This document is a Bid Schedule for the Lamb House Demolition and Stabilization project, issued by the Bureau of Land Management's Tres Rios Field Office in Colorado for the year 2025. The bid schedule outlines 20 line items covering various construction and site preparation activities, including mobilization, asbestos and hazardous material removal, demolition, roof reconstruction, and infrastructure improvements. Specific tasks include installing 8 doors, 13 windows, painting, site grading, rock excavation (160 cubic yards), importing fill (40 cubic yards), trail surface and base course aggregate work, fence installation (200 linear feet), culvert work, and electrical service and distribution. The project also includes installing a ductless mini-split air conditioner and concrete parking stops. The document is designed for contractors to provide unit pricing for each listed item, with the total project cost to be calculated based on the submitted unit prices.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule - Lamb House Demolition and Stabilization - Updated Amendment 1
TRFO CANM Lamb House Demolition and Stabilization 2025
Bureau of Land Management Tres Rios Field Office, Colorado
Contract Line Item Number Description Quantity Unit Of Measure Unit Price Price
1 Mobilization and Demobilization 1 Job $
2 Asbestos and Hazardous Material Removal 1 Job $
3 CDPHE Demolition Permit 1 Job $
4 Demolition 1 Job $
5 Roof Reconstruction 1 Job $
6 Doors 8 Each $ $
7 Windows 13 Each $ $
8 Painting 1 Job $
9 Site Grading 1 Job $
10 Rock Excavation 160 Cubic Yard $ $
11 Imported Fill 40 Cubic Yard $ $
12 Trail Surface Aggregate 100 Ton $ $
13 Aggregate Base Course, CO-DOT class 6 90 Ton $ $
14 Cistern Fill Aggregate 10 Ton $ $
15 Concrete Parking Stop 3 Each $ $
16 Buck and Pole Fence 200 Linear Feet $ $
17 Culvert 1 Job $
18 Electrical Service 1 Job $
19 Electric Distribution 1 Job $
20 Ductless Mini Split Air Conditioner 1 Job $
Total $
Lamb House Demolition and Stabilizaiton 2025