A04_ATTACHMENT_001_-_SOW_Roadside_Striping_Parkwide.pdf

PDF 413 KB Posted

Attached to
GRSM ROAD STRIPING Federal contract opportunity
Solicitation number
140P5326R0022
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This is a Statement of Work (SOW) for roadway striping services at Great Smoky Mountains National Park (GRSM) in Tennessee and North Carolina, dated February 4, 2026 (with updates through December 16, 2024).

The work consists of installing centerline striping, pavement edge lines, pavement markings (arrows, stop bars, gore areas, accessible spaces, and parking spaces) along park roadways and parking areas. The contractor must match existing striping patterns (double solid, single solid, dashed, or skips) and apply FHWA Type B waterborne traffic paint (yellow acrylic water-based) with Type I and Type III glass beads for reflectivity. Centerlines must be 4-inch-wide stripes with 4-inch spacing between double lines. Paint application requires a minimum 25 mil wet film thickness at 71 square feet per gallon, with glass beads applied at 6-8 pounds per gallon using a drop-on pressurized method. The contractor must furnish truck-mounted striping equipment with automatic measuring capabilities (within 1% accuracy), pressurized paint nozzles, heating capability to 140°F minimum, and ability to apply two parallel stripes simultaneously.

Significant work restrictions apply: no work is permitted during October, at night, on Federal holidays, or weekends (Friday 1:00 p.m. to Monday 6:00 a.m.). All work must be completed, equipment demobilized, and the site ready for visitor use by the performance period's end. The contractor must provide qualified traffic control personnel certified by state DOT, ATSSA, or equivalent programs with minimum two years temporary work zone experience. A competent project supervisor with safety authority, adequate skilled workers, and detailed Safety and Traffic Control Plans are required. The contractor bears responsibility for site security, paint spill cleanup, roadway surface preparation, temporary traffic control devices per MUTCD, and protection of freshly painted markings using traffic cones until dry (at 50-100 foot intervals depending on road configuration). Payment is structured as a lump sum contract with one final payment upon completion and acceptance, though partial payments may be requested with proper documentation submission. This is a lump sum contract with no unit price measurement.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Roadway Striping Great Smoky Mountains National Park

February 4, 2026

STATEMENT OF WORK

ROADWAY STRIPING

Great Smoky Mountains National Park Tennessee and North Carolina

PART 1 – GENERAL

1-1 DESCRIPTION OF WORK

A. Heavy traffic conditions, created by over 13 million annual visitors to the Great Smoky Mountains National Park (GRSM), along with snow plowing operations and extreme winter freezing conditions, have contributed to the accelerated deterioration of roadway striping. The work consists of installing centerline striping in accordance with these specifications along on park roadways and parking areas in Tennessee and North Carolina.

B. This Statement of Work (SOW) consists of matching existing centerline striping, pavement edge lines, pavement markings including arrows, stop bars, gore areas, accessible spaces, and parking spaces along roadways and in parking areas. Required work shall be performed in Tennessee and North Carolina.

C. Additive work consists of matching existing centerline striping along designated sections of the GRSM. All, some, or none of the additive work may be included in the project as authorized by the CO.

(See bid sheet document to bid base and additive work.

D. D. Attachments:

1. CM-16 Transmittals Form (Submittals)

2. GRSM Load Limits

E. 2 LOCATION AND ACCESS

A. Job Site: The work shall be performed on various roads in Tennessee and North Carolina. The work is being performed in the following counties: Blount (TN), Sevier (TN), Haywood (NC) and Swain (NC).

B. Access

1. All damage shall be repaired to the Government’s specification by those who cause it and at no cost to the Government. Return the area to the condition existing prior to any work.

1-3 PROJECT PERSONNEL

A. Government

1. The Contracting Officer (CO) is the only person with authority to enter into, administer, modify and/or terminate the contract.

2. The Contracting Officer’s Representative (COR) is a program official designated by the CO to assist in administering technical aspects of the contract. The COR cannot modify the contract.

3. Other NPS personnel may be on site to assist with project inspection. These individuals cannot

Great Smoky Mountains National Park

February 4, 2026 modify the contract. Any on site issues or concerns shall be directed to the COR.

B. Contractor

1. Assign a competent and experienced person to oversee the construction and safety of this project with the authority to stop or correct work due to safety concerns, unsatisfactory materials, or workmanship.

2. Use adequate numbers of skilled workers who are fully qualified and experienced in the type of work to be executed in this contract. When applicable, personnel shall be certified in the necessary work for which being performed by that person. The COR may at any time request copies of necessary certifications.

