This document is a comprehensive set of environmental assessment reports for a Bureau of Land Management property located at 12691 County Road G in Cortez, Colorado. The reports include an Asbestos Survey and a Lead-Based Paint Inspection, both conducted by Plateau, Inc. on October 27, 2016.
The Asbestos Survey revealed that out of 57 samples collected from various building materials and surfaces, only one sample (sample #32) contained asbestos - a sponge texture in the southwest bedroom with 0.50% Chrysotile. The Lead-Based Paint Inspection found lead-based paint in three specific locations: the tin ceiling in the family room (2.1% lead), the wall system in the family room (1.1% lead), and the den ceiling north of the family room (2.7% lead). Due to these findings, the report recommends lead hazard reduction activities as defined by the EPA and notes that any renovation or construction work will require contractors experienced in handling hazardous materials and following specific safety protocols.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS SURVEY FOR RENOVATION
LAMB RESIDENCE
12691 County Road G Cortez, Colorado 81321
Prepared for:
Bureau of Land Management Attn: Tara Hough
2465 South Townsend Avenue Montrose, Colorado 81401
Prepared by:
Christopher Lakin, P.E., I.H.
Colorado State Certified Asbestos Building Inspector #13283
November 7, 2016
Project No. BLM10272016
PLATEAU, INC.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
ASBESTOS CONSULTING FIRM # ACF-14973
236 South 3rd Street, #340 | Montrose, Colorado 81401 | 970.252.1363 | 970.728.5737 | 970.641.1000
TABLE OF CONTENTS
ACRONYMS .............................................................................................................................. i
1.0 INTRODUCTION
2.0 ASBESTOS METHODOLOGY
3.0 ASBESTOS INSPECTION PROCEDURE
3.1 Asbestos Sample Collection
3.2 Asbestos Sample Analysis
4.0 ASBESTOS REGULATORY CRITERIA
5.0 ASBESTOS INSPECTION RESULTS
5.1 12691 County Road G, Cortez, Colorado
6.0 CONCLUSIONS AND RECOMMENDATIONS
7.0 LIMITATIONS
SUMMARY OF FEDERAL AND STATE ASBESTOS REGULATIONS
TABLE 1 – ASBESTOS RESULTS FOR HOMOGENEOUS MATERIALS
APPENDIX A – PLATEAU, INC. CERTIFICATIONS
ACRONYMS
Commonly Used Acronyms
ACBM Asbestos Containing Building Materials
ACM Asbestos Containing Materials
AHERA Asbestos Hazard Emergency Response Act
CDPHE Colorado Department of Public Health and Environment
EPA Environmental Protection Agency
HA Homogeneous Area
HEPA High Efficiency Particulate Air
HVAC Heating Ventilation and Air Conditioning
NESHAP National Emission Standards for Hazardous Air Pollutants
O&M Operations and Maintenance
OSHA Occupational Safety and Health Administration
PCM Phase Contrast Microscopy
PLM Polarized Light Microscopy
RBM Regulated Building Material
TEM Transmission Electron Microscopy
TSI Thermal System Insulation
[i]
1.0 INTRODUCTION
Plateau, Inc. was retained by the Bureau of Land Management to perform an asbestos survey for the purpose of remodeling of a historic home back to original structure. The home is located at 12691 County Road G, Cortez, Colorado. Mr. Chris Lakin, certified by the EPA and CDPHE, retains certification in accordance with regulatory guidelines and is identified by CDPHE as
Asbestos Inspector #13283. The inspection was conducted in accordance with applicable EPA, OSHA and CDPHE regulations and was performed on October 27, 2016. Those materials affected by assumed to be affected by renovation activities were inspected and sampled in general accordance with AHERA regulations.
2.0 ASBESTOS METHODOLOGY
The purpose of the asbestos inspection was to identify the condition of friable and
Category II non-friable asbestos materials that are present and will be affected by renovation activities. Only accessible materials were inspected and testing in accordance with Colorado Reg.
8, Part B. During the asbestos materials survey, Plateau, Inc. performed the following tasks:
Inspected accessible areas for suspected asbestos materials;
Developed a sampling plan for each material based on the homogeneous material type, friability, accessibility, and material locations;
Collected samples of suspected homogeneous and non-homogeneous materials in accordance of Colorado Reg. 8, Part B and submitted them for laboratory analysis by Polarized Light Microscopy (PLM); and, Documented findings and inspection protocol in accordance with accepted industry standards.
[4]
3.0 ASBESTOS INSPECTION PROCEDURE
Asbestos sampling is conducted by segregating building materials into sampling units call homogeneous areas. A homogeneous area is defined as a material that is uniform in texture and color and appears identical in every other respect. Homogeneous suspect asbestos materials were identified by visually inspecting the following systems:
Surface Systems Thermal Systems Miscellaneous Systems
Based on Mr. Lakin’s inspection, the following types of suspect asbestos-containing materials were identified:
Surface Systems o Wall Systems – Numerous, Multiple Textures
Miscellaneous o Sheet Flooring - Numerous o Mortar o Roofing – Numerous o Roofing Underlayment
3.1 Asbestos Sample Collection
The EPA and CDPHE regulate the minimum number of samples to be collected of each suspect material as outlined on Table 1, Sampling Minimums.
TABLE 1 – SAMPLING MINIMUMS
MATERIAL
HOMOGENEOUS AREA
SIZE
UNITS
MINIMUM SAMPLE
AMOUNT
SURFACING LESS THAN 1,000 SF 3
SURFACING 1,000 TO 5,000 SF 5
SURFACING MORE THAN 5,000 SF 7
THERMAL SYSTEM INSULATION LF/ SF/EA 3
MISCELLANEOUS MATERIALS LF/SF/EA 2
SF – Square Feet LF – Linear Feet EA – Each
Mr. Lakin collected bulk samples of the suspected friable and non-friable asbestos materials in a random and representative manner as defined by the U.S. Environmental Protection Agency
(EPA) statistical sampling methods. To prevent cross contamination, equipment is washed in between the collection process. The collected samples were packaged in sealed baggies and labeled appropriately.
