A06_SPECIFICATIONS_LAMB_HOUSE_DEMO.pdf
PDF 695 KB Posted
- Solicitation number
- 140L1725R0014
About this file
This is a detailed specification document for the Lamb House Demolition and Stabilization project, issued by the Bureau of Land Management's Tres Rios Field Office in Colorado for a 2025 project. The project involves comprehensive demolition and reconstruction of two historic stone buildings, including removing all building additions, reconstructing roofs, providing electrical service, and creating infrastructure such as a parking lot and access trail.
Key work elements include: demolishing building additions while protecting original stone walls, removing hazardous materials like asbestos, reconstructing roofs with synthetic shake shingles, installing a ductless mini-split air conditioner, providing electrical service to the south building, installing new doors and windows, creating a buck and pole fence, constructing a parking lot and access trail, and performing extensive earthwork. The project requires careful preservation of historic architectural elements, with specific requirements for material selection, installation techniques, and site restoration. The total project duration is set at 180 days from the Notice to Proceed, with work limited to Monday-Friday, excluding federal holidays and specific blackout periods.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Tres Rios Field Office Colorado
Lamb House Demolition and Stabilization
SPECIFICATIONS
LAMB HOUSE - DEMOLITION AND STABILIZATION
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 15 TRAFFIC CONTROL AND PUBLIC SAFETY
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 20 00 SURVEY AND PROJECT STAKEOUT
02 41 10 DEMOLITION
02 82 10 ASBESTOS REMOVAL AND DISPOSAL
02 84 50 HAZARDOUS MATERIAL REMOVAL
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 30 00 ROOF RECONSTRUCTION
07 31 00 SYNTHETIC SHAKE SHINGLES AND SIDING
DI VI SI ON 08 - OPENI NGS
08 50 00 DOORS, WINDOWS, WEATHERPROOFING
DI VI SI ON 09 - FI NI SHES
09 90 10 PAINTING
DI VI SI ON 12 - FURNI SHI NGS
12 93 00 CONCRETE PARKING STOPS
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 81 10 DUCTLESS MINI SPLIT AIR CONDITIONER
DI VI SI ON 26 - ELECTRI CAL
26 10 00 ELECTRICAL SERVICE
26 20 00 ELECTRICAL DISTRIBUTION
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 50 BUCK AND POLE FENCE
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAINAGE UTILITIES
PROJECT TABLE OF CONTENTS Page 1
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to; Demolish all additions to the two original stone buildings. Reconstruct the roofs over the original stone buildings. Provide electrical service to the south stone building.
Construct a parking lot and an access trail.
1.2 LOCATION
The project is located at:
12761 County Road G Cortez, CO 81321.
Note: Google Maps has the work location address: 12921 County Road G
1.3 WORK SCHEDULE
Work shall occur Monday - Friday. Work shall not occur on Federal Holidays, December 26-31, and the day after Thanksgiving. Work shall be completed within 180 days of the Notice to Proceed.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones, work listed in the bid schedule, and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities.
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 9
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 10
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until
SECTION 01 33 00 Page 11 resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
02 41 10 SD-01 Preconstruction Submittals
1.2Colorado Department Of Public
Health And Environment (Cdphe)
Demolition Permit
3.1 GDemolition Plan
02 82 10 SD-01 Preconstruction Submittals
3.1Asbestos Removal Work Plan
03 30 00 SD-03 Product Data
2.2 GStructural Macro Synthetic
Reinforcing Fibers
3.3 GColor Sample
07 30 00 SD-03 Product Data
2.2 GSnow Guards
07 31 00 SD-03 Product Data
2.2 GRoofing Underlayment
2.4 GSynthetic Shake Siding
2.3 GRoof Synthetic Shake Shingles
2.1 GWaterproof Sheet Membrane
08 50 00 SD-03 Product Data
2.1 GDoors
2.2 GWindows
12 93 00 SD-03 Product Data
2.1 GConcrete Parking Stops
23 81 10 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
23 81 10 2.1 GDuctless Mini Split Air
Conditioner
2.2 GCondensate Pump
SD-08 Manufacturer’s Instructions
3.1Installation Instructions
26 20 00 SD-03 Product Data
2.2 GElectric Distribution Panel
31 00 00 SD-03 Product Data
2.2 GTrail Surface Aggregate
2.3 GAggregate Base Course
SD-07 Certificates
3.16Weight Tickets
33 40 00 SD-03 Product Data
2.1 GCorrugated Steel Pipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 01 35 15
TRAFFIC CONTROL AND PUBLIC SAFETY
PART 1 GENERAL
1.1 SECTION SUMMARY
Contractor is responsible for work site safety at all times.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 SAFETY
Contractor shall take precautions, as necessary, to protect the public and employees from construction hazards.
3.2 TRAFFIC CONTROL
Contractor shall provide traffic control measures, as necessary, for traffic, trucks, equipment, dumpsters or other potential hazards entering and leaving the work site.