3. Traffic Control Personnel

a. Provide onsite at all times a traffic control supervisor to oversee work zone operations, installation, and maintenance of temporary traffic control devices. The individual(s) shall be certified by a state department of transportation, American Traffic Safety Services

Association (ATSSA), or other acceptable certification programs with a minimum of two years of Temporary Work Zone Traffic Control “On the Job Training” (work involving the setup, take-down and or inspection of Work Zones within existing Highway Right-of-Way).

The traffic control supervisor shall regularly oversee the work zone temporary traffic control but may perform minor rolls in the work.

b. Provide flaggers, spotters, or operators of Automated Flagger Assist Devices (AFAD) certified by a state department of transportation, ATSSA, or other acceptable certification programs.

c. Prior to work beginning, provide contact information and certification(s) of person(s) responsible for the individuals meeting SOW Section 1-3.B.3.a and b.

d. Individuals meeting the above requirements shall carry a card issued by the certifying firm that shows the dates of certification with recertification at regular intervals.

e. See SOW Section 3-3.

1-4 CONTRACTOR-FURNISHED ITEMS

A. The contractor shall furnish all necessary supervision, personnel, equipment, tools, transportation, supplies, materials, and incidentals required to perform the work of the contract in a safe, professional manner and to satisfactorily complete the work of this project.

B. The contractor shall furnish all necessary temporary traffic control and signage to alert motorists of work in progress and to protect the work from damage.

C. Work site security measures. Nearly all GRSM land is accessible by the public 24-hours a day throughout the year. GRSM law enforcement officers and other staff will not be designated to provide extra security to protect project sites from visitor intrusion. It is the responsibility of the Contractor to take measures to prevent vandalism, theft, or destruction of project materials and equipment. Any proposed security measures that may affect ongoing access or use of areas otherwise not already included in the construction zone (including remote security cameras or alarms) must be discussed with and approved in advance by the COR, in consultation with the GRSM District Ranger. Any security issues must be reported to the COR immediately upon notice.

GRSM law enforcement staff may request official statements or other information from Contractor personnel needed to follow up on reported issues.

D. Equipment used to install the roadway striping shall have the following characteristics:

1. Truck-mounted and self-contained vehicle. The vehicle shall be in good working order, routinely

Great Smoky Mountains National Park

February 4, 2026 used in the type of work for this contract and have current the necessary certifications and inspections as required by the state in which it is registered.

2. Pressurized paint nozzles located outboard of the vehicle wheels.

3. On-off control for bead dispenser synchronized with the On-Off control for the paint nozzle.

4. Provide a pressurized bead dispenser/applicator.

5. Must have a measuring device capable of automatically and accurately measuring and totaling the stripe lengths.

a. Accuracy shall be maintained, via field calibration, within 1 percent plus or minus of actual measured length.

b. If equipment does not have field calibration capability, any error in excess of 1 percent shall be mathematically corrected for payment.

6. A heating device capable of heating and delivering paint to the spray nozzle at a minimum of

140 degrees Fahrenheit or as recommended by the paint manufacturer to improve quick dry characteristics.

7. Capable of applying hot paint under pressure directly to the pavement with a uniform width and thickness to produce clean, sharp, and smooth edges on stripes.

8. Capable of automatically or manually applying two parallel solid or broken stripes simultaneously.

9. The spray nozzle and bead dispenser shall be shielded to prevent over-spraying.

10. Mobile and maneuverable to the extent that straight lines can be followed, and all standard curves can be made in true arcs.

1-5 WORK CONDITIONS AND LIMITATIONS

A. Facility Use

1. The GRSM motor road is open to visitors year-round, 24-hours a day weather permitting.

Visitation is highest during summer months and especially leaf viewing season (typically October).

B. Required Performance Period

1. The performance period for this project is defined in the contract documents.

2. No work is permitted during the month of October.

3. No work will be permitted at night.

4. No work will be permitted on Federal holidays.

5. No work will be permitted on weekends – Friday 1:00 p.m. to Monday at 6:00 a.m.

6. All work shall be complete, equipment demobilized, excess materials removed, and the work area(s) ready for visitor use by the last day of the performance period.

7. For any temporary periods of no work performance, equipment and materials shall be confined to areas designated by the COR. The roadway shall be open and safely passable for visitor use.

Temporary traffic control shall be covered or removed during this period if not applicable.

8. Roadway striping in the tunnels are a different material and not included in this contract. No roadway striping is to be installed inside any tunnels as part of this contract.