[5]
3.2 Asbestos Sample Analysis
The bulk samples of suspected asbestos materials were submitted under chain of custody to an independent laboratory for analysis. EMSL Analytical Inc. is accredited by the National
Voluntary Laboratory Accreditation Program (NVLAP) (Lab Code 200828-0). Individual layers of the samples were analyzed by PLM (Polarized Light Microscopy), a bulk sample analysis method established by the National Voluntary Laboratory Accreditation Program (NVLAP), to determine asbestos type and content. Bulk samples were analyzed using EPA Method 600/R-93/116. Unused portions of the samples are archived for 60 days, unless the client requests special handling. By regulation, any single positive asbestos sample classifies the entire homogeneous material as asbestos - containing and additional analysis is not required.
4.0 ASBESTOS REGULATORY CRITERIA
According to the Occupational Safety and Health Administration (OSHA), the EPA, and the
Colorado Department of Public Health and Environment (CDPHE), samples with asbestos concentrations greater than 1 percent are classified as asbestos containing and are a regulated material. If a building structure is scheduled for renovation or demolition, samples that contain a
“trace” amount of asbestos (less than 1 percent) must be further analyzed by a more accurate point-count analysis to determine if they surpass the 1 percent threshold, or the materials must be assumed to contain asbestos and be classified as a regulated material.
The EPA and OSHA distinguish between friable and non-friable forms of asbestos materials. Friable materials can be crumbled or reduced to powder by hand pressure when dry. Non-friable materials cannot be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friable materials are more likely to be released into the air, especially if impacted or damaged during normal use, renovation, or demolition of a building. Therefore, the distinction between friable and non-friable asbestos materials is important. The EPA further segregates non-friable asbestos materials into Category I or Category II. Category I non-friable asbestos materials include floor tiles and roofing felts. Removal of these asbestos materials is not required prior to demolition as long as they are in good condition. Category II asbestos materials are all other non-friable asbestos
[6] materials and must be removed prior to normal demolition or renovation.
Whether removed or remaining in a structure during demolition, the confirmed or presumed asbestos materials are subject to EPA National Emission Standards for Hazardous Air
Pollutants (NESHAP) and OSHA regulations. In 40CFR61.145, NESHAP requires that each owner or operator of a demolition activity provide the administrator with written notice of intent. The
CDPHE has implemented the NESHAP program. At the time of this report, a scope of work detailing construction activities has not been provided to Plateau, Inc. Please contact Plateau when plans are developed to obtain a Colorado State demolition permit if necessary.
5.0 ASBESTOS INSPECTION RESULTS
Results of the asbestos analyses for the homogeneous material collected from the structure are summarized below and in Table 2. Table 2 presents Plateau, Inc.’s homogeneous material identifier and laboratory results for asbestos content. Laboratory reports for the samples are presented in Appendix B.
12691 County Road G, Cortez, Colorado
Plateau, Inc. collected fifty-seven (57) samples of suspect building materials from the structure.
PLEASE REFERENCE TABLE 2 – ASBESTOS RESULTS FOR HOMOGENEOUS MATERIALS
All but one sample submitted under chain of custody to EMSL Analytical, Inc. were non-detect for asbestos. The one sample, sample number 32, required point counting analysis according to
Colorado Reg. 8, Part B. and the final result is .50% Chrysotile. Sample 32 is a homogenous area of texturing in the southwest bedroom that includes the wall and ceiling surfaces. The appearance of the material is a sponge texture colored white. This material is not regulated by Colorado Reg. 8, Part B; however, it is regulated by OSHA. Removal of the wall/ceiling systems or striping of the texture will require a contractor with experience in OSHA hazardous materials protocol.
[7]
6.0 CONCLUSIONS AND RECOMMENDATIONS
Asbestos containing materials are regulated by the Colorado Department of Public Health and Environment (CDPHE), the U.S. Environmental Protection Agency (EPA), and the Occupational
Safety and Health Administration (OSHA). Colorado Reg. 8, Part B requires demolition permits for projects that require the removal of any load bearing member. A Colorado State demolition permit application is not included with this report. Please contact Plateau upon final renovation plans so we may determine if a demolition permit application is necessary.
7.0 LIMITATIONS
This report was prepared for the use of assessing the potential asbestos building materials that may be affected during renovation activities of a structure located at 12691 County Road G, Cortez, Colorado. Observations made were not intrusive and limited to readily visible or exposed building material within the structure. Our services were performed with no destruction for sampling; thus, our services are not intended to guarantee or certify the absence of asbestos.
The accuracy and reliability of environmental studies are a reflection of the number and type of samples taken and extent of the analyses conducted, and are thus inherently limited to and dependent upon the resources expended. An independent laboratory performed laboratory analysis. Plateau, Inc. is not responsible for the accuracy of data presented by others.
Plateau, Inc. performed the survey in a manner consistent with the level of care and expertise exercised by members of the asbestos inspection and assessment profession. Plateau, Inc. does not imply or guarantee that every suspect asbestos material on or in the building has been identified or sampled. Historically, asbestos has been used extensively in the United States. This inspection is intended to identify those components that are reasonably suspect and hence most likely to be asbestos materials in quantities subject to regulation based on existing industry and regulatory standards. If additional asbestos materials or asbestos-suspect materials are encountered, work should be stopped and an additional asbestos inspection performed.
Thank you for your business. If we can be of further service, please do not hesitate to call us, 970.252.1363.
Sincerely, Plateau, Inc.
Christopher Lakin, P.E., I.H.
Certified Asbestos Building Inspector # 13283
SUMMARY OF FEDERAL AND STATE ASBESTOS REGULATIONS
OSHA: U.S. Department of Labor, Occupational Safety, and Health Administration, including but not limited to:
Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and
Actinolite;
Final Rules Title 29, Part 1910, Section 1325 and Part 1926, Section 1101 of the Code of Federal Regulations;
Respiratory Protection Standard Title 29, Part 1910, Section 134 of the Code of Federal Regulations;
Construction Industry Title 29, Part 1926, of the Code of Federal Regulations;
Access to Employee Exposure and Medical Records Title 29, Part 1910, Section 2 of the Code of Federal Regulations;
Hazard Communication Title 29, Part 1926 Section 59 of the Code of
Federal Regulations; and
Specifications for Accident Prevention Signs and Tags Title 29, Part 1910, Section 145 of the Code of Federal Regulations.