SECTION 01 35 15 Page 13
SECTION 02 20 00
SURVEY AND PROJECT STAKEOUT
PART 1 GENERAL
1.1 SECTION SUMMARY
Not Used.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PROJECT STAKEOUT
The BLM will stake out the centerline of the access trail and the parking lot stakeout points, as detailed on the plans, one time. The contractor is responsible for all other surveying. The contractor is responsible for re-staking, if necessary, for any reason.
SECTION 02 20 00 Page 14
SECTION 02 41 10
DEMOLITION
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Demolish all additions to the (2) two stone buildings. There may be loose items inside the building, those loose items will be part of the demolition. Conditions existing at time of the pre-bid site visit inspection will be maintained by the Government.
1.2 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE)
DEMOLITION PERMIT
Obtain a Colorado Department of Public Health and Environment (CDPHE) Demolition permit prior to beginning work. Submit a copy the approved permit to the Contracting Officer's Representative before beginning demolition work.
1.3 HAZARDOUS MATERIALS
All hazardous materials must be properly removed prior to demolition.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Colorado Department Of Public Health And Environment (Cdphe) Demolition Permit
Demolition Plan ; G
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 DEMOLITION PLAN
Submit a demolition plan that details the how the work will be accomplished. The plan shall include: Sequence of work, protection measures of structures to remain, removal of hazardous materials.
3.2 PROTECTION OF STRUCTURES TO REMAIN
Demolition shall not damage the buildings, or structures, that shall remain.
SECTION 02 41 10 Page 15
3.3 ROOF FINIALS - SALVAGE
Salvage the roof finials and reinstall in accordance with 07 30 00 ROOF
RECONSTRUCTION.
3.4 ANTIQUE STOVE - SALVAGE
Salvage the antique stove. Relocate the stove inside the south stone building, next to the fireplace.
3.5 UTILITIES - PROPANE
Demolish the propane tank and all distribution lines from the tank to the building. The propane tank contains propane. The propane shall be properly removed prior to demolition. Propane shall not be released from the tank into the air.
3.6 UTILITIES - ELECTRIC
Disconnect the electric service to the building, shed, and well house at the meter located on the electric pole. Remove the service wires (service drop) from the pole to the buildings, shed, and well house.
3.7 SEPTIC TANK
Demolish the septic tank. Demolish the sewer line from the buildings to the septic tank. Remove all waste inside the septic tank prior to demolition. Dispose of waste in accordance with federal, state, and local requirements. Backfill with satisfactory soil materials in accordance with section 31 00 00 .
3.8 BUILDING ADDITIONS
Demolish all additions to the (2) two stone buildings. Including walls, roofs, and foundations. Foundations shall be demolished to a depth of 48 inches below grade.
3.9 BELOW GRADE DEMOLITION
Remove below-grade construction a minimum 48 inches below grade. Below grade construction includes; concrete slabs, foundation walls, footings, sewer lines, gas lines, water lines, electric lines and other additions that were not part of the original stone buildings.
Completely fill below-grade areas and voids resulting from demolition operations with satisfactory soil materials in accordance with section 31 00 00 .
3.10 STONE WALL - CONTEMPORARY ADDITION DEMOLITION AND PROTECTION
Demolish all additions to the interior and exterior original stone walls.
Additions include, but are not limited to; drywall, furring strips, ledger boards, heating, ventilation, and air conditioning (HVAC), gas piping, electric wiring and conduit, lights, cabinets, plumbing, door frames, window sills, caulking, flashing, bolts, screws, and other fastening hardware.
Protect all stone walls from damage during demolition.
SECTION 02 41 10 Page 16
3.11 STONE WALL - PLASTER REMOVAL
Removal of plaster applied directly to stone walls is not required. For each wall where plaster is applied directly to the stone wall, remove a six inch diameter section of the plaster to expose the stone underneath.
Take care not to damage the stone wall when removing plaster. Removal of electrical conduit and outlets that are embedded in the plaster is not required.
3.12 STONE BUILDING CEILINGS, FLOOR AND ROOF STRUCTURAL MEMBERS
Demolish ceilings in the stone buildings. Completely expose the floor joists, roof rafters, roof ridge beam, and other structural members.
3.13 DOORS
Demolish all additions to the stone openings at the doors, including but not limited to; doors, door frames, door sills, door jambs, and thresholds.
3.14 WINDOWS
Demolish all additions to the stone openings at the windows, including but not limited to; windows, window frames, and window sills.
3.15 CISTERN
Protect cistern from damage during demolition. Completely fill the cistern in accordance with section 31 00 00 . Leave the stone block covering the cistern in place, undisturbed.
3.16 DEMOLISHED MATERIALS DISPOSAL
All materials designated to be demolished shall become the property of the Contractor and removed from Government property. Dispose of demolition materials in accordance with all applicable federal, state, and local regulations. The Contractor may salvage any of the demolished materials and items.
