Estimate Summary
| Project: | FY24 IR1 MPP PSA | Estimate By: |
| | Date: |
| IGE amount | Reviewed By: |
| | Date: |
| Item No. | Description | Site 1 | Site 2 | Site 3 | Total |
| Base Bid | | | | |
| 1 | PSA Scheduling, Planning and Logistics | | | | 0.00 |
| 2 | PSA Report Writing and Quality Control | | | | 0.00 |
| 3 | Field Work | | | | 0.00 |
| 4 | Travel | | | | 0.00 |
| 5 | Cost Estimator | | | | 0.00 |
| 6 | Remote Assistance | | | | 0.00 |
| Base- Total Estimated Cost | $0.00 |
| Base Travel- Total Estimated Cost | $0.00 |
| Option 1 | | | |
| 1 | PSA Scheduling, Planning and Logistics | | | 0.00 |
| 2 | PSA Report Writing and Quality Control | | | 0.00 |
| 3 | Field Work | | | 0.00 |
| 4 | Travel | | | 0.00 |
| 5 | Cost Estimator | | | 0.00 |
| 6 | Remote Assistance | | | 0.00 |
| Option 1- Total Estimated Cost | $0.00 | $0.00 | $0.00 |
| Option 1 Travel- Total Estimated Cost | $0.00 | $0.00 | $0.00 |
| Option 2 | |
| 1 | PSA Scheduling, Planning and Logistics | $0.00 |
| 2 | PSA Report Writing and Quality Control | $0.00 |
| 3 | Field Work | $0.00 |
| 4 | Travel | $0.00 |
| 5 | Cost Estimator | $0.00 |
| 6 | Remote Assistance | $0.00 |
| Option 2- Total Estimated Cost | $0.00 | $0.00 | $0.00 | $0.00 |
| Option 2 Travel- Total Estimated Cost | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"United States Department of the Interior National Park Service &11Class C Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
Site 1 PSA Site 1
| Base Bid | Billing Labor Category | Unit Rate | Unit | Total |
| Overall Project Management | | | | |
| Prime - Program Management, Review, Meetings | Program Manager III | | /hr | $ - 0 |
| Prime - Overall Project Management | Project Manager III | | /hr | $ - 0 |
| Prime - Weekly Meetings | Project Manager III | | /hr | $ - 0 |
| Prime - Meetings | Project Manager II | | /hr | $ - 0 |
| Scheduling, Planning, Logistics | Billing Labor Category | Unit | Total |
| Prime - Team Lead - Advanced Planning Calls | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Advanced Planning Calls | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Office Time (Before Site Visit) | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Office Time (Before Site Visit) | SUB: Quantity Surveyor | /hr | $ - 0 |
| Field Work | | | |
| Prime - Team Lead - On-Site Assessments | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Develop SOW | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Travel to and from office to the site | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Transportation (Air, Train, car) | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Airport Transportation, Parking | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Rental car (plus gas) or POV Mileage | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Lodging | Project Manager II | /night | $ - 0 |
| Prime - Team Lead - Per Diem | Project Manager II | /day | $ - 0 |
| Prime - Architect SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Travel Home-Site_Home | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Transportation (Air, train) | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - Architect SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - MEP SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Transportation (air, train) | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - MEP SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - Civil/Structural SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Transportation (Air, Train) | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME -Lodging | Consultant III | /night | $ - 0 |
| Prime - Civil/Structural SME - Per Diem | Consultant III | /day | $ - 0 |
| Report Writing, Quality Control | SUB: Quantity Surveyor | Unit | Total |
| Prime - Team Lead - Kickoff Meeting, Closeout Meeting | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Kickoff Meeting, Closeout Meeting | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Writing Draft Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Draft Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Draft Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Follow-up Questions/Input | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Follow-up Questions/Input | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Addressing NPS Comments, Revising Final Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Final Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Final Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Organizing Photos / Documents for Final Submission | Project Manager II | /hr | |
| Cost Estimating | Billing Labor Category | Unit | Total |
| Sub - Overall Project Management | SUB: Cost Estimator PM | /hr | $ - 0 |
| Sub - Develop Cost Estimate - Small Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Medium Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Large Project | | /estimate | $ - 0 |
TOTAL Base Bid $ - 0 0
Site 2 PSA Site 2
| Base Bid | Billing Labor Category | Unit Rate | Unit | Total |
| Overall Project Management | | | | |
| Prime - Program Management, Review, Meetings | Program Manager III | | /hr | $ - 0 |
| Prime - Overall Project Management | Project Manager III | | /hr | $ - 0 |
| Prime - Weekly Meetings | Project Manager III | | /hr | $ - 0 |
| Prime - Meetings | Project Manager II | | /hr | $ - 0 |
| Scheduling, Planning, Logistics | Billing Labor Category | Unit | Total |
| Prime - Team Lead - Advanced Planning Calls | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Advanced Planning Calls | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Office Time (Before Site Visit) | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Office Time (Before Site Visit) | SUB: Quantity Surveyor | /hr | $ - 0 |
| Field Work | | | |
| Prime - Team Lead - On-Site Assessments | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Develop SOW | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Travel to and from office to the site | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Transportation (Air, Train, car) | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Airport Transportation, Parking | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Rental car (plus gas) or POV Mileage | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Lodging | Project Manager II | /night | $ - 0 |
| Prime - Team Lead - Per Diem | Project Manager II | /day | $ - 0 |