C. Contractor’s Use of Premises

1. The Contractor may store all paint, beads, and any other materials on GRSM property with approval by the COR.

2. Staging and parking for vehicles, equipment, and materials shall be confined to paved areas and areas specifically designated by the COR. For other areas, provide written request to the COR three days prior to occupying these other areas.

3. The only exception shall be overnight parking of the paint striping truck at GRSM facilities on a

Great Smoky Mountains National Park

February 4, 2026 space available basis. Request overnight parking in writing to the CO five days in advance.

4. All project materials shall be delivered and stored in the manufacturer’s original suitable container and remain in such containers until immediate use. Material packaging shall be clearly and adequately marked with the material, color, date of manufacture, process, batch or lot number, manufacturer’s name and location, temperature range, shelf life, and include the material safety data sheets (MSDS).

5. Keep work site clear of trash and debris. Dispose of any trash, debris, and other unusable material legally at authorized facilities on non-Federal land.

6. Food trash and debris shall be removed at the end of each day.

D. Existing Utilities

1. No utilities are expected to be impacted by this project.

2. If utilities are encountered, cease work and notify the COR immediately.

E. Field Verification

1. The measurements and quantities specified are estimated and provided for information only.

The Contractor shall verify all dimensions and conditions affecting the work.

2. The Contractor shall notify the COR of any errors or omissions as soon as realized.

F. Park-Specific Conditions and Limitations

1. The following conditions may be applicable to work sites inside GRSM boundaries:

a. WEATHER- Sudden and dramatic changes in climate conditions are common. The Contractor must be prepared to alter work plans and provide protection for workers and equipment.

b. CLOSURES- GRSM officials may close roadways in GRSM at any time to protect visitors from hazardous conditions or to implement official duties of the GRSM.

c. REMOTENESS- Many portions of the GRSM are of extreme distance to typical services available in developed areas, including cellular, food, fuel, and emergency services. The Contractor must arrange and account for appropriate precautions and plans prior to bid submission.

d. RESOURCES- As a unit of the National Park System, GRSM is tasked to preserve unimpaired its natural and cultural resources and values. The Contractor must make every effort to ensure no impacts are made deleterious to these resources. It is expected that the project site and access areas will be minimally impacted only as absolutely necessary for the performance of the SOW requirements. Mitigations approved by the COR will be taken to restore pre-existing conditions.

e. INVASIVE EXOTICS- To reduce the chance that harmful, non-native plants or organisms will be transported from off-GRSM locations to the work site, the contractor, prior to entering the GRSM, must clean all soils, roots, seeds, and other sources of plant parts and pathogens from any equipment used for the application of grasses and all heavy equipment, such as dump trucks, front end loader, and graders, which have previously been operating off the park.

f. WILDLIFE- All wildlife is protected within the park boundaries, and some species, which occur within the park, receive special State and Federal protection due to their rare, threatened or endangered status. Very few wildlife species present any danger to persons working within the park. Even species which have the potential to do harm to persons, can usually be avoided. Unless wildlife is presenting an immediate threat to persons, harassment or destruction of wildlife is prohibited.

2. Project-specific environmental compliance mitigations

Great Smoky Mountains National Park

February 4, 2026

a. All debris shall be removed from the park for legal and proper disposal.

b. Staging and parking for vehicles, equipment, and materials shall be confined to designated areas approved by the COR.

c. All construction activities shall be performed in a manner having the least possible detrimental effect to the GRSM’s cultural and natural resources.

1-6 QUALITY CONTROL

A. It is the responsibility of the Contractor to develop and implement a construction quality process to ensure work conforms to the requirements of the contract.

B. Assign a competent and experienced person to oversee the construction of this project with the authority to stop or correct work due to unsatisfactory materials or workmanship.

C. Perform quality control inspection, documentation, and process control sampling and testing as required by applicable standards.

D. All materials and methods used shall meet or exceed the current local, state, and federal codes, standards, and regulations applicable to this project.

E. The COR will perform on-site inspections to insure conformance to this contract. The Government reserves the right to perform any testing it sees fit to ensure a satisfactory product is delivered. Any non-conforming work will be removed and replaced at no cost to the Government.

1-7 REFERENCE STANDARDS:

A. Perform all work in accordance with the SOW, Project Plans, and following referenced specifications.

B. Federal Highway Administration (FHWA) Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP14). These specifications are available for free download at https://flh.fhwa.dot.gov/resources/specs/.

C. Materials shall meet FP-14 specifications or be currently approved for use by NCDOT or TDOT on the approved products list.

D. Temporary Traffic Control Devices shall be placed and maintained in accordance with the current version of the Manual on Uniform Traffic Control Devices (MUTCD) and the Project Plans. The MUTCD is available for free download at: https://mutcd.fhwa.dot.gov/index.htm.