SECTION 02 41 10 Page 17
SECTION 02 82 10
ASBESTOS REMOVAL AND DISPOSAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Asbestos is present at the work site. The asbestos shall be removed and disposed in accordance with all Federal, State, and Local requirements.
1.2 CRITERIA FOR BIDDING
The BLM has an asbestos survey and inspection report for the work site, from February 2016. Contractor shall assume that no additional asbestos will be found that was not already identified in the existing asbestos survey and inspection report. If additional asbestos is found in the work, then an equitable adjustment for the removal will be made.
Work that occurred in the project since the 2016 asbestos survey includes;
re-roofing over the east building addition, demolition inside the bathroom located closest to the cistern, electrical panel box installation, and sump pump installation.
1.3 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.1101 Asbestos
40 CFR 61-SUBPART M National Emission Standard for Asbestos
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Asbestos Removal Work Plan
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ASBESTOS REMOVAL AND DISPOSAL
Perform all work in accordance 40 CFR 61-SUBPART M and 29 CFR 1926.1101 .
Asbestos must be removed by an asbestos removal contractor, certified by the State of Colorado. Submit an asbestos removal work plan that details
SECTION 02 82 10 Page 18 the removal and required safety precautions. Include in the work plan the certification(s) of the person(s) creating the work plan and of the person(s) performing the removal.
SECTION 02 82 10 Page 19
SECTION 02 84 50
HAZARDOUS MATERIAL REMOVAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
All hazardous materials must be properly removed prior to demolition.
Hazardous materials include, but are not limited to: asbestos, ozone depleting controlled substances (refrigerants), Polychlorinated Biphenyls (fluorescent light ballasts).
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ASBESTOS
See section 02 82 10 for asbestos removal requirements.
3.2 LEAD PAINT
Lead paint is present in the work site. The BLM has a lead paint survey from 2016. This project does not require lead paint to be remediated.
However, the Contractor shall follow any Federal, State, or Local requirements for handling and proper disposal of the materials covered with lead paint.
3.3 OTHER HAZARDOUS MATERIALS
The BLM is not aware of any other hazardous materials. The Contractor shall notify the BLM if any other hazardous materials, requiring special disposal are encountered prior to demolition.
SECTION 02 84 50 Page 20
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 SECTION SUMMARY
Patch concrete slab, as necessary for providing electrical service.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ASTM INTERNATIONAL (ASTM)
ASTM C387/C387M (2017) Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar
NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)
NRMCA QC 3 (2015) Quality Control Manual: Section 3, Plant Certifications Checklist:
Certification of Ready Mixed Concrete Production Facilities
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Structural Macro Synthetic Reinforcing Fibers ; G
Color Sample ; G
PART 2 PRODUCTS
2.1 CONCRETE
Provide concrete composed of portland cement, aggregates, water, and admixtures as specified.
SECTION 03 30 00 Page 21
2.1.1 STRENGTH
Compressive strength (f'c) shall be 3500 psi at 28 days.
2.1.2 Air Entrainment
Attain air content at point of placement between 4 and 6 percent.
2.1.3 SLUMP
Slump of the concrete, at the point of placement, shall be 4 inches or less.
2.1.4 PORTLAND CEMENT
ASTM C150/C150M, Type II.
2.2 STRUCTURAL MACRO SYNTHETIC REINFORCING FIBERS
Structural macro synthetic reinforcing fibers shall be Sika Fibermesh 650, or approved equal. Structural macro synthetic reinforcing fibers shall have a diameter greater than 0.3 mm and a length between 1 inch and 3 inches.
2.3 PREPACKAGED CONCRETE MIXTURE
Prepackaged concrete mix shall be identified as conforming to
ASTM C387/C387M
2.4 READY MIXTURE
Ready-mix plant equipment and facilities must be certified in accordance with NRMCA QC 3.
2.5 COLOR
Match existing slab color.
PART 3 EXECUTION
3.1 CONCRETE PATCH
Concrete patch dimensions (thickness and footings) shall match existing dimensions.
3.2 STRUCTURAL MACRO SYNTHETIC REINFORCING FIBERS
Provide 4 pounds of reinforcing fibers per cubic yard of concrete.
Incorporate into concrete mix as recommended by the manufacturer.
3.3 COLOR SAMPLE
Provide a sample of cured, colored concrete prior to placing concrete.
3.4 PREPACKAGED CONCRETE MIXTURE
Use the minimum amount of water to make the mixture. Adding too much water to the mixture will greatly reduce the overall compressive strength. Average slump shall be between 2" to 4".
SECTION 03 30 00 Page 22
3.5 CONCRETE CONSOLIDATION
Concrete shall be adequately vibrated, rodded, or spaded into place to fill voids.