| Prime - Architect SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Travel Home-Site_Home | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Transportation (Air, train) | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - Architect SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - MEP SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Transportation (air, train) | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - MEP SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - Civil/Structural SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Transportation (Air, Train) | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME -Lodging | Consultant III | /night | $ - 0 |
| Prime - Civil/Structural SME - Per Diem | Consultant III | /day | $ - 0 |
| Report Writing, Quality Control | SUB: Quantity Surveyor | Unit | Total |
| Prime - Team Lead - Kickoff Meeting, Closeout Meeting | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Kickoff Meeting, Closeout Meeting | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Writing Draft Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Draft Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Draft Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Follow-up Questions/Input | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Follow-up Questions/Input | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Addressing NPS Comments, Revising Final Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Final Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Final Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Organizing Photos / Documents for Final Submission | Project Manager II | /hr | |
| Cost Estimating | Billing Labor Category | Unit | Total |
| Sub - Overall Project Management | SUB: Cost Estimator PM | /hr | $ - 0 |
| Sub - Develop Cost Estimate - Small Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Medium Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Large Project | | /estimate | $ - 0 |
TOTAL Base Bid $ - 0 0
Site 3 PSA Site 3
| Base Bid | Billing Labor Category | Unit Rate | Unit | Total |
| Overall Project Management | | | | |
| Prime - Program Management, Review, Meetings | Program Manager III | | /hr | $ - 0 |
| Prime - Overall Project Management | Project Manager III | | /hr | $ - 0 |
| Prime - Weekly Meetings | Project Manager III | | /hr | $ - 0 |
| Prime - Meetings | Project Manager II | | /hr | $ - 0 |
| Scheduling, Planning, Logistics | Billing Labor Category | Unit | Total |
| Prime - Team Lead - Advanced Planning Calls | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Advanced Planning Calls | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Office Time (Before Site Visit) | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Office Time (Before Site Visit) | SUB: Quantity Surveyor | /hr | $ - 0 |
| Field Work | | | |
| Prime - Team Lead - On-Site Assessments | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Develop SOW | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Travel to and from office to the site | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Transportation (Air, Train, car) | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Airport Transportation, Parking | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Rental car (plus gas) or POV Mileage | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Lodging | Project Manager II | /night | $ - 0 |
| Prime - Team Lead - Per Diem | Project Manager II | /day | $ - 0 |
| Prime - Architect SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Travel Home-Site_Home | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Transportation (Air, train) | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - Architect SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - MEP SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Transportation (air, train) | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - MEP SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - Civil/Structural SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Transportation (Air, Train) | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME -Lodging | Consultant III | /night | $ - 0 |
| Prime - Civil/Structural SME - Per Diem | Consultant III | /day | $ - 0 |
| Report Writing, Quality Control | SUB: Quantity Surveyor | Unit | Total |
| Prime - Team Lead - Kickoff Meeting, Closeout Meeting | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Kickoff Meeting, Closeout Meeting | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Writing Draft Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Draft Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Draft Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Follow-up Questions/Input | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Follow-up Questions/Input | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Addressing NPS Comments, Revising Final Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Final Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Final Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Organizing Photos / Documents for Final Submission | Project Manager II | /hr | |
| Cost Estimating | Billing Labor Category | Unit | Total |
| Sub - Overall Project Management | SUB: Cost Estimator PM | /hr | $ - 0 |
| Sub - Develop Cost Estimate - Small Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Medium Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Large Project | | /estimate | $ - 0 |
TOTAL Base Bid $ - 0 0
Site 4 PSA Site 4
| Base Bid | Billing Labor Category | Unit Rate | Unit | Total |
| Overall Project Management | | | | |
| Prime - Program Management, Review, Meetings | Program Manager III | | /hr | $ - 0 |
| Prime - Overall Project Management | Project Manager III | | /hr | $ - 0 |
| Prime - Weekly Meetings | Project Manager III | | /hr | $ - 0 |
| Prime - Meetings | Project Manager II | | /hr | $ - 0 |
| Scheduling, Planning, Logistics | Billing Labor Category | Unit | Total |
| Prime - Team Lead - Advanced Planning Calls | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Advanced Planning Calls | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Office Time (Before Site Visit) | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Office Time (Before Site Visit) | SUB: Quantity Surveyor | /hr | $ - 0 |
| Field Work | | | |
| Prime - Team Lead - On-Site Assessments | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Develop SOW | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Travel to and from office to the site | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Transportation (Air, Train, car) | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Airport Transportation, Parking | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Rental car (plus gas) or POV Mileage | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Lodging | Project Manager II | /night | $ - 0 |