PART 2 – SUBMITTAL REQUIREMENTS

2-1 GENERAL

A. Refer to attached CM-16 Transmittal Form for required submittal items. Contractor is responsible for additional submittals that may be required. Electronic forms are available.

B. Unless otherwise instructed by the CO, send construction material and other items requiring approval to the CO and copy the COR. Provide one (1) electronic copy of each submittal unless otherwise specified. Forward related materials as a package. Reference the SOW section number on each submittal. Allow 7 days for review and approval.

Great Smoky Mountains National Park

February 4, 2026

C. The CO will indicate in writing the approval or disapproval of each submittal, the reason for any disapproval, and any resubmission requirements. One (1) of each approved submittal will be stamped and returned to the Contractor unless otherwise requested.

D. Until the Contractor receives approval from the CO, no construction material or other items requiring the CO’s approval may be ordered, delivered, or incorporated into the project work.

E. There will be no waiver of any required submittal unless authorized by the CO. The CO may request submittals other than those specified in this document.

2-2 Work Plan Submittals

A. Project Schedule: Contractor shall submit a construction schedule outlining each phase of the work along with a written narrative of the activities displayed in the schedule.

B. Safety and Traffic Control Plan

1. Contractor shall submit a site-specific Safety and Traffic Control Plan for the work prescribed in this contract.

2. Refer to the following FHWA publications for further guidance when developing the traffic control component of this plan:

https://www.workzonesafety.org/files/documents/training/courses_programs/rsa_program/RS P_Guidance_Documents_Download/RSP_ITCP_Guidance_Download.pdf

3. The plan shall designate a competent individual capable of overseeing and understanding worker safety and the hazards associated with this type of work to implement the plan.

4. The plan shall describe the potential hazards of the work site for each phase, along with all company policies, controls, work practices selected to minimize those hazards and detail the implementation of the plan.

5. The plan shall contain at a minimum company policy or goals statement, list of responsible persons, hazard identification, hazard controls and safe practices, emergency and accident response, employee training and communication as well as recordkeeping procedures.

6. Provide plans for placing and maintaining both traffic and pedestrian control devices.

7. See attached SUGGESTED OUTLINE FOR CONTRACTOR’S SAFETY PLAN for assistance in developing the site-specific Safety Plan.

8. Refer to the following Occupational Safety and Health Administration (OSHA) website for further assistance: https://www.osha.gov/Publications/OSHA3886.pdf

C. Paint Spill Cleanup Plan

1. Contractor shall submit a detailed plan listing the procedures, equipment, and materials to be used to clean up any paint spills that might occur within the GRSM during the course of this project.

2. The plan should anticipate cleanup methods not only for spills on asphalt pavement but also on grassed shoulders or adjacent natural ground landscapes.

2-3 MATERIAL SUBMITTALS

A. Submittals: Materials

1. Centerline Roadway Striping (Pavement Marking Paint)

a. FHWA Type B – Waterborne traffic paint with Type 1 glass beads (reflective)

b. Furnish a yellow, acrylic water-based, ready-mixed paint conforming to the following:

http://www.workzonesafety.org/files/documents/training/courses_programs/rsa_program/RS http://www.osha.gov/Publications/OSHA3886.pdf

Great Smoky Mountains National Park

1. Composition. Furnish a paint composed of resin solids of 100 percent acrylic polymer with the exact formulation determined by the manufacturer. Conform to the following:

a. Pigment, ASTM D3723 45 to 55 percent by mass

b. Lead, chromium, cadmium, or cobalt ASTM D3335 &

ASTM D3718

0 percent by mass

c. Volatile organic compounds, EPA Method 24 20.0 oz/gallon (150 g/L) max.

d. Density of paint, ASTM D1475 12.0 lb/gallon (1.44 kg/L) min

2. Viscosity. ASTM D562 75-90 Krebs units

3. Drying time

a. Dry to no pickup, ASTM D711 10 minutes max

b. Drying to no track, ASTM D713 90 seconds max

4. Flexibility. ASTM D522, using the ¼-in (6.4-mm) cylindrical mandrel

No cracking or flaking

5. Dry opacity. ASTM D2805, contrast ratio at 319 ft2/gallon (7.85 m2 /L) spreading rate

0.96 min

6. Color

a. White, ASTM D1729 Match FHWA standard highway white

b. Yellow, ASTM D1729 Match FHWA standard highway yellow

7. Daylight reflectance. (Without glass beads)

a. White, ASTM E1347 84 percent relative to magnesium oxide standard

b. Yellow, ASTM E1347 55 percent relative to magnesium oxide standard

8. Bleeding ratio. ASTM D868. Determine reflectance according to ASTM D1347 immediately after drying. Divide the average of three reflectance readings of the paint over the bleeding surface by the average of three readings over the non-bleeding surface to determine the bleeding ratio

0.96 min

9. Freeze-thaw stability. ASTM D2243 ±5 Krebs units max

10. Storage stability. During a 12-month storage period, conform to the following:

a. No excessive setting, caking, or increase in viscosity; and

b. Readily stirred to a consistency for use in the striping equipment.