DOT: U.S. Department of Transportation, including but not limited to:
Hazardous Substances Title 29, Part 171 and 172 of the Code of
Federal Regulations.
EPA: U.S. Environmental Protection Agency, including but not limited to:
Asbestos Hazard Emergency Response Act (AHERA) Regulation;
Asbestos Containing Materials in Schools Final Rule & Notice Title 40, Part 763 Sub-part E of the Code of Federal Regulations;
Training Requirements of (AHERA) Regulation;
Asbestos Containing Materials in Schools Final Rule & Notice Title 40,Part 763, Sub-part E, Appendix C of the Code of Federal Regulations;
National Emission Standard for Hazardous Air Pollutants (NESHAPS); and
National Emission Standard for Asbestos Title 40, Part 61, Sub-part A, Sub-part M (Revised Sub-part B) of the Code of Federal Regulations.
CDPHE: Colorado Department of Public Health and Environment, including but not limited to:
Air Quality Control Commission, Regulation No. 8, Part B “Emissions
Standards for Asbestos”; and
Hazardous Materials and Waste Management Division, 6 CCR 1007-2, Section 5 “Asbestos Waste Management.”
TABLE 2
ASBESTOS RESULTS FOR HOMOGENEOUS MATERIALS
KEY - RED INK = COLORADO REGULATED MATERIAL
BLUE INK = OSHA/EPA REGULATED MATERIAL
BLACK INK = NON REGULATED MATERIAL
SAMPLE/MATERIAL LAB RESULT LOCATION OF MATERIAL
1. SS-1, SURFACE SYSTEM,
KNOCKDOWN TEXTURE ON
GYPSUM WALL BOARD
NON-DETECT
KITCHEN CEILING, KITCHEN
E/W WALLS, LIVING ROOM
CEILING, CELLAR ENTRANCE
CEILING
2. SS-1, SURFACE SYSTEM,
KNOCKDOWN TEXTURE ON
GYPSUM WALL BOARD
NON-DETECT
KITCHEN CEILING, KITCHEN
E/W WALLS, LIVING ROOM
CEILING, CELLAR ENTRANCE
CEILING
3. SS-1, SURFACE SYSTEM,
KNOCKDOWN TEXTURE ON
GYPSUM WALL BOARD
NON-DETECT
KITCHEN CEILING, KITCHEN
E/W WALLS, LIVING ROOM
CEILING, CELLAR ENTRANCE
CEILING
4. SS-1, SURFACE SYSTEM,
KNOCKDOWN TEXTURE ON
GYPSUM WALL BOARD
NON-DETECT
KITCHEN CEILING, KITCHEN
E/W WALLS, LIVING ROOM
CEILING, CELLAR ENTRANCE
CEILING
5. SS-1, SURFACE SYSTEM,
KNOCKDOWN TEXTURE ON
GYPSUM WALL BOARD
NON-DETECT
KITCHEN CEILING, KITCHEN
E/W WALLS, LIVING ROOM
CEILING, CELLAR ENTRANCE
CEILING
6. M-1, MISCELLANEOUS, MORTAR NON-DETECT
KITCHEN, LIVING ROOM,
BATHROOM, FAMILY ROOM
7. M-1, MISCELLANEOUS, MORTAR NON-DETECT
KITCHEN, LIVING ROOM,
BATHROOM, FAMILY ROOM
8. SS-2, SURFACE SYSTEM, SPLATTER
TEXTURE ON STONE
NON-DETECT
LIVING ROOM ON STONE,
EAST, WEST AND SOUTH
WALLS
9. SS-2, SURFACE SYSTEM, SPLATTER
TEXTURE ON STONE
NON-DETECT
LIVING ROOM ON STONE,
EAST, WEST AND SOUTH
WALLS
10. SS-2, SURFACE SYSTEM, SPLATTER
TEXTURE ON STONE
NON-DETECT
LIVING ROOM ON STONE,
EAST, WEST AND SOUTH
WALLS
11. SS-3, SURFACE SYSTEM, STUCCO
LOOK TEXTURING
NON-DETECT
MAIN LEVEL BATHROOM
WALLS AND CEILING
BUREAU OF LAND MANAGEMENT
NOVEMBER 7, 2016
12. SS-3, SURFACE SYSTEM, STUCCO
LOOK TEXTURING
NON-DETECT
UNIT 102 CEILINGS,
SLIGHTLY DOWN WALLS
13. SS-3, SURFACE SYSTEM, STUCCO
LOOK TEXTURING
NON-DETECT
UNIT 102 CEILINGS,
SLIGHTLY DOWN WALLS
14. SS-4, SURFACE SYSTEM, HEAVY
GLOBULAR TEXTURING
NON-DETECT
LAUNDRY ROOM WALLS
AND CEILINGS
15. SS-4, SURFACE SYSTEM, HEAVY
GLOBULAR TEXTURING
NON-DETECT
LAUNDRY ROOM WALLS
AND CEILINGS
16. SS-4, SURFACE SYSTEM, HEAVY