3.6 COLD WEATHER REQUIREMENTS
Perform cold weather concreting in accordance with ACI 306.1 . Use special protection measures if freezing temperatures are anticipated before the expiration of the specified curing period. The ambient temperature of the air where concrete is to be placed and the temperature of surfaces to receive concrete must be not less than 40 degrees F. The temperature of the concrete when placed must be not less than 50 degrees F nor more than 75 degrees F. Heat the mixing water or aggregates to regulate the concrete placing temperature. Materials entering the mixer must be free from ice, snow, or frozen lumps. Do not incorporate salt, chemicals or other materials in the concrete to prevent freezing.
3.7 HOT WEATHER REQUIREMENTS
When job-site conditions are present or anticipated that accelerate the rate of moisture loss or rate of cement hydration of freshly mixed concrete, including an ambient temperature of 80 degrees F or higher, and an evaporation rate that exceeds 0.2 lb/ft2/h, conform concrete work to all requirements of ACI 305.1 .
SECTION 03 30 00 Page 23
SECTION 07 30 00
ROOF RECONSTRUCTION
PART 1 GENERAL
1.1 SECTION SUMMARY
Reconstruct the roofs over the two stone buildings.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Snow Guards ; G
1.3 CRITERIA FOR BIDDING
The condition of the portions of the roof to remain is unknown. The contractor shall assume that up to 10% of the roofs structural members and up to 10% of the roofs non-structural members that are designated to remain shall be replaced or repaired. More than 10% replacement or repair will be a contract modification or equitable adjustment.
Structural members include the roof rafters, ridge beam, sheathing or wood planks or boards on top of the rafters, dormer framing.
Non-structural members include soffit, fascia, trim, and dormer cladding.
PART 2 PRODUCTS
2.1 FLASHING
26 gage galvanized steel.
2.2 SNOW GUARDS
Rocky Guard RG10, as manufactured by rocky mountain snow guards inc.
https://www.rockymountainsnowguards.com/
PART 3 EXECUTION
3.1 DEMOLITION
Demolish roofing as required by section 02 41 10 DEMOLITION and as shown on the drawings. Protect roofing structural members to remain from damage during demolition. Demolish shingles and roofing underlayment of the portion of the roofs to remain.
3.2 WEATHER PROTECTION
Protect buildings from weather and rain at all times. Do not allow rain or precipitation to enter the buildings.
SECTION 07 30 00 Page 24
3.3 ROOF INSPECTION PREPARATION
Completely expose the roof rafters, ridge beam, and other structural members prior to roof inspection.
3.4 ROOF INSPECTION
The BLM will inspect the roof's structural and non- structural members.
The inspection will be completed by a separate BLM contractor. The inspection is not a requirement of this contract, however, coordination with the BLM's contract inspector is a contract requirement.
Provide 30 days notice of when the roof's structural and non- structural members will be ready for inspection. Allow 14 days in the schedule for the coordination of the inspection.
The roof will be inspected for structural deficiencies, such as cracks, splits, deformation, or weathering. And inspected for Wood Destroying Organisms (insects, fungi, bacteria, algae).
Provide access and fall protection for the BLM's roof inspection contractor.
Work on the roof shall not continue until after the inspection.
3.5 REPLACEMENT AND REPAIR
After completing the roof's structural and non-structural inspection, the Contracting Officer's Representative, will designate portions of the roof to be repaired or replaced.
3.6 ROOF RECONSTRUCTION
Reconstruct the roofs, as necessary, to match the plan and elevation views shown on the drawings. Reconstruct any portions of the roof that were damaged during demolition. Provide flashing, underlayment, and synthetic shake shingles for the roofs.
3.7 SURFACE PREPARATION
Ensure that roof deck is smooth, clean, dry, and without loose knots.
Roof surfaces must be firm and free from loose boards, large cracks, and projecting ends that might damage the roofing. Cover knotholes and cracks with sheet metal nailed securely to sheathing. Chimneys, and other projections through roofs, shall be properly flashed. Projecting nails shall be driven flush with the deck.
3.8 METAL FLASHING
Form in longest possible lengths, 8 feet minimum.
Counterflashings: Extend minimum 4 inches up vertical surfaces and minimum 4 inches under shingles.
Valley flashings: Minimum 24 inches wide, extending minimum 10 inches from valley center line.
Eave flashings: Fabricate with bottom edge formed outward 1/4 inch and hemmed to form drip.
SECTION 07 30 00 Page 25
3.9 METAL DRIP EDGE
Provide a metal drip edge, designed to allow water run-off to drip free of underlying construction, at eaves and gable ends prior to the application of roofing shingles.
3.10 SYNTHETIC SHAKE SHINGLE
Provide in accordance with section 07 31 00 SYNTHETIC SHAKE SHINGLES AND
SIDING.
3.11 ROOF FINIALS
Reinstall salvaged roof finials.
3.12 PAINT
Paint soffit, fascia, trim, and cladding in accordance with section
09 90 10 PAINTING.