Great Smoky Mountains National Park

2. Glass Beads

a. Furnish glass beads conforming AASHTO M247, Type I and Type III with the following specific properties:

1. Gradation Sieve Designation Mass % Passing Standard, mm Alternate No. Type 1 Type 3

1.70 12 100

1.40 14 95-100

1.18 16 100 80-95

1.00 18 10-40

0.850 20 95-100 0-5

0.710 25 0-2

0.600 30 75-95

0.425 40

0.300 50 15-35

0.180 80

0.150 100 0-5

2. Roundness. The glass beads shall have a minimum of 70 percent true spheres.

3. Refractive Index. The glass beads shall have a refractive index of 1.50–1.55.

4. Coatings: Flotation, Flow, Moisture Resistance, and Adherence – When tested in accordance with Sections 8 through 14 of T 346, the presence of the purchaser-specified coatings shall be unambiguous. Beads shall flow properly when tested in accordance with the procedure in Section 8 of T 346 unless specified to be moisture resistant, in which case the beads shall flow properly when tested in accordance with the procedure in Section 9 of T 346.

5. General. The beads shall be dry and free of lumps and clusters.

b. Treat glass beads with an adherence coating as recommended by manufacturer.

3. Paint Removal Material

a. Contractor shall provide an industry standard safe and effective product or means for removal and cleanup of spilled or incorrectly applied marking paint.

b. The method or product shall not damage the existing pavement, shoulder or natural landscape.

c. This method or product should be fully described in the Paint Spill Cleanup Plan, for proper review and approval.

d. The plan should anticipate possible paint or solvent spills on various substrates such as asphalt pavement, grass shoulders or natural landscapes within the work site of this project.

Great Smoky Mountains National Park

December 16, 2024

PART 3 – WORK REQUIREMENTS

3-1 GENERAL

A. The contractor is responsible for investigating site conditions in the vicinity of the work including frost depths, groundwater, location of rock, existing utilities, or any other hazards or obstacles which may increase time or cost of the work.

B. Contracts for other construction projects may be underway or may commence during the construction of this project. Coordinate with the COR and other contractors to minimize disruption to this project and to other construction projects in the area.

3-2 SITE SURVEYING AND CONSTRUCTION STAKING

A. The intent of this contract is to match existing striping such as double solid, single solid, dashed, or skips.

B. If new striping is required, coordinate with the COR for the layout prior to beginning work.

3-3 TRAFFIC CONTROL

A. Temporary Traffic Control Devices (TTC) shall be installed and maintained in accordance with the current version of the Manual on Uniform Traffic Control Devices (MUTCD) and the approved Safety and Traffic Control Plan. TTC shall be covered or removed during periods of no work.

B. Furnish sufficient quantity of personnel and equipment to operate a mobile operation for the work of this project.

C. If operations have to be temporarily stationary such as near an intersection, provide a flagger operation. Limit traffic delays to a maximum of 10 minutes.

D. Keep traffic on the paved roadway (do not use the road shoulder to move traffic past the striping operation).

E. All Contractor vehicles shall be equipped with white or amber strobe lights or rotating beacons installed atop the vehicles. These warning lights shall operate at all times when vehicles are located at the job site, unless the vehicle is not in use and parked well away from the active traffic lanes.

F. Personnel working on the job shall have and use required personal protective equipment such as high visibility safety vests and hard hats.

G. National Park Service Law Enforcement will not be available to assist with traffic control.

H. Refer to SOW Section 1-3.B.3 for qualified personnel requirements.

Great Smoky Mountains National Park

3-4 WORK EXECUTION

A. Layout of work

1. The intent of this project is to restripe existing, faded pavement markings. It is anticipated that little to no layout work will be required.

2. Before placing any striping paint, mark badly faded existing pavement markings as necessary by placing spots of paint at start and end points and at intervals to ensure accurate location of lines on the road.