GLOBULAR TEXTURING
NON-DETECT
LAUNDRY ROOM WALLS
AND CEILINGS
17. MISC-2, MISCELLANEOUS, SHEET
FLOORING, 2 LAYERS, 9X9 FAUX
TILE LOOK
NON-DETECT LAUNDRY ROOM
18. MISC-2, MISCELLANEOUS, SHEET
FLOORING, 2 LAYERS, 9X9 FAUX
TILE LOOK
NON-DETECT LAUNDRY ROOM
19. MISC-6, MISCELLANEOUS,
UNDERLAYMENT TO SHEET
FLOORING
NON-DETECT LAUNDRY ROOM
20. SS-5, SURFACE SYSTEM, SPONGE
TEXTURE
NON-DETECT FAMILY ROOM
21. SS-5, SURFACE SYSTEM, SPONGE
TEXTURE
NON-DETECT FAMILY ROOM
22. SS-5, SURFACE SYSTEM, SPONGE
TEXTURE
NON-DETECT FAMILY ROOM
23. SS-6, SURFACE SYSTEM, SMOOTH
PLASTER
NON-DETECT MASTER BEDROOM WALLS
24. SS-6, SURFACE SYSTEM, SMOOTH
PLASTER
NON-DETECT MASTER BEDROOM WALLS
25. SS-6, SURFACE SYSTEM, SMOOTH
PLASTER
NON-DETECT MASTER BEDROOM WALLS
26. SS-7, SURFACE SYSTEM, HEAVY
KNOCKDOWN ON GYPSUM WALL
BOARD
NON-DETECT
ND
FLOOR OPEN AREA, 2
ND
FLOOR BATHROOM, WALLS
AND CEILINGS
27. SS-7, SURFACE SYSTEM, HEAVY
KNOCKDOWN ON GYPSUM WALL
BOARD
NON-DETECT
ND
28. SS-7, SURFACE SYSTEM, HEAVY
KNOCKDOWN ON GYPSUM WALL
BOARD
NON-DETECT
ND
29. SS-8, SURFACE SYSTEM, GRANULAR
TEXTURE
NON-DETECT
SOUTHEAST BEDROOM
WALLS AND CEILING, HALL
30. SS-8, SURFACE SYSTEM, GRANULAR
TEXTURE
NON-DETECT
SOUTHEAST BEDROOM
WALLS AND CEILING, HALL
31. SS-8, SURFACE SYSTEM, GRANULAR
TEXTURE
NON-DETECT
SOUTHEAST BEDROOM
WALLS AND CEILING, HALL
32. SS-9, SURFACE SYSTEM, SPONGE
TEXTURE
.50% CHRYSOTILE
SOUTHWEST BEDROOM
WALLS AND CEILINGS
33. SS-9, SURFACE SYSTEM, SPONGE
TEXTURE
NON-DETECT
SOUTHWEST BEDROOM
WALLS AND CEILINGS
34. SS-9, SURFACE SYSTEM, SPONGE
TEXTURE
NON-DETECT
SOUTHWEST BEDROOM
WALLS AND CEILINGS
35. MISC-3, MISCELLANEOUS, SHEET
FLOORING, GREN/GREY GRANITE
LOOK WITH MASTIC
NON-DETECT UPSTAIRS BATHROOM
36. MISC-3, MISCELLANEOUS, SHEET
FLOORING, GREN/GREY GRANITE
LOOK WITH MASTIC
NON-DETECT UPSTAIRS BATHROOM
37. MISC-4, MISCELLANEOUS, DARK
MORTAR
NON-DETECT UPSTAIRS
38. MISC-4, MISCELLANEOUS, DARK
MORTAR
NON-DETECT UPSTAIRS
39. R-3, ROOFING, RED 3 TAB SHINGLE NON-DETECT ROOF
40. R-3U, RED 3 TAB BOTTOM LAYER NON-DETECT ROOF
41. RU, ROOFING UNDERLAYMENT NON-DETECT ROOF, WEST
42. R-3, ROOFING, RED 3 TAB SHINGLE NON-DETECT ROOF
43. R-3U, RED 3 TAB BOTTOM LAYER NON-DETECT ROOF
44. RU, ROOFING UNDERLAYMENT NON-DETECT ROOF, WEST
45. R-1A, ROOFING, RED ROLLED
ROOFING
NON-DETECT
ROOF, EAST AND TORN
PIECES ON GROUND
46. R-1B, ROOFING, BROWN ROLLED
ROOFING
NON-DETECT ROOF, EAST
47. R-1C, ROOFING, RED/BLUE ROLLED
ROOFING
NON-DETECT ROOF, EAST
48. R-1U, ROOFING ROLLED
UNDERLAYMENT
NON-DETECT ROOF, EAST
49. R-1A, ROOFING, RED ROLLED
ROOFING
NON-DETECT
ROOF, EAST AND TORN
PIECES ON GROUND
50. R-1B, ROOFING, BROWN ROLLED
ROOFING
NON-DETECT ROOF, EAST
51. R-1C, ROOFING, RED/BLUE ROLLED
ROOFING
NON-DETECT ROOF, EAST
52. R-1U, ROOFING ROLLED
UNDERLAYMENT
NON-DETECT ROOF, EAST
53. JC, JOINT COMPOUND NON-DETECT THROUGHOUT
54. JC, JOINT COMPOUND NON-DETECT THROUGHOUT
55. C-1, CONCRETE NON-DETECT EXTERIOR
56. M-1, BLOCK MORTAR NON-DETECT EXTERIOR
57. B-1, BLOCK NON-DETECT EXTERIOR
EMSL Analytical, Inc.
1010 Yuma Street Denver, CO 80204
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Attention: Phone:Chris Lakin (970) 252-1363
Fax:Plateau, Inc.
