A06_Priority_2_Access_SFO_2026_Saltcedar_Treatment.pdf
PDF 2 MB Posted
- Attached to
- SFO 2026 SALTCEDAR TREATMENT
- Solicitation number
- 140L1726Q0056
About this file
This document is a project map and access route guide for the 2026 Salt Cedar Treatments program managed by the Bureau of Land Management (BLM) Socorro Field Office in New Mexico. The treatment area encompasses 1 acre designated as Priority 2, located in Socorro County near the intersection of Interstate 25 and State Highway 380.
Access to the treatment site requires specific routing: travelers should exit I-25 at Exit 139, proceed 4.17 miles east on State Highway 380, then turn north onto a gated pipeline road (unpaved/graded) for 1.77 miles to a second gate. From the gate, the route continues 0.61 miles east to the first earthen tank location. Access to the second earthen tank requires an additional 1.85 miles east along a two-track road and may necessitate UTV transport or walking portions of the route. The map identifies the Priority 2 Access Route in magenta, shows Bureau of Land Management, state, and private property boundaries, and includes relevant road classifications and geographic references. The document is dated August 24, 2026, and provides contact information for the Socorro Field Office at 901 South Highway 85, Socorro, New Mexico 87801, telephone 575-835-0412.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
§̈¦25
£¤380
Las Cruces
Albuquerque Socorro
Santa Fe
§̈¦25
§̈¦40
§̈¦10
Pa th bl m
\d fs
\l oc
\G
BP
\N M
\S
FO
\g is
_u se rs _s cr at ch \r ko lik an t\
PR
O
JE
CT
_D
IR
EC
TO
R Y\
\2
Sa lt Ce da r\
Pr oj ec t
M ap
.a pr x
New Mexico
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of this map or the data displayed for individual use or aggregate use with other data.
0 1 2 Miles
0 1 2 Kilometers
8/24/2026
Bureau of Land Management Socorro Field Office
901 South Highway 85 Socorro, New Mexico 87801
575-835-0412
Priority 2 Access Route
StateRt
Major Road
Bureau of Land Management (BLM)
State
Private or Unknown
Priority 2 - Access Route
2026 Salt Cedar Treatments
Treatment Area Priority 2
1 Acre
Take Exit 139 from I-25 and head 4.17 miles east on State Highway 380.
Turn north on the gated pipeline road (unpaved/graded) and continue for 1.77 miles to the second gate.
Continue another 0.61 miles east from the gate to the first earthen tank.
To access the second earthen tank, continue 1.85 miles east along the two-track road.
The second tank may require UTV and/or walking a portion of the two-track.
File details come from the government source that posted it. Updated .