B. Roadway Surface Preparation

1. Prepare the surface for striping in accordance with manufacturer specifications.

2. Prior to applying pavement markings, the Contractor shall clean the pavement to be marked by brooming, air blasting, high pressure water, manual scrubbing with water and approved detergent, or other acceptable cleaning method.

3. Surface must be dry, free of dust, dirt, leaves, loose gravel, oil, grease, debris and other foreign contaminants before painting.

C. Roadway Striping Application

1. General

a. Match existing colors, patterns, and spacing. Advise the COR of any locations which do not meet the MUTCD and coordinate with the COR a resolution for these locations.

b. The installed pavement marking material shall have a uniform thickness and smooth surfaced cross section throughout its entire length, while maintaining the listed tolerances and application rates.

c. Centerlines shall be 4-inch-wide stripes; yellow paint with reflective beads. Separate double centerline stripes with 4-inch space.

d. The Contractor shall protect the pavement markings until track free.

e. Any markings tracked by a vehicle shall be removed by methods acceptable to the COR and at no additional expense to the Government.

f. The Contractor shall be responsible for removing all roadway striping materials spilled on the road surface by a method acceptable to the COR.

2. Tolerances

a. New striping shall match to the greatest extent possible the of the existing striping.

b. Stripes shall begin and end within 2 inches of the ends of the existing markings.

c. Any greater deviations shall be sufficient cause for requiring the material to be removed and repainted at no additional cost to the Government.

d. All stripes shall be plus or minus 1/4 inch of the required stripe width and length.

3. Application Rates

a. All longitudinal pavement stripes 8 inches or less in width shall be applied with one pass of the pavement marking equipment.

b. Stripes greater than 8 inches in width and pavement marking symbols may be applied with multiple passes of the pavement marking equipment.

Great Smoky Mountains National Park

c. Spray paint at 25 mil (0.63 millimeters) minimum wet film thickness or at a rate of 71 square feet per gallon (1.7 square meters per liter).

4. Glass Bead Application

a. Use a drop-on method of application, where the glass beads are dispensed by a pressurized mechanical feed or a high pressurized means onto the pavement marking as it is applied to the pavement. Drop-on bead dispensing methods for pavement marking lines shall not be simply dependent on gravity or dropped by hand.

b. Approximately 70 percent of the beads shall be fully buried in paint with the remaining 30 percent embedded 50 percent into the paint surface.

c. Use two bead dispensers. Apply Type III glass beads on the paint at a rate of 6 to 8 pounds per gallon (0.72 to 0.960 kilograms per liter) followed by Type I glass beads on the paint at a rate of 6 to 8 pounds per gallon (0.72 to 0.96 kilograms per liter) of paint.

D. Repair of Roadway Striping

1. The Contractor shall be responsible for removing and replacing any improperly applied, smeared, tracked or damaged pavement markings at no additional cost to the Government.

2. Improperly applied and damaged markings shall be removed using methods that will not damage the pavement surface or leave confusing patterns on the pavement similar to the traffic markings being removed.

3. Methods used for paint removal shall be detailed in the Paint Spill Cleanup Plan.

4. Remove any excess material resulting from the marking removal and replacement pavement markings.

E. Paint Spill Cleanup

1. Prevention

a. Contractor shall take precautions to prevent spills when transporting paint, filling striping truck paint reservoirs, and cleaning paint nozzles on the equipment.

b. Whenever possible, move equipment off of the pavement during filling and cleaning operations.

c. Use material such as building paper, plastic sheeting, drop cloths, or other disposable sheeting to protect the ground and/or pavement surface from paint spills.

2. Spill Cleanup

a. Paint spills shall be immediately cleaned up at the time of occurrence.

b. The crew shall have on hand at all times the necessary materials and equipment to perform effective spill cleanups.

c. If spills occur on road shoulders or other non-paved areas, remove and dispose of any contaminated soil and/or vegetation.

d. Methods and materials used for paint spill cleanup shall be those approved as part of the

Paint Spill Cleanup Plan.

Great Smoky Mountains National Park

3. Paint on Vehicles

a. It is the responsibility of the Contractor to protect the pavement markings until dry.

b. The Contractor is responsible for resolving issues with paint getting onto visitor vehicles.