Received Date:236 So. 3rd Street 10/31/2016 10:00 AM
Analysis Date:#340 11/02/2016
Collected Date:Montrose, CO 81401 10/27/2016
Project: Lamb House
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
1-Texture
221607867-0001
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
1-Drywall
221607867-0001A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
2-Texture
221607867-0002
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
2-Drywall
221607867-0002A
None DetectedGypsum
Non-fibrous (Other)
70%
13%
Cellulose
Glass
15%
2%
Brown/White
Fibrous
Homogeneous
3-Texture
221607867-0003
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
3-Drywall
221607867-0003A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
4-Texture
221607867-0004
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
4-Drywall
221607867-0004A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
5-Texture
221607867-0005
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
5-Drywall
221607867-0005A
None DetectedGypsum
Non-fibrous (Other)
70%
13%
Cellulose
Glass
15%
2%
Brown/White
Fibrous
Homogeneous
6-Mortar
221607867-0006
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
60%
20%
20%
Gray
Non-Fibrous
Homogeneous
7-Mortar
221607867-0007
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
60%
20%
20%
Gray
Non-Fibrous
Homogeneous
8-Texture
221607867-0008
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
9-Texture
221607867-0009
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
Initial report from: 11/02/2016 18:50:43
Page 1 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
10-Texture
221607867-0010
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
11-Texture 1
221607867-0011
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
11-Texture 2
221607867-0011A
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
11-Drywall
221607867-0011B
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
12-Texture
221607867-0012
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
13-Texture 1
221607867-0013
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
13-Texture 2
221607867-0013A
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
13-Drywall
221607867-0013B
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
14-Texture
221607867-0014
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
14-Drywall
221607867-0014A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
15-Texture
221607867-0015
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable beige paint / coating layer included in analysis
15-Drywall
221607867-0015A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
16-Texture
221607867-0016
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
16-Drywall
221607867-0016A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
17-Flooring 1
221607867-0017
None DetectedNon-fibrous (Other)80%Cellulose
Glass
15%
5%
Tan/White
Fibrous
Homogeneous
17-Mastic 2
221607867-0017A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Page 2 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
17-Flooring 2
221607867-0017B
None DetectedNon-fibrous (Other)80%Cellulose
Glass
15%
5%
White/Beige
Fibrous
Homogeneous
17-Mastic 2
221607867-0017C
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
17-Flooring 3
221607867-0017D
None DetectedNon-fibrous (Other)80%Cellulose
Glass
15%
5%
Beige
Fibrous
Homogeneous
18-Flooring 1
221607867-0018
None DetectedNon-fibrous (Other)80%Cellulose
Glass
15%
5%
Tan/White
Fibrous
Homogeneous
18-Mastic 1
221607867-0018A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
18-Flooring 2
221607867-0018B
None DetectedNon-fibrous (Other)80%Cellulose
Glass
15%
5%
White/Beige
Fibrous
Homogeneous
18-Mastic 2
221607867-0018C
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
19-Flooring
221607867-0019
None DetectedNon-fibrous (Other)80%Cellulose
Glass
15%
5%
Beige
Fibrous
Homogeneous
19-Mastic
221607867-0019A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
20-Texture
221607867-0020
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
20-Drywall
221607867-0020A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
21-Texture
221607867-0021
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
21-Drywall
221607867-0021A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
22-Texture
221607867-0022
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable paint / coating layer included in analysis
22-Drywall
221607867-0022A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
23-Texture
221607867-0023
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
24-Skim Coat
221607867-0024
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
10%
20%
70%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
Page 3 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
24-Base Coat
221607867-0024A
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
70%
20%
10%
Tan
Non-Fibrous
Homogeneous
25-Texture
221607867-0025
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
26-Texture
221607867-0026
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
26-Drywall
221607867-0026A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
27-Texture
221607867-0027
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
27-Drywall
221607867-0027A
None DetectedGypsum
Non-fibrous (Other)
70%
13%
Cellulose
Glass
15%
2%
Brown/White
Fibrous
Homogeneous
28-Texture
221607867-0028
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
28-Drywall
221607867-0028A
None DetectedGypsum
Non-fibrous (Other)
70%
13%
Cellulose
Glass
15%
2%
Brown/White
Fibrous
Homogeneous
29-Drywall
221607867-0029
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
Texture comprised of sand grains embedded in paint layer. Inseparable white paint / coating layer included in analysis.
30-Texture
221607867-0030
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
30-Drywall
221607867-0030A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
31-Texture 1
221607867-0031
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
31-Texture 2
221607867-0031A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
31-Tape
221607867-0031B
None DetectedNon-fibrous (Other)2%Cellulose98%Tan
Fibrous
Homogeneous
31-Joint Compound
221607867-0031C
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
32-Texture
221607867-0032
<1% ChrysotileCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
Page 4 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
33-Texture
221607867-0033
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
33-Drywall
221607867-0033A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
34-Texture
221607867-0034
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
34-Drywall
221607867-0034A
None DetectedGypsum
Non-fibrous (Other)
70%
15%
Cellulose15%Brown/White
Fibrous
Homogeneous