SECTION 07 30 00 Page 26
SECTION 07 31 00
SYNTHETIC SHAKE SHINGLES AND SIDING
PART 1 GENERAL
1.1 SECTION SUMMARY
Provide synthetic shake roof shingles and synthetic shake siding.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D1970/D1970M (2019) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Roofing Underlayment ; G
Synthetic Shake Siding ; G
Roof Synthetic Shake Shingles ; G
Waterproof Sheet Membrane ; G
PART 2 PRODUCTS
2.1 WATERPROOF SHEET MEMBRANE
Self-adhered, leak barrier underlayment, conforming to ASTM D1970/D1970M .
2.2 ROOFING UNDERLAYMENT
Asphalt-saturated organic felt. Type II (No. 30 felt), in accordance with
ASTM D226/D226M
2.3 ROOF SYNTHETIC SHAKE SHINGLES
Multi-width Shake, as manufactured by:
SECTION 07 31 00 Page 27
DaVinci Roofscapes, LLC, 800-DAVINCI, www.davinciroofscapes.com.
10 inch exposure Color: Aged Cedar
Submit the product and the manufacturer's written installation instructions.
2.4 SYNTHETIC SHAKE SIDING
Multi-width Shake, as manufactured by:
DaVinci Roofscapes, LLC, 800-DAVINCI, www.davinciroofscapes.com.
10 inch exposure Color: Aged Cedar
Submit the product and the manufacturer's written installation instructions.
2.5 OR EQUAL PRODUCTS
The synthetic shake shingles and siding products were chosen specifically for their durability, constructability, and aesthetics. In addition, the product specified has been successfully used by the BLM on previous historic restoration projects. "Or equal" products shall equal the properties listed in part 2 of the manufacturer's specifications.
2.6 FASTENERS
Stainless steel, 3/8 inch flat head nails, 1-1/2 inches (38 mm) long.
PART 3 EXECUTION
3.1 WATERPROOF SHEET MEMBRANE
Provide self-adhered waterproof sheet membrane on eaves, rakes, valleys, and around projections or penetrations. Install and fasten in accordance with the manufacturer's written installation instructions. Waterproof sheet membrane is required in addition to roofing underlayment.
3.2 ROOFING UNDERLAYMENT
In addition to the waterproof sheet membrane, provide asphalt roofing underlayment over full roof area. Install and fasten underlayment as specified or recommended by the manufacturer's written instructions. Lay underlayment parallel to roof eaves, starting at eaves. Provide minimum 4 inch laps. Nail in place with roofing nails spaced in accordance with manufacturer's recommendations.
3.3 SYNTHETIC SHAKE SHINGLE INSTALLATION
Install synthetic shake shingles in accordance with the manufacturer's written installation instructions.
3.4 SYNTHETIC SHAKE SIDING INSTALLATION
Install synthetic shake siding in accordance with the manufacturer's written installation instructions.
Install synthetic shake siding on vertical surfaces of roof dormers.
Remove dormer battens as necessary for installation.
SECTION 07 31 00 Page 28
3.5 METAL FLASHING AND DRIP EDGE
Provide in accordance with section 07 30 00 ROOF RECONSTRUCTION.
3.6 SNOW GUARDS
Provide in accordance with section 07 30 00 ROOF RECONSTRUCTION.
SECTION 07 31 00 Page 29
SECTION 08 50 00
DOORS, WINDOWS, WEATHERPROOFING
PART 1 GENERAL
1.1 SECTION SUMMARY
Replace doors and windows. Make the buildings weather tight.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Doors ; G
Windows ; G
PART 2 PRODUCTS
2.1 DOORS
Solid wood. Six panel.
2.2 WINDOWS
Windows shall be wood, single hung, with grilles. Windows shall consist of complete units including but not limited to; sash, glass, frame, weatherstripping, insect screen, and hardware.
PART 3 EXECUTION
3.1 DEMOLITION
Demolish existing doors and windows as required by section 02 41 10
DEMOLITION.
3.2 WEATHERPROOFING
The buildings shall be maintained weatherproof at all times during the work. After demolition is complete, carefully inspect the building for openings. Permanently cover over all openings to provide a weather tight building envelope.
3.3 STONE OPENINGS
Exterior openings in the stone shall be permanently covered in a manor that is weather tight, blends well with the existing stonework, and that can be removed for stone restoration in the future.
SECTION 08 50 00 Page 30
3.4 DOORS
Stone openings are irregular sizes. Provide structural framing, as necessary, for the installation of the largest standard size door that will fit the opening. Provide door frames, door sills, door jambs, and thresholds. Provide door hardware and hinges. All doors locksets shall operate with the same key. Hang doors. Provide weatherstripping for a weathertight installation.
3.5 WINDOWS
Stone openings are irregular sizes. Provide framing, sills, and jambs, as necessary for proper installation of the window. Install windows.
Provide a weather tight installation.
3.6 PAINT
Paint door framing and window framing, interior and exterior, in accordance with section 09 90 10 .
3.7 FINISH
Finish the wood doors in accordance with section 09 90 10 PAINTING.
