A04_BID_SCHEDULE_LAMB_HOUSE_DEMO.pdf

PDF 465 KB Posted

Attached to
GAOA TRFO LAMB HOUSE DEMOLITION AND STABILIZATION
Solicitation number
140L1725R0014
Issued by

About this file

The document is a Bid Schedule for the Lamb House Demolition and Stabilization project by the Bureau of Land Management's Tres Rios Field Office in Colorado, scheduled for 2025. The bid schedule details 19 line items covering a comprehensive demolition and reconstruction effort, including mobilization, asbestos and hazardous material removal, demolition permit, structural reconstruction, and site improvements. Key quantities include 8 doors, 13 windows, 160 cubic yards of rock excavation, 50 cubic yards of imported fill, 100 tons of trail surface aggregate, 90 tons of aggregate base course, 200 linear feet of buck and pole fence, and installation of electrical services, distribution, and a ductless mini-split air conditioner. The document provides a structured template for contractors to input unit prices for each line item, with the intention of calculating a total project cost.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule - Lamb House Demolition and Stabilization

TRFO CANM Lamb House Demolition and Stabilization 2025

Bureau of Land Management Tres Rios Field Office, Colorado

Contract Line Item Number Description Quantity Unit Of Measure Unit Price Price

1 Mobilization and Demobilization 1 Job $

2 Asbestos and Hazardous Material Removal 1 Job $

3 CDPHE Demolition Permit 1 Job $

4 Demolition 1 Job $

5 Roof Reconstruction 1 Job $

6 Doors 8 Each $ $

7 Windows 13 Each $ $

8 Painting 1 Job $

9 Site Grading 1 Job $

10 Rock Excavation 160 Cubic Yard $ $

11 Imported Fill 50 Cubic Yard $ $

12 Trail Surface Aggregate 100 Ton $ $

13 Aggregate Base Course, CO-DOT class 6 90 Ton $ $

14 Concrete Parking Stop 3 Each $ $

15 Buck and Pole Fence 200 Linear Feet $ $

16 Corrugated Metal Pipe Culvert 1 Job $

17 Electrical Service 1 Job $

18 Electric Distribution 1 Job $

19 Ductless Mini Split Air Conditioner 1 Job $

Total $

Lamb House Demolition and Stabilizaiton 2025