F. Roadway Striping Protection

1. Protect markings from traffic until dried to a no-tracking condition. Remove tracking marks, spilled marking material, markings in unauthorized areas, and defective markings.

a. Place traffic cones on all freshly painted traffic markings to keep traffic off wet markings and prevent smearing, tracking or movement of the markings.

i. Curves: Place cones at intervals of 50 foot or less in curved road sections.

ii. Straight Sections: Place cones at intervals of 100 feet or less on all straight or nearly straight road sections.

iii. Intersections: Place cones at ends and sides of markings.

iv. On-Ramps: Place cones at intervals of 25 feet or less at on-ramps which have a tight turning radius.

v. Parking Lots: For small parking pull offs, place traffic cones or suitable barricades to close off each entrance to the parking lot until striping is placed and dry. On larger parking lots, place cones at locations to protect the sections of the parking lot striping being installed, or rope off areas, until the striping is dry.

b. Remove all cones as soon as paint has dried or cured sufficiently to prevent smearing, tracking or movement of the markings.

2. For centerline striping, the distance between the cone placement vehicle and the paint striping truck shall be maintained at no more than 150 feet at all times.

a. The cone pickup vehicle shall travel with the traffic flow and no part of the vehicle shall cross or straddle the centerline.

b. When five or more vehicles accumulate behind the cone pickup vehicle, the cone pickup vehicle should exit the roadway at the first convenient and safe location and allow traffic to pass.

c. The cone pickup vehicle shall also allow following traffic to pass at intervals not to exceed 5 minutes.

3-5 CLEAN UP

A. Routine Cleanup: Keep project site neat, orderly and in safe condition at all times. Provide enough refuse containers for collecting construction debris. Pick up construction debris daily to prevent blowing and scattering. Keep volatile wastes in covered containers. Unless otherwise specified, all removed material becomes the property of the contractor and shall be disposed of outside of the park in accordance to local, state and county regulations.

B. Final Cleanup: Remove all tools, equipment, surplus materials and rubbish from the site upon completion of the work. Restore or refinish surfaces of existing facilities that are marred, scratched or damaged due to work of this contract, to match the original condition. Remove any grease, dirt, asphalt, stains or foreign material from the finished surfaces. Use cleaning materials recommended

Great Smoky Mountains National Park by the manufacturer of the surface to be cleaned. Sweep paved or concrete areas and rake grounds to remove all construction debris. At time of the final inspection, project site shall be thoroughly clean and ready for use. All nails shall be found, collected and removed during the final cleanup of the site and through the entirety of the project at the end of each workday.

3-6 CLOSEOUT

A. Closeout Submittals: Upon completion of the work, the Contractor shall provide any final submittals called for in SOW PART 2.

B. Substantial Completion and Final Inspection: Submit written certification that project, or designated portion of the project, is substantially complete, and request in writing a final inspection. The COR or designated representative will inspect within 10 days of receipt of request. When the COR determines that the work is substantially complete, it will prepare a list of any deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. If the COR determines the work is not substantially complete, the Contractor will be notified in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection.

PART 4 – MEASUREMENT AND PAYMENT

4-1 GENERAL

Provide all supervision, labor, materials, transportation, equipment, tools and incidentals to complete execution as specific in this SOW and related references.

4-2 MEASUREMENT

This is a lump sum contract. Individual items of work will not be measured for payment. Quantities are provided for estimating and planning purposes.

4-3 PAYMENT

This a lump sum contract with one final payment made at the completion and acceptance of the project.

If the Contractor wishes to receive partial payments, a proposed payment schedule for the project work shall be submitted to the CO for review and approval. Partial payments can then be made providing all necessary documentation (e.g. payrolls, daily reports, photos, etc.) has been submitted to support the partial payment request/invoice.

END OF STATEMENT

Great Smoky Mountains National Park

ATTACHMENT

CM-16 TRANSMITTAL FORM - NATIONAL PARK SERVICE

Project:

Roadway Striping – GRSM 288451

Contract No.:

Date:

Contractor:

Subcontractor/Supplier:

NPS ACTION

Item No.

Specification Section No.

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

No. Copies Submitted Approved Approved w/

Notations Disapproved -

Resubmit

Attachment 1

GRSM LOAD LIMITS

Gross Vehicle Weight Restrictions

Single Units

Gross Vehicle Weight Pounds Kilograms Tons

2 axles

40,000

18,100

3 axles 48,000 21,800 24 4 or more axles 52,000 23,600 26 Combination Units

3 axles

57,000

25,900

4 axles 62,000 28,100 31 5 or more axles 66,000 29,600 33

IMPORTANT

• When the ground is saturated with water or during periods of freezing and/or thawing, or operation over GRSM bridges, the GRSM may impose further load restrictions or suspend hauling.

• Operate vehicles at speeds not exceeding 40 mph (65 kph) and spaced at

500 feet (150m) minimum intervals.

• On bridges, speeds shall not exceed 25 mph (40 kph) and not more than one loaded hauling vehicle will be allowed on any bridge at one time.