SECTION 08 50 00 Page 31
SECTION 09 90 10
PAINTING
PART 1 GENERAL
1.1 SECTION SUMMARY
Paint soffit, fascia, trim, and cladding. Paint framing around doors and windows. Paint windowsills. Finish doors.
1.2 COLOR SELECTION
Paint color will be provided after award.
PART 2 PRODUCTS
2.1 PRIMER
Sherwin-Williams; Exterior latex wood primer.
2.2 PAINT
Sherwin-Williams; Emerald urethane trim enamel.
Paint sheen; Satin.
2.3 FINISH
Spar Urethane.
PART 3 EXECUTION
3.1 PROTECTION OF AREAS NOT TO BE PAINTED
Mask, or otherwise protect stone and other items not to be coated.
Restore surfaces contaminated by coating materials to original condition.
3.2 SURFACE PREPARATION
Remove blistering, cracking, flaking, peeling or otherwise deteriorated coatings. Repair damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls with suitable material to match adjacent undamaged areas. Feather and sand smooth edges of chipped paint. Remove dirt, loose particles, and other foreign matter and substances deleterious to coating performance of paint.
3.3 APPLICATION
Thoroughly work coating materials into joints, crevices, and open spaces.
Allow time between coats, as recommended by the coating manufacturer, to permit thorough drying. Each coat shall cover surface of preceding coat or surface completely, and there shall be a visually perceptible difference in shades of successive coats. Provide finished surfaces free from runs, drops, ridges, waves, laps, brush marks, and variations in colors.
SECTION 09 90 10 Page 32
3.4 COATS REQUIRED - PAINTED SURFACES
(1) Primer.
(2) Finish coat.
(3) Second finish coat.
3.5 COATS REQUIRED - FINISHED SURFACES (DOORS)
Three coats are required. Sand the door between coats.
SECTION 09 90 10 Page 33
SECTION 12 93 00
CONCRETE PARKING STOPS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Concrete Parking Stops ; G
PART 2 PRODUCTS
2.1 CONCRETE PARKING STOPS
Parking stops shall be reinforced concrete. With minimum dimensions of;
six foot length, eight inch width, and 5 inch height.
PART 3 EXECUTION
3.1 CONCRETE PARKING STOPS
Each parking stop shall be held in place with two (2) #4 rebars, 24 inches long.
SECTION 12 93 00 Page 34
SECTION 23 81 10
DUCTLESS MINI SPLIT AIR CONDITIONER
PART 1 GENERAL
1.1 SECTION SUMMARY
Provide a ductless mini split air conditioner.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Ductless Mini Split Air Conditioner ; G
Condensate Pump ; G
SD-08 Manufacturer's Instructions
Installation Instructions
PART 2 PRODUCTS
2.1 DUCTLESS MINI SPLIT AIR CONDITIONER
Mitsubishi Electric, 12,000 BTU/H unit.
Floor mount indoor unit model number: MFZ-KJ12NA Outdoor unit model number: MUFZ-KJ12NAHZ
2.2 CONDENSATE PUMP
REFCO, Combi, item number: 3004146.
PART 3 EXECUTION
3.1 INSTALLATION
Install ductless mini split air conditioner and condensate pump in accordance with the manufacturer's written installation instructions .
Provide electrical service as required.
3.2 WALL PENETRATIONS
All wall penetrations shall go through the windowsill. Wall penetrations shall not go through the stone.
3.3 TRAINING
Train BLM personnel on the proper operation and maintenance of the unit.
SECTION 23 81 10 Page 35
SECTION 26 10 00
ELECTRICAL SERVICE
PART 1 GENERAL
1.1 SECTION SUMMARY
Provide electrical service to the south building, first floor.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 2023 National Electrical Code
PART 2 PRODUCTS
2.1 CONDUIT ABOVE GRADE
Galvanized rigid steel conduit. Threaded fittings.
2.2 CONDUIT BELOW GRADE
HDPE, Schedule 40.
2.3 SERVICE WIRE
Copper, 4 AWG.
2.4 GROUND ROD
5/8 inch by 8 foot. Copper-bonded steel.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Perform all work in accordance with NFPA 70 .
3.2 UTILITY COORDINATION
Contractor shall coordinate all work with the utility company, as required by the utility company.
3.3 EXISTING DISTRIBUTION PANEL (POLE MOUNTED)
Run service through the existing distribution panel, located on the power pole.
3.4 UNDERGROUND CONDUCTORS
Run conductors underground from the existing distribution panel (power
SECTION 26 10 00 Page 36 pole) to the building. Bury conductors a minimum of 18 inches.
3.5 CONDUIT
Underground conduit run shall have as few bends as practical. Underground conduit shall have less than the equivalent of three (3) ninety degree bends.
3.6 WALL PENETRATIONS
All wall penetrations shall go through the windowsill. Wall penetrations shall not go through the stone.