35-Flooring
221607867-0035
None DetectedNon-fibrous (Other)80%Cellulose20%Tan/White
Non-Fibrous
Homogeneous
35-Mastic
221607867-0035A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
35-Leveler
221607867-0035B
None DetectedCa Carbonate
Non-fibrous (Other)
25%
75%
Gray
Non-Fibrous
Homogeneous
36-Flooring
221607867-0036
None DetectedNon-fibrous (Other)80%Cellulose20%Tan/White
Fibrous
Homogeneous
36-Mastic
221607867-0036A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
36-Leveler
221607867-0036B
None DetectedCa Carbonate
Non-fibrous (Other)
25%
75%
Gray
Non-Fibrous
Homogeneous
37-Mortar
221607867-0037
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
60%
25%
15%
Brown/Gray
Non-Fibrous
Homogeneous
38-Mortar
221607867-0038
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
65%
20%
15%
Brown/Gray
Non-Fibrous
Homogeneous
39-Roofing Shingle
221607867-0039
None DetectedQuartz
Non-fibrous (Other)
10%
50%
Glass40%Brown/Red/Black
Fibrous
Homogeneous
40-Roofing Shingle
221607867-0040
None DetectedQuartz
Non-fibrous (Other)
10%
50%
Cellulose40%Red/Black/Blue
Fibrous
Homogeneous
41-Roofing Felt
221607867-0041
None DetectedNon-fibrous (Other)15%Cellulose85%Brown
Fibrous
Homogeneous
42-Roofing Shingle
221607867-0042
None DetectedQuartz
Non-fibrous (Other)
10%
35%
Glass55%Brown/Red/Black
Fibrous
Homogeneous
43-Roofing Shingle
221607867-0043
None DetectedQuartz
Non-fibrous (Other)
10%
45%
Cellulose45%Red/Black/Blue
Fibrous
Homogeneous
44-Roofing Felt
221607867-0044
None DetectedNon-fibrous (Other)10%Cellulose90%Brown
Fibrous
Homogeneous
Page 5 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
45-Roofing Shingle
221607867-0045
None DetectedQuartz
Non-fibrous (Other)
20%
30%
Glass50%Red/Black
Fibrous
Homogeneous
46-Roofing Shingle
221607867-0046
None DetectedQuartz
Non-fibrous (Other)
15%
40%
Cellulose45%Brown/Black
Fibrous
Homogeneous
47-Roofing Shingle
221607867-0047
None DetectedQuartz
Mica
Non-fibrous (Other)
15%
10%
35%
Cellulose40%Gray/Red/Black
Fibrous
Homogeneous
48-Roofing Felt
221607867-0048
None DetectedNon-fibrous (Other)20%Cellulose80%Black
Fibrous
Homogeneous
49-Roofing Shingle
221607867-0049
None DetectedQuartz
Non-fibrous (Other)
20%
30%
Cellulose50%Red/Black
Fibrous
Homogeneous
50-Roofing Shingle
221607867-0050
None DetectedQuartz
Non-fibrous (Other)
15%
25%
Cellulose60%Brown/Tan/Black
Fibrous
Homogeneous
51-Roofing Shingle
221607867-0051
None DetectedQuartz
Mica
Non-fibrous (Other)
15%
10%
30%
Cellulose45%Gray/Red/Black
Fibrous
Homogeneous
52-Roofing Felt
221607867-0052
None DetectedNon-fibrous (Other)20%Cellulose80%Black
Fibrous
Homogeneous
53-Texture/Joint
Compound
221607867-0053
None DetectedCa Carbonate
Non-fibrous (Other)
20%
80%
White
Non-Fibrous
Homogeneous
Inseparable white paint / coating layer included in analysis
53-Mesh Tape
221607867-0053A
None DetectedNon-fibrous (Other)15%Glass85%White
Fibrous
Homogeneous
54-Joint Compound
221607867-0054
None DetectedCa Carbonate
Mica
Non-fibrous (Other)
20%
5%
75%
White
Non-Fibrous
Homogeneous
54-Tape
221607867-0054A
None DetectedNon-fibrous (Other)2%Cellulose98%Tan
Fibrous
Homogeneous
55-Mortar
221607867-0055
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
60%
25%
15%
Brown/Gray
Non-Fibrous
Homogeneous
56-Mortar
221607867-0056
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
60%
25%
15%
Gray
Non-Fibrous
Homogeneous
57-Brick
221607867-0057
None DetectedQuartz
Ca Carbonate
Non-fibrous (Other)
70%
15%
15%
Gray/Red
Non-Fibrous
Homogeneous
Page 6 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
Tel/Fax: (303) 740-5700 / (303) 741-1400 http://www.EMSL.com / denverlab@emsl.com
221607867EMSL Order:
Customer ID: PLAT42
Customer PO:
Project ID:
Analyst(s)
Stuart Printz (96) Brendon Rawlings, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Denver, CO NVLAP Lab Code 200828-0
Page 7 of 7ASB_PLM_0008 - 1.71 Printed: 11/2/2016 4:50 PM
LIMITED LEAD-BASED PAINT
INSPECTION AND VISUAL
ASSESSMENT REPORT
Property Address:
12691 County Road G
Cortez, Colorado
Prepared for:
Bureau of Land Management
2465 South Townsend Avenue Montrose, Colorado
Inspected & Prepared By:
Christopher A. Lakin
Lead Inspector / Risk Assessor
Plateau, Inc.
236 So 3rd St., #340
Montrose, CO 81401
970.252.1363
License No: 21988
Lead-Based Paint Inspection Date:
October 27, 2016
Report Date:
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
LEAD CONSULTING FIRM # 17358
236 South 3rd Street, #340 | Montrose, Colorado 81401 | 970.252.1363 | 970.728.5737 |970.641.1000
TABLE OF CONTENTS
1.0 COVER LETTER
2.0 EXECUTIVE SUMMARY
3.0 SCOPE OF INSPECTION
A) Background Information
B) Preface
C) Training
D) Inspection Company
E) Methods
4.0 FINDING
5.0 CONCLUSIONS
6.0 DISCLOSURE RESPONSIBILITY
7.0 DISCLAIMERS
APPENDICES
Appendix A – Laboratory Results
Appendix B – Glossary
Appendix C - Certifications
1.0) Cover Letter
Prepared for: Bureau of Land Management Montrose, Colorado 81401
Subject Property: 12691 County Road G Cortez, Colorado 81321
Dear Sirs:
Please find the limited lead-based inspection and visual assessment report for the future renovation project located at 12691 County Road G, Cortez, Colorado. The lead-based paint inspection and visual assessment was performed following guidelines set forth by the EPA model for lead-based paint. The purpose of the limited LBP survey was to determine the presence or absence of lead-based paint of suspect surfaces on accessible building materials at the subject property.
Plateau, Inc. is a certified evaluation firm in the State of Colorado and their certification # is 17358. Chris Lakin performed the Inspection and is Certified Lead Inspector/Risk Assessor in the State of Colorado and his certification # is 21988 with an expiration date April 29, 2017. Plateau conducted the visual assessment and lead paint inspection on October 27, 2016.
At the time of this report, the future use of this property has not been determined nor has a renovation scope of work been developed by the BLM. This report is for informational purposes only not allowing hazard assessments for future occupants. The home was originally constructed 1911 according to the Montezuma county assessor records. The home is 100% masonry stone, one and a half stories with a gabled composite shingled roof. Interior materials include painted gypsum wallboard, painted tin ceilings and painted trim components. Exterior materials include painted soffits, trim and wood wallboard.
Chris Lakin performed the inspection utilizing laboratory paint-chip analysis. During the visual assessment Plateau, Inc. observed paint on the interior and exterior components of the property. The survey is a general assessment of existing paint products providing information for what can be anticipated during renovation.