• Hauling over bridges, and/or oversize loads will require hauler to submit information on the dimensions and gross weight of vehicles and loads, including:

o Overall length and width including load.

o Details of axle locations, weight on each axle, number of tires on each axle, size of tire on each axle, width of each tire, air pressure in each tire and location of hitch/vehicle hinge points.

• Special consideration may be made by GRSM officials for overweight and oversize loads. Special permits, times and traffic control may be required for heavy/wide loads.

• All damage shall be repaired to the Government’s specification by those who cause it and at no cost to the Government. Return the area to the condition existing prior to any work.

Attachment

Safety (Appendix) March 2009

3A-30 Outline for Contractor’s Safety Plan

3A.4 SUGGESTED OUTLINE FOR CONTRACTOR’S SAFETY

PLAN

A. Overall Responsibility - Who will be responsible for the on site safety program?

What are the credentials (training & experience) of that person? Will they have direct authority or will their authority be through the superintendent? Who will be responsible for reporting accidents and maintaining the accident log required by

OSHA?

B. Subcontractors -Will subcontractors be under prime’s program or will they have their own program? If they have their own program, separate plans are required.

C. Safety Policy - How will new employees be oriented and their responsibilities explained? How will all employees be oriented to specific project hazards or the hazards of new operations? How will drug & alcohol policy be conveyed to employees?

D. Personal Protection -What conditions/operations will require personal protection equipment? Hardhats, ear plugs, steel toed boots, respirators, etc? Who will decide when protection is needed? Who will monitor its use?

E. Safety Meetings - Who will conduct meetings? What will frequency be? Who will attend? How will subjects be selected?

F. Emergency Medical Care - Telephone Nos. (Ambulance, Fire, Rescue).

Directions. Prearrangements made - insurance, workmen’s comp?

G. First Aid - Names of trained employees. Names of CPR trained employees

H. Trenching and Excavating - Who will be responsible for selecting slopes, shoring and protection systems during trenching operations? Is the person trained and competent in the revised (1989) OSHA regulations?

I. Hazard Recognition, Reporting and Abatement - To whom will employees report perceived hazards? How will these reports be handled? Who will correct hazards?

J. Equipment Inspection - Who will inspect construction and hauling equipment?

Will it be inspected before shipment to project, or after? How will suppliers’ equipment be inspected (e.g. asphalt hauling trucks)?

K. Separating Pedestrians from Construction Vehicles and Public Traffic -Are there hazards associated with pedestrians (contractor or public) moving amidst equipment and public traffic? How will these hazards be abated?

L. Jobsite Inspections - Who will perform jobsite inspections? What will the frequency be? Will a report be generated? How will deficiencies be corrected?

Immediate order or report back to superintendent?

Federal Lands Highway Construction

Attachment

Safety (Appendix) March 2009

Outline for Contractor’s Safety Plan 3A-31

M. Hazardous Materials -Will hazardous materials be generated? Asphalt products, solvents, chemicals? What are special procedures for handling, disposing?

N. Explosives - See Section 205 for special requirements. What are provisions for storage and inventory control of explosives?

O. Fire Fighting and Emergencies - What are fire hazards requiring special attention? What resources are available for fire emergencies?

P. Maintenance of Traffic (MOT) and the Public - All MOT controls and operations will be per the current MUTCD. How will protection of the public, whether on foot or vehicle, be planned and coordinated? What provisions are there to separate the public from the construction activities? Who will perform inspections? What will the frequency be? Will a report be generated? How will deficiencies be corrected?

Immediate order or report back to superintendent? How will the ability of the public to interfere with construction activities minimized?

STATEMENT OF WORK
PART 1 – GENERAL
1-2 LOCATION AND ACCESS
1-3 PROJECT PERSONNEL
1-4 CONTRACTOR-FURNISHED ITEMS
1-5 WORK CONDITIONS AND LIMITATIONS
1-6 QUALITY CONTROL
1-7 REFERENCE STANDARDS:
PART 2 – SUBMITTAL REQUIREMENTS 2-1 GENERAL
2-2 Work Plan Submittals
2-3 MATERIAL SUBMITTALS
PART 3 – WORK REQUIREMENTS 3-1 GENERAL
3-2 SITE SURVEYING AND CONSTRUCTION STAKING
3-3 TRAFFIC CONTROL
3-4 WORK EXECUTION
3-5 CLEAN UP
3-6 CLOSEOUT
PART 4 – MEASUREMENT AND PAYMENT 4-1 GENERAL
4-2 MEASUREMENT
4-3 PAYMENT