| Prime - Team Lead - Per Diem | Project Manager II | /day | $ - 0 |
| Prime - Architect SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Travel Home-Site_Home | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Transportation (Air, train) | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - Architect SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - MEP SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Transportation (air, train) | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - MEP SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - Civil/Structural SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Transportation (Air, Train) | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME -Lodging | Consultant III | /night | $ - 0 |
| Prime - Civil/Structural SME - Per Diem | Consultant III | /day | $ - 0 |
| Report Writing, Quality Control | SUB: Quantity Surveyor | Unit | Total |
| Prime - Team Lead - Kickoff Meeting, Closeout Meeting | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Kickoff Meeting, Closeout Meeting | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Writing Draft Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Draft Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Draft Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Follow-up Questions/Input | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Follow-up Questions/Input | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Addressing NPS Comments, Revising Final Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Final Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Final Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Organizing Photos / Documents for Final Submission | Project Manager II | /hr | |
| Cost Estimating | Billing Labor Category | Unit | Total |
| Sub - Overall Project Management | SUB: Cost Estimator PM | /hr | $ - 0 |
| Sub - Develop Cost Estimate - Small Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Medium Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Large Project | | /estimate | $ - 0 |
TOTAL Base Bid $ - 0 0
Site 5 PSA Site 5
| Base Bid | Billing Labor Category | Unit Rate | Unit | Total |
| Overall Project Management | | | | |
| Prime - Program Management, Review, Meetings | Program Manager III | | /hr | $ - 0 |
| Prime - Overall Project Management | Project Manager III | | /hr | $ - 0 |
| Prime - Weekly Meetings | Project Manager III | | /hr | $ - 0 |
| Prime - Meetings | Project Manager II | | /hr | $ - 0 |
| Scheduling, Planning, Logistics | Billing Labor Category | Unit | Total |
| Prime - Team Lead - Advanced Planning Calls | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Advanced Planning Calls | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Office Time (Before Site Visit) | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Office Time (Before Site Visit) | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Office Time (Before Site Visit) | SUB: Quantity Surveyor | /hr | $ - 0 |
| Field Work | | | |
| Prime - Team Lead - On-Site Assessments | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Develop SOW | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Travel to and from office to the site | Project Manager II | /hr | $ - 0 |
| Prime - Team Lead - Transportation (Air, Train, car) | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Airport Transportation, Parking | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Rental car (plus gas) or POV Mileage | Project Manager II | /ea | $ - 0 |
| Prime - Team Lead - Lodging | Project Manager II | /night | $ - 0 |
| Prime - Team Lead - Per Diem | Project Manager II | /day | $ - 0 |
| Prime - Architect SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Travel Home-Site_Home | Consultant III | /hr | $ - 0 |
| Prime - Architect SME - Transportation (Air, train) | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Architect SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - Architect SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - MEP SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Transportation (air, train) | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - MEP SME - Lodging | Consultant III | /night | $ - 0 |
| Prime - MEP SME - Per Diem | Consultant III | /day | $ - 0 |
| Prime - Civil/Structural SME - On-Site Assessments | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Develop SOW | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Travel Home-Site-Home | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Transportation (Air, Train) | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Airport Transportation, Parking | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME - Rental car (plus gas) or POV Mileage | Consultant III | /ea | $ - 0 |
| Prime - Civil/Structural SME -Lodging | Consultant III | /night | $ - 0 |
| Prime - Civil/Structural SME - Per Diem | Consultant III | /day | $ - 0 |
| Report Writing, Quality Control | SUB: Quantity Surveyor | Unit | Total |
| Prime - Team Lead - Kickoff Meeting, Closeout Meeting | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Kickoff Meeting, Closeout Meeting | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Kickoff Meeting, Closeout Meeting | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Writing Draft Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Draft Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Draft Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Follow-up Questions/Input | Project Manager II | /hr | $ - 0 |
| Prime - Architect SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - MEP SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Prime - Civil/Structural SME - Follow-up Questions/Input | Consultant III | /hr | $ - 0 |
| Sub - Quantity Surveyor - Follow-up Questions/Input | SUB: Quantity Surveyor | /hr | $ - 0 |
| Prime - Team Lead - Addressing NPS Comments, Revising Final Report, Review Cost Estimate | Project Manager II | /hr | $ - 0 |
| Prime - Reviewer - Review Final Report | Consultant IV | /hr | $ - 0 |
| Prime - Team Lead - Addressing Prime Reviewer Comments | Project Manager II | /hr | $ - 0 |
| Prime - Senior PM - Finalizing, Issuing Final Report | Project Manager III | /hr | $ - 0 |
| Prime - Team Lead - Organizing Photos / Documents for Final Submission | Project Manager II | /hr | |
| Cost Estimating | Billing Labor Category | Unit | Total |
| Sub - Overall Project Management | SUB: Cost Estimator PM | /hr | $ - 0 |
| Sub - Develop Cost Estimate - Small Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Medium Project | | /estimate | $ - 0 |
| Sub - Develop Cost Estimate - Large Project | | /estimate | $ - 0 |
TOTAL Base Bid $ - 0 0