In association with the visual assessment, a limited lead-based paint inspection was performed on components that may be disturbed during a renovation of the property. Positive lead-based paint was found on the tin ceiling in the family room, the wall system in the family room as well as the den ceiling north of the family room. Due to these findings lead hazard reduction activities will be required as defined by the EPA.
If you have any questions please contact us directly at 970.252.1363.
Regards, Christopher Lakin
Lead Inspector / Risk Assessor
Plateau, Inc.
2.0) Executive Summary
The Bureau of Land Management has authorized Plateau, Inc. to perform a visual assessment and lead-based paint
(LBP) inspection on a future renovation project located at, 12691 County Road G, Cortez, Colorado 81321.
Plateau, Inc. tested a limited number of painted components according to the specifications described in the protocols for Lead-Based Paint testing in Chapter 7 of the Housing and Urban Development (HUD) Guidelines
(Revised 1997) and all applicable Federal, State, and Local regulations for the inspection of lead based paint.
Plateau’s scope of services involved laboratory paint-chip testing as well as a surface-by-surface visual inspection of the painted surfaces documented to be constructed prior to 1978 and will be potentially disturbed by future renovation activities.
Plateau sampled a total of twenty-four (24) surfaces. Twenty-one components were found to contain lead at levels less than the regulatory level of 0.5% by weight. These surfaces are identified in Section 4.0 (Findings). This report represents all field data, observations and findings related to the lead inspection performed in the above referenced property. The results, assessments and findings stated in this report are representative of the conditions observed in the property at the time of inspection.
Lead inspections determine the presence of lead in paint and other possible lead-based and contaminated areas.
This inspection, measures lead in both deteriorated and intact paint surfaces. The procedure involved taking samples from representative surfaces throughout the testing area or room.
3.0) Scope of Inspection
Background Information
The property is located at 12691 County Road G, Cortez, Colorado 81321. The property is vacant currently with future renovation activities that are unknown at the time of this report. No written permission was required to access the property as the owner’s representative provided access at the time of the inspection. The structure is vacant with no visible signs of occupancy, i.e., water and electricity.
Preface
Plateau, Inc. was authorized by Tara Hough with the Bureau of Land Management to perform a lead-based paint inspection on the above referenced property to determine the possible presence of lead-based paint. Only painted walls, ceilings and trim materials comprised the testing combination. The inspection was conducted on
October 27, 2016.
At the time of inspection, a scope of future renovation activities was not provided for review. Plateau based the limited LBP inspection on likely areas of impact for future renovation activities.
Training
All inspectors utilized by Plateau, Inc. have EPA/State licensure and are licensed Lead Risk Assessors, or Inspectors who have passed the “HUD Visual Assessment Course”. Training certificates are included with this report.
Inspection Company
The inspection was performed by an employee of Plateau, Inc. Plateau, Inc. is a Colorado registered Lead
Evaluation Firm No: LEF17358. Company certificates are included with this report.
Methods
Inspections are done using the inspection protocol in Chapter 7 of the Housing of Urban Development (HUD)
Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (1997 Revision) as well as all other Federal, State and Local guidelines. The methods utilized for lead analysis include careful removal of material, documenting amount and characteristics of material. Material is submitted under chain of custody to an accredited laboratory. Only laboratories recognized under the EPA NLLAP may be used for analyzing samples of paint in target housing or pre-1978 child occupied facilities. Laboratory analysis is more accurate and precise than
XRF, but only if great care is used to collect and analyze the paint-chip sample.
4.0) Findings
12691 County Road G, Cortez, Colorado 81321
This property is currently vacant with pending future renovations. No extrapolations were required because
Chapter 7 Single Family Testing Rules were followed.
Plateau, Inc. tested twenty-four surfaces via laboratory analysis. Twenty-one tested components were found to contain lead at levels below the EPA regulatory level of 0.5% by weight. Three surfaces were found to contain lead at levels above the EPA regulatory level of 0.5% by weight. Please review Table A for location and description.
5.0) Conclusions
When evaluating this report, it is assumed that according to Chapter 7 HUD guidelines, that if one testing combination (i.e. window, door) is positive for lead in an interior or exterior room equivalent, that all other similar testing combinations in those areas are assumed to be positive. The same is true for negative readings. All inaccessible areas are assumed to be positive, even though they were not able to be tested. The positive findings for LBP is the family room and den walls, family room tin ceiling and the den wood ceiling.
Some painted surfaces may contain levels of lead below 0.5% by weight; these components could create lead dust or lead contaminated soil hazards if the paint is turned into dust by abrasion, scraping, sanding or friction. If conditions of intact paint surfaces become destabilized, these conditions will need to be addressed in the future. If any construction or modernization work is done on the premises, this report should be given to the contractors, as well as to any future tenants.
Any stabilization/construction activities that affect the existing paint films (including sanding and demolition) must be initiated by workers who have successfully received proper training and certification in the handling of lead-contaminated materials.
Plateau, Inc. recommends all contractors follow the “Lead Safe Work Practices” as outlined in The Lead Safe
Housing Rule 24 CFR Part 35 as amended June 21, 2004. Interim control measures on friction or impact surfaces, such as windows and doors, may lead to rapid treatment failure. It is the contractor’s responsibility to follow all city, state and federal regulations when performing Lead Hazard Reduction Activities.
6.0) Disclosure Responsibility
A copy of this limited report must be provided to new lessees (tenants) and purchasers of this property under Federal Law (24 CFR part 35 and 40 CFT part 745) before they become obligated under a lease or sales contract. The complete report must also be provided to new purchasers and it must be made available to new tenants. Landlords
(lessors) and sellers are also require to distribute an educational pamphlet and include standard warning language in their leases or sales contracts to ensure that parents have the information they need to protect their children from lead-based paint hazards.
7.0) Disclaimers
This is our report of a limited visual survey and lead-based paint analysis. The presence or absence of lead-based paint (LBP) or lead-based paint hazards applies only to the tested or assessed surfaces on the date of the field visit and it should be understood that conditions might change due to deterioration or maintenance. The results and material conditions noted within this report were accurate at the time of the inspection and in no way reflect the conditions at the property after the date of the inspection. Ongoing monitoring by the owner is usually necessary.