3.7 CONCRETE SLAB
Saw cut existing concrete slab as required for underground installation of electric service. Cut in neat lines. Patch in accordance with section
03 30 00 CAST-IN-PLACE CONCRETE.
3.8 GROUND RODS
Install (2) ground rods, separated 6 feet apart at new service entrance and bonded to new distribution panel ground bar. Ground rods shall be installed to a depth of 8 feet. If rock is encountered, then the contractor may install the ground rods in a trench at least 30 inches deep, and in accordance with NFPA 70 .
SECTION 26 10 00 Page 37
SECTION 26 10 00
ELECTRICAL DISTRIBUTION
PART 1 GENERAL
1.1 SECTION SUMMARY
Provide electricity inside the south building, first floor.
1.2 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4)
National Electrical Code
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Electric Distribution Panel ; G
PART 2 PRODUCTS
2.1 ELECTRICAL METALLIC TUBING (EMT)
Zinc coated steel.
2.2 ELECTRIC DISTRIBUTION PANEL
100 amp, 240 Volt, 12- Space, 24 Circuit, Square D distribution panel.
Home Depot Product:
Internet # 204836339 Model # HOM1224M100PC Store SKU # 1000040029
Panel shall have the following circuits:
Circuit Quantity Ampere Location
1 30 Ductless Mini Split
1 15 Overhead lights
SECTION 26 20 00 Page 38
Circuit Quantity Ampere Location
1 20 Receptacles
2.3 CEILING LIGHTS
Ceiling light similar to "Maxim Lighting's Essentials Collection" Flush mount, 3 bulb, oil rubbed bronze finish. Home Depot product number:
5842MROI
2.4 LIGHT SWITCH
Light switch shall be a timer.
Home Depot Product:
20 Amp 12-Hour Spring Wound In-Wall Timer, White Internet # 205478810 Model # SW12HWK Store SKU # 1000632791
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Perform all work in accordance with NFPA 70 .
3.2 ELECTRIC DISTRIBUTION PANEL
Securely mount distribution panel to the wall in accordance with manufacturer's recommendations.
3.3 WALL PENETRATIONS
All wall penetrations shall go through the windowsill. Wall penetrations shall not go through the stone.
3.4 GROUNDING
Ground distribution panel, EMT, and ductless mini splt, in accordance with
NFPA 70 .
3.5 CONDUIT
Run conduit horizontal along the existing base board to outlets. Secure conduit to the base board where possible. Minimize the conduit run along the stone (plaster) wall. Run conduit exposed on the ceiling to the ceiling lights.
3.6 RECEPTACLE LOCATION
Mount receptacles on the existing base boards.
3.7 CEILING LIGHTS
Remove existing ceiling lights. Provide two (2) ceiling lights and a wall mounted timer switch.
SECTION 26 20 00 Page 39
SECTION 26 20 00 Page 40
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Trail Surface Aggregate ; G
Aggregate Base Course ; G
SD-07 Certificates
Weight Tickets
PART 2 PRODUCTS
2.1 IMPORTED FILL MATERIAL
Imported fill material shall be any material classified by ASTM D2487 as
GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SC, ML, CL, MH.
And comprise stones less than 3 inches in any dimension. Organic soils, and highly plastic, fat clay soils are not acceptable.
2.2 TRAIL SURFACE AGGREGATE
Trail surface aggregate shall be crushed rock or stone and meet the following gradation:
Sieve Size % passing
1/2" 100%
#4 60% - 80%
SECTION 31 00 00 Page 41
Sieve Size % passing
#8 40% - 60%
#200 10%-20%
2.3 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2023, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
2.4 GEOTEXTILE LANDSCAPE FABRIC
Geotextile landscape fabric specifically designed to prevent vegetation from growing through the fabric, while allowing water to pass through.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities prior to demolition. Contractor shall relocate, or re-bury, the underground communications line, as required, for the roadside rock excavation.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. Perform excavation and fill in a manner and sequence that will provide proper drainage at all times, including during construction.
3.3 ROCK EXCAVATION
Solid rock is present and shall be excavated as required.
Rock Excavation - Location Quantity (Cubic Yards)
East Trail Section 90
West Trail Section 65
Middle Trail Section 8
Parking Lot 3
SECTION 31 00 00 Page 42
3.4 ACCESS TRAIL MATERIAL QUANTITIES - STATION 0+00 TO 2+20
Cubic Yards
Cut 90
Fill 80
3.5 IMPORTED FILL MATERIAL QUANTITIES
Imported Fill Location Quantity (Cubic Yards)
Demolished Building Footprint and Foundation 20
Septic Tank 5
Cistern 10
Culvert 15
3.6 GROUND SURFACE PREPARATION
Clear and grub in accordance with section 31 11 00 . Do not perform construction when surfaces are frozen or muddy. Prepare the subgrade to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Shape subgrade to drain.
3.7 AGGREGATE PLACEMENT LOCATIONS (PARKING LOT, ACCESS TRAIL, AROUND
BUILDING)
Subparagraphs apply to the parking lot, access trail, and aggregate placement locations around the buildings.
3.7.1 SUBGRADE
Prepare the subgrade to the lines and grades shown on the plans.
3.7.2 SUBGRADE - COMPACTION
Moisten material as necessary to achieve compaction. Compact the subgrade by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
3.7.3 AGGREGATE PLACEMENT
Contractor shall receive approval of the subgrade prior to placing aggregate base course. Place base course aggregate to the lines and grades shown on the plans.
3.7.4 AGGREGATE BASE COURSE - COMPACTION
Moisten material as necessary to achieve compaction. Compact the base course aggregate by operating vibratory compaction equipment over the full width. Continue compaction until a firm surface is achieved, without any soft areas, and a minimum of 3 passes over the entire width.
SECTION 31 00 00 Page 43
3.8 ACCESS TRAIL CONSTRUCTION
Provide vibratory plate compactor, or other approved methods, to compact the trail subgrade and aggregate in accordance with paragraph 3.7 AGGREGATE PLACEMENT LOCATIONS and subparagraphs.
3.9 ACCESS TRAIL STONE EDGING
Provide stone edging along the access trail. Contractor may utilize the rock excavated for the access trail to construct the trail stone edging.
Work, shape, split, and hew rock as necessary to create stone edging.
Stones shall fit together snugly, such that the stones contain the trail surface aggregate.
3.10 DEMOLITION FILL
Completely fill the voids created after demolition of building additions, foundations, and underground utilities. Fill the voids in complete layers not exceeding 18 inches thickness.
3.11 CISTERN FILL
Completely fill the cistern. Fill the cistern in complete layers not exceeding 18 inches thickness. Fill the cistern with imported fill material. The top 12 inches of cistern fill shall be trail surface aggregate. Leave the stone block covering the cistern in place, undisturbed.
3.12 SEPTIC TANK FILL
Completely fill the void created after demolition of septic tank. Fill the void in complete layers not exceeding 18 inches thickness.
3.13 GRADING - DEMOLITION SITES
The Contractor shall grade the area of demolished construction to a smooth surface, free from irregular surface changes. Import fill material, as necessary, to provide a smooth transition between the stone buildings and adjacent existing grades. Provide positive drainage away from stone buildings.
3.14 DEMOLISHED BUILDING LOCATIONS - TRAIL SURFACE AGGREGATE - GEOTEXTILE
Place trail surface aggregate in the location of the demolished building additions, as shown on the drawings. Place geotextile landscape fabric under the trail surface aggregate. Compact aggregate as required by paragraph 3.7 AGGREGATE PLACEMENT LOCATIONS.
3.15 FINISHING
Finish the surfaces to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.2 foot of the grades and elevations indicated. Finish surfaces in a manner that will result in effective drainage, regardless of tolerance. Finish slopes shall generally match the slopes shown and never exceed the slopes shown.
SECTION 31 00 00 Page 44
3.16 WEIGHT TICKETS
Submit weight tickets for aggregate base couse and trail surface aggregate. Weight tickets are required prior to payment.
SECTION 31 00 00 Page 45
SECTION 31 11 00
CLEARING AND GRUBBING
PART 1 GENERAL
Not Used.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 CLEARING AND GRUBBING LIMITS
Clearing and grubbing limits shall be within the fence, access trail, and parking lot. Remove the tree next to the south building as shown on the drawings.
3.2 PROTECTION
Protect trees and vegetation from damage incident to clearing, grubbing, and construction operations.
3.3 CLEARING
Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface.
3.4 GRUBBING
Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.
Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 12 inches below the original surface level of the ground in the area of new road construction. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.
3.5 DISPOSAL OF CLEARING AND GRUBBING VEGETATION
Dispose of clearing and grubbing material in the material disposal location designated on the plans. Logs, stumps, roots, brush, rotten wood, and other organic material resulting from the clearing and grubbing operations, shall be uniformly scattered on site in piles less than 18 inches off the ground. Process, mulch, cut, or limb material as necessary to comply with disposal pile requirements.
The tree next to the Lamb House is demolished material and shall be removed in accordance with section 02 41 10 DEMOLITION.
SECTION 31 11 00 Page 46
SECTION 31 11 00 Page 47
SECTION 32 31 50
BUCK AND POLE FENCE
PART 1 GENERAL
1.1 SECTION SUMMARY
Provide buck and pole fence.
PART 2 PRODUCTS
2.1 WOOD BUCK POSTS
Minimum 5 inch diameter. Clean-peeled wood poles with inner bark removed and with knots and limbs cut flush with the surface. Posts shall be of tamarack, black or honey locust, ponderosa or lodgepole pine, juniper, osage orange or white oak.
2.2 WOOD POLES
Minimum 3 inch diameter. Clean-peeled wood poles with inner bark removed and with knots and limbs cut flush with…
This is the start of the file's text. The full file is on GovTribe.