A06_Priority_2_Project_Map_SFO_2026_Saltcedar_Treatment.pdf
PDF 2 MB Posted
- Attached to
- SFO 2026 SALTCEDAR TREATMENT
- Solicitation number
- 140L1726Q0056
About this file
This is a project map issued by the Bureau of Land Management (BLM) Socorro Field Office in New Mexico, dated August 24, 2026, depicting the 2026 Saltcedar Treatments Priority 2 project area. The map displays two Priority 2 treatment areas, each comprising 1 acre total, located within BLM-managed lands in Socorro County, New Mexico. The project areas are shown in green shading on the aerial imagery and are accessed via a designated Priority 2 Access Route marked in magenta/pink on the map. The treatment areas are positioned across sections within Township 4S-5S and Range 1E-2E, with Highway US 380 visible in proximity to the project sites. The map includes standard geographical references including township and range section designations, state boundaries, and scale measurements in both miles and kilometers.
The document serves as a visual reference for the geographical location and extent of saltcedar treatment work to be conducted on federal lands managed by the BLM Socorro Field Office. The map provides contextual information regarding project boundaries, access routes, and surrounding land management jurisdictions (federal BLM lands and state lands are differentiated by color coding). No specific contract requirements, timelines, or performance specifications are included in this map document; it functions solely as a spatial reference tool for project planning and implementation purposes.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SWSE
SWSE
NESW
SENW
SWSE
NWNE
SESW
SESW
SWNW
SESW
NWSENWSW
SESW
NWNW
SENWSWNE
SWSW
NENW
NESWNESE
SWSW
SWSW SESW
SENE
NESE
SESE
NENWNWNW
SENE
SESW
NENE
SWSE
NENE
NESW
NWSW
NWNE
SWSW
SESE
SESE
SWNW
SESE
NWSE
SWNE
NENW
SENW
NENWNENE
NENW NENWNWNWNWNE
NWNWNENE NWNE
NESE
SESE
SENE
NENE
SESE
2930 28
31 32 33
4S 2E
5S 1E 5S 2E
4S 1E
£¤380
Pa th bl m
\d fs
\l oc
\G
BP
\N M
\S
FO
\g is
_u se rs _s cr at ch \r ko lik an t\
PR
O
JE
CT
_D
IR
EC
TO
R Y\
\2
Sa lt Ce da r\
Pr oj ec t
M ap
.a pr x
New Mexico
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of this map or the data displayed for individual use or aggregate use with other data.
0 0.15 0.3 Miles
0 0.15 0.3 Kilometers
8/24/2026
Bureau of Land Management Socorro Field Office
901 South Highway 85 Socorro, New Mexico 87801
575-835-0412
Priority 2 Project Areas
Priority 2 Access Route
StateRt
Bureau of Land Management (BLM)
State
Priority 2 - Project Area
2026 Saltcedar Treatments
Treatment Area Priority 2
1 Acre (total)
Treatment Area Priority 2
1 Acre (total)
File details come from the government source that posted it. Updated .