Those surfaces that do not contain lead-based paint at or above the federal, state, or local standards may still pose a hazard if disturbed.
The Occupational Safety and Health Administration (OSHA) Lead in Construction Standard states that
“negative” readings (i.e. those below the HUD/EPA definition of what constitutes LBP [1.0 mg/cm2]) do not relieve contractors from performing exposure assessments (personal air monitoring) on their employees per the OSHA Lead Standard, and should not be interpreted as lead free. Although a reading may indicate “negative”, airborne lead concentrations still may exceed the OSHA Action Level or the OSHA Permissible Exposure Limit (PEL) depending on the work activity.
TABLE A
EMSL Laboratory
Lead Analysis
Results
NO COMPONENT SUBSTRATE COLOR ROOM SIDE RESULTS LAB RESULTS
L1 WALL GYPSUM WHITE KITCHEN EAST NEGATIVE ≤0.010% WT
L2 WALL GYPSUM WHITE LIVING ROOM SOUTH NEGATIVE ≤0.010% WT
L3 CEILING TIN WHITE FAMILY ROOM EAST POSITIVE 2.1% WT
L4 WINDOW WOOD WHITE LIVING ROOM SOUTH NEGATIVE 0.094% WT
L5 DOOR TRIM WOOD WHITE FAMILY ROOM EAST NEGATIVE ≤0.010% WT
L6 WALL GYPSUM WHITE FAMILY ROOM EAST POSITIVE 1.1% WT
L7 WALL GYPSUM WHITE KITCHEN NORTH NEGATIVE ≤0.010% WT
L8 DOOR TRIM WOOD TAN KITCEHN EAST NEGATIVE ≤0.010% WT
L9 DOOR WOOD WHITE LIVING ROOM NORTH NEGATIVE 0.036% WT
L10 CEILING WOOD WHITE DEN NORTH POSITIVE 2.7% WT
L11 WINDOW TRIM WOOD WHITE MASTER BEDROOM EAST NEGATIVE 0.031% WT
L12 WINDOW TRIM WOOD WHITE
UPPER SOUTHEAST
BEDROOM EAST NEGATIVE 0.037% WT
L13 FLOOR WOOD STAIN UPPER SITTING AREA WEST NEGATIVE ≤0.010% WT
L14 CEILING TIN WHITE MASTER BEDROOM WEST NEGATIVE 0.14% WT
L15 WALL CONCRETE WHITE MASTER BEDROOM NORTH NEGATIVE ≤0.010% WT
L16 WALL CONCRETE WHITE MASTER BEDROOM EAST NEGATIVE ≤0.010% WT
L17 SHOWER WALL CONCRETE WHITE MASTER BATHROOM EAST NEGATIVE 0.025% WT
L18 WALL GYPSUM WHITE
UPPER SOUTHWEST
BEDROOM NORTH NEGATIVE ≤0.010% WT
L19 WINDOW TRIM WOOD RED EXTERIOR WINDOW WEST NEGATIVE ≤0.010% WT
L20 WINDOW TRIM WOOD RED EXTERIOR WINDOW SOUTH NEGATIVE 0.22% WT
L21 SIDING WOOD RED EXTERIOR EAST NEGATIVE ≤0.010% WT
L22 SIDING WOOD RED EXTERIOR EAST NEGATIVE 0.028% WT
L23 SIDING WOOD RED EXTERIOR NORTH NEGATIVE ≤0.010% WT
L24 SOFFIT WOOD RED EXTERIOR NORTH NEGATIVE ≤0.010% WT
APPENDIX C
GLOSSARY
Abatement· A measure or set of measures designed to permanently eliminate lead-based paint hazards or llead-based paint Abate ment strategies include the removal of lead-based paint, enclosure,encapsulation, replacement of building components coated with lead-based paint, removal of lead-contaminated dust, and removal of lead-contaminated soil or overlaying of soil with a durable covering such as asphalt (grass and sod are considered interim control measures). All of these strategies require preparation; cleanup, waste disposal, post-abatement clearance testing; recordkeeping; and, if applicable, monitoring. See also Complete Abatement and Intrim Controls.
Accessible surface - Any protruding interior or exterior surface, such as an interior windowsill, that a young child can mouth or chew.
Accreditation - A formal recognition that an organization, such as a laboratory, is competent to carry out specific tasks or types of tests.
Accredited laboratory • A laboratory that has been evaluated and approved by the National Lead Laboratory Accreditation Program (NLLAP) to perform lead measurement or analysis, usually over a specified period of time.
Apron • A trim board that is installed beneath a window sill Area wells ·Corrugated metal or concrete barrier walls installed around a basement window to hold back the earth Attic access· An opening that is placed in the dry walled ceiling of a home providing access to the attic.
Attic Ventilators - In houses, screened openings provided to ventilate an attic space Backing - Frame lumber installed between the wall studs to give additional support for drywall or an interior trim related iitem, such as handrail brackets, cabinets, and towel bars. In this way, items are screwed and mounted into solid wood rather than weak drywall that may allow the item to break loose from the wall. Carpet backing holds the pile fabric in place.
Balusters - Vertical members in a railing used between atop rail and bottom rail or the stair treads. Sometimes referred to as 'pickets' or 'spindles'.
Balustrade· The rail posts and vertical balusters along the edge of a stairway or elevated walkway.
Bare soil - Soil not covered with grass, sod, some other similar vegeta tion, or paving, including the sand in sandboxes.
Barge board • A decorative board covering the projecting ratter (fly rafter) of the gable end. At the cornice, this member is a fascia board.
Base or baseboard • A trim board placed against the wall around the room next to the floor.
Basement window Inserts •The window frame and glass unit that is installed in the window.
Base shoe· Molding used next to the floor on Interior baseboard. Some times called a carpet strip.
Batt - A section of fiber-glass or rock-wool insulation measuring 15 or 23 inches wide by four to eight feet long and various thicknesses.
Sometimes "faced" (meaning to have a paper covering on one side) or "unfaced" (without…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .