within 150 days of the Notice to Proceed, performed during normal business hours of 7:00 a.m. to 3:30 p.m., Monday through Friday, excluding Federal holidays. The contractor must submit a proposal package including technical approach, qualifications, safety plan, Quality Control Plan addressing daily reporting and remediation methods, proof of business liability and workers compensation insurance, and a detailed schedule. All work must comply with National Park Service regulations, OSHA requirements, and applicable environmental laws.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Collins Creek Roof Replacement

SECTION 1

I. BACKGROUND

The project is for roofing replacement. This project would replace 3,600 square feet of roofing on Three visitor use locations within Collins Creek Picnic area which is located on the North Carolina side of the Park. Collins Creek

Picnic area is located on Newfound Gap rd. roughly 8 miles outside of Cherokee NC, just 4.9 miles north of the

Oconaluftee Visitor center. The three structures are Collins Creek Picnic pavilion, Collins Creek comfort stations

Buildings 414 and 416. Asphalt roofing to be installed will be or equal to CertainTeed Presidential Shake asphalt shingles color to be Weathered Wood. Maps and Photos of the buildings and locations of the building’s roofs can be made available upon request. The buildings are listed below:

Collins Creek Picnic Pavilion

• Latitude 35° 34' 05.16" N, Longitude 83° 20' 19.36" W

• ESTIMATED 18 roofing squares (Roof Estimated 1800 SQFT) – up to 8/12 pitch

• CertainTeed Presidential Shake Weathered Wood

• Permanent under ridge cap Fall protection roof anchors

• Contractor responsible for acquiring all materials

Collins Creek Building 414

• Latitude 35° 34' 06.04" N, Longitude 83° 20' 16.62" W

• ESTIMATED 9 roofing squares (Roof Estimated 900 SQFT) – up to 6/12 pitch

• CertainTeed Presidential Shake Weathered Wood

• Permanent under ridge Fall protection roof anchors

Collins Creek Building 416

• Latitude 35° 34' 07.24" N, Longitude 83° 20’ 14.69" W

• ESTIMATED 9 roofing squares (Roof Estimated 900 SQFT) – up to 6/12 pitch

• CertainTeed Presidential Shake Weathered Wood

• Permanent under ridge Fall protection roof anchors

II. DESCRIPTION OF WORK/SCOPE: The contractor shall furnish all personnel, equipment, tools, materials, supervision, and other items and services necessary to remove and replace roofing material. The structures are older buildings that have settled and may contain areas that are not perfectly square. The contractor will be responsible for using proper installation methods and proper trade methods for the adjustment of both unsquared and square areas along the roof; thus creating a visually appealing and weather tight roof.

Roof Specification:

a) The contractor will remove the existing asphalt shingles and transport them to a waste collection or recycling facility for disposal. The disposal will include all components including shingles, drip edge, flashing, and all other miscellaneous roof materials. The contractor will be responsible for providing load tickets for what was disposed.

b) The contractor will be responsible for protecting surrounding structures and landscaping from damage during the duration of the job. The contractor will be required to tarp off all areas around the structures to catch all loose debris. A magnet will be used daily to remove any loss screws, nails, fasteners or other tire puncture hazards.

c) The contractor is to provide temporary weatherproofing of all exposed roof surfaces during non-work hours of project, and in inclement weather during work hours. If damage occurs as a result of inadequate weatherproofing, Contractor shall make repairs at no additional cost to the government.

d) The contractor will be responsible for addressing rotten decking components before installing new roofing products. The materials used will be in-kind to existing materials on the structure. The contractor will be responsible for no more than 25% wood replacement per structure.

e) The contractor will clean the roof decking of all protruding staples, nails, and debris before installing any new products. The Park requires a site inspection once demolition and repairs have been completed, for verification. The inspection must occur prior to installation of any new roofing components. The Contracting Officer’s Representative (COR) will sign off on completion before final components are installed.

f) The contractor will install an ice and water shield in areas required on the roof surface. The remaining underlayment will be installed using complete sections minimizing joints along the roof surface.

g) The contractor will be responsible for installing aluminum drip edge brown in color along all outside edges. The drip edge will be installed using full 10’, or longer, length sections where applicable to minimize unsightly joints. All adjoining sections will be cut to proper angles and overlapped to create a seamless transition.

h) The roofing shingles are to be CertainTeed, Presidential Shake asphalt shingles color to be

Weathered Wood or comparable asphalt shingles of another manufacturer so long as the color and pattern is similar to CertainTeed, Presidential Shake, color is Weathered Wood. If using a manufacturer other than CertainTeed, Presidential Shake, the COR must inspect and approve of the color and pattern of the other asphalt shingles prior to beginning of any construction. Contractor will install all roofing materials with proper galvanized roofing fasteners that do not protrude through visible decking. All materials must be installed according to manufacturer’s installation standards.

i) The contractor will be responsible for installing all new roof flashing. The flashing will be installed using proper fasteners and techniques insuring a watertight seal.

j) The contractor will “boot” and seal all vent tubes, electrical masts, and exhaust stacks that are venting through the roof with new boots/flashing. The existing boots/flashing will not be accepted.

k) The contractor will be responsible for Installing permanent under ridge vent, or Ridge cap fall protection roof anchors, roof anchors shall be installed approximately every 8’ along the ridge, anchors shall not be installed within 6’ of the gable end. Anchors shall be designed to accept lanyards with D-clips and permanently mounted to withstand 1,800 lbs. of force for an employee with a body harness. The anchorage shall be rigid and shall not have a deflection greater than 0.04 inches when a force of 2,250 lbs. is applied, per OSHA 29 CFR 1926.502(d)(15)

l) The contractor will be responsible for installing Shingle Over Plastic Ridge Vent. In areas that ridge vents were installed previously. The ridge vent will be installed using proper fasteners and shingles will be layered to meet manufacturer’s specifications.

m) The contractor will supply copies of the warrantees, and all applicable written product operation and maintenance instruction manuals. The contractor should also be prepared to brief the park’s COR on the maintenance requirements.

n) All warranty documentation will be provided to the contracting officer and COR. All materials will be installed in accordance with industry standard installation techniques and manufacturer’s installation specifications.

o) All work required by the project documents is to be successfully and satisfactorily completed, in its entirety, by the Contractor, to include minor items/services that may not be specifically mentioned in the project documents.

p) Comply with all applicable National Park Service regulations and directives pertaining to security, safety, occupational health, fire, traffic, and personnel clearances while at Great Smoky Mountains

National Park. The park rules are located at under the polices link. Superintendent’s Compendium The

COR can also provide if requested. The COR can also provide if requested.

https://www.nps.gov/grsm/learn/management/superintendent-s-compendium.htm

q) If the contractor makes use of any scaffolding, the area around the scaffolding must be barricaded in such a way as to prevent accidental entry into the scaffolding area by unauthorized individuals and any scaffolding over ten feet in height will make use of toe boards. Contractor shall comply with all OSHA regulations pertaining to this project

r) Workers and other persons below a roofing surface where construction is taking place or beneath scaffolding, that is greater than ten feet in height, will be required to wear a hard hat. The contractor shall follow all OSHA requirements on the job site including OSHA hard hat requirements.

IV. Business Hours. The contractor shall complete on-site work during normal business hours of 7:00 am to 3:30 pm, Monday through Friday, excluding Federal holidays. The contractor shall coordinate specific on-site work schedule with the Contracting Officer and COTR at least five days prior to performance start date. While on site, the COTR may be reached by mobile phone during normal business hours. Work shall be completed within 150 days after Contracting Officer issues the Notice to Proceed. Any work outside of normal business hours shall be requested with 72 hours notice to the

Contracting Officer and COR.

V. Management. The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on-time completion of this contract.

VI. Safety & Environmental Compliance:

a. The contractor shall comply with pertinent provisions of the Occupational

Safety and Health Act (OSHA), and state, local, safety, laws.

b. The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.

c. The Park Safety Officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten

Government and contractor employees or damage to Government property.

d. The contractor shall immediately report to the Contracting Officer, COR and

Park safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.

VII. Insurance. The Contractor shall be insured in accordance with State of North

Carolina insurance regulations. The Government is not responsible for damage to

Contractor's equipment, vehicles, tools or materials or their employees and the personal property brought on- site. The Government will not accept any liability due to contractor employee negligence.

a. Workers Compensation: The contractor shall furnish proof of workers compensation insurance to the Contracting Officer for those employees performing work related to this contract and shall comply with the Workman's Compensation

Laws of the State of North Carolina.

b. Liability: The Contractor shall maintain a level of insurance that will protect the contractor and the Government from any claims because of bodily injury

(including death) and property damage which may arise from and during the performance of this contract and shall submit proof of insurance to the

Contracting Officer.

VIII. Motor Vehicle & Traffic Regulations. Contractor employees operating motor vehicles shall possess a valid driver's license. Driver and vehicle permit, licenses, registrations, and proof of insurance shall be always maintained in the vehicle and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be always worn. Contractor employees shall adhere to the posted speed limits.

IX. Employee Badges/Parking. All contractor employees shall comply with parking procedures published for the Park. Contractor employees shall return any PARK issued personal or vehicle identification badges or parking tags immediately upon termination of employment or completion of this contract.

X. Replacement of Contractor Employee for Security Reasons. The Government retains the right to request removal of the contractor's employee(s), regardless of prior clearances.

XI. Non-Payment for Additional Work. Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

XII. Conflict of Interest. The contractor shall not employ off-duty COR' s or other

Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

XIII. Quality Control. The contractor shall establish and maintain a Quality Control Plan

(QCP) to ensure the work performed conforms to the contract requirements. T he contractor's QCP shall address methods for remedying poor performance. The Contractor shall develop QCP and submit with proposal package. The Contractor's QCP includes:

a. Required work identified in this Statement of Work

b. Daily Reports

c. Method and timeframe for responding to COR

d. Progress meetings with Government stakeholders

XIV. Quality Assurance. The COR will monitor the contractor's performance under this contract. The COR will coordinate the following:

a. Acceptance of the contractor's quality control plan

b. Inspection of the contractor's work and compliance to the specifications

c. Progress meetings with the contractor

XV. Contractor's Proposal Package. The following deliverables are to be submitted with offer in response to RFQ.

a. Technical approach to perform required work that meet specifications.

b. Contractor’s qualifications.

c. Contractor safety plan.

d. Contractor's QCP.

e. Proof of Insurance-Business Liability & Workers Compensation.

XVI. Inspection. The Government will conduct inspection upon completion of required work. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

XVII. Schedule. The Contractor shall provide a schedule for completing the proposed scope of work. The schedule shall include all time required for mobilization, demolition, replacement of roofs, and final clean-up.